CN107169747A - A kind of management system of various engineering of civil construction - Google Patents
A kind of management system of various engineering of civil construction Download PDFInfo
- Publication number
- CN107169747A CN107169747A CN201710462127.9A CN201710462127A CN107169747A CN 107169747 A CN107169747 A CN 107169747A CN 201710462127 A CN201710462127 A CN 201710462127A CN 107169747 A CN107169747 A CN 107169747A
- Authority
- CN
- China
- Prior art keywords
- construction
- module
- workers
- building
- budget
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Accounting & Taxation (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Finance (AREA)
- Biodiversity & Conservation Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Technology Law (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种土木建筑各项工程的管理系统,涉及建筑工程管理领域。该系统包括:建筑材料预估模块,用于估算各类型建筑材料所需量;建筑材料预算模块,用于获取所需建筑材料的总价格范围;工人预估模块,用于估算建筑所需各工种的工人数量;工人预算模块,用于获取所需工人的总价格范围;建筑预算模块,用于获取建筑总预算;施工工期监管模块,用于将阶段实际施工量和阶段预计施工量对比;施工安全监管模块,用于实时监控建筑建设情况和工人工作情况;施工质量监管模块,用于对已施工建筑进行质量监测。本发明通对建筑材料管理、建筑工人管理、建筑安全管理和建筑施工管理实行一体化协调管理,增加了本发明管理系统的功能,提高了管理效果。
The invention discloses a management system for various civil construction projects, and relates to the field of construction project management. The system includes: a construction material estimation module, used to estimate the required amount of various types of construction materials; a construction material budget module, used to obtain the total price range of required construction materials; The number of workers in the type of work; the worker budget module is used to obtain the total price range of required workers; the construction budget module is used to obtain the total construction budget; the construction period supervision module is used to compare the actual construction volume of the stage with the estimated construction quantity of the stage; The construction safety supervision module is used for real-time monitoring of building construction and workers' working conditions; the construction quality supervision module is used for quality monitoring of constructed buildings. The present invention implements integrated coordinated management of building material management, construction worker management, building safety management and building construction management, increases the functions of the management system of the present invention, and improves the management effect.
Description
技术领域technical field
本发明涉及建筑工程管理领域,更具体的涉及一种土木建筑各项工程的管理系统。The invention relates to the field of construction engineering management, and more specifically to a management system for various civil engineering projects.
背景技术Background technique
土木建筑工程指通过对各类房屋建筑及其附属设施的建造和与其配套的线路、管道、设备的安装活动所形成的工程实体。随着经济的发展,我国国内的土木建筑工程正在不断的建设。土木建筑工程各项作业中,由监督者依据经验,在综合考虑作业量及工期的基础上规划作业工程,需要花费大量时间及劳务,且易导致安排上的疏漏及延误作业展开。同时,还容易造成作业质量欠稳定,降低工程信用度。Civil construction engineering refers to engineering entities formed through the construction of various housing buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. With the development of economy, my country's domestic civil engineering is constantly under construction. In various civil and construction projects, the supervisor plans the project based on his experience and comprehensively considers the workload and construction period, which takes a lot of time and labor, and easily leads to omissions in the arrangement and delays in the start of the work. At the same time, it is easy to cause unstable operation quality and reduce project credit.
目前,通过智能化的土木建筑工程管理系统可以快速、方便、准确的管理土木建筑工程中的事项,但是现有的管理系统往往仅管理土木建筑工程中的一个事项,不能综合管理多个事项,其管理系统功能单一,管理效果不佳。At present, through the intelligent civil engineering management system, the items in the civil engineering can be managed quickly, conveniently and accurately, but the existing management system often only manages one item in the civil engineering, and cannot comprehensively manage multiple items. The function of its management system is single, and the management effect is not good.
综上所述,现有技术中的土木建筑工程管理系统,存在管理系统功能单一,管理效果不佳的问题。To sum up, the civil engineering management system in the prior art has the problem of single function of the management system and poor management effect.
发明内容Contents of the invention
本发明实施例提供一种土木建筑各项工程的管理系统,用以解决现有技术中存在管理系统功能单一,管理效果不佳的问题。An embodiment of the present invention provides a management system for various civil engineering projects, which is used to solve the problems in the prior art that the management system has single functions and poor management effects.
本发明实施例提供一种土木建筑各项工程的管理系统,包括:An embodiment of the present invention provides a management system for various civil engineering projects, including:
数据获取模块,用于获取建筑模型信息;The data acquisition module is used to acquire building model information;
建筑材料预估模块,用于根据建筑模型信息,估算各类型建筑材料所需量,并按照建筑材料类型将所需建筑材料类型和所需建筑材料类型对应的所需量存储至云端数据库;The building material estimation module is used to estimate the required amount of various types of building materials according to the building model information, and store the required building material type and the required amount corresponding to the required building material type in the cloud database according to the building material type;
建筑材料预算模块,用于根据所需建筑材料类型和所需建筑材料类型对应的所需量,结合各所需建筑材料的市场价格范围,获取所需建筑材料的总价格范围;The building material budget module is used to obtain the total price range of the required building materials according to the required building material type and the required amount corresponding to the required building material type, combined with the market price range of each required building material;
工人预估模块,用于根据建筑模型信息,结合建筑总工期,估算建筑所需各工种的工人数量,并按照工种将所需工人工人和所需工人工种对应的数量存储至云端数据库;The worker estimation module is used to estimate the number of workers required for each type of work based on the building model information, combined with the total construction period, and store the required workers and the corresponding number of required workers in the cloud database according to the type of work;
工人预算模块,用于根据各工种的工人数量,结合各工种工人的市场价格范围,获取所需工人的总价格范围;The worker budget module is used to obtain the total price range of required workers according to the number of workers of each type of work, combined with the market price range of workers of each type of work;
建筑预算模块,用于根据所需建筑材料的总价格范围和所需工人的总价格范围,获取建筑总预算;如果建筑总预算超出预设预算范围,则调整建筑材料种类或工人数量或建筑总工期,使建筑总预算在预设预算范围内;如果建筑总预算在预设预算范围内,正常施工;The construction budget module is used to obtain the total construction budget according to the total price range of the required construction materials and the total price range of the required workers; if the total construction budget exceeds the preset budget range, adjust the type of construction materials or the number of workers or the total construction cost Construction period, so that the total construction budget is within the preset budget range; if the total construction budget is within the preset budget range, normal construction;
施工工期监管模块,用于将阶段实际施工量和阶段预计施工量对比,如果阶段实际施工量小于阶段预计施工量,则分析原因;如果阶段实际施工量大于或等于阶段预计施工量,则正常施工;The construction period supervision module is used to compare the actual construction amount of the stage with the estimated construction amount of the stage. If the actual construction amount of the stage is less than the estimated construction amount of the stage, analyze the reason; if the actual construction amount of the stage is greater than or equal to the estimated construction amount of the stage, then normal construction ;
施工安全监管模块,用于通过设置于建筑工地不同位置处的摄像头实时监控建筑建设情况和工人工作情况;用于根据建筑建设情况和工人工作情况,预测施工安全情况;The construction safety supervision module is used for real-time monitoring of building construction and workers' working conditions through cameras installed at different locations on the construction site; it is used to predict construction safety conditions according to building construction conditions and workers' working conditions;
施工质量监管模块,用于通过质量检测模块对已施工建筑进行质量监测;如果质量检测不合格,则重新施工;如果质量检测合格,则正常施工;The construction quality supervision module is used to monitor the quality of the constructed building through the quality inspection module; if the quality inspection fails, the construction will be restarted; if the quality inspection is qualified, the construction will be normal;
工资结算模块,用于根据不同工种工人的工作时间、工作量和绩效成绩,计算工人的工资,并通过转账模块对工人的工资明细进行打印;The wage settlement module is used to calculate the wages of workers according to the working hours, workload and performance achievements of different types of workers, and print the wage details of workers through the transfer module;
数据处理模块,用于协调上述模块工作。The data processing module is used to coordinate the work of the above modules.
较佳地,所述建筑模型信息包括:建筑尺寸结构信息和所需建筑材料名称和要求。Preferably, the building model information includes: building size and structure information, names and requirements of required building materials.
较佳地,本发明实施例提供一种土木建筑各项工程的管理系统,还包括,实际施工量获取模块,通过实际测量或估测获取所述实际施工量信息。Preferably, an embodiment of the present invention provides a management system for various civil engineering projects, which further includes an actual construction quantity acquisition module, which acquires the actual construction quantity information through actual measurement or estimation.
较佳地,本发明实施例提供一种土木建筑各项工程的管理系统,还包括,建筑预算打印模块,用于对各类型所需建筑材料名称和价格,各工种所需工人数量和价格,以及建筑总预算进行打印。Preferably, the embodiment of the present invention provides a management system for various projects of civil engineering, which also includes a construction budget printing module, which is used to list the names and prices of various types of required building materials, the number and prices of workers required for each type of work, And the total construction budget for printing.
较佳地,所述云端数据库,还用于存储建筑项目信息、建筑公司基本信息和工人基本信息。Preferably, the cloud database is also used to store construction project information, construction company basic information and worker basic information.
较佳地,所述质量检测模块,包括:建筑材料材质检测模块和建筑结构检测模块。Preferably, the quality detection module includes: a building material material detection module and a building structure detection module.
较佳地,所述数据处理模块采用微处理器、计算机或服务器。Preferably, the data processing module adopts a microprocessor, a computer or a server.
本发明实施例中,提供一种土木建筑各项工程的管理系统,与现有技术相比,其有益效果为:本发明通对建筑材料管理、建筑工人管理、建筑安全管理、建筑施工管理和工资管理实行一体化协调管理,增加了本发明管理系统的功能,提高了管理效果。In the embodiment of the present invention, a management system for various projects of civil engineering is provided. Compared with the prior art, the beneficial effects are: the present invention can manage building materials, construction workers, building safety, building construction and The wage management implements integrated coordinated management, which increases the functions of the management system of the present invention and improves the management effect.
附图说明Description of drawings
图1为本发明实施例提供的一种土木建筑各项工程的管理系统功能模块示意图。Fig. 1 is a schematic diagram of functional modules of a management system for various civil engineering projects provided by an embodiment of the present invention.
具体实施方式detailed description
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
图1为本发明实施例提供的一种土木建筑各项工程的管理系统功能模块示意图。如图1所示,该系统包括:Fig. 1 is a schematic diagram of functional modules of a management system for various civil engineering projects provided by an embodiment of the present invention. As shown in Figure 1, the system includes:
数据获取模块1,用于获取建筑模型信息。The data acquisition module 1 is used to acquire building model information.
需要说明的是,建筑模型信息包括:建筑尺寸结构信息和所需建筑材料名称和要求。It should be noted that the building model information includes: building size and structure information, names and requirements of required building materials.
建筑材料预估模块2,用于根据建筑模型信息,估算各类型建筑材料所需量,并按照建筑材料类型将所需建筑材料类型和所需建筑材料类型对应的所需量存储至云端数据库。The building material estimation module 2 is used to estimate the required amount of various types of building materials according to the building model information, and store the required building material type and the required amount corresponding to the required building material type in the cloud database according to the building material type.
建筑材料预算模块3,用于根据所需建筑材料类型和所需建筑材料类型对应的所需量,结合各所需建筑材料的市场价格范围,获取所需建筑材料的总价格范围。The building material budget module 3 is used to obtain the total price range of the required building materials according to the required building material type and the required amount corresponding to the required building material type, combined with the market price range of each required building material.
工人预估模块4,用于根据建筑模型信息,结合建筑总工期,估算建筑所需各工种的工人数量,并按照工种将所需工人工人和所需工人工种对应的数量存储至云端数据库。The worker estimation module 4 is used for estimating the number of workers of each type of work required for the construction based on the building model information and the total construction period, and storing the required workers and the corresponding number of required workers in the cloud database according to the type of work.
工人预算模块5,用于根据各工种的工人数量,结合各工种工人的市场价格范围,获取所需工人的总价格范围。The worker budget module 5 is used to obtain the total price range of required workers according to the number of workers of each type of work and the market price range of workers of each type of work.
建筑预算模块6,用于根据所需建筑材料的总价格范围和所需工人的总价格范围,获取建筑总预算;如果建筑总预算超出预设预算范围,则调整建筑材料种类或工人数量或建筑总工期,使建筑总预算在预设预算范围内;如果建筑总预算在预设预算范围内,正常施工。The construction budget module 6 is used to obtain the total construction budget according to the total price range of the required construction materials and the total price range of the required workers; if the total construction budget exceeds the preset budget range, adjust the type of construction materials or the number of workers or construction The total construction period, so that the total construction budget is within the preset budget range; if the total construction budget is within the preset budget range, normal construction.
需要说明的是,本发明实施例提供一种土木建筑各项工程的管理系统,还包括,建筑预算打印模块,用于对各类型所需建筑材料名称和价格,各工种所需工人数量和价格,以及建筑总预算进行打印。It should be noted that the embodiment of the present invention provides a management system for various civil engineering projects, which also includes a construction budget printing module, which is used to list the names and prices of various types of required building materials, the number and prices of workers required for each type of work , and the total construction budget is printed.
施工工期监管模块7,用于将阶段实际施工量和阶段预计施工量对比,如果阶段实际施工量小于阶段预计施工量,则分析原因;如果阶段实际施工量大于或等于阶段预计施工量,则正常施工。The construction period supervision module 7 is used to compare the actual construction amount of the stage with the estimated construction amount of the stage. If the actual construction amount of the stage is less than the estimated construction amount of the stage, analyze the reason; if the actual construction amount of the stage is greater than or equal to the expected construction amount of the stage, it is normal construction.
需要说明的是,本发明实施例提供一种土木建筑各项工程的管理系统,还包括,实际施工量获取模块,通过实际测量或估测获取实际施工量信息。It should be noted that an embodiment of the present invention provides a management system for various civil engineering projects, which further includes an actual construction quantity acquisition module, which acquires actual construction quantity information through actual measurement or estimation.
施工安全监管模块8,用于通过设置于建筑工地不同位置处的摄像头实时监控建筑建设情况和工人工作情况;用于根据建筑建设情况和工人工作情况,预测施工安全情况。The construction safety supervision module 8 is used for real-time monitoring of building construction and workers' working conditions through cameras installed at different positions on the construction site; and for predicting construction safety conditions according to building construction conditions and workers' working conditions.
施工质量监管模块9,用于通过质量检测模块对已施工建筑进行质量监测;如果质量检测不合格,则重新施工;如果质量检测合格,则正常施工。The construction quality supervision module 9 is used to monitor the quality of the constructed building through the quality inspection module; if the quality inspection fails, re-construction; if the quality inspection is qualified, normal construction will be carried out.
需要说明的是,质量检测模块,包括:建筑材料材质检测模块和建筑结构检测模块。It should be noted that the quality inspection module includes: a building material inspection module and a building structure inspection module.
工资结算模块10,用于根据不同工种工人的工作时间、工作量和绩效成绩,计算工人的工资,并通过转账模块对工人的工资明细进行打印。The wage settlement module 10 is used to calculate the wages of workers according to the working hours, workload and performance achievements of workers of different types of work, and print the details of wages of workers through the transfer module.
数据处理模块11,用于协调上述模块工作。The data processing module 11 is used to coordinate the work of the above modules.
需要说明的是,数据处理模块采用微处理器、计算机或服务器。It should be noted that the data processing module adopts a microprocessor, a computer or a server.
较佳地,云端数据库,还用于存储建筑项目信息、建筑公司基本信息和工人基本信息。Preferably, the cloud database is also used to store construction project information, basic information of construction companies and basic information of workers.
需要说明的是,本发明通对建筑材料管理、建筑工人管理、建筑安全管理、建筑施工管理和工资管理实行一体化协调管理,增加了本发明管理系统的功能,提高了管理效果。It should be noted that the present invention implements integrated and coordinated management of building material management, construction worker management, building safety management, building construction management, and salary management, which increases the functions of the management system of the present invention and improves the management effect.
以上公开的仅为本发明的几个具体实施例,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。The above disclosures are only a few specific embodiments of the present invention, and those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention, provided that these modifications and modifications of the present invention belong to the rights of the present invention The present invention also intends to include these modifications and variations within the scope of the requirements and their technical equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710462127.9A CN107169747A (en) | 2017-06-19 | 2017-06-19 | A kind of management system of various engineering of civil construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710462127.9A CN107169747A (en) | 2017-06-19 | 2017-06-19 | A kind of management system of various engineering of civil construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107169747A true CN107169747A (en) | 2017-09-15 |
Family
ID=59820272
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710462127.9A Withdrawn CN107169747A (en) | 2017-06-19 | 2017-06-19 | A kind of management system of various engineering of civil construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107169747A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109636675A (en) * | 2018-12-12 | 2019-04-16 | 上海荷福人工智能科技(集团)有限公司 | A kind of management method and system of the construction site based on artificial intelligence |
| CN109977159A (en) * | 2019-03-27 | 2019-07-05 | 新疆畺路交通科技有限公司 | A kind of civil engineering test detection system based on cloud computing technology |
| CN110070343A (en) * | 2019-04-24 | 2019-07-30 | 广州市城市规划勘测设计研究院 | A kind of prospecting project management system and method |
| CN112348478A (en) * | 2020-11-16 | 2021-02-09 | 尹继强 | Visual building decoration monitoring system and method based on Internet of things |
| CN112801615A (en) * | 2021-01-27 | 2021-05-14 | 太仓市路桥工程有限公司 | Road and bridge engineering equipment safety monitoring system and method |
| CN112978529A (en) * | 2019-12-02 | 2021-06-18 | 株式会社日立大厦系统 | Congestion degree prediction display system, congestion degree prediction display method, and computer-readable medium |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104123604A (en) * | 2014-06-09 | 2014-10-29 | 湖北福泰建筑装饰工程有限公司 | Engineering management information processing system |
| CN104329120A (en) * | 2014-10-17 | 2015-02-04 | 成都四为电子信息股份有限公司 | Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method |
| CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
| CN105696467A (en) * | 2016-02-04 | 2016-06-22 | 广厦建设集团有限责任公司 | Formwork support construction method based on P-BIM technology |
| CN105825331A (en) * | 2016-03-08 | 2016-08-03 | 河南理工大学 | Management system for different projects of civil construction |
| CN105912909A (en) * | 2016-04-20 | 2016-08-31 | 孙雨 | Monitoring and management system and method for construction project quality detection |
| CN106096909A (en) * | 2016-06-03 | 2016-11-09 | 绵阳九鼎智远知识产权运营有限公司 | A kind of architectural engineering whole process monitoring system |
| CN106408157A (en) * | 2016-08-26 | 2017-02-15 | 成都晨越造价咨询有限公司 | Building project progress and cost management system |
| CN106446358A (en) * | 2016-09-08 | 2017-02-22 | 黄川东 | Basic building data module system |
| CN107169546A (en) * | 2017-07-03 | 2017-09-15 | 国网冀北电力有限公司唐山供电公司 | A kind of power construction managing security tools and instruments management method and system based on Quick Response Code |
-
2017
- 2017-06-19 CN CN201710462127.9A patent/CN107169747A/en not_active Withdrawn
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104123604A (en) * | 2014-06-09 | 2014-10-29 | 湖北福泰建筑装饰工程有限公司 | Engineering management information processing system |
| CN104329120A (en) * | 2014-10-17 | 2015-02-04 | 成都四为电子信息股份有限公司 | Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method |
| CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
| CN105696467A (en) * | 2016-02-04 | 2016-06-22 | 广厦建设集团有限责任公司 | Formwork support construction method based on P-BIM technology |
| CN105825331A (en) * | 2016-03-08 | 2016-08-03 | 河南理工大学 | Management system for different projects of civil construction |
| CN105912909A (en) * | 2016-04-20 | 2016-08-31 | 孙雨 | Monitoring and management system and method for construction project quality detection |
| CN106096909A (en) * | 2016-06-03 | 2016-11-09 | 绵阳九鼎智远知识产权运营有限公司 | A kind of architectural engineering whole process monitoring system |
| CN106408157A (en) * | 2016-08-26 | 2017-02-15 | 成都晨越造价咨询有限公司 | Building project progress and cost management system |
| CN106446358A (en) * | 2016-09-08 | 2017-02-22 | 黄川东 | Basic building data module system |
| CN107169546A (en) * | 2017-07-03 | 2017-09-15 | 国网冀北电力有限公司唐山供电公司 | A kind of power construction managing security tools and instruments management method and system based on Quick Response Code |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109636675A (en) * | 2018-12-12 | 2019-04-16 | 上海荷福人工智能科技(集团)有限公司 | A kind of management method and system of the construction site based on artificial intelligence |
| CN109977159A (en) * | 2019-03-27 | 2019-07-05 | 新疆畺路交通科技有限公司 | A kind of civil engineering test detection system based on cloud computing technology |
| CN110070343A (en) * | 2019-04-24 | 2019-07-30 | 广州市城市规划勘测设计研究院 | A kind of prospecting project management system and method |
| CN112978529A (en) * | 2019-12-02 | 2021-06-18 | 株式会社日立大厦系统 | Congestion degree prediction display system, congestion degree prediction display method, and computer-readable medium |
| CN112978529B (en) * | 2019-12-02 | 2022-06-28 | 株式会社日立大厦系统 | Congestion degree prediction display system and display method, computer readable medium |
| CN112348478A (en) * | 2020-11-16 | 2021-02-09 | 尹继强 | Visual building decoration monitoring system and method based on Internet of things |
| CN112801615A (en) * | 2021-01-27 | 2021-05-14 | 太仓市路桥工程有限公司 | Road and bridge engineering equipment safety monitoring system and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107169747A (en) | A kind of management system of various engineering of civil construction | |
| US10990927B2 (en) | Systems and methods for managing mobile workers | |
| CN106845646A (en) | A kind of power marketing intelligence auditing system and method based on GIS platform | |
| CN103048967A (en) | Building resource consumption monitoring and management system | |
| JP6795866B1 (en) | Construction support cloud system and program | |
| CN111325490A (en) | Replenishment method and device | |
| CN117391638A (en) | A management platform for construction projects based on network technology | |
| CN105159262A (en) | Intelligent base station energy saving management system | |
| CN107464055A (en) | Schedule estimation method and device | |
| CN108510200A (en) | The computational methods and device of data assets operation benefits based on Life cycle | |
| CN104281913B (en) | Marine environmental monitoring task assessment realization method and system | |
| CN104881799A (en) | Business expansion controllable link time limit monitor and processing method | |
| TW201349135A (en) | Construction engineering working quality management system | |
| CN118505153B (en) | A large-scale engineering integrated management system and method | |
| Bajaj et al. | Parametric estimating for design costs | |
| CN105303463A (en) | Mobile terminal equipment used for electric power production | |
| CN205091787U (en) | Cigarette market supervision work systems | |
| CN117745217A (en) | Concrete joint super management method, system, electronic equipment and storage medium | |
| CN204465591U (en) | A real-time carbon accounting system for the textile industry based on the Internet of Things and cloud computing platform | |
| CN203178764U (en) | Energy management system | |
| JP2020166596A (en) | How to level the annual work by having the delivery person replace the meter | |
| RU2493596C1 (en) | System and method of managing maintenance of buildings and structures | |
| Ajayi et al. | Cost Management Evolution in Building Projects: A Review of Innovations and Challenges | |
| CN106355810A (en) | Intelligent positioning managing system for fire hazard based on cloud server | |
| CN202189364U (en) | Small business expansion project budget device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170915 |
|
| WW01 | Invention patent application withdrawn after publication |