CN107941203A - A kind of intellectual faculties and method - Google Patents
A kind of intellectual faculties and method Download PDFInfo
- Publication number
- CN107941203A CN107941203A CN201711228098.6A CN201711228098A CN107941203A CN 107941203 A CN107941203 A CN 107941203A CN 201711228098 A CN201711228098 A CN 201711228098A CN 107941203 A CN107941203 A CN 107941203A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- cavity body
- connector
- protective fence
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 238000012544 monitoring process Methods 0.000 claims abstract description 144
- 238000012806 monitoring device Methods 0.000 claims abstract description 63
- 230000008569 process Effects 0.000 claims abstract description 27
- 230000001681 protective effect Effects 0.000 claims description 73
- 238000012545 processing Methods 0.000 claims description 33
- 239000003562 lightweight material Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000005855 radiation Effects 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 35
- 238000010248 power generation Methods 0.000 description 11
- 230000005856 abnormality Effects 0.000 description 8
- 239000003643 water by type Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000002159 abnormal effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 208000019901 Anxiety disease Diseases 0.000 description 1
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000036506 anxiety Effects 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000036760 body temperature Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 239000003653 coastal water Substances 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000001012 protector Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C13/00—Surveying specially adapted to open water, e.g. sea, lake, river or canal
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B19/00—Alarms responsive to two or more different undesired or abnormal conditions, e.g. burglary and fire, abnormal temperature and abnormal rate of flow
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Engineering & Computer Science (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
The present invention provides a kind of intellectual faculties and method, by supporting carrier to deliver monitoring device to monitoring object position, the corresponding at least one monitoring information of monitoring object is obtained by monitoring device, monitoring object status is determined according at least one monitoring information, alarm in the case where monitoring object status meets preset condition, realize the monitoring to monitoring object status.And monitoring device can also be adjusted hydroelectric generation process according at least one monitoring information, so that the hydroelectric generating efficiency after adjustment maximizes, realize to hydroelectric adjust automatically.
Description
Technical field
The invention belongs to intelligent inspection technology field, more specifically, more particularly to a kind of intellectual faculties and
Method.
Background technology
With the shortage increasingly of the non-renewable resources such as oil, natural gas and coal so that State Grid once reproduces anxiety,
Hydroelectric generation is rapidly developed in the case.Wherein hydroelectric generation refers to the generation mode that water can be converted to electric energy, such as
It can be generated electricity using renewable resources such as ocean, lake and rivers.
Have hydro-electric power generating equipment in coastal waters field at present, but needed when hydro-electric power generating equipment carries out hydroelectric generation pair
Power, generated energy and the hydrologic regime of hydro-electric power generating equipment are monitored, therefore there is an urgent need for a kind of intellectual faculties, with to water
Monitoring object such as hydro-electric power generating equipment and hydrologic regime of process of power power generation etc. are monitored.
The content of the invention
In view of this, it is an object of the invention to provide a kind of intellectual faculties and method, for monitoring object
Row monitoring.Technical solution is as follows:
The present invention provides a kind of intellectual faculties, the system comprises:Support carrier, protective device and monitoring are set
It is standby;
The support carrier, for carrying the protective device and the monitoring device, and the monitoring device is located at institute
State in protective device;
The monitoring device, for obtaining the corresponding at least one monitoring information of monitoring object, according at least one
Monitoring information determines the monitoring object status, in the case where the monitoring object status meets preset condition into
Row alarm, and hydroelectric generation process is adjusted according at least one monitoring information, so that the waterpower hair after adjustment
The generating efficiency of electricity maximizes.
Preferably, the support carrier includes:First cavity body, the second cavity body, the first connector and the second connector;
The shape of the front end of wherein described first cavity body and the rear end of first cavity body is fore, and described second is empty
The shape of the front end of cavity and the rear end of second cavity body is fore, and first cavity body and/or described second empty
The pipeline at least penetrating lower surface is reserved with cavity;
The first end of first connector is fixed on the first side of first cavity body, first connector
Second end is fixed on the second side of second cavity body;
The first end of second connector is fixed on the first side of first cavity body, second connector
Second end is fixed on the second side of second cavity body, and is spaced between first connector and second connector
There is pre-determined distance;
The protective device is located on first connector and second connector.
Preferably, the support carrier further includes:First protective fence, the second protective fence, the 3rd protective fence and the 4th protection
Column;
Wherein described first protective fence is fixed on the upper surface of first cavity body;
Second protective fence is fixed on the upper surface of second cavity body;
The first end of 3rd protective fence is fixed on the upper surface of first cavity body, and the of the 3rd protective fence
Two ends are fixed on the upper surface of second cavity body;
The first end of 4th protective fence is fixed on the upper surface of first cavity body, and the of the 4th protective fence
Two ends are fixed on the upper surface of second cavity body;
First connector and second connector between the 3rd protective fence and the 4th protective fence,
And it is provided with connecting plate on the 3rd protective fence and the 4th protective fence.
Preferably, the support carrier further includes:It is fixed on the upper surface of first cavity body and/or is fixed on described
The connecting strand of the upper surface of second cavity body.
Preferably, the connecting strand is connected by way of Chang Lianshi.
Preferably, the material of the protective device is lightweight material, and is reserved with through hole in the protective device.
Preferably, the monitoring device includes:Collecting device, processing equipment and relay device;
Wherein described collecting device, for obtaining the corresponding at least one monitoring information of monitoring object;
The processing equipment, for determining the monitoring object status according at least one monitoring information,
The monitoring object status meets to alarm by the relay device in the case of preset condition, and according to it is described extremely
A kind of few monitoring information is adjusted hydroelectric generation process, is adjusted instruction, and sending adjustment by the relay device refers to
Order is so that the hydroelectric generating efficiency after adjustment maximizes.
Preferably, the monitoring device further includes:Microcomputer video information corresponding with the processing equipment protects machine, is used for
Reduce the information radiation amount of the processing equipment.
Preferably, transmitted between the collecting device and the processing equipment using Shielded Twisted Pair into row information, it is described
Transmitted between processing equipment and the relay device using Shielded Twisted Pair into row information.
The present invention also provides a kind of intelligent monitoring method, the described method includes:
Obtain the corresponding at least one monitoring information of monitoring object;
The monitoring object status is determined according at least one monitoring information;
Alarm in the case where the monitoring object status meets preset condition;
Hydroelectric generation process is adjusted according at least one monitoring information, so that the hydroelectric generation after adjustment
Generating efficiency maximize.
Compared with prior art, above-mentioned technical proposal provided by the invention has the following advantages that:
It was found from above-mentioned technical proposal, by supporting carrier to deliver monitoring device to monitoring object position,
The corresponding at least one monitoring information of monitoring object is obtained by monitoring device, monitoring pair is determined according at least one monitoring information
As status, alarm, realized to residing for monitoring object in the case where monitoring object status meets preset condition
The monitoring of state.And monitoring device can also be adjusted hydroelectric generation process according at least one monitoring information, so that
Hydroelectric generating efficiency after must adjusting maximizes, and realizes to hydroelectric adjust automatically.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are the present invention
Some embodiments, for those of ordinary skill in the art, without creative efforts, can also basis
These attached drawings obtain other attached drawings.
Fig. 1 is the structure diagram of intellectual faculties provided in an embodiment of the present invention;
Fig. 2 is a kind of structure diagram that carrier is supported in intellectual faculties provided in an embodiment of the present invention;
Fig. 3 is another structure diagram that carrier is supported in intellectual faculties provided in an embodiment of the present invention;
Fig. 4 is the flow chart of intelligent monitoring method provided in an embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
Part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
All other embodiments obtained without making creative work, belong to the scope of protection of the invention.
Referring to Fig. 1, it illustrates the structure diagram of intellectual faculties provided in an embodiment of the present invention, for pair
Monitoring object is monitored, and such as equipment (such as underwater power generator) status in hydroelectric generation can be supervised
Survey.Wherein, intellectual faculties include shown in Fig. 1:Support carrier 1, protective device 2 and monitoring device 3.
Carrier 1 is supported, for bearing protector 2 and monitoring device 3, can so be filled by supporting carrier 1 to protect
Put 2 and monitoring device 3 deliver to region residing for monitoring object, and avoid protective device 2 and monitoring device 3 from being damaged by other objects
Possibility.If monitoring object is the equipment in hydroelectric generation, in the case of such as underwater power generator, by supporting carrier 1 can
Delivering protective device 2 and monitoring device 3 to waters residing for these equipment, and by supporting 1 protective device of carrier, 2 He
Monitoring device 3 is located on the horizontal plane in waters, so as to reduce the possibility that protective device 2 and monitoring device 3 are immersed in water
Property, and then protective device 2 and monitoring device 3 are reduced because the impaired possibility of the extraneous factor such as water, improve 2 He of protective device
The service life of monitoring device 3.
And protective device 2 and monitoring device 3 can be fixed on support carrier 1, so in the support delivery protection dress of carrier 1
When putting 2 and monitoring device 3, the shock between protective device 2 and monitoring device 3 can be reduced, is realized to 2 He of protective device
The protection of monitoring device 3.
Monitoring device 3 is located in protective device 2, to realize the closed protective to monitoring device 3 by protective device 2, into
One step reduces other extraneous factors, influence of such as weather conditions to monitoring device 3.If protective device 2 can be a shape
For the obturator of rectangle, monitoring device 3 is located at the centre position of obturator, to prevent monitoring device 3 and the surrounding of obturator from touching
Hit.In addition in the present embodiment, the material of protective device 2 is lightweight material, to reduce the weight that support carrier 1 is carried.And
And through hole is reserved with protective device 2, such as at least one side of 2 this obturator of protective device, such as the middle part of front side
The top of position and adjacent with front side two opposite flanks is reserved with a through hole respectively, can by these through holes
Air circulation in obturator, reduces the possibility because closing excessively high etc. reason damage monitoring equipment 3 of body temperature, and these are logical
Hole is also used as the passage that monitoring device 3 obtains monitoring information.
Monitoring device 3, for obtaining the corresponding at least one monitoring information of monitoring object, according at least one monitoring information
Determine monitoring object status, alarm in the case where monitoring object status meets preset condition.
Wherein monitoring object is the equipment used during hydroelectric generation, if monitoring object can be hydroelectric generation process
In underwater power generator and carry out at least one of gate etc. of water level adjustment, can be obtained under water by monitoring device 3
(hydrologic regime includes but not limited to water temperature, current stream for the power of generator, the power generation duration of underwater power generator and hydrologic regime
Speed, height of water level etc.) etc. monitoring information, according to these monitoring informations can determine monitoring object status be normal condition also
It is abnormality, if monitoring object status is abnormality, illustrates that monitoring object status meets preset condition, this
When monitoring device 3 can alarm to prompt monitoring object to be in abnormality.
Such as in the case where monitoring object is underwater power generator, underwater power generation can at least be obtained by monitoring device 3
The power of machine, the power generation duration of underwater power generator and hydrologic regime these three monitoring informations, can be with according to these three monitoring informations
Determine whether the generating state of underwater power generator is normal, the alarm signal of the generating state of adjustment underwater power generator is sent if abnormal
Number, it is adjusted with the generating state to underwater power generator.Such as monitoring device 3 determines that the generated output of underwater power generator is more than
Default normal power, then send the alarm signal for the generated output for reducing underwater power generator;If monitoring device 3 determines underwater power generation
The height of water level of machine is more than default normal level, then sends and start the alarm signal that gate discharges water.
In another example:It can determine whether there is exception items around monitoring object from monitoring information by monitoring device 3,
Such as house refuse, organism in water, if being described monitoring object status meets preset condition, monitoring device 3 can at this time
Monitoring object is prompted to be in abnormality to alarm.
Further, monitoring device 3 can also be adjusted hydroelectric generation process according at least one monitoring information, with
, such as can be according at least to the power, underwater of above-mentioned underwater power generator so that the hydroelectric generating efficiency after adjustment maximizes
Power generation duration and hydrologic regime (hydrologic regime includes but not limited to water temperature, flow rate of water flow, height of water level etc.) of generator etc. are supervised
Measurement information is adjusted the equipment such as the underwater power generator during hydroelectric generation and gate so that hydroelectric after adjustment
Generating efficiency maximizes.Such as monitoring device 3 can be come according at least to the power, flow rate of water flow, height of water level of underwater power generator
Adjust the power of underwater power generator so that the generating efficiency of the underwater power generator after adjustment is more than the generating efficiency before adjustment.
Herein it should be noted is that:For monitoring device 3, it can be according at least one monitoring information pair
Hydroelectric generation process is adjusted, but is needed with specific reference to which of which monitoring information adjustment hydroelectric generation process equipment
Depending on actual conditions (actual conditions in such as waters and equipment), adjustment process is no longer described in detail in the embodiment of the present invention.
It is in place to monitoring object institute by supporting carrier 1 to deliver monitoring device 3 it was found from above-mentioned technical proposal
Put, the corresponding at least one monitoring information of monitoring object is obtained by monitoring device 3, determines to supervise according at least one monitoring information
Object status is surveyed, alarms, is realized to monitoring object in the case where monitoring object status meets preset condition
The monitoring of status.And monitoring device 3 can also be adjusted hydroelectric generation process according at least one monitoring information,
So that the hydroelectric generating efficiency after adjustment maximizes, realize to hydroelectric adjust automatically.
In the present embodiment, the alternative construction of above-mentioned support carrier 1 is as shown in Fig. 2, can include:First cavity body 11,
Second cavity body 12, the first connector 13 and the second connector 14.
Wherein the shape of the front end of the first cavity body 11 and the rear end of the first cavity body 11 is fore, the second cavity body 12
The shape of front end and the rear end of the second cavity body 12 is fore, and so-called first cavity body, 11 and second cavity body 12 is support carrier
The inside of 1 the two support members for sky, can so reduce support carrier 1 it is important, and use front-end and back-end for
Fore shape is beneficial to movement of the support carrier 1 on waters so that support carrier is compact and flexible, adapts to a variety of water environments.
And the pipeline 19 at least penetrating lower surface, such monitoring device 3 are reserved with the first cavity body 11 and/or the second cavity body 12
Underwater monitoring information, power, flow rate of water flow, the height of water level of such as underwater power generator are obtained with by pipeline.
The first end of first connector 13 is fixed on the first side of the first cavity body 11, the second end of the first connector 13
The second side of the second cavity body 11 is fixed on, the first end of the second connector 14 is fixed on the first side of the first cavity body 11
Face, the second end of the second connector 14 are fixed on the second side of the second cavity body 12, to pass through the first connector 13 and second
Connector 14 realizes being fixedly connected for the first cavity body 11 and the second cavity body 12.In the present embodiment, 13 He of the first connector
Pre-determined distance is separated between second connector 14 (specific value does not limit) so that protective device 2 is located at the first connector 13
On the second connector 14.Further first connector, 13 and second connector 14 in the case where being separated with pre-determined distance also
It can be parallel to each other so that the first connector 13 is identical with the impact force that the second connector 14 carries, and improves to the first cavity body
11 and second cavity body 12 it is firm.
In the present embodiment, another alternative construction of carrier 1 is supported as shown in figure 3, can also be wrapped on the basis of Fig. 2
Include:First protective fence 15, the second protective fence 16, the 3rd protective fence 17 and the 4th protective fence 18.
Wherein the first protective fence 15 is fixed on the upper surface of the first cavity body 11.Second protective fence 16 is fixed on the second cavity
The upper surface of body 12.Specifically, the first protective fence 15 is fixed on the outside of the upper surface of the first cavity body 11 (i.e. away from protection dress
Put 2 side), the second protective fence 16 is fixed on the outside (one i.e. away from protective device 2 of the upper surface of the second cavity body 12
Side), such personnel on supporting carrier 1 when working, it is possible to achieve the safe protection to personnel.
The first end of 3rd protective fence 17 is fixed on the upper surface of the first cavity body 11, and the second end of the 3rd protective fence 17 is consolidated
It is scheduled on the upper surface of the second cavity body 12.The first end of 4th protective fence 18 is fixed on the upper surface of the first cavity body 11, and the 4th
The second end of protective fence 18 is fixed on the upper surface of the second cavity body 12.First connector 13 and the second connector 14 are located at the 3rd
Between 17 and the 4th protective fence 18 of protective fence, and connecting plate is provided with the 3rd protective fence 17 and the 4th protective fence 18, passes through company
Fishplate bar can cause personnel to be moved between the first cavity body 11 and the second cavity body, and anti-by the 3rd protective fence 17 and the 4th
Guardrail 18 realizes the security protection to personnel.
In addition, above-mentioned support carrier 1 further includes the upper surface for being fixed on the first cavity body and/or is fixed on the second cavity body
Upper surface connecting strand, which can be connected by way of Chang Lianshi, be such as connected to by rope on a hull,
Support carrier 1 is drawn by hull.
In the present embodiment, above-mentioned monitoring device 3 includes collecting device, processing equipment and relay device.Wherein collection is set
It is standby, for obtaining the corresponding at least one monitoring information of monitoring object, as collecting device includes a variety of different types of sensors
With image it is first-class, as power sensor, temperature sensor, water level sensor, hydraulic pressure sensor and shooting it is first-class, set by these
It is standby to obtain the corresponding a variety of monitoring informations of monitoring object, as the power of underwater power generator, water temperature, hydraulic pressure, height of water level and
Ambient image of monitoring object position etc..
Processing equipment, for determining the monitoring object status according at least one monitoring information, in monitoring object
Status meets to alarm by relay device in the case of preset condition, and according at least one monitoring information to waterpower
Power generation process is adjusted, and is adjusted instruction, by relay device transmission adjust instruction so that the hydroelectric generation after adjustment
Generating efficiency maximize.Monitoring object status how is determined for processing equipment and how to adjust hydroelectric generation process
The above-mentioned description to monitoring device 3 is referred to, this present embodiment is no longer illustrated.
In the present embodiment, processing equipment is used with CPU (the Central Processing to handle up with large capacity at a high speed
Unit, central processing unit) so that processing equipment can be with the above-mentioned monitoring information of efficient process.And can be with processing equipment
Install RAID (Redundant Arrays of Independent Disks, disk array) card, with ensure processing equipment due to
Fortuitous event recovers the information stored in processing equipment automatically when destroying.And processing equipment can by relay device
, such as can be by above-mentioned monitoring information, the corresponding alarm signal of alarm and adjustment to carry out information exchange with remote supervisory and control(ling) equipment
Instruction is sent to remote supervisory and control(ling) equipment, and remote supervisory and control(ling) equipment can then monitor the work feelings of processing equipment by relay device
Condition, and processing equipment is safeguarded by remote supervisory and control(ling) equipment when processing equipment is in abnormal, realize to processing equipment
Remote monitoring.
In addition, monitoring device further includes:Microcomputer video information corresponding with processing equipment protects machine, to pass through microcomputer video
Information protection machine reduces the information radiation amount of processing equipment, reduces the risk that information is stolen.For data in processing equipment
Protection can also use and carry out locking operation to processing equipment, this present embodiment is no longer described in detail.And collecting device and processing are set
Transmitted between standby using STP (Shielded Twisted Pair, Shielded Twisted Pair) into row information, processing equipment and transfer are set
Transmitted between standby using STP into row information, to reduce the possibility of data electromagnetic exposure.
Corresponding with said system embodiment, the embodiment of the present invention also provides a kind of intelligent monitoring method, the intelligence
Change monitoring method based on above-mentioned intellectual faculties to implement, its flow chart is as shown in figure 4, may comprise steps of:
401:Obtain the corresponding at least one monitoring information of monitoring object.Wherein monitoring object is made during hydroelectric generation
The equipment used, such as monitoring object can be the gates of the underwater power generator and progress water level adjustment during hydroelectric generation
At least one of, by above-mentioned monitoring device can obtain the power of underwater power generator, the power generation duration of underwater power generator and
The monitoring informations such as hydrologic regime (hydrologic regime includes but not limited to water temperature, flow rate of water flow, height of water level etc.).
402:Monitoring object status is determined according at least one monitoring information, that is, determines that monitoring object status is
Normal condition or abnormality.
403:Alarm in the case where monitoring object status meets preset condition.If specifically, monitoring object
Status is abnormality, then illustrates that monitoring object status meets preset condition, monitoring device can be reported at this time
Warn to prompt monitoring object to be in abnormality.
Such as in the case where monitoring object is underwater power generator, underwater power generator can at least be obtained by monitoring device
Power, the power generation duration and hydrologic regime these three monitoring informations of underwater power generator, can be true according to these three monitoring informations
Determine whether the generating state of underwater power generator is normal, the alarm signal of the generating state of adjustment underwater power generator is sent if abnormal
Number, it is adjusted with the generating state to underwater power generator.Such as monitoring device determines that the generated output of underwater power generator is more than
Default normal power, then send the alarm signal for the generated output for reducing underwater power generator;If monitoring device determines underwater power generation
The height of water level of machine is more than default normal level, then sends and start the alarm signal that gate discharges water.
In another example:It can determine whether there is exception items around monitoring object from monitoring information by monitoring device,
Such as house refuse, organism in water, if being described monitoring object status meets preset condition, monitoring device can be with this time
Alarm to prompt monitoring object to be in abnormality.
404:Hydroelectric generation process is adjusted according at least one monitoring information, so that the hydroelectric generation after adjustment
Generating efficiency maximize, such as can be according at least to the power of above-mentioned underwater power generator, the power generation duration of underwater power generator and water
The monitoring informations such as literary situation (hydrologic regime includes but not limited to water temperature, flow rate of water flow, height of water level etc.) are to hydroelectric generation process
In underwater power generator and the equipment such as gate be adjusted so that the hydroelectric generating efficiency after adjustment maximizes.Such as
Monitoring device can adjust the power of underwater power generator according at least to the power, flow rate of water flow, height of water level of underwater power generator,
So that the generating efficiency of the underwater power generator after adjustment is more than the generating efficiency before adjustment.
Herein it should be noted is that:For monitoring device, it can be according at least one monitoring information pair
Hydroelectric generation process is adjusted, but is needed with specific reference to which of which monitoring information adjustment hydroelectric generation process equipment
Depending on actual conditions (actual conditions in such as waters and equipment), adjustment process is no longer described in detail in the embodiment of the present invention.
It was found from above-mentioned technical proposal, after the corresponding at least one monitoring information of monitoring object is obtained, according at least one
Kind monitoring information determines monitoring object status, is reported in the case where monitoring object status meets preset condition
It is alert, realize the monitoring to monitoring object status.And can also be according at least one monitoring information to hydroelectric generation process
It is adjusted, so that the hydroelectric generating efficiency after adjustment maximizes, realizes to hydroelectric adjust automatically.
It should be noted that each embodiment in this specification is described by the way of progressive, each embodiment weight
Point explanation is all difference with other embodiment, between each embodiment identical similar part mutually referring to.
For method class embodiment, since it is substantially similar to system embodiment, so description is fairly simple, related part ginseng
See the part explanation of system embodiment.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or order.Moreover, term " comprising ", "comprising" or its any other variant meaning
Covering non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only include that
A little key elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic key element of equipment.In the absence of more restrictions, the key element limited by sentence "including a ...", is not arranged
Except also there are other identical element in the process, method, article or apparatus that includes the element.
The foregoing description of the disclosed embodiments, enables those skilled in the art to realize or use the present invention.To this
A variety of modifications of a little embodiments will be apparent for a person skilled in the art, and the general principles defined herein can
Without departing from the spirit or scope of the present invention, to realize in other embodiments.Therefore, the present invention will not be limited
The embodiments shown herein is formed on, and is to fit to consistent with the principles and novel features disclosed herein most wide
Scope.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
- A kind of 1. intellectual faculties, it is characterised in that the system comprises:Support carrier, protective device and monitoring device;The support carrier, for carrying the protective device and the monitoring device, and the monitoring device is located at the guarantor In protection unit;The monitoring device, for obtaining the corresponding at least one monitoring information of monitoring object, according at least one monitoring Information determines the monitoring object status, is reported in the case where the monitoring object status meets preset condition It is alert, and hydroelectric generation process is adjusted according at least one monitoring information, so that hydroelectric after adjustment Generating efficiency maximizes.
- 2. system according to claim 1, it is characterised in that the support carrier includes:First cavity body, the second cavity Body, the first connector and the second connector;The shape of the front end of wherein described first cavity body and the rear end of first cavity body is fore, second cavity body Front end and the shape of rear end of second cavity body be fore, and first cavity body and/or second cavity body On be reserved with the pipeline at least penetrating lower surface;The first end of first connector is fixed on the first side of first cavity body, and the second of first connector End is fixed on the second side of second cavity body;The first end of second connector is fixed on the first side of first cavity body, and the second of second connector End is fixed on the second side of second cavity body, and between first connector and second connector between be separated with it is pre- If distance;The protective device is located on first connector and second connector.
- 3. system according to claim 2, it is characterised in that the support carrier further includes:First protective fence, second prevent Guardrail, the 3rd protective fence and the 4th protective fence;Wherein described first protective fence is fixed on the upper surface of first cavity body;Second protective fence is fixed on the upper surface of second cavity body;The first end of 3rd protective fence is fixed on the upper surface of first cavity body, the second end of the 3rd protective fence It is fixed on the upper surface of second cavity body;The first end of 4th protective fence is fixed on the upper surface of first cavity body, the second end of the 4th protective fence It is fixed on the upper surface of second cavity body;First connector and second connector are between the 3rd protective fence and the 4th protective fence, and institute State and be provided with connecting plate on the 3rd protective fence and the 4th protective fence.
- 4. the system according to Claims 2 or 3, it is characterised in that the support carrier further includes:It is fixed on described first The upper surface of cavity body and/or be fixed on second cavity body upper surface connecting strand.
- 5. system according to claim 4, it is characterised in that the connecting strand is connected by way of Chang Lianshi.
- 6. system according to claim 1, it is characterised in that the material of the protective device is lightweight material, and described Through hole is reserved with protective device.
- 7. system according to claim 1, it is characterised in that the monitoring device includes:Collecting device, processing equipment and Relay device;Wherein described collecting device, for obtaining the corresponding at least one monitoring information of monitoring object;The processing equipment, for determining the monitoring object status according at least one monitoring information, described Monitoring object status meets to alarm by the relay device in the case of preset condition, and according to described at least one Kind of monitoring information is adjusted hydroelectric generation process, is adjusted instruction, by relay device transmission adjust instruction with So that the hydroelectric generating efficiency after adjustment maximizes.
- 8. system according to claim 7, it is characterised in that the monitoring device further includes:With the processing equipment pair The microcomputer video information protection machine answered, for reducing the information radiation amount of the processing equipment.
- 9. system according to claim 7, it is characterised in that using screen between the collecting device and the processing equipment Cover twisted-pair feeder to transmit into row information, passed between the processing equipment and the relay device using Shielded Twisted Pair into row information It is defeated.
- A kind of 10. intelligent monitoring method, it is characterised in that the described method includes:Obtain the corresponding at least one monitoring information of monitoring object;The monitoring object status is determined according at least one monitoring information;Alarm in the case where the monitoring object status meets preset condition;Hydroelectric generation process is adjusted according at least one monitoring information, so that the hydroelectric hair after adjustment Electrical efficiency maximizes.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711228098.6A CN107941203A (en) | 2017-11-29 | 2017-11-29 | A kind of intellectual faculties and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711228098.6A CN107941203A (en) | 2017-11-29 | 2017-11-29 | A kind of intellectual faculties and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107941203A true CN107941203A (en) | 2018-04-20 |
Family
ID=61947734
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711228098.6A Pending CN107941203A (en) | 2017-11-29 | 2017-11-29 | A kind of intellectual faculties and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107941203A (en) |
Citations (63)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN85101368A (en) * | 1985-04-01 | 1987-01-24 | 株式会社日立制作所 | The method and the device of control variable-speed hydroelectric power system |
| CN2192051Y (en) * | 1994-03-18 | 1995-03-15 | 北京电子技术研究所 | Video frenquency radiation information interference unit for computer |
| US5861756A (en) * | 1997-09-15 | 1999-01-19 | Yankielun; Norbert E. | Method of detecting accretion of frazil ice on water |
| CN1599838A (en) * | 2001-10-04 | 2005-03-23 | 罗泰克控股有限公司 | Generator and Turbine Units |
| CN101413472A (en) * | 2008-11-27 | 2009-04-22 | 上海交通大学 | Free style electric generating apparatus of river water stream |
| CN101437148A (en) * | 2007-11-16 | 2009-05-20 | 西安电子科技大学 | Video information leakage resistance method and processing device |
| CN201254266Y (en) * | 2008-06-20 | 2009-06-10 | 上海海事大学 | Multifunctional water surface robot |
| CN101526586A (en) * | 2009-04-17 | 2009-09-09 | 上海电力学院 | Embedded remote state monitoring system of generating unit |
| CN201331688Y (en) * | 2008-12-30 | 2009-10-21 | 本溪满族自治县小水电管理站 | Hydroelectric generating set operation monitoring device based on GSM communication |
| CN201409108Y (en) * | 2009-05-15 | 2010-02-17 | 上海恒锦动力科技有限公司 | Generator group control module |
| CN201515345U (en) * | 2009-09-10 | 2010-06-23 | 杭州西湖电力电子技术有限公司 | Automatic control system of hydroelectric low-pressure machine set |
| CN201535778U (en) * | 2009-08-21 | 2010-07-28 | 肖剑 | Drift water quality monitoring platform |
| CN201616178U (en) * | 2010-01-18 | 2010-10-27 | 广东康菱动力科技有限公司 | Remote wireless communication control system for generator set |
| CN101902576A (en) * | 2010-08-02 | 2010-12-01 | 华南师范大学 | Video encryption camera and its encryption method |
| CN101957425A (en) * | 2009-07-14 | 2011-01-26 | 鸿富锦精密工业(深圳)有限公司 | Detecting device |
| CN201749353U (en) * | 2010-07-22 | 2011-02-16 | 湖南华自科技有限公司 | A Completely Unattended Hydropower Station LCU Monitoring Device |
| CN201786533U (en) * | 2010-09-03 | 2011-04-06 | 湖南山立水电设备制造有限公司 | Hydraulic turbine |
| CN201802551U (en) * | 2010-08-20 | 2011-04-20 | 孙立平 | Temperature-measuring braking screen cabinet for hydroelectric generating set |
| CN102116246A (en) * | 2011-02-24 | 2011-07-06 | 华中科技大学 | Device, system and method for monitoring efficiency of hydro-electric generating set |
| CN202065118U (en) * | 2011-04-12 | 2011-12-07 | 扬州润邮自动控制设备研究所有限公司 | Intelligent water turbine revolving speed signal device |
| CN102291078A (en) * | 2011-08-09 | 2011-12-21 | 东元总合科技(杭州)有限公司 | Electric power generating system and control method thereof |
| CN102439285A (en) * | 2009-04-17 | 2012-05-02 | 开放水知识产权有限公司 | An enhanced method of controlling the output of a hydroelectric turbine generator |
| CN102439286A (en) * | 2009-05-22 | 2012-05-02 | 亚特兰蒂斯能源有限公司 | Improvements in underwater turbine control |
| CN202228263U (en) * | 2011-10-06 | 2012-05-23 | 武陟县电业总公司 | Water turbine capable of being monitored in real time |
| CN202300820U (en) * | 2011-09-30 | 2012-07-04 | 安徽志诚节能科技有限公司 | Remote monitoring system for cooling tower water turbine |
| CN102629136A (en) * | 2012-04-26 | 2012-08-08 | 深圳市兰德玛水环境工程科技有限公司 | Water quality hydrology environment perception and water conservancy facility integrated intelligent management system and method |
| CN202522894U (en) * | 2012-03-23 | 2012-11-07 | 西安青山电控技术有限公司 | Generating set monitoring system based on wireless network |
| CN202696658U (en) * | 2012-03-28 | 2013-01-23 | 深圳市沃尔奔达新能源股份有限公司 | Wireless control system |
| CN103147903A (en) * | 2013-02-04 | 2013-06-12 | 郑贵林 | Sea observation platform for unmanned and automatic navigation |
| CN203012528U (en) * | 2012-11-14 | 2013-06-19 | 成都万维图新信息技术有限公司 | IoT (Internet of Things) based self power supplying type centralized riverbed water level monitoring system |
| CN203275606U (en) * | 2013-05-31 | 2013-11-06 | 长沙智尚电气有限公司 | Mobile generating set monitoring and managing system |
| CN103498757A (en) * | 2013-10-12 | 2014-01-08 | 东南大学 | Marine energy resource generation monitoring device |
| CN203398588U (en) * | 2013-06-17 | 2014-01-15 | 湖南湘能电力强弱电工程有限公司 | Intelligent type transformer station box body |
| CN103742338A (en) * | 2014-01-09 | 2014-04-23 | 清华大学 | Underwater monitor powered by ocean current energy |
| CN103953490A (en) * | 2014-04-23 | 2014-07-30 | 浙江工业大学 | Implementation method for monitoring status of hydraulic turbine set based on HLSNE |
| CN104061113A (en) * | 2014-06-12 | 2014-09-24 | 广西广宁工业科技有限公司 | Unattended intelligent small-size package water turbine power station |
| CN104216383A (en) * | 2014-09-22 | 2014-12-17 | 国家电网公司 | Operating efficiency optimizing method of small hydropower station unit |
| CN104345170A (en) * | 2013-07-29 | 2015-02-11 | 王启平 | Hydraulic generator rotating speed measuring system |
| CN104460627A (en) * | 2014-12-10 | 2015-03-25 | 国家电网公司 | A display and control system and control method for a hydroelectric generator set in a hydropower station |
| CN104503417A (en) * | 2015-01-13 | 2015-04-08 | 华自科技股份有限公司 | System for monitoring hydropower station |
| CN104503372A (en) * | 2013-12-26 | 2015-04-08 | 广东西电动力科技股份有限公司 | Equipment used for assembling manufacturing execution system of diesel generating set |
| CN104729624A (en) * | 2015-01-24 | 2015-06-24 | 河南省郑州水利学校 | Water level monitoring system of hydropower station |
| CN104748839A (en) * | 2015-04-02 | 2015-07-01 | 贵州电力试验研究院 | Hydroelectric generating unit vibration state region monitoring method based on real-time online monitoring |
| CN204458195U (en) * | 2015-03-13 | 2015-07-08 | 广东梅雁吉祥水电股份有限公司 | A kind of hydroelectric generator that can regulate generating capacity according to rainfall rate |
| CN204537396U (en) * | 2015-04-27 | 2015-08-05 | 浙江海洋学院 | Based on the marine environment wireless monitor early warning system of ocean energy |
| CN204652418U (en) * | 2015-06-04 | 2015-09-16 | 南阳医学高等专科学校 | A kind of excellent heat dissipation performance, there is the router of shock-absorbing function |
| CN105045235A (en) * | 2015-07-15 | 2015-11-11 | 重庆市同扬电气设备有限公司 | Cascade power station remote control system based on intelligent cloud technology |
| CN105182917A (en) * | 2015-04-02 | 2015-12-23 | 重庆新世纪电气有限公司 | Mid-small-sized hydropower station intelligent control system and method therefor |
| CN205038204U (en) * | 2015-10-21 | 2016-02-17 | 北京易净优智环境科技有限公司 | Air quality monitoring equipment |
| CN105351152A (en) * | 2015-11-18 | 2016-02-24 | 电子科技大学 | Remote offshore wind power monitoring device based on ZigBee and GPRS techniques |
| CN205065021U (en) * | 2015-10-09 | 2016-03-02 | 上海力典电磁阀有限公司 | Distant early warning system for valve |
| CN105486641A (en) * | 2015-11-26 | 2016-04-13 | 青岛爱华高科仪器有限公司 | Self-generating water quality monitor |
| CN205225577U (en) * | 2015-12-10 | 2016-05-11 | 成都合众能科技有限公司 | Hydroelectric set composite control system |
| CN205249105U (en) * | 2015-12-18 | 2016-05-18 | 时代 | A generator protection system for hydropower has a feedback control |
| CN205301941U (en) * | 2015-12-23 | 2016-06-08 | 大唐岩滩水力发电有限责任公司 | Remote control formula hydroelectric power generation security detection device |
| CN205540221U (en) * | 2016-01-19 | 2016-08-31 | 无锡职业技术学院 | Power station remote monitering system based on thing networking |
| CN106089554A (en) * | 2016-06-29 | 2016-11-09 | 绩溪县东安自动化设备科技研发有限公司 | A kind of control method of hydroelectric generator |
| CN205691113U (en) * | 2016-03-31 | 2016-11-16 | 西华大学 | A kind of hydrographic information monitoring device, monitoring system and power station |
| CN106340967A (en) * | 2016-10-20 | 2017-01-18 | 湖南长高思瑞自动化有限公司 | Smart operation apparatus and smart operation method of low-voltage generator of hydropower station |
| CN206161669U (en) * | 2017-01-06 | 2017-05-10 | 重庆市同扬电气设备有限公司 | Keep watch on rotational speed bashertron of rotational speed of water turbine |
| CN206158860U (en) * | 2016-09-22 | 2017-05-10 | 东莞团诚自动化设备有限公司 | Generating set data collection station based on WIFI |
| CN106837676A (en) * | 2017-04-07 | 2017-06-13 | 贵州电网有限责任公司电力科学研究院 | A kind of small power station's unit energy-conservation integrated control device and control method |
| CN206477950U (en) * | 2016-12-29 | 2017-09-08 | 常熟市双灵船舶设备有限公司 | Based on double floating body mechanical wave-energy power generation devices |
-
2017
- 2017-11-29 CN CN201711228098.6A patent/CN107941203A/en active Pending
Patent Citations (63)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN85101368A (en) * | 1985-04-01 | 1987-01-24 | 株式会社日立制作所 | The method and the device of control variable-speed hydroelectric power system |
| CN2192051Y (en) * | 1994-03-18 | 1995-03-15 | 北京电子技术研究所 | Video frenquency radiation information interference unit for computer |
| US5861756A (en) * | 1997-09-15 | 1999-01-19 | Yankielun; Norbert E. | Method of detecting accretion of frazil ice on water |
| CN1599838A (en) * | 2001-10-04 | 2005-03-23 | 罗泰克控股有限公司 | Generator and Turbine Units |
| CN101437148A (en) * | 2007-11-16 | 2009-05-20 | 西安电子科技大学 | Video information leakage resistance method and processing device |
| CN201254266Y (en) * | 2008-06-20 | 2009-06-10 | 上海海事大学 | Multifunctional water surface robot |
| CN101413472A (en) * | 2008-11-27 | 2009-04-22 | 上海交通大学 | Free style electric generating apparatus of river water stream |
| CN201331688Y (en) * | 2008-12-30 | 2009-10-21 | 本溪满族自治县小水电管理站 | Hydroelectric generating set operation monitoring device based on GSM communication |
| CN102439285A (en) * | 2009-04-17 | 2012-05-02 | 开放水知识产权有限公司 | An enhanced method of controlling the output of a hydroelectric turbine generator |
| CN101526586A (en) * | 2009-04-17 | 2009-09-09 | 上海电力学院 | Embedded remote state monitoring system of generating unit |
| CN201409108Y (en) * | 2009-05-15 | 2010-02-17 | 上海恒锦动力科技有限公司 | Generator group control module |
| CN102439286A (en) * | 2009-05-22 | 2012-05-02 | 亚特兰蒂斯能源有限公司 | Improvements in underwater turbine control |
| CN101957425A (en) * | 2009-07-14 | 2011-01-26 | 鸿富锦精密工业(深圳)有限公司 | Detecting device |
| CN201535778U (en) * | 2009-08-21 | 2010-07-28 | 肖剑 | Drift water quality monitoring platform |
| CN201515345U (en) * | 2009-09-10 | 2010-06-23 | 杭州西湖电力电子技术有限公司 | Automatic control system of hydroelectric low-pressure machine set |
| CN201616178U (en) * | 2010-01-18 | 2010-10-27 | 广东康菱动力科技有限公司 | Remote wireless communication control system for generator set |
| CN201749353U (en) * | 2010-07-22 | 2011-02-16 | 湖南华自科技有限公司 | A Completely Unattended Hydropower Station LCU Monitoring Device |
| CN101902576A (en) * | 2010-08-02 | 2010-12-01 | 华南师范大学 | Video encryption camera and its encryption method |
| CN201802551U (en) * | 2010-08-20 | 2011-04-20 | 孙立平 | Temperature-measuring braking screen cabinet for hydroelectric generating set |
| CN201786533U (en) * | 2010-09-03 | 2011-04-06 | 湖南山立水电设备制造有限公司 | Hydraulic turbine |
| CN102116246A (en) * | 2011-02-24 | 2011-07-06 | 华中科技大学 | Device, system and method for monitoring efficiency of hydro-electric generating set |
| CN202065118U (en) * | 2011-04-12 | 2011-12-07 | 扬州润邮自动控制设备研究所有限公司 | Intelligent water turbine revolving speed signal device |
| CN102291078A (en) * | 2011-08-09 | 2011-12-21 | 东元总合科技(杭州)有限公司 | Electric power generating system and control method thereof |
| CN202300820U (en) * | 2011-09-30 | 2012-07-04 | 安徽志诚节能科技有限公司 | Remote monitoring system for cooling tower water turbine |
| CN202228263U (en) * | 2011-10-06 | 2012-05-23 | 武陟县电业总公司 | Water turbine capable of being monitored in real time |
| CN202522894U (en) * | 2012-03-23 | 2012-11-07 | 西安青山电控技术有限公司 | Generating set monitoring system based on wireless network |
| CN202696658U (en) * | 2012-03-28 | 2013-01-23 | 深圳市沃尔奔达新能源股份有限公司 | Wireless control system |
| CN102629136A (en) * | 2012-04-26 | 2012-08-08 | 深圳市兰德玛水环境工程科技有限公司 | Water quality hydrology environment perception and water conservancy facility integrated intelligent management system and method |
| CN203012528U (en) * | 2012-11-14 | 2013-06-19 | 成都万维图新信息技术有限公司 | IoT (Internet of Things) based self power supplying type centralized riverbed water level monitoring system |
| CN103147903A (en) * | 2013-02-04 | 2013-06-12 | 郑贵林 | Sea observation platform for unmanned and automatic navigation |
| CN203275606U (en) * | 2013-05-31 | 2013-11-06 | 长沙智尚电气有限公司 | Mobile generating set monitoring and managing system |
| CN203398588U (en) * | 2013-06-17 | 2014-01-15 | 湖南湘能电力强弱电工程有限公司 | Intelligent type transformer station box body |
| CN104345170A (en) * | 2013-07-29 | 2015-02-11 | 王启平 | Hydraulic generator rotating speed measuring system |
| CN103498757A (en) * | 2013-10-12 | 2014-01-08 | 东南大学 | Marine energy resource generation monitoring device |
| CN104503372A (en) * | 2013-12-26 | 2015-04-08 | 广东西电动力科技股份有限公司 | Equipment used for assembling manufacturing execution system of diesel generating set |
| CN103742338A (en) * | 2014-01-09 | 2014-04-23 | 清华大学 | Underwater monitor powered by ocean current energy |
| CN103953490A (en) * | 2014-04-23 | 2014-07-30 | 浙江工业大学 | Implementation method for monitoring status of hydraulic turbine set based on HLSNE |
| CN104061113A (en) * | 2014-06-12 | 2014-09-24 | 广西广宁工业科技有限公司 | Unattended intelligent small-size package water turbine power station |
| CN104216383A (en) * | 2014-09-22 | 2014-12-17 | 国家电网公司 | Operating efficiency optimizing method of small hydropower station unit |
| CN104460627A (en) * | 2014-12-10 | 2015-03-25 | 国家电网公司 | A display and control system and control method for a hydroelectric generator set in a hydropower station |
| CN104503417A (en) * | 2015-01-13 | 2015-04-08 | 华自科技股份有限公司 | System for monitoring hydropower station |
| CN104729624A (en) * | 2015-01-24 | 2015-06-24 | 河南省郑州水利学校 | Water level monitoring system of hydropower station |
| CN204458195U (en) * | 2015-03-13 | 2015-07-08 | 广东梅雁吉祥水电股份有限公司 | A kind of hydroelectric generator that can regulate generating capacity according to rainfall rate |
| CN105182917A (en) * | 2015-04-02 | 2015-12-23 | 重庆新世纪电气有限公司 | Mid-small-sized hydropower station intelligent control system and method therefor |
| CN104748839A (en) * | 2015-04-02 | 2015-07-01 | 贵州电力试验研究院 | Hydroelectric generating unit vibration state region monitoring method based on real-time online monitoring |
| CN204537396U (en) * | 2015-04-27 | 2015-08-05 | 浙江海洋学院 | Based on the marine environment wireless monitor early warning system of ocean energy |
| CN204652418U (en) * | 2015-06-04 | 2015-09-16 | 南阳医学高等专科学校 | A kind of excellent heat dissipation performance, there is the router of shock-absorbing function |
| CN105045235A (en) * | 2015-07-15 | 2015-11-11 | 重庆市同扬电气设备有限公司 | Cascade power station remote control system based on intelligent cloud technology |
| CN205065021U (en) * | 2015-10-09 | 2016-03-02 | 上海力典电磁阀有限公司 | Distant early warning system for valve |
| CN205038204U (en) * | 2015-10-21 | 2016-02-17 | 北京易净优智环境科技有限公司 | Air quality monitoring equipment |
| CN105351152A (en) * | 2015-11-18 | 2016-02-24 | 电子科技大学 | Remote offshore wind power monitoring device based on ZigBee and GPRS techniques |
| CN105486641A (en) * | 2015-11-26 | 2016-04-13 | 青岛爱华高科仪器有限公司 | Self-generating water quality monitor |
| CN205225577U (en) * | 2015-12-10 | 2016-05-11 | 成都合众能科技有限公司 | Hydroelectric set composite control system |
| CN205249105U (en) * | 2015-12-18 | 2016-05-18 | 时代 | A generator protection system for hydropower has a feedback control |
| CN205301941U (en) * | 2015-12-23 | 2016-06-08 | 大唐岩滩水力发电有限责任公司 | Remote control formula hydroelectric power generation security detection device |
| CN205540221U (en) * | 2016-01-19 | 2016-08-31 | 无锡职业技术学院 | Power station remote monitering system based on thing networking |
| CN205691113U (en) * | 2016-03-31 | 2016-11-16 | 西华大学 | A kind of hydrographic information monitoring device, monitoring system and power station |
| CN106089554A (en) * | 2016-06-29 | 2016-11-09 | 绩溪县东安自动化设备科技研发有限公司 | A kind of control method of hydroelectric generator |
| CN206158860U (en) * | 2016-09-22 | 2017-05-10 | 东莞团诚自动化设备有限公司 | Generating set data collection station based on WIFI |
| CN106340967A (en) * | 2016-10-20 | 2017-01-18 | 湖南长高思瑞自动化有限公司 | Smart operation apparatus and smart operation method of low-voltage generator of hydropower station |
| CN206477950U (en) * | 2016-12-29 | 2017-09-08 | 常熟市双灵船舶设备有限公司 | Based on double floating body mechanical wave-energy power generation devices |
| CN206161669U (en) * | 2017-01-06 | 2017-05-10 | 重庆市同扬电气设备有限公司 | Keep watch on rotational speed bashertron of rotational speed of water turbine |
| CN106837676A (en) * | 2017-04-07 | 2017-06-13 | 贵州电网有限责任公司电力科学研究院 | A kind of small power station's unit energy-conservation integrated control device and control method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207587141U (en) | A kind of landslide monitoring alarm | |
| CN202120385U (en) | Railway line electronic anti-invasion system | |
| CN111681381A (en) | Intelligent recognition system for preventing external damage of power transmission line | |
| CN102289903A (en) | Overhead power transmission line monitoring system | |
| CN106194264B (en) | A kind of coal and gas prominent monitors in real time and early warning system | |
| CN201177852Y (en) | High-voltage transmission line iron tower anti-theft monitoring device | |
| CN106652279A (en) | Power equipment intelligent antitheft alarming system | |
| CN107274090A (en) | Architectural Equipment supervisory systems based on BIM technology | |
| CN104332025B (en) | A Precise Monitoring and Alarming System for the Protected Surface | |
| CN115541704A (en) | Nuclear power plant cold source safety system | |
| CN206330611U (en) | It is a kind of can remote real time monitoring steel tower safety intelligent monitor system | |
| CN109959409A (en) | A kind of embankment safety monitoring system | |
| CN112291508B (en) | An intelligent underwater security arresting net system and intrusion early warning method | |
| CN208655003U (en) | A kind of comprehensive alarm system of field cultural relic protection | |
| CN207379640U (en) | The underwater garbage barrier net early warning and alarming monitoring system of nuclear power station | |
| CN203337216U (en) | Water level monitoring and early warning system | |
| CN107941203A (en) | A kind of intellectual faculties and method | |
| CN111121864A (en) | Power transmission line structure safety monitoring method, device and equipment | |
| CN207283709U (en) | One kind is used for field security protection intelligence caution device | |
| CN208654988U (en) | A kind of field cultural relic protection imaging identification alarm system | |
| CN207319384U (en) | Electric power tower anti-theft device | |
| CN206440348U (en) | A kind of hydrographic water resource telemetering equipment | |
| CN110029860A (en) | A kind of communication tower with monitoring function | |
| CN105785926A (en) | CAN bus-based offshore wind turbine generator monitoring system | |
| CN207033011U (en) | Electric force pole tower based on GPRS |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |