CN1072129A - Manufacturing method of pipe - Google Patents

Manufacturing method of pipe Download PDF

Info

Publication number
CN1072129A
CN1072129A CN 91110477 CN91110477A CN1072129A CN 1072129 A CN1072129 A CN 1072129A CN 91110477 CN91110477 CN 91110477 CN 91110477 A CN91110477 A CN 91110477A CN 1072129 A CN1072129 A CN 1072129A
Authority
CN
China
Prior art keywords
pipeline
internal mold
concrete
garden
pour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 91110477
Other languages
Chinese (zh)
Inventor
岑武祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 91110477 priority Critical patent/CN1072129A/en
Publication of CN1072129A publication Critical patent/CN1072129A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

Manufacturing method of pipe is to make pipeline with the method for vibrating compacting.Its advantage is: need be few with equipment, and concrete water-cement ratio is little, saves cement, and cost is low; Vibrating compacting concrete strength height, the pipeline bearing capacity is big; Horizontal making pipeline, two ends have the annulus location, and pipeline wall thickness is even; Replace the reinforcement fabrication pipeline with steel plate, steel are all play at both direction in length and breadth effect, and the saving steel of making the best use of everything, steel plate play the external mold effect and save template, and protective layer is done after the pipeline typing again, protects effective.

Description

Manufacturing method of pipe
The present invention relates to problems such as the preparation method of pipeline and required facility.
The preparation method of existing pipeline has and outstandingly is rolled into several different methods such as type, centrifugal forming, and pipeline quality is good, but need many with equipment, the cost height; If with simple device fabrication pipeline, quality does not reach requirement again, wall unevenness is even, and bearing capacity is low.
The purpose of this invention is to provide some new manufacturing method of pipe, remedy the defective of existing manufacturing method of pipe.
The object of the present invention is achieved like this: the inside and outside mould of pipeline is stood on the ground, pour into concrete and cover annular pressing plate, vibrating mould also with mechanical pressure garden ring, shakes the compacting pipeline; Or on the arc topotype, adorn two arcs, and open us above, two ends link with it with the garden ring, again internal mold are passed through caliber hole installation in position, pour into concrete and adhere to the internal mold vibrating forming with electromagnetic shaker; Or on the topotype of arc, adorn two arcs, and open us above, two ends are attached thereto (having a garden ring to slide along arc) with the garden ring, internal mold is passed through caliber hole installation in position, pour into concrete and cover panel, the vibrations internal mold also with mechanical pressure garden ring, shakes the compacting pipeline; Or at topotype top-pour one layer concrete of half garden shape, the pipeline reinforcing bar of welding or colligation shaping is imbedded in the concrete (the plain concrete pipe does not have this procedure), internal mold is pierced in the steel reinforcement cage, two garden rings are contained in the internal mold two ends, water internal mold top half garden concrete again, half garden tubular external mold is covered, and the vibrations internal mold also with mechanical pressure garden ring, shakes the compacting pipeline; Or the steel plate that is welded into tubulose or loudspeaker tubulose stood on the ground or crouch on support, again internal mold is put in the tubulose steel plate, pour into concrete and cover garden ring-shaped pressuring plate (horizontal two skulls), the vibrations internal mold also encircles with mechanical pressure garden, vibrations compacting pipeline, and then make protective layer (corrosion resistant plate can not done); Steel plate can be pressed with decorative pattern in length and breadth, strengthens steel plate and concrete cementitiousness and shear resistance; By purposes several sections pipeline weldings are got up to form all size electric pole.
The present invention makes pipeline with the method for vibrations compacting need be few with equipment, and concrete water-cement ratio is little, saves cement, and cost is low; Vibrations compacted concrete intensity height, the pipeline bearing capacity is big; Horizontal making pipeline, there is the garden loop mapping at two ends, and pipeline wall thickness is even; Replace the reinforcement fabrication pipeline with steel plate, steel are all play at both direction in length and breadth has effect, the saving steel of making the best use of everything; steel plate plays the external mold effect and saves template; can make the impervious ability that concrete improves pipeline with self-stressing cement again, protective layer is done after the pipeline setting again, protects effective.
Specific practice of the present invention is provided by following embodiment and accompanying drawing.
Fig. 1 is vertical making pipeline profile, the 1st, and the tubulose internal mold, 2 is external molds that two and half garden tubes are formed, the 3rd, the garden ring-shaped pressuring plate, the 4th, transmit press member, the 5th, jack, the 6th, steel wire rope, the 7th, cross-arm.Fig. 2 is simple and easy lifting gear, the 11st, and vertical rod, the 12nd, cross bar, the 13rd, rotating disk, the 14th, steel wire rope, the 15th, cable wind rope.Fig. 3 is the arc formwork elevation, the 21st, and arc, hole 22 is left at two ends.Fig. 4 is the A-A profile.Fig. 5 is an end mould elevation, and two hole 22 corresponding connecting plates 23 with arc are respectively stretched out on both sides, are drilled with hole 24, leave the hole identical with internal diameter of the pipeline 25.Fig. 6 is the B-B profile.Fig. 7 is a pipeline external mold installation diagram, upright arc shown in Figure 3 32 on the curved surface topotype of arc, the hole 22 usefulness pins 33 that two end moulds shown in Figure 5 inserted arc are fixing, load onto another piece arc at another side again, fix with pin, external mold is just assembled and has been finished.Fig. 8 is the profile after shaping is smash in the pipeline shake, the 32nd, and arc, the 34th, arc topotype, the 35th, tubulose internal mold.Fig. 9 is another kind of pipeline external mold installation diagram, and upright end mould 31 shown in Figure 5 on the curved surface topotype of arc is inserted in two arcs shown in Figure 3 32 connecting plate 23 of holding mould, fixing with pin 33, load onto garden ring-shaped pressuring plate 36 at the other end again, clamp with anchor clamps 37, external mold is just assembled and has been finished.Figure 10 is the profile after the pipe vibration compacting, the 32nd, and arc, the 35th, tubulose internal mold, the 38th, curved cover plate, the 34th, topotype.Figure 11 is the profile after the another kind of pipe vibration compacting, the 41st, and the tubulose internal mold, 42 is half garden tubular external molds, the 43rd, bolt, 44 is half garden shape curved surface topotypes.Figure 12 is the profile after the compacting of steel plate concrete pipe vibration, the 51st, and tubulose internal mold, the 52nd, tubulose steel plate, the 53rd, garden ring-shaped pressuring plate.Figure 13 is the profile after the steel plate concrete pipeline is made completion, the 52nd, and tubulose steel plate, the 54th, protective layer.Figure 14 is the pipeline template locator, is welded by rectangle reinforcing bar 61 and steel hoop 62.Figure 15 is the C-C profile.Figure 16 is the profile after the steel plate concrete bell-and-spigot pipe vibrations compacting, the 71st, and loudspeaker tubulose internal mold, the 72nd, loudspeaker tubulose steel plate, the 73rd, garden ring-shaped pressuring plate.
The method of vertical making pipeline as shown in Figure 1, the inside and outside mould of pipeline is stood in (electromagnetic shaker is contained in the internal mold the inside) on the ground, with locator location shown in Figure 14, pour into the apparatus tamping of end face protective layer concrete, fixing inside and outside mould position, extract locator, put into steel reinforcement cage, pour into concrete again, cover garden ring-shaped pressuring plate 3, load onto force transferring part 4 and jack 5, cross-arm 7 is pressed on the jack, with steel wire rope 6 external mold 2 and cross-arm 7 is linked up, vibration internal mold 1 is also with very heavy roof pressure garden ring 3, vibrations compacting pipeline stops vibration and pressurization after the pipeline moulding; Unload jack, cross-arm, force transferring part and steel wire rope, extract internal mold, take out the garden ring-shaped pressuring plate, remove the just remaining pipeline of external mold and stood on the ground.Again inside and outside mould is stood in and produce another pipeline on the ground.Water seasoning after concrete strength reaches 70%, just can transport out of precasting yard in good time.No muscle manufacturing method of pipe is that interior external mold is stood on the ground, with the locator location, pours into concrete, extracts locator, covers the garden ring-shaped pressuring plate, and the vibrations internal mold also encircles with mechanical pressure garden ring or with the gravity pressure garden, vibrations compacting pipeline.Extracting internal mold can be with cantilever gin pole or other machinery, also available simple and easy lifting gear shown in Figure 2, and cross bar 12 and vertical rod 11 usefulness rotating disks 13 link, and cross bar can rotate around vertical rod, adorns a jack and just can transfer to internal mold on cross bar.
The method of horizontal making pipeline is to adorn two end moulds 31 shown in Figure 5 on the arc-shaped curved surface topotype, and two curved slabs shown in Figure 3 32 are inserted in the connecting plate of holding mould, and is fixing with pin 33, as shown in Figure 7; Again tubulose internal mold 35 by caliber hole installation in position (electromagnetic shaker be contained in internal mold the inside), pour into concrete vibrations internal mold, with arc hawk compacting visual concrete, pipe vibration is promptly extracted internal mold after being shaped, and removes external mold, remaining pipeline crouches on topotype; Again external mold is contained in next section and produces another pipeline.In good time water seasoning, after concrete strength reaches 70%, but just the demoulding transports out of precasting yard.The preparation method that the muscle pipeline is arranged is after external mold installs, and pours into the bottom concrete, and the pipeline reinforcing bar is imbedded concrete, the internal mold installation in position, pour into concrete again, the vibration internal mold is shaped pipe vibration, with arc hawk compacting pipeline exposed parts, as shown in Figure 8.
The method of another kind of horizontal making pipeline is to adorn two end moulds 31 shown in Figure 5 on the arc-shaped curved surface topotype, and two curved slabs shown in Figure 3 32 are inserted in the connecting plate of holding mould, and is fixing with pin 33, as shown in Figure 7; Pour into the bottom concrete, tubulose internal mold 35 by caliber hole installation in position (electromagnetic shaker be contained in internal mold the inside), watering into again, concrete covers panel 38 as shown in figure 10, pressurize and the vibration internal mold around the external mold binding by topotype with steel wire rope, the vibrating compacting pipeline, pipeline is promptly extracted internal mold after being shaped, and removes external mold, and remaining pipeline crouches on topotype; Again external mold is contained in next section and produces another pipeline.In good time water seasoning, after concrete strength reaches 70%, but just the demoulding transports out of precasting yard.
The method of another kind of horizontal making pipeline is to adorn an end mould 31 shown in Figure 5 on the arc-shaped curved surface topotype, two curved slabs shown in Figure 3 32 are inserted in the connecting plate of end mould, fixing with pin 33, the garden ring 36 that leaves the caliber hole is contained in the curved slab other end clamps as shown in Figure 9 with anchor clamps 37; Pour into the bottom concrete, tubulose internal mold 35 by caliber hole installation in position (electromagnetic shaker be contained in internal mold the inside), watering into again, concrete covers curved cover plate 38 as shown in figure 10, in a down-to-earth manner or with bolt binding make topotype and curved slab form a cavity by topotype around the external mold binding with steel wire rope, the vibration internal mold is also with mechanical pressure garden ring 36, and the vibrating compacting pipeline is promptly transferred to internal mold after the pipeline shaping, remove external mold, remaining pipeline crouches on topotype; Again external mold is contained in next section and produces another pipeline.In good time water seasoning, after concrete strength reaches 70%, but just the demoulding transports out of precasting yard.
The method of another kind of horizontal making pipeline is at half garden curved surface or half loudspeaker tubulose topotype top-pour bottom concrete, the pipeline reinforcing bar of welding or colligation shaping is imbedded in the concrete (the plain concrete pipe does not have this procedure), the internal mold of tubulose or loudspeaker tubulose is pierced into (electromagnetic shaker is contained in the internal mold the inside) in the steel reinforcement cage, two garden rings are contained in the internal mold two ends, water internal mold top half garden concrete again, (also can enclose both sides with auxiliary mould, watered concrete roll over again remove), half garden tubular or half loudspeaker tubular external mold are covered, make itself and topotype form a cavity, the vibration internal mold also encircles with mechanical pressure garden, the vibrating compacting pipeline, as shown in figure 11.Pipeline is promptly extracted internal mold after being shaped, and removes external mold, and remaining pipeline crouches on topotype; Produce another pipeline at next section again.In good time water seasoning, after coagulation intensity reaches 70%, but just the demoulding transports out of precasting yard.The internal mold of producing bell-and-spigot pipe also can be combined by head of the trumpet and garden pipe, can be convenient to extract internal mold like this, also is convenient to long line production.
Another kind of method of making pipeline is a steel plate 52 that is welded into tubular is stood on the ground or to crouch on support, tubulose internal mold 51 is put into (electromagnetic shaker is contained in the internal mold the inside) in the tube, insert locator shown in Figure 14, the fixing position of internal mold and steel plate, pour into concrete, extract locator, cover horizontal two skulls of garden ring-shaped pressuring plate 53(), also with mechanical pressure garden ring, the vibrating compacting pipeline as shown in figure 12 for the vibration internal mold; Promptly extract internal mold after pipeline is shaped, water seasoning in good time is when concrete strength reaches the protective layer 54 of doing steel plate 52 after 70% again, as shown in figure 13.
Another kind of method of making bell-and-spigot pipe is that the internal mold 71 of loudspeaker tubular is stood on the steel plate 72 that is inserted in the loudspeaker tubulose on the ground, or the internal mold 71 that the steel plate 72 of loudspeaker tubulose is crouched and pierce into the loudspeaker tubulose on support, (electromagnetic shaker is contained in the internal mold the inside), insert locator shown in Figure 14, fixedly the position of internal mold and steel plate pours into concrete, extract locator, cover horizontal two skulls of garden ring-shaped pressuring plate 73(), also with mechanical pressure garden ring, the vibrating compacting pipeline is as shown in figure 16 for the vibration internal mold; Pipeline is promptly extracted internal mold after being shaped, and water seasoning reaches the protective layer of doing steel plate 72 after 70% again when concrete strength in good time.
But the protective layer rust prevention by applying liquid material of steel plate concrete pipe lacquer or other materials also can be smeared cement mortar, and corrosion resistant plate can not done protective layer again; Pipeline coagulation soil can be made of self-stressing cement, improves the impervious ability of pipeline; At pipe end stirrup is installed, several sections pipelines is connect the electric pole that to form all size again by purposes; Pipeline exerted pressure can adopt the way shown in Figure 1 also can be with electric pushrod or other machinery, vertical making pipeline also can adopt the gravity pressurization; Horizontal making pipeline can be exerted pressure to the garden ring-shaped pressuring plate at two, also can fix the garden ring-shaped pressuring plate of an end and exert pressure at the other end; Swing die can vibrate internal mold also can use other mode of vibrations; To the maintenance of the pipeline natural curing of can watering, also can be topped with coloured film, use solar energy curing, the available again steam press maintenance of steel plate concrete pipeline.The steel plate concrete pipeline can be formed containers such as pond, oil sump again with reinforced concrete floor, can be the combination of prefabricated steel concrete duct and cast-in-situ steel reinforced concrete base plate, can be again that steel plate concrete pipeline and reinforced concrete floor are cast together.

Claims (7)

1, a kind of method of vertical making pipeline is characterized in that: use external mold round internal mold on the ground, pour into concrete and cover annular pressing plate, adhere to inner mould vibration and encircle the vibrating compacting pipeline with mechanical pressure garden with vibrator.
2, a kind of method of horizontal making pipeline is characterized in that: adorn two curved slabs on the arc topotype, two ends link with it with the garden ring, again internal mold are passed through caliber hole installation in position, pour into concrete, adhere to inner mould vibration with vibrator, and pipe vibration is shaped.
3, a kind of method of horizontal making pipeline, it is characterized in that: on the arc topotype, adorn two curved slabs, two ends link with it with the garden ring, again internal mold is passed through caliber hole installation in position, pour into concrete, cover curved panel, bundle sturdy extruded concrete and vibrate internal mold, the vibrating compacting pipeline around curved slab by topotype with steel wire rope.
4, a kind of method of horizontal making pipeline, it is characterized in that: on the arc topotype, adorn two curved slabs, two ends are attached thereto (having a garden ring to slide along curved slab) with the garden ring internal mold are passed through caliber hole installation in position, pour into concrete and cover curved panel, the vibration internal mold is also with mechanical pressure garden ring, vibrating compacting pipeline.
5, a kind of method of horizontal making pipeline, it is characterized in that: at the topotype top-pour bottom concrete of half garden shape or half loudspeaker tubulose, the pipeline reinforcing bar of welding or colligation shaping is imbedded in the concrete (the plain concrete pipeline does not have this procedure), internal mold is pierced in the steel reinforcement cage, two garden rings are contained in the internal mold two ends, water internal mold top half garden concrete again, half garden tubular or half loudspeaker tubulose external mold are covered, the vibration internal mold is also with mechanical pressure garden ring, vibrating compacting pipeline.
6, a kind of method of making pipeline; it is characterized in that: the steel plate that is welded into tubular or loudspeaker tubular is stood on the ground or crouch on support; again internal mold is put in the tube; pour into concrete and cover garden ring-shaped pressuring plate (horizontal two skulls); the vibration internal mold also encircles with mechanical pressure garden; the vibrating compacting pipeline, and then make protective layer (corrosion resistant plate can not done).
7, a kind of method of making electric pole; it is characterized in that: the steel plate that is welded into tubulose is stood on the ground or crouch on support; again internal mold is put in the pipe; pour into concrete and cover garden ring-shaped pressuring plate (horizontal two skulls); the vibration internal mold also encircles with mechanical pressure garden; the vibrating compacting pipeline, and then make protective layer (corrosion resistant plate can not done), by purposes several sections pipeline weldings are got up to form all size electric pole.
CN 91110477 1991-11-06 1991-11-06 Manufacturing method of pipe Pending CN1072129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 91110477 CN1072129A (en) 1991-11-06 1991-11-06 Manufacturing method of pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 91110477 CN1072129A (en) 1991-11-06 1991-11-06 Manufacturing method of pipe

Publications (1)

Publication Number Publication Date
CN1072129A true CN1072129A (en) 1993-05-19

Family

ID=4910117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 91110477 Pending CN1072129A (en) 1991-11-06 1991-11-06 Manufacturing method of pipe

Country Status (1)

Country Link
CN (1) CN1072129A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814462B (en) * 2006-03-02 2010-11-03 姜凤和 Movable two-child support type concrete potted landscape and its making method
CN101892724A (en) * 2010-07-06 2010-11-24 江苏弘盛建设工程集团有限公司 Padding block processor
CN103085168A (en) * 2013-02-05 2013-05-08 北京金盾华通科技有限公司 Technology producing cement pipe with cement pipe manufacturing equipment
CN103144189A (en) * 2013-02-05 2013-06-12 中国建筑科学研究院建筑机械化研究分院 Cement pipe manufacturing device
CN103358396A (en) * 2013-07-31 2013-10-23 黄金良 Cement guiding and leaking pipe and producing method thereof
CN103568116A (en) * 2012-07-31 2014-02-12 江苏邦威机械制造有限公司 Vertical vibrating die for armor pipes
CN103707410A (en) * 2013-12-31 2014-04-09 江苏华光双顺机械制造有限公司 Core mold vibration pipemaking machine vibration rod locking device and installation method thereof
CN106914970A (en) * 2017-03-06 2017-07-04 成都银线电杆有限公司 One kind improves concurrent early strength and exempts from steam protecting method
CN109676752A (en) * 2018-12-04 2019-04-26 叶子鹏 A kind of honeycombed cement tubulation and its manufacture craft
CN112092181A (en) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814462B (en) * 2006-03-02 2010-11-03 姜凤和 Movable two-child support type concrete potted landscape and its making method
CN101892724A (en) * 2010-07-06 2010-11-24 江苏弘盛建设工程集团有限公司 Padding block processor
CN101892724B (en) * 2010-07-06 2012-08-22 江苏弘盛建设工程集团有限公司 Padding block processor
CN103568116A (en) * 2012-07-31 2014-02-12 江苏邦威机械制造有限公司 Vertical vibrating die for armor pipes
CN103085168B (en) * 2013-02-05 2015-04-08 北京金盾华通科技有限公司 Technology producing cement pipe with cement pipe manufacturing equipment
CN103144189A (en) * 2013-02-05 2013-06-12 中国建筑科学研究院建筑机械化研究分院 Cement pipe manufacturing device
CN103085168A (en) * 2013-02-05 2013-05-08 北京金盾华通科技有限公司 Technology producing cement pipe with cement pipe manufacturing equipment
CN103144189B (en) * 2013-02-05 2015-07-29 中国建筑科学研究院建筑机械化研究分院 Pipe of cement manufacturing equipment
CN103358396A (en) * 2013-07-31 2013-10-23 黄金良 Cement guiding and leaking pipe and producing method thereof
CN103358396B (en) * 2013-07-31 2015-08-12 黄金良 Cement is led and is oozed pipe and production method thereof
CN103707410A (en) * 2013-12-31 2014-04-09 江苏华光双顺机械制造有限公司 Core mold vibration pipemaking machine vibration rod locking device and installation method thereof
CN103707410B (en) * 2013-12-31 2016-08-31 江苏华光双顺机械制造有限公司 Core mould vibrating pipe-making machine vibrating head locking device and installation method thereof
CN106914970A (en) * 2017-03-06 2017-07-04 成都银线电杆有限公司 One kind improves concurrent early strength and exempts from steam protecting method
CN109676752A (en) * 2018-12-04 2019-04-26 叶子鹏 A kind of honeycombed cement tubulation and its manufacture craft
CN112092181A (en) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof
CN112092181B (en) * 2020-09-10 2021-05-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof

Similar Documents

Publication Publication Date Title
CN101936002B (en) Prestressed concrete hollow square pile and production method thereof
CN206633177U (en) The direct extrusion and vibration method integrally forming mould of cement prefab
CN1072129A (en) Manufacturing method of pipe
CN210308385U (en) Automatic pouring device for cement precast block
CN108951683A (en) A kind of prefabricated cushion cap of land superposed type and its production and installation method
CN109339089A (en) A kind of rim of a cup isolated footing cup core forming method
CN206174120U (en) Prefabricated constructional column and structure thereof
CN107217790A (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method
CN101914913A (en) Pretensioned prestressed concrete quadrilateral pile and production method thereof
CN108166679A (en) A kind of concrete lintel constructing structure and its construction method
CN201660886U (en) Pretensioning prestressed concrete quadrangular pile
CN111673883A (en) Production line system of prefabricated concrete member
CN212201282U (en) Cast-in-situ large-area reinforced concrete hollowed special-shaped column mold
CN112873527A (en) Manufacturing mold and method for supporting pile
CN109227885B (en) Prefabricated hollow square pile machining system and machining process
CN114434627B (en) Post-tensioning method large tubular pile production process
CN219604686U (en) Hollow steel skeleton prefabricated column with built-in combined metal template
CN112227817A (en) Construction method for casting circular herringbone column of cooling tower in sections
CN106065565B (en) A kind of construction method of prefabricated architectural concrete pier column
CN105507645B (en) Method for manufacturing reinforced concrete large thin shell spherical product by using hemispherical steel die
CN201660889U (en) Hollow prestressed concrete square pile
CN208267093U (en) A precast concrete frame structure
US3180000A (en) Formwork for manufacturing prestressed hollow concrete bodies
CN217325451U (en) A prefabricated base building
CN116180718B (en) Precast pile structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)