[go: up one dir, main page]

CN107191203A - It is a kind of it is adjustable control tunnel surrounding convergent deformation false stull device and apply method - Google Patents

It is a kind of it is adjustable control tunnel surrounding convergent deformation false stull device and apply method Download PDF

Info

Publication number
CN107191203A
CN107191203A CN201710215985.3A CN201710215985A CN107191203A CN 107191203 A CN107191203 A CN 107191203A CN 201710215985 A CN201710215985 A CN 201710215985A CN 107191203 A CN107191203 A CN 107191203A
Authority
CN
China
Prior art keywords
steel
jack
supporting
support
unit box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710215985.3A
Other languages
Chinese (zh)
Other versions
CN107191203B (en
Inventor
邵志远
范春宇
徐松
刘雪冬
李德武
马学宁
刘颜峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
China Railway 22nd Bureau Group Co Ltd
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Original Assignee
Lanzhou Jiaotong University
China Railway 22nd Bureau Group Co Ltd
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University, China Railway 22nd Bureau Group Co Ltd, Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd filed Critical Lanzhou Jiaotong University
Priority to CN201710215985.3A priority Critical patent/CN107191203B/en
Publication of CN107191203A publication Critical patent/CN107191203A/en
Application granted granted Critical
Publication of CN107191203B publication Critical patent/CN107191203B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作方法,包括支撑钢管、工作室、圆柱形千斤顶、楔形顶角、纵向圆钢、管内加固钢板、插销、固定支座、U型支座、脚耳,工作室由上下两部分组成,上面是顶盖,工作室内放置在固定轨道内滑行的圆柱形千斤顶,圆柱形千斤顶用U型支座进行支托以便滑动;工作室两端开孔,开孔尺寸根据支撑钢管尺寸而定;工作室制作成单元箱,每个单元箱通过插销穿过脚耳连接成整体;单元箱内固定支座将支撑圆钢进行支托;由千斤顶对两侧钢管施加预应力,钢管两端支顶隧道钢拱架底脚处,通过楔形顶角钢管与钢拱架接触良好;为控制下沉,在钢拱架上焊接纵向圆钢,使其卡死;支撑钢管内部置有管内加固钢板。

An adjustable temporary cross-bracing device and construction method for controlling the convergence and deformation of the tunnel surrounding rock, including a supporting steel pipe, a working chamber, a cylindrical jack, a wedge-shaped top angle, a longitudinal round steel, a reinforcing steel plate inside the pipe, a bolt, a fixed support, The U-shaped support, the lugs, and the studio are composed of upper and lower parts, the upper part is the top cover, and the cylindrical jack sliding in the fixed track is placed in the studio, and the cylindrical jack is supported by the U-shaped support for sliding; the studio Holes are opened at both ends, and the size of the opening is determined according to the size of the supporting steel pipe; the studio is made into a unit box, and each unit box is connected as a whole through the pin through the lug; the fixed support in the unit box supports the supporting round steel; The steel pipes on both sides are prestressed by the jack, and the two ends of the steel pipes support the foot of the tunnel steel arch frame, and the wedge-shaped top angle steel pipes are in good contact with the steel arch frame; in order to control the subsidence, longitudinal round steel is welded on the steel arch frame, Make it stuck; there is a reinforced steel plate inside the supporting steel pipe.

Description

一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作 方法An adjustable temporary cross-bracing device for controlling the convergent deformation of the surrounding rock of the tunnel and its construction method

技术领域technical field

本发明涉及一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作方法,特别适用于软岩大变形隧道的收敛变形控制。The invention relates to an adjustable temporary cross-brace device and construction method for controlling the convergent deformation of the surrounding rock of the tunnel, and is especially suitable for the convergent deformation control of the large-deformed soft rock tunnel.

背景技术Background technique

随着我国在交通建设领域的飞速发展,出现了大量的铁路、公路隧道,同时一些高难度、高围压等级的隧道也越来越多的出现在隧道建设中,施工中的变形控制显得尤为重要。针对收敛变形控制,目前隧道施工中用到较多的工法是三台阶临时仰拱法。现有临时仰拱的结构,是在隧道台阶形成后,在台阶上按照一定的间距做弧形钢架,对隧道初期支护钢架底脚形成支撑,同时喷射混凝土进行封闭,这种结构对侧向收敛起支顶作用,同时增加底部的受力面积,使控制收敛有很好的效果。但是由于隧道施工要求快循环快封闭,而采用临时仰拱法由于无法使用机械设备快速施工,并且拆除过程比较繁琐,施工后无法实现快速转换,拆除后的钢材部分报废无法继续使用,这就使得对其进一步改进成为必要。With the rapid development of our country in the field of transportation construction, a large number of railway and highway tunnels have appeared. At the same time, more and more tunnels with high difficulty and high confining pressure have appeared in tunnel construction. The deformation control in construction is particularly important. important. For the control of convergent deformation, the three-step temporary inverted arch method is currently used more frequently in tunnel construction. The structure of the existing temporary inverted arch is to build arc-shaped steel frames on the steps according to a certain distance after the tunnel steps are formed, to support the foot of the steel frame for the initial support of the tunnel, and to seal it with shotcrete at the same time. The lateral convergence plays the role of supporting the top, and at the same time increases the stress area of the bottom, so that the control convergence has a good effect. However, because the tunnel construction requires fast circulation and fast closure, the temporary inverted arch method cannot be used for rapid construction with mechanical equipment, and the demolition process is relatively cumbersome. After construction, it is impossible to achieve fast conversion, and the steel after demolition is partially scrapped and cannot be used. This makes It is necessary to further improve it.

发明内容Contents of the invention

为了解决上述背景技术中的不足之处,提供一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作方法,可以有效的替代临时仰拱控制收敛变形,提高施工速度,节约材料。In order to solve the deficiencies in the above-mentioned background technology, an adjustable temporary brace device and construction method for controlling the convergence deformation of the surrounding rock of the tunnel are provided, which can effectively replace the temporary inverted arch to control the convergence deformation, increase the construction speed, and save materials .

实现本发明而采用的技术方案为:The technical scheme adopted to realize the present invention is:

一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作方法,包括支撑钢管(1)、工作室(2)、圆柱形千斤顶(3)、楔形顶角(4)、纵向圆钢(5)、管内加固钢板(6)、插销(7)、固定支座(8)、U型支座(9)、脚耳(10),其特征在于:工作室(2)由上下两部分组成,上面是顶盖,工作室(2)内放置在固定轨道内滑行的圆柱形千斤顶(3),圆柱形千斤顶(3)用U型支座(9)进行支托,千斤顶可以沿轨道平行于工作室(2)进行滑动;工作室两端开孔,开孔尺寸根据支撑钢管(1)尺寸而定;工作室制作成单元箱,每个单元箱通过插销(7)穿过脚耳(10)连接成整体,拆卸方便;单元箱内固定支座(8)将支撑圆钢(1)进行支托;由千斤顶对两侧钢管施加预应力,钢管两端支顶隧道钢拱架底脚处,通过楔形顶角(4)使钢管与钢拱架接触良好;为控制下沉,在钢拱架上焊接纵向圆钢(5),使其卡死;支撑钢管(1)内部置有管内加固钢板(6),保证其具有一定的刚度。An adjustable temporary brace device and construction method for controlling the convergent deformation of the surrounding rock of the tunnel, including a supporting steel pipe (1), a working chamber (2), a cylindrical jack (3), a wedge-shaped top angle (4), a longitudinal circle steel (5), reinforced steel plate (6), latch (7), fixed support (8), U-shaped support (9), lugs (10), it is characterized in that: the studio (2) consists of two upper and lower The upper part is the top cover, and the cylindrical jack (3) sliding in the fixed track is placed in the working room (2). The cylindrical jack (3) is supported by a U-shaped support (9), and the jack can move along the track Sliding parallel to the working room (2); holes are opened at both ends of the working room, and the size of the opening is determined according to the size of the supporting steel pipe (1); the working room is made into a unit box, and each unit box passes through the lug through the pin (7) (10) Connected into a whole, easy to disassemble; the fixed support (8) in the unit box supports the supporting round steel (1); the jack applies prestress to the steel pipes on both sides, and the two ends of the steel pipe support the bottom of the tunnel steel arch At the foot, the steel pipe is in good contact with the steel arch frame through the wedge-shaped top angle (4); in order to control the sinking, a longitudinal round steel (5) is welded on the steel arch frame to make it stuck; the supporting steel pipe (1) is equipped with The steel plate (6) is reinforced inside the tube to ensure that it has a certain rigidity.

与现有临时横撑相比,本临时横撑具有的优点和效果如下:Compared with the existing temporary braces, the advantages and effects of the temporary braces are as follows:

1.本发明易于拆装,快速循环,可以提高施工进度。1. The invention is easy to assemble and disassemble, and can be circulated quickly, which can improve the construction progress.

2.本发明具有良好的整体性,通过逐级加压和受力传递,将预应力施加在初期支护和围岩上,达到可调控横撑压力、控制隧道围岩收敛变形的效果。2. The invention has good integrity, applies prestress to the initial support and surrounding rock through step-by-step pressurization and force transfer, and achieves the effect of adjusting the pressure of the cross brace and controlling the convergent deformation of the surrounding rock of the tunnel.

3.本发明更加经济合理,取代现有结构中用后拆除,不能够循环使用的现象,不仅降低了工程造价,而且节省了施工的时间。3. The invention is more economical and reasonable, replaces the phenomenon that the existing structure cannot be recycled after being dismantled after use, not only reduces the engineering cost, but also saves construction time.

附图说明Description of drawings

图1本发明调节前立面图;Fig. 1 adjusts the front elevation of the present invention;

图2本发明调节后立面图;Fig. 2 elevation view after adjustment of the present invention;

图3本发明控制室内部的结构示意图;Fig. 3 is the structural representation inside the control room of the present invention;

图4 图2A-A断面剖视图Fig. 4 Fig. 2A-A section view

具体实施方式detailed description

一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作方法,包括支撑钢管(1)、工作室(2)、圆柱形千斤顶(3)、楔形顶角(4)、纵向圆钢(5)、管内加固钢板(6)、螺栓(7)、固定支座(8)、U型支座(9)、脚耳(10),其特征在于:工作室(2)由上下两部分组成,上面是顶盖,工作室(2)内放置在固定轨道内滑行的圆柱形千斤顶(3),圆柱形千斤顶(3)用U型支座(9)进行支托,千斤顶可以沿轨道平行于工作室(2)进行滑动;工作室两端开孔,开孔尺寸根据支撑钢管(1)尺寸而定;工作室制作成单元箱,每个单元箱通过螺栓(7)穿过脚耳(10)连接成整体,拆卸方便;单元箱内固定支座(8)将支撑圆钢(1)进行支托;由千斤顶对两侧钢管施加预应力,钢管两端支顶隧道钢拱架底脚处,通过楔形顶角(4)使钢管与钢拱架接触良好;为控制下沉,在钢拱架上焊接纵向圆钢(5),使其卡死;支撑钢管(1)内部置有管内加固钢板(6),保证其具有一定的刚度。An adjustable temporary brace device and construction method for controlling the convergent deformation of the surrounding rock of the tunnel, including a supporting steel pipe (1), a working chamber (2), a cylindrical jack (3), a wedge-shaped top angle (4), a longitudinal circle steel (5), reinforced steel plate (6), bolt (7), fixed support (8), U-shaped support (9), lug (10), it is characterized in that: working room (2) consists of upper and lower two The upper part is the top cover, and the cylindrical jack (3) sliding in the fixed track is placed in the working room (2). The cylindrical jack (3) is supported by a U-shaped support (9), and the jack can move along the track Sliding parallel to the working room (2); holes are opened at both ends of the working room, and the size of the opening is determined according to the size of the supporting steel pipe (1); the working room is made into a unit box, and each unit box passes through the lugs through bolts (7) (10) Connected into a whole, easy to disassemble; the fixed support (8) in the unit box supports the supporting round steel (1); the jack applies prestress to the steel pipes on both sides, and the two ends of the steel pipe support the bottom of the tunnel steel arch At the foot, the steel pipe is in good contact with the steel arch frame through the wedge-shaped top angle (4); in order to control the sinking, a longitudinal round steel (5) is welded on the steel arch frame to make it stuck; the supporting steel pipe (1) is equipped with The steel plate (6) is reinforced inside the tube to ensure that it has a certain rigidity.

工作原理:工作室制作成单元箱,每个单元箱通过螺栓连接成整体,拆卸方便;通过工作室,将千斤顶、支顶钢管良好的结合成整体;通过千斤顶加压,使钢管两端支顶隧道钢拱架底脚处;通过楔形顶角使钢管与钢拱架接触良好;为控制下沉,在钢拱架上焊接纵向圆钢,将钢管卡死;通过调节千斤顶压力的大小来控制隧道围岩的收敛变形。Working principle: the studio is made into a unit box, and each unit box is connected as a whole by bolts, which is easy to disassemble; through the studio, the jack and the supporting steel pipe are well combined into a whole; pressurized by the jack, so that both ends of the steel pipe are supported At the foot of the steel arch of the tunnel; through the wedge-shaped top angle, the steel pipe is in good contact with the steel arch; in order to control the subsidence, a longitudinal round steel is welded on the steel arch to lock the steel pipe; the tunnel is controlled by adjusting the pressure of the jack Convergent deformation of surrounding rock.

Claims (1)

1.一种可调节式控制隧道围岩收敛变形的临时横撑装置及施作方法,包括支撑钢管(1)、工作室(2)、圆柱形千斤顶(3)、楔形顶角(4)、纵向圆钢(5)、管内加固钢板(6)、插销(7)、固定支座(8)、U型支座(9)、脚耳(10),其特征在于:工作室(2)由上下两部分组成,上面是顶盖,工作室(2)内放置在固定轨道内滑行的圆柱形千斤顶(3),圆柱形千斤顶(3)用U型支座(9)进行支托,千斤顶可以沿轨道平行于工作室(2)进行滑动;工作室两端开孔,开孔尺寸根据支撑钢管(1)尺寸而定;工作室制作成单元箱,每个单元箱通过插销(7)穿过脚耳(10)连接成整体,拆卸方便;单元箱内固定支座(8)将支撑圆钢(1)进行支托;由千斤顶对两侧钢管施加预应力,钢管两端支顶隧道钢拱架底脚处,通过楔形顶角(4)使钢管与钢拱架接触良好;为控制下沉,在钢拱架上焊接纵向圆钢(5),使其卡死;支撑钢管(1)内部置有管内加固钢板(6),保证其具有一定的刚度。1. An adjustable temporary cross bracing device and construction method for controlling the convergence and deformation of tunnel surrounding rock, including supporting steel pipes (1), working chambers (2), cylindrical jacks (3), wedge-shaped top angles (4), Longitudinal round steel (5), reinforced steel plate (6), bolt (7), fixed support (8), U-shaped support (9), lugs (10), characterized in that: the studio (2) consists of It consists of upper and lower parts, the upper part is the top cover, and the cylindrical jack (3) is placed in the working room (2) and slides in the fixed track. The cylindrical jack (3) is supported by the U-shaped support (9). The jack can Slide along the track parallel to the working room (2); holes are opened at both ends of the working room, and the size of the opening is determined according to the size of the supporting steel pipe (1); the working room is made into a unit box, and each unit box passes through the bolt (7) The lugs (10) are connected as a whole, which is easy to disassemble; the fixed support (8) in the unit box supports the supporting round steel (1); the jack applies prestress to the steel pipes on both sides, and the two ends of the steel pipe support the tunnel steel arch At the foot of the frame, the steel pipe is in good contact with the steel arch through the wedge-shaped top angle (4); in order to control the subsidence, a longitudinal round steel (5) is welded on the steel arch to make it stuck; the inside of the supporting steel pipe (1) A reinforced steel plate (6) is provided in the pipe to ensure that it has a certain rigidity.
CN201710215985.3A 2017-04-05 2017-04-05 An adjustable temporary horizontal bracing device for controlling the convergence and deformation of tunnel surrounding rock and its construction method Active CN107191203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710215985.3A CN107191203B (en) 2017-04-05 2017-04-05 An adjustable temporary horizontal bracing device for controlling the convergence and deformation of tunnel surrounding rock and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710215985.3A CN107191203B (en) 2017-04-05 2017-04-05 An adjustable temporary horizontal bracing device for controlling the convergence and deformation of tunnel surrounding rock and its construction method

Publications (2)

Publication Number Publication Date
CN107191203A true CN107191203A (en) 2017-09-22
CN107191203B CN107191203B (en) 2023-11-28

Family

ID=59871409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710215985.3A Active CN107191203B (en) 2017-04-05 2017-04-05 An adjustable temporary horizontal bracing device for controlling the convergence and deformation of tunnel surrounding rock and its construction method

Country Status (1)

Country Link
CN (1) CN107191203B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956492A (en) * 2017-12-22 2018-04-24 同济大学 Fractured zones mountain tunnel steel arch-shelf supporting apparatus
CN110259483A (en) * 2019-07-17 2019-09-20 中铁上海工程局集团华海工程有限公司 The adjustable interim inverted arch steelframe installation structure of one kind and construction method
CN110630296A (en) * 2019-09-27 2019-12-31 中铁四局集团有限公司 A recyclable length-adjustable temporary tunnel brace and its use method
CN111441802A (en) * 2020-04-17 2020-07-24 济南城建集团有限公司 Temporary inverted arch dismantling and replacing structure and technology in a CRD method construction tunnel

Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1111715A (en) * 1964-09-18 1968-05-01 Coal Industry Patents Ltd Mine roof supports
DE2708719A1 (en) * 1977-03-01 1978-09-07 Bochumer Eisen Heintzmann Mine support with overlapping channel clamp - has hydraulic cylinder between two brackets, one with locating finger
CN86201711U (en) * 1986-03-22 1987-06-10 湖南省公路管理局 Self-aligning shifting bearings for horizontal jack
GB8908967D0 (en) * 1988-04-22 1989-06-07 Linsingen Heintzmann Von A method of safeguarding the face throughway in underground mine workings and a roadway support arch adapted for the method
JPH06294295A (en) * 1993-04-08 1994-10-21 Ishikawajima Constr Materials Co Ltd Structure for connecting segment to tie rod
JPH10184286A (en) * 1996-12-25 1998-07-14 Konoike Constr Ltd Side pressure support device for concrete lining formwork
KR19980046123U (en) * 1996-12-27 1998-09-25 박병재 Jack device for car lift
JPH10280894A (en) * 1997-04-07 1998-10-20 Mitsubishi Heavy Ind Ltd Cylindrical holding device
RU22185U1 (en) * 2000-11-01 2002-03-10 ЗАО "Метрокон" DEVICE FOR CONSTRUCTING THE MIDDLE TUNNEL OF A COLUMN STATION OF A DEEP LOADING IN A SUSTAINABLE SOIL BY THE METHOD OF AN EXCEPT MOUNT
CN1785792A (en) * 2005-11-25 2006-06-14 广州广船国际股份有限公司 Method and device for moving heavy object
KR20080018666A (en) * 2006-08-25 2008-02-28 송관권 Reinforcement assembly for underground structure steel pipe
JP2010101023A (en) * 2008-10-21 2010-05-06 Ohbayashi Corp Method and structure for reinforcing segment
KR101013450B1 (en) * 2010-11-11 2011-02-14 (주)유경기술단 Forming device for underground concrete structure with dome part integrated on top of vertical tunnel and construction method using same
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 Reinforcement structure for conveying steel lining formwork for tunnel
CN102699594A (en) * 2012-05-16 2012-10-03 李莉 Welding fixture of lifting jack U-shaped support
CN202707093U (en) * 2012-08-21 2013-01-30 龙建路桥股份有限公司 Temporary support system for tunnel construction
CN203080571U (en) * 2013-02-01 2013-07-24 中联重科股份有限公司渭南分公司 Scraper knife lifting oil cylinder supporting device and bulldozer with same
CN103470279A (en) * 2013-09-15 2013-12-25 湘潭大学 U-shaped steel bracket capable of actively controlling deformation of surrounding rocks
CN203603193U (en) * 2013-12-16 2014-05-21 山推工程机械股份有限公司 Connecting device for lifting oil cylinder of bulldozer
CN104249976A (en) * 2014-09-15 2014-12-31 太仓市金达机械厂 Novel cross beam levelness regulating device
US20150086272A1 (en) * 2012-04-26 2015-03-26 Xinbin Li Self-moving tunnel support canopy
CN204492852U (en) * 2015-01-27 2015-07-22 中交三公局第一工程有限公司 A kind of tunnel excavation temporary support system
KR20160000792A (en) * 2014-06-25 2016-01-05 주식회사 포스코건설 Natm tunnel structure and construction method thereof
CN105269673A (en) * 2015-10-10 2016-01-27 无为县华标新型墙体材料有限公司 Oil cylinder support for brick making machine
US20160032667A1 (en) * 2014-07-30 2016-02-04 1440072 Alberta Ltd. Horseshoe jack for drilling, work-overs and completions
CN105806714A (en) * 2016-05-23 2016-07-27 安徽理工大学 Tunnel lining supporting structure indoor model test method
CN105909268A (en) * 2016-06-29 2016-08-31 黄竟强 Pre-stress combined well/tunnel module structure construction method and module structure
CN205713124U (en) * 2016-04-22 2016-11-23 河南森源重工有限公司 The main pump of a kind of concrete mixer send cylinder supporting device

Patent Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1111715A (en) * 1964-09-18 1968-05-01 Coal Industry Patents Ltd Mine roof supports
DE2708719A1 (en) * 1977-03-01 1978-09-07 Bochumer Eisen Heintzmann Mine support with overlapping channel clamp - has hydraulic cylinder between two brackets, one with locating finger
CN86201711U (en) * 1986-03-22 1987-06-10 湖南省公路管理局 Self-aligning shifting bearings for horizontal jack
GB8908967D0 (en) * 1988-04-22 1989-06-07 Linsingen Heintzmann Von A method of safeguarding the face throughway in underground mine workings and a roadway support arch adapted for the method
JPH06294295A (en) * 1993-04-08 1994-10-21 Ishikawajima Constr Materials Co Ltd Structure for connecting segment to tie rod
JPH10184286A (en) * 1996-12-25 1998-07-14 Konoike Constr Ltd Side pressure support device for concrete lining formwork
KR19980046123U (en) * 1996-12-27 1998-09-25 박병재 Jack device for car lift
JPH10280894A (en) * 1997-04-07 1998-10-20 Mitsubishi Heavy Ind Ltd Cylindrical holding device
RU22185U1 (en) * 2000-11-01 2002-03-10 ЗАО "Метрокон" DEVICE FOR CONSTRUCTING THE MIDDLE TUNNEL OF A COLUMN STATION OF A DEEP LOADING IN A SUSTAINABLE SOIL BY THE METHOD OF AN EXCEPT MOUNT
CN1785792A (en) * 2005-11-25 2006-06-14 广州广船国际股份有限公司 Method and device for moving heavy object
KR20080018666A (en) * 2006-08-25 2008-02-28 송관권 Reinforcement assembly for underground structure steel pipe
JP2010101023A (en) * 2008-10-21 2010-05-06 Ohbayashi Corp Method and structure for reinforcing segment
KR101013450B1 (en) * 2010-11-11 2011-02-14 (주)유경기술단 Forming device for underground concrete structure with dome part integrated on top of vertical tunnel and construction method using same
KR101056249B1 (en) * 2011-03-07 2011-08-11 양현기 Reinforcement structure for conveying steel lining formwork for tunnel
US20150086272A1 (en) * 2012-04-26 2015-03-26 Xinbin Li Self-moving tunnel support canopy
CN102699594A (en) * 2012-05-16 2012-10-03 李莉 Welding fixture of lifting jack U-shaped support
CN202707093U (en) * 2012-08-21 2013-01-30 龙建路桥股份有限公司 Temporary support system for tunnel construction
CN203080571U (en) * 2013-02-01 2013-07-24 中联重科股份有限公司渭南分公司 Scraper knife lifting oil cylinder supporting device and bulldozer with same
CN103470279A (en) * 2013-09-15 2013-12-25 湘潭大学 U-shaped steel bracket capable of actively controlling deformation of surrounding rocks
CN203603193U (en) * 2013-12-16 2014-05-21 山推工程机械股份有限公司 Connecting device for lifting oil cylinder of bulldozer
KR20160000792A (en) * 2014-06-25 2016-01-05 주식회사 포스코건설 Natm tunnel structure and construction method thereof
US20160032667A1 (en) * 2014-07-30 2016-02-04 1440072 Alberta Ltd. Horseshoe jack for drilling, work-overs and completions
CN104249976A (en) * 2014-09-15 2014-12-31 太仓市金达机械厂 Novel cross beam levelness regulating device
CN204492852U (en) * 2015-01-27 2015-07-22 中交三公局第一工程有限公司 A kind of tunnel excavation temporary support system
CN105269673A (en) * 2015-10-10 2016-01-27 无为县华标新型墙体材料有限公司 Oil cylinder support for brick making machine
CN205713124U (en) * 2016-04-22 2016-11-23 河南森源重工有限公司 The main pump of a kind of concrete mixer send cylinder supporting device
CN105806714A (en) * 2016-05-23 2016-07-27 安徽理工大学 Tunnel lining supporting structure indoor model test method
CN105909268A (en) * 2016-06-29 2016-08-31 黄竟强 Pre-stress combined well/tunnel module structure construction method and module structure

Non-Patent Citations (11)

* Cited by examiner, † Cited by third party
Title
何坤水: "隧道明挖基坑工程钢支撑施工技术探讨", 《门窗》 *
何坤水: "隧道明挖基坑工程钢支撑施工技术探讨", 《门窗》, no. 07, 20 July 2013 (2013-07-20), pages 1 - 2 *
徐松;: "牡绥铁路兴源隧道软岩大变形控制技术", 隧道建设, no. 08, pages 116 - 122 *
李伟平: "公路隧道穿越软弱围岩的变形与控制方法", 《现代隧道技术》 *
李伟平: "公路隧道穿越软弱围岩的变形与控制方法", 《现代隧道技术》, no. 02, 15 April 2009 (2009-04-15), pages 1 - 6 *
潘春阳;严松宏;梁孝;: "黄土地层大跨区间隧道新奥法施工格栅拱架受力分析", 铁道建筑, no. 02, pages 65 - 68 *
王东妹: "甬江水底隧道明挖段横撑加固技术", 《安徽建筑》 *
王东妹: "甬江水底隧道明挖段横撑加固技术", 《安徽建筑》, no. 02, 20 April 2009 (2009-04-20), pages 1 - 2 *
王东妹: "甬江水底隧道明挖段横撑加固技术", 安徽建筑, vol. 16, no. 2, pages 113 - 114 *
王政坛: "小直径锚索在高地应力大变形隧道施工中的应用", 隧道建设, no. 03, pages 45 - 48 *
王维富;: "炭质板岩地层隧道施工要点及大变形防治措施", 隧道建设, no. 06, pages 83 - 86 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956492A (en) * 2017-12-22 2018-04-24 同济大学 Fractured zones mountain tunnel steel arch-shelf supporting apparatus
CN107956492B (en) * 2017-12-22 2023-09-22 同济大学 Temporary support device for steel arch frame in mountain tunnel in fractured fracture zone
CN110259483A (en) * 2019-07-17 2019-09-20 中铁上海工程局集团华海工程有限公司 The adjustable interim inverted arch steelframe installation structure of one kind and construction method
CN110630296A (en) * 2019-09-27 2019-12-31 中铁四局集团有限公司 A recyclable length-adjustable temporary tunnel brace and its use method
CN111441802A (en) * 2020-04-17 2020-07-24 济南城建集团有限公司 Temporary inverted arch dismantling and replacing structure and technology in a CRD method construction tunnel

Also Published As

Publication number Publication date
CN107191203B (en) 2023-11-28

Similar Documents

Publication Publication Date Title
CN104234723B (en) A kind of open trench tunnel square-section self-propelled mobile falsework chassis
CN104047614B (en) A method of replacement and support for strongly expansive muddy soft rock roadway
CN107191203A (en) It is a kind of it is adjustable control tunnel surrounding convergent deformation false stull device and apply method
WO2018050079A1 (en) Device and method for testing fractured rock mass collapse chipping and fracture water bursting
CN106089258A (en) Tunnel device and construction method
CN104575238B (en) TBM supports stretcher for boot and shoe tight country rock Experimental Simulating Methods device
CN103018105B (en) Simulation experiment platform of compacting system of solid-filling coal mining solid material
CN204959771U (en) Prestressing force H shaped steel bearing structure
CN108442946B (en) Tunnel secondary lining vault and side wall sealing maintenance device and method
CN111809660A (en) Rectangular trolley for integrated pipe gallery and construction method
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN207161110U (en) Self-walking type moving trolley for tunnel roof with horseshoe-shaped cross section in construction open excavation
CN207122313U (en) Constructing middle partition wall in tunnel template and its constructing device
CN106968687B (en) Closed ring yielding support device and support method for steeply inclined coal seam mining roadway
CN206486912U (en) Precast concrete component settlement adjusting device
CN204140091U (en) A kind of multiple pressure roadway support device that allows
CN110847240A (en) Inspection well in roadway and construction method
CN211038645U (en) A steel sleeve device for assisting the initiation of shield machine
CN110307013A (en) A Biased Tunnel Arch and Biased Tunnel Arch Overhead Structure
CN204299587U (en) The automatic sliding form apparatus of a kind of mine laneway
CN204557918U (en) A kind of TBM supports stretcher for boot and shoe tight country rock Experimental Simulating Methods device
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
WO2021120832A1 (en) Portal-free lining formwork trolley device for concrete construction of tunnel
CN116380512B (en) Wall body fixing device and method for indoor shield cutting underground continuous wall experiment
CN202012083U (en) Inclined-plane movable end of steel support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 113 West Street, Nangang District, Harbin City, Heilongjiang Province, 150001

Applicant after: CHINA RAILWAY 22ND CONSTRUCTION BUREAU 1ST ENGINEERING Co.,Ltd.

Applicant after: China Railway 22nd Bureau Group Co.,ltd.

Applicant after: Lanzhou Jiaotong University

Address before: No. 113 West Street, Nangang District, Harbin City, Heilongjiang Province, 150001

Applicant before: HARBIN RAILWAY CONSTRUCTION GROUP CO.,LTD. OF CHINA RAILWAY 22ND CONSTRUCTION BUREAU CO.,LTD.

Applicant before: China Railway 22nd Bureau Group Co.,ltd.

Applicant before: Lanzhou Jiaotong University

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant