[go: up one dir, main page]

CN106930252A - 一种新型抽水蓄能电站供水系统 - Google Patents

一种新型抽水蓄能电站供水系统 Download PDF

Info

Publication number
CN106930252A
CN106930252A CN201710254929.0A CN201710254929A CN106930252A CN 106930252 A CN106930252 A CN 106930252A CN 201710254929 A CN201710254929 A CN 201710254929A CN 106930252 A CN106930252 A CN 106930252A
Authority
CN
China
Prior art keywords
water
pumped
reservoir
storage power
downstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710254929.0A
Other languages
English (en)
Other versions
CN106930252B (zh
Inventor
王德振
刘亚坤
马梦蝶
高琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201710254929.0A priority Critical patent/CN106930252B/zh
Publication of CN106930252A publication Critical patent/CN106930252A/zh
Application granted granted Critical
Publication of CN106930252B publication Critical patent/CN106930252B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Sewage (AREA)

Abstract

本发明属于抽水蓄能电站供水系统技术领域,提供一种新型抽水蓄能电站供水系统。包括上游拦水坝、抽水电站和下游抽水蓄能电站;抽水电站位于上游拦水坝和下游抽水该蓄能电站之间。上游拦水坝的水库取水口通过输水管道与下游抽水蓄能电站连通,用于给上水库A供水。抽水电站上方的上水库B、通过输水管道给上水库A供水;同时上水库B通过抽水管道与抽水泵连通,用于将下游下河道的水抽至上水库B。下游抽水蓄能电站上方的上水库A通过输水管道与下游水轮机发电组连接,用于发电。本发明可以通过水体自流发电,不消耗电能,不存在资源浪费的现象,可以蓄水定时发电,可以起到调峰的作用;通过小型抽水电站抽水,水体从高差小的地方上水,可以节省很多电能。

Description

一种新型抽水蓄能电站供水系统
技术领域
本发明属于抽水蓄能电站供水系统技术领域,具体涉及一种不消耗电能自动供水系统和一种可以节约用电的供水系统结构。
背景技术
现如今的抽水蓄能电站是利用电网中负荷低谷时的电力,由下水库抽水至上水库蓄能,待电网高峰负荷时,放水回到下水库发电。抽水蓄能电站可以将电网负荷低时的多余电能,转变为电网高峰时期的高价值电能,但它存在着资源浪费的现象,按理论计算,抽水蓄能电站每发电三度,最少需要消耗四度电,如果加上输电线的损耗,其实浪费了1/3的电能。现有的水电站利用建筑物集中天然水流的落差形成水头,汇集天然水流的流量,将集中的水能转换为电能。水库的水电站考虑到水工建筑物安全问题,用于发电的水位差一定,发电量受到水位差限制。
发明内容
针对现有技术存在的问题,本发明提供一种新型抽水蓄能电站供水系统。
本发明的技术方案为:
一种新型抽水蓄能电站供水系统,包括上游拦水坝1、抽水电站8和下游抽水蓄能电站;抽水电站8位于上游拦水坝1和下游抽水该蓄能电站之间。
所述的上游拦水坝1包括水库取水口2、输水管道3和控制阀门A4。水库取水口2位于上游拦水坝1底部,取水口高程位于水库蓄水位以下,水库取水口2与输水管道3连通,输水管道3将上游拦水坝1与下游抽水蓄能电站的上水库B连通,用于给上水库A5供水。输水管道3上设置控制阀门A4;水库取水口2上设置拦污栅、闸门,拦污栅用于拦截水库泥沙与垃圾,闸门用于控制取水口开关。
所述的抽水电站8包括位于上方的上水库B9、抽水泵11、控制阀门10、抽水管道与进水管道。上水库B9通过进水管道与输水管道3连通,用于给上水库A5供水,并通过进水管道上设有的控制阀门B10控制进水量;同时上水库B9通过抽水管道与抽水泵11连通,用于将下游下河道的水抽至上水库B9。控制阀门A4关闭时,控制阀门B10打开,上水库B9水能通过输水管道为上水库A5供水。
所述的下游抽水蓄能电站包括位于上方的上水库A5、水轮机发电组7、输水管道6。上水库A5通过输水管道3与上游拦水坝1连通,同时上水库A5通过输水管道6与下游水轮机发电组7连接,用于发电。
上游拦水坝1的蓄水位高度高于下游抽水蓄能电站中上水库A5的高度,上水库B9的高度高于下游抽水蓄能电站上水库A5的高度;抽水电站8的上水库B9与抽水电站8中下河道的高度差为抽水高度差,下游抽水蓄能电站的上水库A5与下游抽水蓄能电站的下水库的高度差为发电高度,发电高度高于抽水电站8的抽水高度差,保证抽水需要的能量小于发电的能量。
本发明在河上游挡水坝1下方修建进水口2,在河道下游一与河道高差很大山体修建抽水蓄能电站,山顶修建上池A5,上池A5与取水口2通过输水管道3(或水工隧洞)和控制阀门A4连通。河上游挡水坝1的蓄水位比上池高程高,打开控制阀门A4、关闭控制阀门B10,水库蓄水能够自动运输到上池A5,蓄满时关闭阀门4,存储在上池A5的水可已通过输水管道6与水轮机发电组7进行发电。在输水管道3沿途山顶上池与河道高差小的地方修一小型抽水电站8,抽水电站8中上池B9高程高于上池A5的高程,抽水泵11将河道水抽至上池B9,打开控制阀门B10,上池B9的蓄水会自动运输到上池A5,利用上池A5与其下水库的巨大高差进行发电。
本发明的有益效果为:山顶上池与下游河道的高差大于水库水位与河道的高差,发电量会比水库水电站发电量多,并且仅通过水体自流,不消耗电能,不存在资源浪费的现象,可以蓄水定时发电,可以起到调峰的作用。通过小型抽水电站抽水,水体从高差小的地方上水,可以节省很多电能。
附图说明
图1为本发明的系统图;
图中:1上游拦水坝;2水库取水口;3输水管道;4控制阀门A;5上水库A;6输水管道;7水轮机发电组;8抽水电站;9上水库B;10控制阀门B;11抽水泵。
具体实施方式
为使本发明的技术特征、目的和效果更加清晰的理解,现对照附图对本发明的
具体实施方式分两部分详细说明。
实施例1
本发明可以不消耗任何能量为抽水蓄能电站供水,过程中控制阀门B10始终处于关闭状态。在河道下游一处山顶与河道高差较大的地方修建抽水蓄能电站,山顶上池A5的高程低于上游拦水坝内正常蓄水位高程,在上游拦水坝部分1的岸边一侧修建取水口,取水口高程在水库正常蓄水位以下,并配备闸门,启闭机等设备。通过在山体内部及陆地上铺设输水管道3后,打开控制阀门A4后将水库水自动运输到下游抽水蓄能电站上池A5中,蓄满水后关闭控制阀门A4。当需要发电时利用山顶水池与下游河道水位高差,通过输水管道6输水到水轮发电机7中进行发电。
实施例2
本实施例中控制阀门A4始终处于关闭状态,通过小高差抽水蓄能,输水至下游抽水蓄能电站中利用大高差发电,以达到省电的目的。在输水管道3输水途中的某一处,寻找一山,山顶与河道的高差较小,山顶上修建小型抽水电站8。抽水电站的上B9的高程高于或等于下游抽水蓄能电站上池A5的高程。通过抽水泵11将河道中的水抽向上池9中,打开控制阀门B10,储存的水会流向抽水蓄能电站的上池A5中,利用上池A5与下水库的高差发电。
需要说明的是,该实施例仅为该抽水蓄能电站供水的示意图,具体管道的直径铺设的路径、长度、坡度,应根据具体的工程的实际情况采取模型试验确定。所述仅为本发明的优选实施例而已,对于本技术领域的专业人员,可以对本发明进行修改,优化,以及与其他供水方式组合。只要在本发明方式的原理之内,进行的任何改进,等同替换等,均应包含在本发明的权利要求的范围以内。

Claims (3)

1.一种新型抽水蓄能电站供水系统,其特征在于,所述的新型抽水蓄能电站供水系统包括上游拦水坝(1)、抽水电站(8)和下游抽水蓄能电站;抽水电站(8)位于上游拦水坝(1)和下游抽水该蓄能电站之间;
所述的上游拦水坝(1)包括水库取水口(2)、输水管道(3)和控制阀门A(4);水库取水口(2)位于上游拦水坝(1)底部,取水口高程位于水库蓄水位以下,水库取水口(2)与输水管道(3)连通,输水管道(3)将上游拦水坝(1)与下游抽水蓄能电站的上水库B连通,用于给上水库A(5)供水;输水管道(3)上设置控制阀门A(4);所述的上游拦水坝(1)的蓄水位高度高于下游抽水蓄能电站中上水库A(5)的高度;
所述的抽水电站(8)包括位于上方的上水库B(9)、抽水泵(11)、控制阀门(10)、抽水管道与进水管道;上水库B(9)通过进水管道与输水管道(3)连通,给上水库A(5)供水,并通过进水管道上设有的控制阀门B(10)控制进水量;同时上水库B(9)通过抽水管道与抽水泵(11)连通,将下游下河道的水抽至上水库B(9);所述的上水库B(9)的高度高于下游抽水蓄能电站上水库A(5)的高度;
所述的下游抽水蓄能电站包括位于上方的上水库A(5)、水轮机发电组(7)、输水管道(6);上水库A(5)通过输水管道(3)与上游拦水坝(1)连通,同时上水库A(5)通过输水管道(6)与下游水轮机发电组(7)连接,用于发电。
2.根据权利要求1所述的一种新型抽水蓄能电站供水系统,其特征在于,所述的抽水电站(8)的上水库B(9)与抽水电站(8)中下河道的高度差为抽水高度差,下游抽水蓄能电站的上水库A(5)与下游抽水蓄能电站的下水库的高度差为发电高度,发电高度高于抽水电站(8)的抽水高度差,保证抽水需要的能量小于发电的能量。
3.根据权利要求1或2所述的一种新型抽水蓄能电站供水系统,其特征在于,所述的水库取水口(2)上设置拦污栅、闸门,拦污栅用于拦截水库泥沙与垃圾,闸门用于控制取水口开关。
CN201710254929.0A 2017-04-24 2017-04-24 一种新型抽水蓄能电站供水系统 Expired - Fee Related CN106930252B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710254929.0A CN106930252B (zh) 2017-04-24 2017-04-24 一种新型抽水蓄能电站供水系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710254929.0A CN106930252B (zh) 2017-04-24 2017-04-24 一种新型抽水蓄能电站供水系统

Publications (2)

Publication Number Publication Date
CN106930252A true CN106930252A (zh) 2017-07-07
CN106930252B CN106930252B (zh) 2019-12-17

Family

ID=59438257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710254929.0A Expired - Fee Related CN106930252B (zh) 2017-04-24 2017-04-24 一种新型抽水蓄能电站供水系统

Country Status (1)

Country Link
CN (1) CN106930252B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195678A (zh) * 2019-06-19 2019-09-03 浙江中新电力工程建设有限公司自动化分公司 低压电网的电能质量控制分析系统
CN110242478A (zh) * 2019-06-19 2019-09-17 浙江中新电力工程建设有限公司自动化分公司 配电网接地故障检测处理分析系统
CN110258476A (zh) * 2019-06-26 2019-09-20 中国电建集团成都勘测设计研究院有限公司 高山峡谷地区水电站沟水处理用排水洞结构
CN110344378A (zh) * 2019-06-19 2019-10-18 浙江中新电力工程建设有限公司自动化分公司 智能化城市电力照明物联网管理系统
CN110348609A (zh) * 2019-06-19 2019-10-18 浙江中新电力工程建设有限公司自动化分公司 用于电网的综合能源调度系统
CN114481979A (zh) * 2022-02-21 2022-05-13 黄祖华 一种抽水蓄能电站的建造方法
CN116696646A (zh) * 2023-05-30 2023-09-05 上海勘测设计研究院有限公司 潮汐电站和海水抽水蓄能电站的联合电站及其调度方法
WO2025035343A1 (zh) * 2023-08-12 2025-02-20 谢胜宜 调水蓄能电站

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010034160A1 (de) * 2010-08-10 2012-02-16 Wilhelm Ebrecht Vorrichtung und Verfahren zum Speichern elektrischer Energie
CN101831893B (zh) * 2010-04-15 2012-12-26 尹俊钢 人工地下河地上地下水库蓄水循环发电系统
CN104762937B (zh) * 2015-02-16 2016-08-24 浙江水利水电学院 一种应用于生态水库的抽水蓄能水电站及其污水处理方法
CN103821661B (zh) * 2014-02-27 2017-01-11 华北电力大学 基于气体增压技术的抽水蓄能系统
CN206752426U (zh) * 2017-04-24 2017-12-15 大连理工大学 一种新型抽水蓄能电站供水系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831893B (zh) * 2010-04-15 2012-12-26 尹俊钢 人工地下河地上地下水库蓄水循环发电系统
DE102010034160A1 (de) * 2010-08-10 2012-02-16 Wilhelm Ebrecht Vorrichtung und Verfahren zum Speichern elektrischer Energie
CN103821661B (zh) * 2014-02-27 2017-01-11 华北电力大学 基于气体增压技术的抽水蓄能系统
CN104762937B (zh) * 2015-02-16 2016-08-24 浙江水利水电学院 一种应用于生态水库的抽水蓄能水电站及其污水处理方法
CN206752426U (zh) * 2017-04-24 2017-12-15 大连理工大学 一种新型抽水蓄能电站供水系统

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195678B (zh) * 2019-06-19 2024-02-27 浙江中新电力工程建设有限公司自动化分公司 低压电网的电能质量控制分析系统
CN110344378B (zh) * 2019-06-19 2024-05-14 浙江中新电力工程建设有限公司自动化分公司 智能化城市电力照明物联网管理系统
CN110348609B (zh) * 2019-06-19 2024-04-19 浙江中新电力工程建设有限公司自动化分公司 用于电网的综合能源调度系统
CN110344378A (zh) * 2019-06-19 2019-10-18 浙江中新电力工程建设有限公司自动化分公司 智能化城市电力照明物联网管理系统
CN110348609A (zh) * 2019-06-19 2019-10-18 浙江中新电力工程建设有限公司自动化分公司 用于电网的综合能源调度系统
CN110195678A (zh) * 2019-06-19 2019-09-03 浙江中新电力工程建设有限公司自动化分公司 低压电网的电能质量控制分析系统
CN110242478B (zh) * 2019-06-19 2024-02-27 浙江中新电力工程建设有限公司自动化分公司 配电网接地故障检测处理分析系统
CN110242478A (zh) * 2019-06-19 2019-09-17 浙江中新电力工程建设有限公司自动化分公司 配电网接地故障检测处理分析系统
CN110258476A (zh) * 2019-06-26 2019-09-20 中国电建集团成都勘测设计研究院有限公司 高山峡谷地区水电站沟水处理用排水洞结构
CN114481979A (zh) * 2022-02-21 2022-05-13 黄祖华 一种抽水蓄能电站的建造方法
CN114481979B (zh) * 2022-02-21 2024-02-06 黄祖华 一种抽水蓄能电站的建造方法
CN116696646A (zh) * 2023-05-30 2023-09-05 上海勘测设计研究院有限公司 潮汐电站和海水抽水蓄能电站的联合电站及其调度方法
CN116696646B (zh) * 2023-05-30 2024-03-01 上海勘测设计研究院有限公司 潮汐电站和海水抽水蓄能电站的联合电站及其调度方法
WO2025035343A1 (zh) * 2023-08-12 2025-02-20 谢胜宜 调水蓄能电站

Also Published As

Publication number Publication date
CN106930252B (zh) 2019-12-17

Similar Documents

Publication Publication Date Title
CN106930252B (zh) 一种新型抽水蓄能电站供水系统
CN206752426U (zh) 一种新型抽水蓄能电站供水系统
CN108867584A (zh) 利用废弃露天矿与地下井巷联合进行抽水蓄能的系统及方法
CN101852164A (zh) 一种利用废弃矿井储贮电能的方法
CN101314943A (zh) 双库自调节潮汐能发电方法及其系统
CN113323791A (zh) 一种水坝用抽水蓄能储电系统
CN202323895U (zh) 用于阶梯式水利枢纽的尾水渠结构
CN104121142A (zh) 一种水平螺旋桨驱动式海浪能发电系统
CN108589628A (zh) 一种用于拦河工程下放生态水的方法及装置
Mukhammadiev et al. Assessment of investment technologies for use of hydro-accumulating stations on intermediate channels of irrigation systems and water reservoirs
CN206220070U (zh) 一种海洋综合发电系统
CN217115732U (zh) 一种无缝衔接的交替式液控压缩空气储能系统
CN202531344U (zh) 一种移动式太阳能抽水蓄能发电供水灌溉系统
CN102392778A (zh) 高山储水蓄电池
CN202545097U (zh) 一种发电减压系统
CN205805816U (zh) 一种利用海底压力能的储水发电系统
CN220888567U (zh) 消能控流结构
CN208415203U (zh) 一种利用废弃露天矿进行抽水蓄能的系统
CN107939592A (zh) 新能源水力发电塔
CN207700163U (zh) 利用虹吸效应的废弃井巷与地表联合抽水储能系统
CN205567081U (zh) 一种风光储存互补一体化移动抽水系统
CN114808879A (zh) 一种抽水蓄能电站布置结构
CN115679910A (zh) 抽水蓄能电站水库布置结构
TWM632392U (zh) 建構於坡地的水槽發電系統
CN203036666U (zh) 煤粉发电锅炉点火稳燃供氧装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191217

Termination date: 20210424

CF01 Termination of patent right due to non-payment of annual fee