[go: up one dir, main page]

CN106920057A - Material management method and system - Google Patents

Material management method and system Download PDF

Info

Publication number
CN106920057A
CN106920057A CN201710117700.2A CN201710117700A CN106920057A CN 106920057 A CN106920057 A CN 106920057A CN 201710117700 A CN201710117700 A CN 201710117700A CN 106920057 A CN106920057 A CN 106920057A
Authority
CN
China
Prior art keywords
item
category
belonging
under
outbound
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710117700.2A
Other languages
Chinese (zh)
Other versions
CN106920057B (en
Inventor
欧阳娅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taikang Insurance Group Co Ltd
Original Assignee
Taikang Insurance Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taikang Insurance Group Co Ltd filed Critical Taikang Insurance Group Co Ltd
Priority to CN201710117700.2A priority Critical patent/CN106920057B/en
Publication of CN106920057A publication Critical patent/CN106920057A/en
Application granted granted Critical
Publication of CN106920057B publication Critical patent/CN106920057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials

Landscapes

  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Finance (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Accounting & Taxation (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The disclosure is directed to a kind of material management method and material management system.The method includes:When receiving a first item and being asked to the borrow that a second item borrows material, respond and described borrow request determining the material category that the material is belonged to;According to the material category determined, whether the material number for judging the material under the material category belonging to the second item of current record is zero;If not zero, then the material number of the material under the material category belonging to the second item is subtracted one, while adding one by the material number of the material under the material category belonging to institute's first item.Operation and system data modification process that the borrowing lending that the disclosure can simplify material is related to, for the borrowing lending operation of material when multiple projects are carried out in enterprise's handling of goods and materials provides facility, improve materiel warehouse-out efficiency.

Description

Material management method and system
Technical field
This disclosure relates to material information administrative skill field, more particularly to a kind of material management method and handling of goods and materials system System.
Background technology
In enterprise product production or engineering construction, the material needed for a project generally deposits in warehouse or storehouse In.Material is frozen into the project in case sundry item is used during materiel warehouse-in.During project is carried out, the thing for using To be tracked after material outbound, such as project information where knowing material etc..
In correlation technique, Quick Response Code is sticked during storage on material, the exclusive identification code comprising the material in the Quick Response Code And the bullets information for being belonged to, by scan Quick Response Code can be stored in the database of enterprise management system material with The one-to-one relationship of the project for being belonged to.Can so realize being frozen into material in belonged to project, it is also possible to carry out The later stage of material follows the trail of.
But still there is problems with correlation technique:Material occurs during more than two projects are carried out Borrowing lending situation, now needs to adjust the corresponding relation of material and the project for being belonged to, actual behaviour on enterprise management system The material is found in work in storehouse and new Quick Response Code is changed, corresponding material and the project for being belonged to is changed in system again Corresponding relation, this causes the borrowing operation that is related to of lending of material and system data modification process too cumbersome.In addition, one Search material during materiel warehouse-out belonging to project to be difficult, when same class material quantity is more in warehouse, in order to find the project pair The material consuming time answered is more long, and when the material variety of an item association is more, outbound efficiency is lower.
Therefore, it is necessary to providing a kind of new technical scheme improves one or more problem present in such scheme.
It should be noted that information is only used for strengthening the reason of background of this disclosure disclosed in above-mentioned background section Solution, therefore can include not constituting the information to prior art known to persons of ordinary skill in the art.
The content of the invention
The purpose of the disclosure is to provide a kind of material management method and material management system, and then at least to a certain degree On overcome due to one or more problem caused by the limitation of correlation technique and defect.
Other characteristics and advantage of the disclosure will be apparent from by following detailed description, or partially by the disclosure Practice and acquistion.
According to the first aspect of the embodiment of the present disclosure, there is provided a kind of material management method, methods described includes:
Receive a first item to a second item borrow material borrow ask when, respond it is described borrow request with Determine the material category that the material is belonged to;
According to the material category determined, the material category belonging to the second item of current record is judged Under the material number of the material whether be zero;
If not zero, then the material number of the material under the material category belonging to the second item is subtracted one, The material number of the material under the material category belonging to institute's first item is added one simultaneously.
In a kind of exemplary embodiment of the disclosure, methods described also includes:
When the material number of the material under judging to draw the material category belonging to the second item is zero, show Show the information for indicating the material to lend.
In a kind of exemplary embodiment of the disclosure, methods described also includes:
When being zero after the material number of the material under the material category belonging to the second item subtracts one, delete At least one of the information of the material category belonging to the second item and the information of the material.
In a kind of exemplary embodiment of the disclosure, methods described also includes:
After adding one by the material number of the material under the material category belonging to the first item, when receiving During the materiel warehouse-out request of the first item, there is provided the outbound material table of the first item;
The material for comparing the outbound material table and the first item freezes table, when each in the outbound material table Outbound material number under material category is both less than when freezing corresponding material number in table equal to the material, it is allowed to the Section 1 Purpose materiel warehouse-out;
Wherein, the material freezes record in table each material category belonging to presently described first item and each The material number of the material under the material category.
In a kind of exemplary embodiment of the disclosure, methods described also includes:
Item identification information according to the first item and belong to the first item each material material mark Knowledge information generates Quick Response Code;
The Quick Response Code for generating is attached on corresponding each described material;
After the materiel warehouse-out for allowing the first item, the Quick Response Code on each described material is scanned, according to scanning institute The material identification information for stating Quick Response Code acquisition changes the existing material number and outbound number of each material in the first item, In combination with scan the item identification information that the Quick Response Code obtains in database each described material of associated record with The one-to-one relationship of the first item.
According to the second aspect of the embodiment of the present disclosure, there is provided a kind of material management system, the system includes:
Material category determining module, for receiving borrow request of the first item to second item borrow material When, respond described borrow and ask to determine the material category that the material is belonged to;
Material quantity judge module, for according to the material category determined, judging described the second of current record Whether the material number of the material under the material category belonging to project is zero;And
Material quantity update module, for when the judged result of the material quantity judge module is not zero, by described in The material number of the material under the material category belonging to second item subtracts one, while by the institute belonging to the first item The material number for stating the material under material category plus one.
In a kind of exemplary embodiment of the disclosure, the system also includes:
Information display module, described in being drawn belonging to the second item when material quantity judge module judgement When the material number of the material under material category is zero, the information for indicating the material to lend is shown.
In a kind of exemplary embodiment of the disclosure, the system also includes:
Information deletion module, for when the material number of the material under the material category belonging to the second item When being zero after subtracting one, in the information of the material category and the information of the material belonging to the deletion second item at least One.
In a kind of exemplary embodiment of the disclosure, the system also includes:
Materiel warehouse-out module, for by the material of the material under the material category belonging to the first item After number Jia one, when the materiel warehouse-out request of the first item is received, there is provided the outbound material table of the first item;
Material comparing module, the material for comparing the outbound material table and the first item freezes table, when described Outbound material number under each material category in outbound material table is both less than and freezes corresponding material in table equal to the material During number, it is allowed to the materiel warehouse-out of the first item;
Wherein, the material freezes record in table each material category belonging to presently described first item and each The material number of the material under the material category.
In a kind of exemplary embodiment of the disclosure, the system also includes:
Two-dimensional code generation module, for the item identification information according to the first item and belonging to the first item Each material material identification information generation Quick Response Code;Wherein, the Quick Response Code of the generation is used to be attached to corresponding each institute State on material;
Scanning logging modle, for after the materiel warehouse-out for allowing the first item, scanning on each described material Quick Response Code, each material shows in the material identification information modification first item according to the scanning Quick Response Code acquisition There are material number and outbound number, note is associated in database in combination with the item identification information for scanning the Quick Response Code acquisition Record the one-to-one relationship of each described material and the first item.
The technical scheme provided by this disclosed embodiment can include the following benefits:
In a kind of embodiment of the disclosure, by above-mentioned material management method and handling of goods and materials device, when two projects are entered When material situation occurs borrowing in a project during row, the borrow material is searched whether in another project, it is straight if having Connecing can in systems change quantity information of two projects on borrow material, namely have updated material with item destination homing pass System.Thus it is possible, on the one hand, in materiel warehouse-in, without pasting Quick Response Code, material is frozen into and passes through change system in belonged to project Material number in the project of middle material ownership realizes, simplifies operation that the borrowing lending of material is related to and system data is changed Process.On the other hand, it is that the borrowing lending operation of material when multiple projects are carried out in enterprise's handling of goods and materials is provided convenience, improves The efficiency of project materiel warehouse-out.
It should be appreciated that the general description of the above and detailed description hereinafter are only exemplary and explanatory, not The disclosure can be limited.
Brief description of the drawings
Accompanying drawing herein is merged in specification and constitutes the part of this specification, shows the implementation for meeting the disclosure Example, and it is used to explain the principle of the disclosure together with specification.It should be evident that drawings in the following description are only the disclosure Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis These accompanying drawings obtain other accompanying drawings.
Fig. 1 schematically shows first material management method flow chart in disclosure exemplary embodiment;
Fig. 2 schematically shows second material management method flow chart in disclosure exemplary embodiment;
Fig. 3 schematically shows 3 material management method flow chart in disclosure exemplary embodiment;
Fig. 4 schematically shows 4 materials management method flow chart in disclosure exemplary embodiment;
Fig. 5 schematically shows material borrowing lending schematic diagram of a scenario in disclosure exemplary embodiment;
Fig. 6 schematically shows the block diagram of first material management system in disclosure exemplary embodiment;
Fig. 7 schematically shows the block diagram of second material management system in disclosure exemplary embodiment;
Fig. 8 schematically shows the block diagram of 3 material management system in disclosure exemplary embodiment;
Fig. 9 schematically shows the block diagram of 4 materials management system in disclosure exemplary embodiment;
Figure 10 schematically shows the block diagram of handling of goods and materials device in disclosure exemplary embodiment.
Specific embodiment
Example embodiment is described more fully with referring now to accompanying drawing.However, example embodiment can be with various shapes Formula is implemented, and is not understood as limited to example set forth herein;Conversely, thesing embodiments are provided so that the disclosure will more Fully and completely, and by the design of example embodiment those skilled in the art is comprehensively conveyed to.Described feature, knot Structure or characteristic can be combined in one or more implementation methods in any suitable manner.
Additionally, accompanying drawing is only the schematic illustrations of the disclosure, it is not necessarily drawn to scale.Identical accompanying drawing mark in figure Note represents same or similar part, thus will omit repetition thereof.Some block diagrams shown in accompanying drawing are work( Energy entity, not necessarily must be corresponding with physically or logically independent entity.These work(can be realized using software form Energy entity, or these functional entitys are realized in one or more hardware modules or integrated circuit, or at heterogeneous networks and/or place These functional entitys are realized in reason device device and/or microcontroller device.
A kind of material management method is provide firstly in this example embodiment, the method can apply to a server On.With reference to shown in Fig. 1, the material management method can include:
Step S101, when receiving a first item and being asked to the borrow that a second item borrows material, response is described Request is borrowed to determine the material category that the material is belonged to;
The material category that step S102, basis are determined, judges the institute belonging to the second item of current record Whether the material number for stating the material under material category is zero;
If not step S103, zero, then by the thing of the material under the material category belonging to the second item Material number subtracts one, while adding one by the material number of the material under the material category belonging to institute's first item.
By above-mentioned material management method, on the one hand, in materiel warehouse-in, without pasting Quick Response Code, material is frozen into is returned Realized by the material number in the project of material ownership in change system in the project of category, the borrowing lending for simplifying material is related to And operation and system data modification process.On the other hand, it is the borrowing of material when multiple projects are carried out in enterprise's handling of goods and materials Lending operation is provided convenience, and improves the efficiency of project materiel warehouse-out.
Below, each step of the above method in this example embodiment will be carried out in more detail referring to figs. 1 to Fig. 5 Explanation.
In step S101, receive a first item to a second item borrow material borrow ask when, response It is described to borrow request to determine the material category that the material is belonged to.
In this example embodiment, the first item and second item can be engineering construction projects, or enterprise one Production project.Each project can include that multiple is specific again using the material of plurality of classes, the material of every kind of classification Material.During project is carried out, when a kind of material needed for a project is temporarily no, can be to another project application Use the identical material belonging to another project.
In step s 102, according to the material category determined, judge belonging to the second item of current record The material category under the material number of the material whether be zero.In namely judging the material belonging to the second item Whether the material for having first item to borrow, can then lend when sometimes.
With reference to shown in Fig. 2, when the material for not having first item to borrow in the material belonging to the second item, show one In example property embodiment, methods described can also include:
Step S104:The material number of the material under judging to draw the material category belonging to the second item When being zero, the information for indicating the material to lend is shown.
In the present exemplary embodiment, the information for indicating the material to lend can be text information, sound Message breath etc., the present exemplary embodiment is not particularly limited to this.So, can be in the material belonging to the second item Do not have to be pointed out during the material of first item borrow.
In step s 103, if the material number of the material under the material category belonging to the second item is not Zero, then the material number of the material under the material category belonging to the second item is subtracted one, while by institute's Section 1 The material number of the material under the material category belonging to mesh adds one.
In this example embodiment, the material number in the project that can be belonged to by a material in change system is come real Existing material is frozen into belonged to project, will the material get up with corresponding project auto-associating, be so not used in warehouse Quick Response Code on middle replacing material, simplifies operation and system data modification process that the borrowing lending of material is related to.
With reference to shown in Fig. 3, in one exemplary embodiment, methods described can also include:
Step S105:It is after the material number of the material under the material category belonging to the second item subtracts one When zero, at least one of the information of the material category belonging to the deletion second item and the information of the material. That is, after the material belonging to the second item is borrowed to the first item use, the material is in second item It has been do not existed that, now need to delete the related information of the material, saved memory space, also upgraded in time each material with returned The corresponding relation of the project of category.
For example, with reference to shown in Fig. 5, the process that material is borrowed is illustrated by taking material borrowing as an example, it is specific as follows:
Step 301:Project 1 applies borrowing a material A to project 2.
Step 302:The quantity m of the material in the material that project 2 is freezed in inspection system under material A, if m>=1, then may be used To lend, staff can go to warehouse to take corresponding material;If m<1, then point out the information that cannot be lent, such as word, language The prompt messages such as sound.
Step 303:When project 2 can lend material A, material A in system belonging to project 2 freezes number (i.e. material Number, similarly hereinafter) subtract one.Now, if it is 0 that this freezes number, to the freezing information of material A in deletion project 2.
Step 304:Material A freezes number in project 1 in modification system, and the number that freezes of material A belonging to project 1 Jia one.
With reference to shown in Fig. 4, in one exemplary embodiment, methods described can also comprise the following steps S106~S107. Wherein:
Step S106, the material number of the material under the material category belonging to the first item is being added one Afterwards, when the materiel warehouse-out request of the first item is received, there is provided the outbound material table of the first item.
That is, after material is borrowed, the material of first item stock needs outbound to be produced or built, now The actual material that providing first item needs forms outbound material table.
The material of step S107, the comparison outbound material table and the first item freezes table, when the outbound material Outbound material number under each material category in table is both less than when freezing corresponding material number in table equal to the material, it is allowed to The materiel warehouse-out of the first item;Wherein, record has each belonging to presently described first item during the material freezes table The material number of the material under material category and each material category.
Treat the material of outbound in systems belonging to the first item of current record, it is necessary to contrast when materiel warehouse-out Whether there is in material (material of i.e. current stock), and whether the quantity of required material is enough, cannot otherwise meet outbound Condition.
For example, with reference to shown in Fig. 5, the set-up procedure before materiel warehouse-out may comprise steps of:
Step 401:Project 1 applies for materiel warehouse-out, and provides outbound material list.
Step 402:The material for comparing the list of outbound material and project 1 freezes list, if in the presence of the outbound number of a class material Freeze number more than what the material of project 1 freezed the material in list, then outbound failure.
Step 403:The jelly in freezing list equal to the material of the project 1 is both less than when the outbound number of all materials of project 1 During knot number, it is allowed to outbound.Now related personnel can take material according to outbound material category and material number from warehouse.
The outbound process to material is illustrated below.On the basis of above-described embodiment, in the present exemplary embodiment, institute The method of stating can also comprise the following steps 201~203.Wherein:
Step 201:Item identification information and each material for belonging to the first item according to the first item Material identification information generation Quick Response Code.For example, the item identification information can be project unique encodings, the material mark Information can be material unique encodings.
Step 202:The Quick Response Code for generating is attached on corresponding each described material.
Step 203:After the materiel warehouse-out for allowing the first item, the Quick Response Code on each described material, root are scanned According to the existing material number for scanning each material in the material identification information modification first item that the Quick Response Code is obtained With outbound number, in combination with scanning the item identification information that the Quick Response Code obtains each institute of associated record in database State the one-to-one relationship of material and the first item.
For example, with reference to shown in Fig. 5, the outbound process of the material may comprise steps of:
Step 404:The COM code generation Quick Response Code of project code and each material according to project 1, the two dimension of generation Code is attached on corresponding material.
Step 405:The Quick Response Code scanned on each material carries out materiel warehouse-out operation, according to the information modification that scanning is obtained The existing of each material freezes number and outbound number in project 1 in system;Each material volume can be recorded in system database simultaneously Code and the corresponding relation of project 1.Wherein, the existing number that freezes is for original freezes the difference that number subtracts outbound number.
In this illustrative embodiments, Quick Response Code is not pasted during project materiel warehouse-in on material, material is frozen into project Realize that only record freezes the quantity of such material, does not record by the number that freezes of material belonging to the project in modification system The project includes the material number of material.The quantity of such material freezed according to project in the materiel warehouse-out belonging to project is taken Material is taken, Quick Response Code barcode scanning outbound is then sticked, the COM code and project code is associated in system.If a project Not to the freezing information of such material, then do not allow for such material to distribute to the project during such materiel warehouse-out.
So, during a project is carried out the borrowing lending of material only need to the project is freezed in adjustment system material number i.e. Can, without adjustment in warehouse.Can arbitrarily be taken such material in project materiel warehouse-out, and material is determined after sticking Quick Response Code With the relation of project, the later stage can be tracked to material.Material management method in the present exemplary embodiment simplifies project pipe The borrowing lending of material and materiel warehouse-out flow in reason, are that the borrowing lending operation of material is provided convenience, while also improving The outbound efficiency of project material.
It should be noted that although each step of method in the disclosure is described with particular order in the accompanying drawings, This does not require that or implies must perform these steps according to the particular order, or have to carry out the step shown in whole Desired result could be realized.It is additional or alternative, it is convenient to omit some steps, multiple steps are merged into a step and is held OK, and/or by a step execution of multiple steps etc. are decomposed into.In addition, being also easy to understand, these steps can be For example either synchronously or asynchronously performed in multiple module/process/threads.
Further, in this example embodiment, a kind of material management system is additionally provided.With reference to shown in Fig. 6, system 100 can include material category determining module 101, material quantity judge module 102 and material quantity update module 103.Wherein:
The material category determining module 101, for receiving a first item to second item borrow material When borrowing request, respond described borrow and ask to determine the material category that the material is belonged to.
The material quantity judge module 102, for according to the material category determined, judging the institute of current record Whether the material number for stating the material under the material category belonging to second item is zero.
The material quantity update module 103, for being not zero in the judged result of the material quantity judge module 102 When, the material number of the material under the material category belonging to the second item is subtracted one, while by the Section 1 The material number of the material under the material category belonging to mesh adds one.
With reference to shown in Fig. 7, in a kind of exemplary embodiment of the disclosure, the system 100 can also be aobvious including information Show module 104, for judging to draw the material category belonging to the second item when the material quantity judge module 102 Under the material number of material when being zero, show the information for indicating the material to lend.
With reference to shown in Fig. 8, in a kind of exemplary embodiment of the disclosure, the system 100 can also be deleted including information Except module 105, for being zero after the material number of the material under the material category belonging to the second item subtracts one When, at least one of the information of the material category belonging to the deletion second item and the information of the material.
With reference to shown in Fig. 9, in a kind of exemplary embodiment of the disclosure, the system 100 can also go out including material Library module 106 and material comparing module 107, wherein:
The materiel warehouse-out module 106, for by the thing under the material category belonging to the first item After the material number of material adds one, when the materiel warehouse-out request of the first item is received, there is provided the outbound of the first item Material table.
The material comparing module 107, the material for comparing the outbound material table and the first item freezes table, When the outbound material number under each material category in the outbound material table be both less than freeze table equal to the material in correspondence Material number when, it is allowed to the materiel warehouse-out of the first item.
Wherein, the material freezes record in table each material category belonging to presently described first item and each The material number of the material under the material category.
In a kind of exemplary embodiment of the disclosure, the system 100 can also include two-dimensional code generation module and scanning Logging modle (not shown).Wherein:
The two-dimensional code generation module, for the item identification information according to the first item and belonging to described first The material identification information generation Quick Response Code of each material of project;Wherein, the Quick Response Code of the generation is corresponding each for being attached to On the individual material.
The scanning logging modle, for after the materiel warehouse-out for allowing the first item, scanning each material On Quick Response Code, change each material in the first item according to the material identification information that the Quick Response Code obtains is scanned Existing material number and outbound number, closed in database in combination with the item identification information that the Quick Response Code obtains is scanned Connection records each described material with the one-to-one relationship of the first item.
On the system in above-described embodiment, wherein modules perform the concrete mode of operation in relevant the method Embodiment in be described in detail, explanation will be not set forth in detail herein.
Although it should be noted that being referred to some modules or list of the equipment for action executing in above-detailed Unit, but this division is not enforceable.In fact, according to embodiment of the present disclosure, it is above-described two or more The feature and function of module or unit can embody in a module or unit.Conversely, an above-described mould The feature and function of block or unit can be further divided into being embodied by multiple modules or unit.As module or list The part of unit's display can be or may not be physical location, you can with positioned at a place, or can also be distributed to On multiple NEs.Some or all of module therein can be according to the actual needs selected to realize the open scheme of wood Purpose.Those of ordinary skill in the art are without creative efforts, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art is it can be readily appreciated that example described herein is implemented Mode can be realized by software, it is also possible to be realized by way of software is with reference to necessary hardware.Therefore, according to the disclosure The technical scheme of implementation method can be embodied in the form of software product, and the software product can store non-volatile at one Property storage medium (can be CD-ROM, USB flash disk, mobile hard disk etc.) in or network on, including some instructions are causing a calculating Equipment (can be server or network equipment etc.) performs the method according to disclosure implementation method.
Figure 10 is shown according to a kind of schematic diagram of handling of goods and materials device 400 in disclosure example embodiment.For example, device 400 may be provided in a server.Reference picture 10, device 400 includes processing assembly 422, and it further includes one or many Individual processor, and the memory resource as representated by memory 432, can be by the finger of the execution of processing assembly 422 for storing Order, such as application program.In memory 432 store application program can include it is one or more each correspond to One group of module of instruction.Additionally, processing assembly 422 is configured as execute instruction, to perform the above method.
Device 400 can also include that a power supply module 426 is configured as the power management of performs device 400, and one has Line or radio network interface 450 are configured as device 400 being connected to network, and input and output (I/O) interface 458.Dress Put 400 can operate based on storage memory 432 operating system, such as Windows ServerTM, Mac OS XTM, UnixTM, LinuxTM, FreeBSDTM or similar.
Those skilled in the art will readily occur to its of the disclosure after considering specification and putting into practice invention disclosed herein Its embodiment.The application is intended to any modification, purposes or the adaptations of the disclosure, these modifications, purposes or Person's adaptations follow the general principle of the disclosure and including the undocumented common knowledge in the art of the disclosure Or conventional techniques.Description and embodiments are considered only as exemplary, and the true scope of the disclosure and spirit are by appended Claim is pointed out.

Claims (10)

1. a kind of material management method, it is characterised in that methods described includes:
When receiving a first item and being asked to the borrow that a second item borrows material, respond and described borrow request determining The material category that the material is belonged to;
According to the material category determined, under judging the material category belonging to the second item of current record Whether the material number of the material is zero;
If not zero, then the material number of the material under the material category belonging to the second item is subtracted one, while The material number of the material under the material category belonging to institute's first item is added one.
2. material management method according to claim 1, it is characterised in that methods described also includes:
When the material number of the material under judging to draw the material category belonging to the second item is zero, display is used In the information for indicating the material to lend.
3. material management method according to claim 1, it is characterised in that methods described also includes:
When being zero after the material number of the material under the material category belonging to the second item subtracts one, delete described At least one of the information of the material category belonging to second item and the information of the material.
4. the material management method according to any one of claims 1 to 3, it is characterised in that methods described also includes:
It is described when receiving after adding one by the material number of the material under the material category belonging to the first item During the materiel warehouse-out request of first item, there is provided the outbound material table of the first item;
The material for comparing the outbound material table and the first item freezes table, each material in the outbound material table Outbound material number under classification is both less than when freezing corresponding material number in table equal to the material, it is allowed to the first item Materiel warehouse-out;
Wherein, the material freezes record in table each material category belonging to presently described first item and each described The material number of the material under material category.
5. material management method according to claim 4, it is characterised in that methods described also includes:
The material mark of item identification information and each material for belonging to the first item according to the first item is believed Breath generation Quick Response Code;
The Quick Response Code for generating is attached on corresponding each described material;
After the materiel warehouse-out for allowing the first item, the Quick Response Code on each described material is scanned, according to scanning described two The material identification information that dimension code is obtained changes the existing material number and outbound number of each material in the first item, while With reference to scan the item identification information that the Quick Response Code obtains in database each described material of associated record with it is described The one-to-one relationship of first item.
6. a kind of material management system, it is characterised in that the system includes:
Material category determining module, for receive a first item to a second item borrow material borrow ask when, Response is described to be borrowed request to determine the material category that the material is belonged to;
Material quantity judge module, for according to the material category determined, judging the second item of current record Whether the material number of the material under the affiliated material category is zero;And
Material quantity update module, for when the judged result of the material quantity judge module is not zero, by described second The material number of the material under the material category belonging to project subtracts one, while by the thing belonging to the first item The material number of the material under material classification adds one.
7. material management system according to claim 6, it is characterised in that the system also includes:
Information display module, for judging to draw the material belonging to the second item when the material quantity judge module When the material number of the material under classification is zero, the information for indicating the material to lend is shown.
8. material management system according to claim 6, it is characterised in that the system also includes:
Information deletion module, for subtracting one when the material number of the material under the material category belonging to the second item After when being zero, delete at least in the information of the material category and the information of the material belonging to the second item It is individual.
9. the material management system according to any one of claim 6~8, it is characterised in that the system also includes:
Materiel warehouse-out module, for adding by the material number of the material under the material category belonging to the first item After one, when the materiel warehouse-out request of the first item is received, there is provided the outbound material table of the first item;
Material comparing module, the material for comparing the outbound material table and the first item freezes table, when the outbound Outbound material number under each material category in material table is both less than when freezing corresponding material number in table equal to the material, Allow the materiel warehouse-out of the first item;
Wherein, the material freezes record in table each material category belonging to presently described first item and each described The material number of the material under material category.
10. material management system according to claim 9, it is characterised in that the system also includes:
Two-dimensional code generation module, for the item identification information according to the first item and belonging to the every of the first item The material identification information generation Quick Response Code of individual material;Wherein, the Quick Response Code of the generation is used to be attached to corresponding each described thing On material;
Scanning logging modle, for after the materiel warehouse-out for allowing the first item, scanning the two dimension on each described material Code, according to the existing thing for scanning each material in the material identification information modification first item that the Quick Response Code is obtained Material number and outbound number, in combination with scanning, the item identification information that the Quick Response Code the obtains associated record in database is each The one-to-one relationship of the individual material and the first item.
CN201710117700.2A 2017-03-01 2017-03-01 Material management method and system Active CN106920057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710117700.2A CN106920057B (en) 2017-03-01 2017-03-01 Material management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710117700.2A CN106920057B (en) 2017-03-01 2017-03-01 Material management method and system

Publications (2)

Publication Number Publication Date
CN106920057A true CN106920057A (en) 2017-07-04
CN106920057B CN106920057B (en) 2020-12-08

Family

ID=59454256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710117700.2A Active CN106920057B (en) 2017-03-01 2017-03-01 Material management method and system

Country Status (1)

Country Link
CN (1) CN106920057B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798500A (en) * 2017-10-17 2018-03-13 郑州云海信息技术有限公司 A kind of method and device of handling of goods and materials
CN107908123A (en) * 2017-11-14 2018-04-13 英业达科技有限公司 A kind of handling of goods and materials device
CN109146364A (en) * 2018-07-31 2019-01-04 深圳春沐源控股有限公司 Warehouse materials management method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101369325A (en) * 2007-08-13 2009-02-18 英业达股份有限公司 Substitute material report establishing method and system
CN102467702A (en) * 2010-11-05 2012-05-23 徐州中矿微星软件有限公司 Inventory control method for mining industry
CN102592206A (en) * 2011-12-21 2012-07-18 南京联创科技集团股份有限公司 Invoicing system for automobile accessories based on two-dimensional code
US20130325581A1 (en) * 2012-06-05 2013-12-05 3M Innovative Properties Company In-library lending activation
CN104268699A (en) * 2014-09-28 2015-01-07 浪潮(北京)电子信息产业有限公司 Method for automatic inspection of bill of material (BOM)
CN106357518A (en) * 2016-09-27 2017-01-25 深圳创维-Rgb电子有限公司 Material warehousing cabinet as well as material warehousing managing method, server and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101369325A (en) * 2007-08-13 2009-02-18 英业达股份有限公司 Substitute material report establishing method and system
CN102467702A (en) * 2010-11-05 2012-05-23 徐州中矿微星软件有限公司 Inventory control method for mining industry
CN102592206A (en) * 2011-12-21 2012-07-18 南京联创科技集团股份有限公司 Invoicing system for automobile accessories based on two-dimensional code
US20130325581A1 (en) * 2012-06-05 2013-12-05 3M Innovative Properties Company In-library lending activation
CN104268699A (en) * 2014-09-28 2015-01-07 浪潮(北京)电子信息产业有限公司 Method for automatic inspection of bill of material (BOM)
CN106357518A (en) * 2016-09-27 2017-01-25 深圳创维-Rgb电子有限公司 Material warehousing cabinet as well as material warehousing managing method, server and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马骥: "基于EMIS的ERP系统的实施及应用", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798500A (en) * 2017-10-17 2018-03-13 郑州云海信息技术有限公司 A kind of method and device of handling of goods and materials
CN107908123A (en) * 2017-11-14 2018-04-13 英业达科技有限公司 A kind of handling of goods and materials device
CN109146364A (en) * 2018-07-31 2019-01-04 深圳春沐源控股有限公司 Warehouse materials management method and system

Also Published As

Publication number Publication date
CN106920057B (en) 2020-12-08

Similar Documents

Publication Publication Date Title
van der Aalst et al. Process equivalence: Comparing two process models based on observed behavior
CN110334152A (en) A data synchronization method, device and server
US10713224B2 (en) Implementing a continuity plan generated using solution data modeling based on predicted future event simulation testing
CN109740129B (en) Report generation method, device and equipment based on blockchain and readable storage medium
CN109885474A (en) Test case editing method and device, terminal and computer-readable storage medium
CN115329011A (en) Data model construction method, data query method, data model construction device and data query device, and storage medium
Shang et al. Spatial scheduling optimization algorithm for block assembly in shipbuilding
US12061585B2 (en) Systems and methods of modeling and querying dynamic temporal graph on massive parallel graph processing and storage engine
Maniezzo et al. An ant-based framework for very strongly constrained problems
Ashraf et al. WeFreS: weighted frequent subgraph mining in a single large graph
CN106920057A (en) Material management method and system
Molka et al. Conformance checking for BPMN-based process models
CN110009473B (en) Data processing method, device, equipment and storage medium
CN112068812A (en) Micro-service generation method and device, computer equipment and storage medium
CN111311329B (en) Tag data acquisition method, device, equipment and readable storage medium
CN111126422A (en) Industry model establishing method, industry determining method, industry model establishing device, industry determining equipment and industry determining medium
CN109871380B (en) Crowd pack application method and system based on Redis
CN116644078A (en) Data quality inspection method, inspection device, inspection equipment and storage medium
CN110442369A (en) Code method for cleaning and device, storage medium suitable for git
CN115063101A (en) Method, system, device and storage medium for generating structural data based on case library
KR102759697B1 (en) Electronic device for constructing building-level greenhouse gas indicator information, system including the same and method thereof
CN114881521A (en) Service evaluation method, device, electronic equipment and storage medium
US20090100000A1 (en) Acquisition and expansion of storage area network interoperation relationships
CN104572802B (en) For the method and system for the data for being loaded with complex relationship
CN115904464B (en) Core developer identification method, device and equipment based on developer collaboration network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant