CN106914876A - A kind of stand transformer dedicated and application method - Google Patents
A kind of stand transformer dedicated and application method Download PDFInfo
- Publication number
- CN106914876A CN106914876A CN201710310581.2A CN201710310581A CN106914876A CN 106914876 A CN106914876 A CN 106914876A CN 201710310581 A CN201710310581 A CN 201710310581A CN 106914876 A CN106914876 A CN 106914876A
- Authority
- CN
- China
- Prior art keywords
- shelf
- hole
- screw
- guardrail
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H5/00—Tool, instrument or work supports or storage means used in association with vehicles; Workers' supports, e.g. mechanics' creepers
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本发明公开了一种台架变压器专用工作台及使用方法,包括支撑爬梯、搁板、连接螺栓、折叠护栏、安全绳。搁板两端通过连接螺栓分别与两个支撑爬梯铰接连接,构成一个由支撑爬梯和搁板组成的高平台。在搁板上插装折叠护栏起到防止人员坠落的作用。通过将两个支撑爬梯上的连接杆互连起到固定工作台的作用,并通过连接杆上的安全绳将连接杆系在电线杆上使工作台更加稳固。支撑爬梯的底部设有调整装置具有适应不同地面的功能。该装置采用组装式结构便于拆卸和安装,因此也具有便于运输和存放的有益效果。
The invention discloses a special workbench for a stand transformer and a use method thereof, which comprises a support ladder, a shelf, connecting bolts, a folding guardrail and a safety rope. The two ends of the shelf are hingedly connected to the two supporting ladders respectively through connecting bolts, forming a high platform composed of the supporting ladder and the shelf. Folding guardrails are inserted on the shelf to prevent people from falling. The workbench is fixed by interconnecting the connecting rods on the two supporting ladders, and the connecting rods are tied to the utility poles through the safety ropes on the connecting rods to make the workbench more stable. The bottom of the supporting ladder is equipped with an adjustment device to adapt to different grounds. The device adopts an assembled structure to facilitate disassembly and installation, and thus also has the beneficial effect of being convenient for transportation and storage.
Description
技术领域technical field
本发明涉电力工程中维修、维护工器具领域,具体说是涉及一种台架变压器专用工作台及使用方法。The invention relates to the field of repair and maintenance tools in electric power engineering, in particular to a special workbench for bench transformers and a use method thereof.
背景技术Background technique
近年来,国家电网公司加大了农村电网改造力度,台架式变压器作为典型设计方案被优先推广应用,台架式变压器距离地面2.5-3米,两电杆中心线之间距离为2.5米,变压器安装在紧贴电杆紧固的两根槽钢做成的横担上,在后期的维护、检修过程中,工作人员需徒手攀爬或借助铁鞋登杆至台架位置才能进行工作,上下极不方便;并且由于变压器台架结构较紧凑,工作人员在变压器台架上工作活动范围受限,维护、检修过程中极易造成工器具和人员坠落。申请号为201520854754.3的一种柱上变压器检修台架,其结构为在安装台架变压器的横担上固定有L形的平台结构,以方便检修人员在上边工作。但是该结构需要每台台架变压器都要安装,提高了成本,同时由于结构单一不具有灵活组合使用的功能。因此设计一种方便组装的台架变压器专用工作台成为迫切的需求。In recent years, the State Grid Corporation of China has intensified efforts to transform rural power grids. As a typical design scheme, bench-type transformers have been given priority for promotion and application. The transformer is installed on the cross arm made of two channel steels that are fastened close to the pole. During the later maintenance and overhaul process, the staff need to climb with bare hands or use iron shoes to climb the pole to the position of the platform to work. It is extremely inconvenient to go up and down; and because the structure of the transformer bench is relatively compact, the working range of the staff on the transformer bench is limited, and it is very easy to cause tools and personnel to fall during maintenance and overhaul. The application number is 201520854754.3, which is a pole-mounted transformer maintenance platform. Its structure is that an L-shaped platform structure is fixed on the cross arm of the transformer installation platform, so as to facilitate the maintenance personnel to work on it. However, this structure requires the installation of each bench transformer, which increases the cost, and at the same time, it does not have the function of flexible combination due to the single structure. Therefore, it is an urgent need to design a special workbench for bench transformers that is convenient for assembly.
发明内容Contents of the invention
本发明要解决的技术问题是:提供了一种台架变压器专用工作台及使用方法,该工作台方便人员上下,进行维护、检修变压器的工作台,同时具有容纳多名人员工作,便于拆装、携带的特点。The technical problem to be solved by the present invention is to provide a special workbench for bench transformers and its use method. The workbench is convenient for personnel to go up and down to maintain and repair the transformer. , Carrying characteristics.
本发明要解决的技术问题的技术方案是:The technical scheme of the technical problem to be solved in the present invention is:
一种台架变压器专用工作台,其特征在于:包括两个支撑爬梯、一个搁板、两个连接螺栓和一个折叠护栏。所述支撑爬梯包括两个支柱以及多个横杆。所述支柱的横截面为L形,两个支柱成“┕┙”形对称设置,支柱的顶部设有铰接管,支柱的下部外侧设有调整装置,支柱的中部设有连接杆。所述横杆与两个支柱垂直且固定连接,横杆的两端设有挡环,挡环和支柱中间的一段横杆上套设有轴承,轴承上部架设有货台,所述货台为矩形平板,货台下部设有挡块,货台上部中间设有圆孔,货台嵌在两个L形支柱和横杆组成的滑槽内。所述铰接管为设有内螺纹的圆管,铰接管的轴心线垂直于支柱且与横杆平行,两个支柱上的铰接管的孔径不同,孔径较大的铰接管为第一铰接管,孔径较小的铰接管为第二铰接管。所述调整装置包括固定块、连动杆、调节丝杠、调节挡块、底座和固定针。所述固定块为矩形块,固定块一侧与支柱固定连接,固定块设有滑孔和调节螺孔,所述滑孔有两个,且贯通固定块的上下两个平面,所述调节螺孔轴心线与滑孔的轴心线平行,调节螺孔位于两个滑孔中间。所述连动杆有两个,分别滑动设置于滑孔内部,连动杆的下端与底座铰接连接,所述底座上,位于两个连动杆与底座铰接处的中间的位置设有圆孔,圆孔的孔径大于调节螺孔的孔径,圆孔的轴心与调节螺孔的轴心重合。所述调节挡块包括两个连接部和联动部,所述联动部为一个圆环,联动部上部设有卡槽,所述卡槽为环形的凹槽,所述连接部为长条状,对称设置于联动部的两侧,两侧的连接部分别与连动杆的下部固定连接。所述调节丝杠为管状结构,调节丝杠与调节螺孔螺接连接,调节丝杠的管壁厚度小于卡槽的截面宽度,用以将调节丝杠嵌入卡槽内部,调节丝杠的底端与卡槽通过轴承连接,调节丝杠管壁的上端设有两个承接槽,两个承接槽宽度相同且相对设置于调节丝杠的管壁上,调节丝杠下部的管壁上对应承接槽的下部设有推出孔,推出孔与承接槽的形状相同。所述固定针下端为针尖状,上端为圆柱体,固定针的上端的侧面设有贯通的方孔,方孔的中心线经过固定针的轴心线,固定针的顶部端面上设有两个定位螺孔,定位螺孔垂直于方孔的中心线,两个定位螺孔相对于固定针的轴心对称,方孔内部设有两个卡块,所述卡块为矩形条,卡块的中部设有限位孔,两个卡块的中间设有弹簧,定位螺孔内部的螺丝穿过卡块中部的限位孔,卡块探出固定针的部分卡设在承接槽内。所述连接螺栓包括小螺纹部、铰接杆、大螺纹部以及操作部。所述小螺纹部位于左端,小螺纹部为与第二铰接管匹配的螺杆。所述铰接杆为圆柱体位于小螺纹部的右侧,铰接杆的孔径略小于连接圆管的孔径,所述大螺纹部位于铰接杆的右侧。大螺纹部为与第一铰接管匹配的螺杆。所述操作部位于大螺纹部的右侧,操作部为正六边形柱体,操作部设有通孔,所述通孔贯通操作部的两个相对的侧面。所述搁板为矩形,搁板的四个角设有矩形的缺口,搁板的左右两端设有连接圆管,搁板的底部平面两端各设有一个组合连接管,组合连接管内部安装连接轴,搁板的下部边缘和左右边缘设有护栏插孔。所述连接圆管放置在支撑爬梯的两个支柱的铰接管中间,连接圆管的轴心线和支柱上的铰接管的轴心线重合,连接圆管的孔径大于第二铰接管的孔径且小于第一铰接管的孔径,连接圆管与两个铰接管通过连接螺栓实现铰接连接。所述折叠护栏包括一个长护栏和两个支撑护栏,所述长护栏的左右两侧分别与支撑护栏铰接连接,长护栏和支撑护栏的底部设有与护栏插孔位置匹配的护栏插头,护栏插头插在护栏插孔内部。A special workbench for bench transformers is characterized in that it includes two supporting ladders, a shelf, two connecting bolts and a folding guardrail. The support ladder includes two pillars and a plurality of cross bars. The cross-section of the pillar is L-shaped, and the two pillars are symmetrically arranged in a "┕┙" shape. The top of the pillar is provided with a hinged pipe, the lower part of the pillar is provided with an adjustment device, and the middle part of the pillar is provided with a connecting rod. The crossbar is vertically and fixedly connected to the two pillars, and the two ends of the crossbar are provided with retaining rings, and a section of the crossbar between the retaining ring and the pillars is provided with a bearing. Rectangular flat plate, the lower part of the cargo platform is provided with a stopper, and the upper part of the cargo platform is provided with a round hole in the middle, and the cargo platform is embedded in the chute formed by two L-shaped pillars and cross bars. The articulated pipe is a circular pipe provided with an internal thread, the axis of the articulated pipe is perpendicular to the pillar and parallel to the cross bar, the articulated pipes on the two pillars have different apertures, and the articulated pipe with a larger aperture is the first articulated pipe , the hinged tube with smaller aperture is the second hinged tube. The adjusting device includes a fixed block, a linkage rod, an adjusting screw, an adjusting block, a base and a fixing pin. The fixed block is a rectangular block, one side of the fixed block is fixedly connected with the pillar, the fixed block is provided with a sliding hole and an adjusting screw hole, the sliding holes have two, and run through the upper and lower planes of the fixing block, the adjusting screw The axis line of the hole is parallel to the axis line of the sliding hole, and the adjusting screw hole is located in the middle of the two sliding holes. There are two connecting rods, which are respectively slidably arranged inside the slide hole, and the lower end of the connecting rod is hingedly connected with the base. On the base, a round hole is arranged in the middle of the joint between the two connecting rods and the base. , the aperture of the circular hole is larger than the aperture of the adjusting screw hole, and the axis of the circular hole coincides with the axis of the adjusting screw hole. The adjustment block includes two connecting parts and a linkage part, the linkage part is a ring, the upper part of the linkage part is provided with a card slot, the card slot is an annular groove, and the connection part is strip-shaped, It is symmetrically arranged on both sides of the linkage part, and the connection parts on both sides are respectively fixedly connected with the lower part of the linkage rod. The adjusting screw has a tubular structure, and the adjusting screw is screwed to the adjusting screw hole. The thickness of the tube wall of the adjusting screw is smaller than the cross-sectional width of the slot, so that the adjusting screw can be inserted into the slot, and the bottom of the adjusting screw is The end and the card slot are connected by bearings. The upper end of the adjustment screw tube wall is provided with two receiving grooves. The two receiving grooves have the same width and are oppositely arranged on the tube wall of the adjustment screw. The bottom of the groove is provided with a push-out hole, and the shape of the push-out hole is the same as that of the receiving groove. The lower end of the fixed pin is needle-shaped, and the upper end is a cylinder. The side of the upper end of the fixed pin is provided with a through square hole. The center line of the square hole passes through the axis line of the fixed pin. Positioning screw holes, the positioning screw holes are perpendicular to the centerline of the square hole, the two positioning screw holes are symmetrical to the axis of the fixed pin, and there are two clamping blocks inside the square hole, the clamping blocks are rectangular strips, the clamping blocks There is a limit hole in the middle, a spring is arranged in the middle of the two blocks, the screw inside the positioning screw hole passes through the limit hole in the middle of the block, and the part of the block protruding from the fixing pin is clamped in the receiving groove. The connecting bolt includes a small threaded part, a hinge rod, a large threaded part and an operating part. The small thread part is located at the left end, and the small thread part is a screw rod matched with the second articulated pipe. The articulated rod is a cylinder located on the right side of the small threaded part, the aperture of the articulated rod is slightly smaller than the aperture of the connecting pipe, and the large threaded part is located on the right side of the articulated rod. The large threaded part is a screw rod matched with the first articulated pipe. The operation part is located on the right side of the large threaded part, and the operation part is a regular hexagonal cylinder. The operation part is provided with a through hole, and the through hole passes through two opposite side surfaces of the operation part. The shelf is rectangular, the four corners of the shelf are provided with rectangular gaps, the left and right ends of the shelf are provided with connecting round pipes, the two ends of the bottom plane of the shelf are respectively provided with a combined connecting pipe, and the inside of the combined connecting pipe is The connecting shaft is installed, and the lower edge and the left and right edges of the shelf are provided with guardrail jacks. The connecting round pipe is placed in the middle of the hinged pipes supporting the two pillars of the ladder, the axis line of the connecting round pipe coincides with the axis line of the hinged pipe on the pillar, and the aperture of the connecting round pipe is larger than the aperture of the second hinged pipe and Smaller than the hole diameter of the first hinged pipe, the connecting circular pipe and the two hinged pipes are hingedly connected by connecting bolts. The folding guardrail includes a long guardrail and two supporting guardrails, the left and right sides of the long guardrail are respectively hingedly connected with the supporting guardrail, and the bottom of the long guardrail and the supporting guardrail is provided with a guardrail plug matching the position of the guardrail jack, and the guardrail plug Insert it inside the guardrail jack.
更好的,所述支撑爬梯最上面的一个横杆中间设有滑轮,滑轮上绕设有拉绳,所述拉绳两端设有挂钩,拉绳一端挂在货台的圆孔内,一端挂在横杆上。More preferably, a pulley is provided in the middle of the uppermost cross bar of the support ladder, and a pulley is wound around the pulley. The two ends of the pulley are provided with hooks. Hang on a rail.
优选的,所述折叠护栏上设有挂钩。Preferably, a hook is provided on the folding guardrail.
优选的,所述连接杆上设有安全绳。Preferably, a safety rope is provided on the connecting rod.
所述的一种台架变压器专用工作台的使用方法包括以下步骤:The method for using the special workbench for a bench transformer includes the following steps:
步骤1,在横担长度方向的一侧组装支撑爬梯和搁板,具体步骤为,步骤1.1将两个支撑爬梯放置在搁板的两侧,搁板两侧的连接圆管放置在支撑爬梯上的两个支柱上的圆管中间,步骤1.2将连接螺栓依次穿过第一铰接管、连接圆管、第二铰接管,并将连接螺栓的大、小螺纹部和第一、二铰接管螺接连接,步骤2,调整支撑爬梯使搁板与安装变压器的横担接近,步骤3,根据搁板的高度调整连接杆,将连接杆最外侧螺孔内的蝶形螺栓拧入另一个连接杆的合适的螺孔内,步骤4,将折叠护栏拿到搁板上,打开折叠护栏并插入搁板的护栏插孔的内部。Step 1. Assemble the supporting ladder and the shelf on one side of the cross-arm length direction. The specific steps are: Step 1.1 Place the two supporting ladders on both sides of the shelf, and place the connecting round pipes on both sides of the shelf on the supporting ladder In the middle of the round tubes on the two pillars, step 1.2 passes the connecting bolts through the first hinged tube, the connecting round tube, and the second hinged tube in turn, and connects the large and small threaded parts of the connecting bolts and the first and second hinged tubes. Connect the connection, step 2, adjust the support ladder so that the shelf is close to the cross arm where the transformer is installed, step 3, adjust the connecting rod according to the height of the shelf, and screw the butterfly bolt in the outermost screw hole of the connecting rod into the other connecting rod In the appropriate screw hole, step 4, take the folding guardrail to the shelf, open the folding guardrail and insert it into the inside of the guardrail socket of the shelf.
更好的,一种台架变压器专用工作台的使用方法,其步骤1的特征在于:在横担的长度方向的两侧分别组装支撑爬梯和搁板,组装完成后将连接轴插入横担长度方向两侧的搁板的对应的组合连接管中。More preferably, a method for using a special workbench for bench transformers, the feature of step 1 is: respectively assembling the supporting ladder and the shelf on both sides of the length direction of the cross arm, and inserting the connecting shaft into the length of the cross arm after the assembly is completed. Orient the corresponding combination of shelves on both sides in the connecting pipe.
更好的,一种台架变压器专用工作台的使用方法,其步骤2的特征在于:方法2.1,硬化地面上调整装置的调节:旋转调节丝杠调整底座的伸出长度来适应不同的高度;方法2.2,松软地面上调整装置的调节:首先,按压卡块使其缩进调节丝杠内部,然后,在调节丝杠上端的内部将固定针向下按压,固定针从底部探出后再从底座的下端往下拉,直至卡块到达推出孔并弹出推出孔,最后,调整调节丝杠至合适位置并将固定针插入松软的地面。More preferably, a method for using a special workbench for bench transformers, the feature of step 2 is: method 2.1, adjustment of the adjustment device on the hardened ground: rotating the adjustment screw to adjust the extension length of the base to adapt to different heights; Method 2.2, the adjustment of the adjustment device on the soft ground: first, press the block to make it retract into the inside of the adjustment screw, and then press down the fixing pin inside the upper end of the adjustment screw, and the fixing pin protrudes from the bottom and then from the The lower end of the base is pulled down until the block reaches the push-out hole and pops out of the push-out hole. Finally, adjust the adjusting screw to a suitable position and insert the fixing pin into the soft ground.
本发明的有益效果在于,The beneficial effect of the present invention is that,
1、采用组装式的结构设计,方便设备的存放和运输,1. The assembled structure design is adopted to facilitate the storage and transportation of the equipment.
2、无需固定在台架变压器的横担上,节约了成本,2. It does not need to be fixed on the cross arm of the bench transformer, which saves the cost.
3、支撑爬梯的横杆设有轴承,方便了笨重设备的上下运输,3. The cross bar supporting the ladder is equipped with bearings, which facilitates the up and down transportation of heavy equipment.
4、支撑爬梯设有调整装置,具有适应不平坦地面的功能,4. The supporting ladder is equipped with an adjustment device, which has the function of adapting to uneven ground.
5、该工作台具有两台组合使用且组合后更牢靠的有益效果。5. The workbench has the beneficial effect that two sets are used in combination and are more reliable after the combination.
附图说明Description of drawings
图1是本发明台架变压器专用工作台一种实施例的主视图,Fig. 1 is the front view of an embodiment of the special workbench for bench transformer of the present invention,
图2是本发明台架变压器专用工作台一种实施例平铺时的俯视图,Fig. 2 is a plan view of an embodiment of the special workbench for bench transformer of the present invention when it is laid flat,
图3是本发明台架变压器专用工作台的支撑爬梯的一种实施例的主视图,Fig. 3 is a front view of an embodiment of the supporting ladder of the bench transformer special workbench of the present invention,
图4是本发明台架变压器专用工作台的支撑爬梯的一种实施例的仰视图,Fig. 4 is a bottom view of an embodiment of the supporting ladder of the bench transformer special workbench of the present invention,
图5是本发明台架变压器专用工作台两台组合使用时的示意图,Fig. 5 is a schematic diagram when two special workbenches for bench transformers of the present invention are used in combination,
图6是本发明台架式变压器专用工作台调整装置的剖视图,Fig. 6 is a cross-sectional view of the special workbench adjustment device for bench-type transformers of the present invention,
图7是本发明台架式变压器专用工作台图6中A区域放大图,Fig. 7 is an enlarged view of area A in Fig. 6 of the bench-type transformer special workbench of the present invention,
图8是本发明台架式变压器专用工作台图6中B区域放大图,Fig. 8 is an enlarged view of area B in Fig. 6 of the bench-type transformer special workbench of the present invention,
图9是本发明台架式变压器专用工作台调节挡块的示意图,Fig. 9 is a schematic diagram of the adjustment block of the bench-type transformer special workbench of the present invention,
图10是本发明台架式变压器专用工作台连接螺栓的示意图。Fig. 10 is a schematic diagram of connecting bolts for the dedicated workbench of the bench-type transformer of the present invention.
图中,In the figure,
1.支撑爬梯,13.连接杆,1. Support ladder, 13. Connecting rod,
2.搁板,21.护栏插孔,22.组合连接管,23.连接轴,24.连接圆管,2. Shelf, 21. Guardrail socket, 22. Combined connecting pipe, 23. Connecting shaft, 24. Connecting round pipe,
3.连接螺栓,31.小螺纹部,32.铰接杆,33.大螺纹部,34.操作部,3. Connecting bolt, 31. Small thread part, 32. Articulating rod, 33. Large thread part, 34. Operation part,
4.横杆,41.挡环,42.轴承,43.滑轮,44.货台,4. Cross bar, 41. Stop ring, 42. Bearing, 43. Pulley, 44. Freight platform,
5.拉绳,5. Drawstring,
6.折叠护栏,61.长护栏,62.支撑护栏,63.护栏插头6. Folding Guardrail, 61. Long Guardrail, 62. Supporting Guardrail, 63. Guardrail Plug
7.安全绳7. Safety rope
8.支柱,81.第一铰接管,82.第二铰接管,8. Strut, 81. First hinged tube, 82. Second hinged tube,
9.调整装置,91.固定块,911.滑孔,912.调节螺孔,92.连动杆,93.调节丝杠,931.承接槽,932.推出孔,94.调节挡块,941.连接部,942.联动部,943.卡槽,95.底座,96.固定针,961.定位螺孔,962.卡块,963.限位孔。9. Adjusting device, 91. Fixed block, 911. Sliding hole, 912. Adjusting screw hole, 92. Linkage rod, 93. Adjusting screw, 931. Accepting groove, 932. Pushing hole, 94. Adjusting block, 941 .Connecting part, 942. Linkage part, 943. Card slot, 95. Base, 96. Fixing pin, 961. Positioning screw hole, 962. Blocking block, 963. Limiting hole.
具体实施方式detailed description
为使本发明的技术方案和有益效果更加清楚,下面对本发明的实施方式做进一步的详细解释。In order to make the technical solutions and beneficial effects of the present invention clearer, the implementation manners of the present invention will be further explained in detail below.
如图1所示,一种台架变压器专用工作台,包括两个支撑爬梯1、一个搁板2、两个连接螺栓3和一个折叠护栏6。As shown in FIG. 1 , a dedicated workbench for bench transformers includes two supporting ladders 1 , a shelf 2 , two connecting bolts 3 and a folding guardrail 6 .
如图3所示,支撑爬梯1包括两个支柱8和多个横杆4。支撑爬梯1的作用有三个,一是支撑上部的搁板2;二是方便人员通过支撑爬梯1到达搁板2的上部;三是方便将笨重的设备拉升至搁板2上。由于电力系统的行业中电气设备多具有体积大,质量重的特点,对于架空安装的变压器进行检修维护应用到的设备同样具有上述特点,因此方便设备由地面运送到台架式变压器上部的这个有益效果成为其一个亮点。As shown in FIG. 3 , the support ladder 1 includes two pillars 8 and a plurality of cross bars 4 . There are three functions of supporting the ladder 1, one is to support the upper shelf 2; Since most of the electrical equipment in the power system industry has the characteristics of large volume and heavy weight, the equipment used for maintenance and maintenance of overhead installed transformers also has the above characteristics, so it is convenient for the equipment to be transported from the ground to the upper part of the bench-type transformer. The effect becomes one of its highlights.
为了实现方便设备和工具的往高处的搁板2上运输,将支撑爬梯1做了特殊设计。如图4所示,首先支柱8设计为横截面为L形的柱体,两个支柱8成“┕┙”形对称设置,因此两根支柱8和横杆4组成一个开口朝上的滑槽;其次在横杆4上加设了轴承42以方便设备在滑槽内部的滑动;最后为了方便运输各种大小的设备,在支柱8和横杆4组成的滑槽内部放置了一个货台44。In order to facilitate the transportation of equipment and tools to the high shelf 2, the support ladder 1 is specially designed. As shown in Figure 4, firstly, the pillar 8 is designed as a cylinder with an L-shaped cross section, and the two pillars 8 are symmetrically arranged in a "┕┙" shape, so the two pillars 8 and the crossbar 4 form a chute with the opening facing upwards ; Secondly, a bearing 42 is added on the cross bar 4 to facilitate the sliding of the equipment inside the chute; finally, in order to facilitate the transportation of equipment of various sizes, a cargo platform 44 is placed inside the chute formed by the pillar 8 and the cross bar 4 .
为了即能实现便于货台44滑动又不影响人员的攀爬,将轴承42套设在横杆4的两端。为了防止轴承42在横杆4水平方向上滑动,在横杆4的两端设置了挡环41,挡环41与横杆4固定连接,由此轴承42即限定在支柱8和挡环41之间的横杆4的端部上。为了使货台44在支柱8与横杆4组成的滑槽内滑动,货台44的宽度应大于两个轴承42之间的距离,小于两个支柱8之间的距离。因此将货台44设计为一个水平方向横跨两个轴承42,竖直方向至少横跨两个横杆4的平板。为了防止设备从货台44上滑落,在货台44的下部边缘设置了挡板。为了便于人员拉动货台44,在货台44上部边缘的中间位置设有一个圆形通孔。圆形通孔用于系绳索或挂挂钩。In order to facilitate the sliding of the cargo platform 44 without affecting the climbing of personnel, the bearings 42 are sleeved at both ends of the cross bar 4 . In order to prevent the bearing 42 from sliding in the horizontal direction of the cross bar 4, a retaining ring 41 is provided at both ends of the cross bar 4, and the retaining ring 41 is fixedly connected with the cross bar 4, so that the bearing 42 is defined between the pillar 8 and the retaining ring 41 On the end of cross bar 4 between. In order to make the cargo platform 44 slide in the chute formed by the pillar 8 and the cross bar 4 , the width of the cargo platform 44 should be greater than the distance between the two bearings 42 and less than the distance between the two pillars 8 . Therefore cargo platform 44 is designed as a horizontal direction spans two bearings 42, and vertical direction spans the flat plate of two cross bars 4 at least. In order to prevent equipment from slipping off from the cargo platform 44, a baffle plate is provided on the lower edge of the cargo platform 44. In order to facilitate personnel to pull the cargo platform 44, a circular through hole is provided at the middle position of the upper edge of the cargo platform 44. The round through hole is used for tying a rope or hanging a hook.
由于安装台架式变压器的地方不一定具有平整的地面,支撑爬梯1往往找不到合适的支点,因此在支撑爬梯1的支柱8的下部设置了调整装置9。调整装置9包括固定块91、连动杆92、调节丝杠93、调节挡块94、底座95、固定针96。为了实现承重和方便固定安装,固定块91为一个矩形块,如图3所示,固定块91的一个侧面与支柱8的外侧固定连接。固定块91除了与支柱8进行连接还有安装调整部件的作用。因此在固定块91上设置了两个滑孔911,为了方便长度的调整,滑孔911为贯通固定块91上下两个平面的通孔。滑孔911的功能是给连动杆92提供滑动调节的轨道,要实现长度的调节,还需要设置一个调节丝杠93。因此还需要为调节丝杆93设置一个调节螺孔912,调节螺孔912位于两个滑孔911的中间,调节螺孔912的轴心线与滑孔911的轴心线平行,调节螺孔912内部的螺纹与调节丝杆93外部的螺纹匹配。两个连动杆92位于两个滑孔911内部,调节丝杠93与调节螺孔912螺接连接。Because the place where the bench-type transformer is installed does not necessarily have a flat ground, a suitable fulcrum is often not found for the support ladder 1, so an adjustment device 9 is provided at the bottom of the pillar 8 of the support ladder 1. The adjustment device 9 includes a fixed block 91 , a linkage rod 92 , an adjustment screw 93 , an adjustment block 94 , a base 95 , and a fixed pin 96 . In order to realize load bearing and facilitate fixed installation, the fixed block 91 is a rectangular block, as shown in FIG. 3 , one side of the fixed block 91 is fixedly connected with the outer side of the pillar 8 . In addition to being connected with the pillar 8, the fixing block 91 also has the function of installing adjustment components. Therefore, two sliding holes 911 are provided on the fixing block 91 . In order to facilitate length adjustment, the sliding holes 911 are through holes passing through the upper and lower planes of the fixing block 91 . The function of the sliding hole 911 is to provide a track for sliding adjustment to the linkage rod 92. To realize the adjustment of the length, an adjusting screw 93 is also required. Therefore also need to set an adjustment screw hole 912 for the adjustment screw 93, the adjustment screw hole 912 is located in the middle of two slide holes 911, the axis line of the adjustment screw hole 912 is parallel to the axis line of the slide hole 911, the adjustment screw hole 912 The internal thread matches the external thread of the adjusting screw rod 93 . The two linkage rods 92 are located inside the two sliding holes 911 , and the adjusting screw 93 is screwed to the adjusting screw hole 912 .
连动杆92的下端与底座95铰接连接。两个连动杆92与底座95的两个铰接连接处的中间,对应调节丝杠93的位置设有圆孔。圆孔的作用是给固定针96提供一个通过的空间,以便固定针96穿过底座95插在地面上。两个连动杆92的中间连接有调节挡块94。调节挡块94的作用是连接连动杆92和调节丝杠93,以实现通过调节丝杆93的转动调整连动杆92的伸缩。为了实现与两个连动杆92的连接和与调节丝杠93的连接,调节挡块94包括连接部941和联动部942。连接部91有两个分别位于联动部942的相对的两侧,且分别与连动杆固定连接。联动部942为环形,在联动部942的上部设有卡槽943,卡槽943为环形,卡槽943与联动部942的轴线重合。卡槽943内部设有轴承,并通过轴承与调节丝杠93的下端连接。轴承的外圈与卡槽943的外侧面固定连接,轴承的内圈与调节丝杠93的下端的外侧面固定连接。The lower end of the linkage rod 92 is hingedly connected with the base 95 . In the middle of the two hinged joints between the two linkage rods 92 and the base 95 , a round hole is provided at the position corresponding to the adjusting screw 93 . The effect of the circular hole is to provide a passing space for the fixing pin 96, so that the fixing pin 96 passes through the base 95 and is inserted on the ground. An adjustment block 94 is connected between the two linkage rods 92 . The function of the adjustment block 94 is to connect the linkage rod 92 and the adjustment screw 93 to realize the expansion and contraction of the adjustment linkage rod 92 through the rotation of the adjustment screw 93 . In order to realize the connection with the two linkage rods 92 and the adjustment screw 93 , the adjustment block 94 includes a connection portion 941 and a linkage portion 942 . Two connecting parts 91 are respectively located on opposite sides of the linkage part 942, and are respectively fixedly connected with the linkage rod. The linking part 942 is ring-shaped, and a locking groove 943 is provided on the upper part of the linking part 942 . Bearings are arranged inside the slot 943 and are connected to the lower end of the adjusting screw 93 through the bearings. The outer ring of the bearing is fixedly connected to the outer surface of the locking groove 943 , and the inner ring of the bearing is fixedly connected to the outer surface of the lower end of the adjusting screw 93 .
为了实现该装置能够固定在松软地面上,采用针状的结构插入底面是一个实现的方法。因此将调节丝杠93设计为管状,并在其内部安装一个固定针96。为了能够将调节丝杠93放置在卡槽943内部并与轴承连接,调节丝杠93的管壁小于卡槽943的宽度。为了便于固定针96固定在调节丝杠93的内部,并且方便固定针96的推出,在调节丝杠93的上端设有两个承接槽931。两个承接槽931对称设置。两个推出孔932位于调节丝杠93的下部,位置与两个承接槽931上下对应。In order to realize that the device can be fixed on the soft ground, using a needle-shaped structure inserted into the bottom surface is a realization method. Therefore, the adjusting screw 93 is designed to be tubular, and a fixed pin 96 is installed inside it. In order to place the adjusting screw 93 inside the slot 943 and connect it with the bearing, the tube wall of the adjusting screw 93 is smaller than the width of the slot 943 . In order to facilitate fixing the fixing pin 96 inside the adjusting screw 93 and facilitating the pushing out of the fixing pin 96 , two receiving grooves 931 are provided on the upper end of the adjusting screw 93 . The two receiving grooves 931 are arranged symmetrically. The two push-out holes 932 are located at the lower part of the adjusting screw 93 , and the positions correspond to the two receiving grooves 931 up and down.
固定针96具有扎入松软底面的作用,因此其下端为针尖状,上端为圆柱体。为了使固定针96支撑在调节丝杠93的内部,固定针96设置了两个卡块962。为了便于卡块962的安装,在固定针96的上端设有一个方孔,方孔横穿固定针96的圆柱面,并且方孔的中心线经过固定针96的轴心线。两个卡块962的中间连接有弹簧,弹簧的两端分别与两个卡块962固定连接。连接有弹簧的两个卡块962安装在方孔内部,为了防止卡块962弹出方孔,在卡块962的中部设有限位孔963,限位孔963为矩形孔,限位孔963的长度方向与方孔的中心线平行。在固定针96的上部平面上设有两个定位螺孔961,两个定位螺孔961位于方孔的上部,且相对于轴心对称设置。将卡块962安装在方孔内部之后,在定位螺孔961内部拧上螺丝,螺丝穿过限位孔963,将卡块962限制在限位孔963的范围内活动。Fixing needle 96 has the effect of pricking into the soft bottom surface, so its lower end is a needle point shape, and its upper end is a cylinder. In order to support the fixing pin 96 inside the adjusting screw 93 , the fixing pin 96 is provided with two blocks 962 . In order to facilitate the installation of the block 962 , a square hole is provided at the upper end of the fixed pin 96 , the square hole crosses the cylindrical surface of the fixed pin 96 , and the centerline of the square hole passes through the axis of the fixed pin 96 . A spring is connected between the two clamping blocks 962 , and both ends of the spring are fixedly connected to the two clamping blocks 962 respectively. Two clamping blocks 962 connected with springs are installed inside the square hole. In order to prevent the clamping blocks 962 from ejecting from the square hole, a limiting hole 963 is provided in the middle of the clamping block 962. The limiting hole 963 is a rectangular hole, and the length of the limiting hole 963 Orientation is parallel to the centerline of the square hole. Two positioning screw holes 961 are arranged on the upper plane of the fixing pin 96, and the two positioning screw holes 961 are located on the upper part of the square hole and are arranged symmetrically with respect to the axis. After the clamping block 962 is installed in the square hole, screws are screwed inside the positioning screw hole 961 , and the screw passes through the limiting hole 963 to limit the clamping block 962 to move within the range of the limiting hole 963 .
在平整的地面上找平时,无需将固定针96探出,因此将卡块962突出方孔的部分卡在承接槽931的内部,然后调整调节丝杠93实现找平。在松软底面找平时,需要将固定针96探出,此时按压卡块962使其缩进调节丝杆93内部,然后将固定针96向下按,使针头露出调节丝杠93,然后向下拉固定针96当到达推出孔932的位置时卡块962自动弹出实现固定针的96的锁定。此时固定针96已经穿过了联动部942的圆孔和底座95的圆孔,就可以插入松软地面实现支撑爬梯1的固定。When leveling on a flat ground, it is not necessary to protrude the fixing pin 96, so the part of the clamping block 962 protruding from the square hole is stuck in the receiving groove 931, and then the adjusting screw 93 is adjusted to achieve leveling. When leveling the soft bottom, it is necessary to protrude the fixing pin 96. At this time, press the block 962 to make it retract into the inside of the adjusting screw 93, and then press down the fixing pin 96 so that the needle is exposed to the adjusting screw 93, and then pull it down. When the fixed pin 96 reaches the position of the push-out hole 932, the block 962 pops out automatically to realize the locking of the fixed pin 96. At this moment, the fixing pin 96 has passed through the circular hole of the linkage part 942 and the circular hole of the base 95, and can be inserted into the soft ground to realize the fixing of the supporting ladder 1.
为了保证该台架变压器专用工作台的稳定,在支撑爬梯1的支柱8的中心设置了连接杆13。连接杆13通过与另一个支撑爬梯1的支柱8的连接杆13连接实现工作台的稳定连接。为了方便固定和调整,连接杆13的一端与支柱8铰接连接,另一端设有至少两个螺孔,每个螺孔之间的间距相同,最外侧的一个螺孔内部设有蝶形螺栓。通过将蝶形螺栓拧入对侧支撑爬梯1的连接杆13的螺孔内实现两个连接杆13的连接,由此来实现两个支撑爬梯1的固定。In order to ensure the stability of the dedicated workbench for the stand transformer, a connecting rod 13 is provided at the center of the pillar 8 supporting the climbing ladder 1 . The connecting rod 13 realizes the stable connection of the workbench by being connected with the connecting rod 13 of another support pillar 8 of the ladder 1 . In order to facilitate fixing and adjustment, one end of the connecting rod 13 is hingedly connected with the pillar 8, and the other end is provided with at least two screw holes with the same spacing between each screw hole, and a butterfly bolt is arranged inside the outermost screw hole. The connection of the two connecting rods 13 is realized by screwing the butterfly bolts into the screw holes of the connecting rods 13 of the opposite side supporting ladder 1 , thereby realizing the fixing of the two supporting ladders 1 .
为了实现方便拆装的设计理念,支撑爬梯1和搁板2设计为用连接螺栓3连接的两个独立的部件。如图2所示,因此在支撑爬梯1的两个支柱8的上端分别设置了铰接管,搁板2的两侧设置了连接圆管24。为了实现铰接管、连接螺栓3、连接圆管24的配合,并且方便安装对铰接管、连接螺栓3、连接圆管24做了改进。In order to realize the design concept of easy disassembly, the supporting ladder 1 and the shelf 2 are designed as two independent parts connected by connecting bolts 3 . As shown in FIG. 2 , hinged pipes are respectively provided on the upper ends of the two pillars 8 supporting the ladder 1 , and connecting circular pipes 24 are provided on both sides of the shelf 2 . In order to realize the cooperation of the hinged pipe, the connecting bolt 3 and the connecting round pipe 24, and facilitate the installation, the hinged pipe, the connecting bolt 3 and the connecting round pipe 24 have been improved.
为了减少零部件在铰接管为内部设有内螺纹的圆管,铰接管的轴心线与支柱8垂直并且与横杆4平行。位于两个支柱8上的铰接管的外径相同内径不同,孔径较大的铰接管为第一铰接管81,孔径较小的铰接管为第二铰接管82。如此设计的好处在于可以实现连接螺栓3的铰接连接。而连接螺栓3的设计也与此匹配。In order to reduce parts, the hinged tube is a circular tube with internal threads inside, and the axis of the hinged tube is perpendicular to the pillar 8 and parallel to the cross bar 4 . The hinged tubes on the two pillars 8 have the same outer diameter and different inner diameters. The hinged tube with a larger aperture is the first hinged tube 81 , and the hinged tube with a smaller aperture is the second hinged tube 82 . The advantage of such a design is that the hinged connection of the connecting bolt 3 can be realized. And the design of connecting bolt 3 also matches this.
为了使连接更加稳固、便于安装,连接螺栓3包括小螺纹部31、铰接杆32、大螺纹部33和操作部34。如图10所示,小螺纹部31位于连接螺栓3的左端,小螺纹部31和第二铰接管82匹配,并且可以与其螺接连接。铰接杆32位于小螺纹部31的右侧,为一个圆柱体,用于放置在连接圆管24内部以实现与搁板2的连接。大螺纹部33位于铰接杆32的右侧,用以和第一铰接管81螺接连接。操作部34为正六边形主体,并且设有通孔。可以通过扳手或者螺丝刀进行旋转操作实现连接螺栓和铰接管的螺接连接。。In order to make the connection more stable and easy to install, the connecting bolt 3 includes a small threaded part 31 , a hinge rod 32 , a large threaded part 33 and an operating part 34 . As shown in FIG. 10 , the small threaded part 31 is located at the left end of the connecting bolt 3 , and the small threaded part 31 matches with the second hinged pipe 82 and can be screwed to it. The hinge rod 32 is located on the right side of the small threaded part 31 and is a cylinder for placing inside the connecting tube 24 to realize the connection with the shelf 2 . The large threaded part 33 is located on the right side of the hinge rod 32 and used for screw connection with the first hinge tube 81 . The operation part 34 is a regular hexagonal body, and is provided with a through hole. The threaded connection between the connecting bolt and the hinged pipe can be realized by rotating a wrench or a screwdriver. .
搁板2为矩形平板。搁板2的四个角设有矩形缺口以便为支撑爬梯1的两个支柱8上的铰接管81提供放置空间。将搁板2左右两端的连接圆管24放置在两个支柱8上的铰接管81的中间,实现与支柱8上的第一、二铰接管81、82的轴心重合。连接螺栓3穿过铰接管81和连接圆管24实现支撑爬梯1和搁板2的铰接连接。Shelf 2 is a rectangular flat board. The four corners of the shelf 2 are provided with rectangular gaps to provide space for the hinged pipes 81 on the two pillars 8 supporting the ladder 1 . Place the connecting round pipes 24 at the left and right ends of the shelf 2 in the middle of the hinged pipes 81 on the two pillars 8 to coincide with the axes of the first and second hinged pipes 81 and 82 on the pillars 8 . The connecting bolt 3 passes through the hinged pipe 81 and the connecting round pipe 24 to realize the hinged connection between the supporting ladder 1 and the shelf 2 .
在组合时,将小螺纹部31依次穿过第一铰接管81、连接圆管24、第二铰接管82。然后小螺纹部31和第二铰接管81螺接,与此同时,第一铰接管81和大螺纹部33也实现了螺接连接。由此便实现了搁板2和支撑爬梯1的铰接连接。When assembling, the small threaded part 31 passes through the first articulated tube 81 , the connecting round tube 24 , and the second articulated tube 82 in sequence. Then the small threaded portion 31 is screwed to the second hinged pipe 81 , and at the same time, the first hinged pipe 81 and the large threaded portion 33 are also screwed together. Thus, the hinged connection between the shelf 2 and the supporting ladder 1 is realized.
在变压器维护过程中会遇到需要在变压器两侧架设该工作台的情况,如果两侧单独架设工作台会因为高度不同,不便于人员的踩踏,因此在搁板2的底部的两端各设有一个组合连接管22。在两边的工作台架设好之后,通过将连接轴23插入到组合连接管22中实现两个平台的连接和固定,以达到更加稳定的支撑效果。In the process of transformer maintenance, it is necessary to set up the workbench on both sides of the transformer. If the workbench is set up separately on both sides, it will be inconvenient for people to step on it because of the different heights. There is a combination connecting pipe 22 . After the workbenches on both sides are erected, the two platforms are connected and fixed by inserting the connecting shaft 23 into the combined connecting pipe 22 to achieve a more stable supporting effect.
台架式变压器安装高度多为三米左右,在进行变压器的检修和维护的时候,为了防止人员的坠落在搁板2上装设了折叠护栏6。同样为了达到便于拆装的设计要求,在搁板2的下部边缘和左右边缘设有多个护栏插孔21用于安装折叠护栏6。Bench type transformer installation height is mostly about three meters, when carrying out the inspection and maintenance of transformer, in order to prevent personnel from falling, folding guardrail 6 is installed on shelf 2. Also in order to meet the design requirements for easy disassembly, a plurality of guardrail jacks 21 are provided on the lower edge and the left and right edges of the shelf 2 for installing the folding guardrail 6 .
为了使折叠护栏6更好的竖立在搁板2上,同时便于折叠护栏6的拆装,折叠护栏6设有一个长护栏61和两个支撑护栏62。长护栏61的左右两端分别与两个支撑护栏62铰接连接。长护栏6的下部设有与搁板2下部边缘匹配的护栏插头63,即数量相同,位置对应。支撑护栏62的下部设有与搁板2左右边缘匹配的护栏插头63。不使用时,两端的支撑护栏62折叠起来,贴合在长护栏61的表面上;使用时,将支撑护栏62打开,使其与长护栏61成90度夹角,由此长护栏61和其两端的支撑护栏62组成一个“[”形护栏,该形状具有了保持竖立的功能。安装时,打开折叠护栏6将其插入到搁板2的护栏插孔21中即可。因此折叠护栏6即实现了在搁板2上的直立放置又具有防止检修作业人员跌落的作用。In order to make the folding guardrail 6 stand better on the shelf 2 and facilitate the disassembly of the folding guardrail 6 , the folding guardrail 6 is provided with a long guardrail 61 and two supporting guardrails 62 . The left and right ends of the long guardrail 61 are hingedly connected with two supporting guardrails 62 respectively. The bottom of the long guardrail 6 is provided with a guardrail plug 63 matched with the lower edge of the shelf 2, that is, the number is the same and the positions are corresponding. The bottom of the supporting guardrail 62 is provided with guardrail plugs 63 matching the left and right edges of the shelf 2 . When not in use, the supporting guardrails 62 at both ends are folded up and attached to the surface of the long guardrail 61; The supporting guardrails 62 at both ends form a "[" shaped guardrail, and this shape has the function of keeping upright. During installation, open the folding guardrail 6 and insert it in the guardrail jack 21 of the shelf 2 to get final product. Therefore, the folding guardrail 6 has not only realized the upright placement on the shelf 2 but also has the function of preventing maintenance operators from falling.
优选的,为了便于人员往搁板2上拉升货台44,在支撑爬梯1的最上面的一个横杆4的中间设有一个滑轮43。滑轮43上绕设有拉绳5。拉绳5的两端设有挂钩,拉绳5一端的挂钩挂在货台44上部的圆形通孔内,另一端挂在支撑爬梯1下部的横杆4上。如果需要往搁板2上拉升设备时,取下横杆4上的挂钩,人员即能在搁板2上拉升,也可以通过滑轮在地面上往上拉升。Preferably, a pulley 43 is provided in the middle of the uppermost cross bar 4 supporting the ladder 1 in order to facilitate personnel to lift the cargo platform 44 on the shelf 2 . The pulley 43 is wound with a stay cord 5 . The two ends of stay cord 5 are provided with hook, and the hook at stay cord 5 one ends hangs in the circular through hole of cargo platform 44 tops, and the other end hangs on the cross bar 4 of support climbing ladder 1 bottom. When pulling up equipment toward shelf 2, take off the hook on the cross bar 4, personnel promptly can pull up on shelf 2, also can pull up on the ground by pulley.
优选的,为了便于检修维护的人员放置物品,在折叠护栏6的内侧设有挂钩。为了防止挂钩妨碍折叠护栏6的折叠同时为了防止对人员造成伤害,在折叠护栏6上设有凹槽,在凹槽内装设挂钩,挂钩未凸出凹槽。Preferably, a hook is provided on the inner side of the folding guardrail 6 in order to facilitate maintenance personnel to place items. In order to prevent the folding of the folding guardrail 6 from being hindered by the hook, a groove is provided on the folding guardrail 6, and a hook is installed in the groove, and the hook does not protrude from the groove.
更好的,为了更好的固定该台架变压器专用工作台,连接杆13上设有安全绳7。安全绳7用于将连接杆13系在电线杆101上。Better, in order to better fix the dedicated workbench for the stand transformer, the connecting rod 13 is provided with a safety rope 7 . The safety rope 7 is used to tie the connecting rod 13 on the utility pole 101 .
所述的一种台架变压器专用工作台使用的方法为:The method used in the special workbench for a kind of bench transformer is:
步骤1,在横担102长度方向的一侧组装支撑爬梯1和搁板2,具体步骤为:Step 1, assemble the supporting ladder 1 and the shelf 2 on one side of the length direction of the cross arm 102, the specific steps are:
步骤1.1,将两个支撑爬梯1放置在搁板2的两侧,搁板2两侧的连接圆管24位于支撑爬梯1的两个支柱8上的圆管中间,使两个铰接管和连接圆管24的轴心线重合在一起;Step 1.1, place two supporting ladders 1 on both sides of the shelf 2, the connecting round tubes 24 on both sides of the shelf 2 are located in the middle of the round tubes on the two pillars 8 of the supporting ladder 1, so that the two hinged tubes and the connecting tubes The axis lines of the circular tube 24 are coincident together;
步骤1.2,将连接螺栓3依过穿过第一铰接管81、连接圆管24、第二铰接管82,然后将小螺纹部31和第二铰接管81螺接,与此同时,第一铰接管81和大螺纹部33也实现了螺接连接。Step 1.2, the connecting bolt 3 is passed through the first hinged pipe 81, the connecting round pipe 24, and the second hinged pipe 82, and then the small threaded part 31 and the second hinged pipe 81 are screwed together. At the same time, the first hinged The pipe 81 and the large threaded portion 33 are also screwed together.
更好的,当需要在变压器的两侧进行检修维护作业时,需要在变压器的两侧分别安装两个台架式变压器专用工作台,此时需要将连接轴23插入两侧搁板2的组合连接管22中,使两个工作台的搁板2位于同一水平面上。Even better, when it is necessary to carry out inspection and maintenance work on both sides of the transformer, it is necessary to install two bench-type transformer special workbenches on both sides of the transformer, and at this time, it is necessary to insert the connecting shaft 23 into the combination of the shelves 2 on both sides In the connecting pipe 22, the shelves 2 of the two workbenches are located on the same horizontal plane.
步骤2,调整支撑爬梯1使搁板2和两侧的支撑爬梯1成梯形。挪动支撑爬梯1的位置以调整搁板2的高度,使其高度与安装变压器的横担102接近。Step 2, adjust the support ladder 1 so that the shelf 2 and the support ladder 1 on both sides form a trapezoid. Move the position of the support ladder 1 to adjust the height of the shelf 2, so that its height is close to the cross arm 102 where the transformer is installed.
更好的,由于变压器安装的位置可能在平整的硬化地面上也可能在凹凸不平的松软地面上,因此不同的地面调整装置9的使用方法也不同,即步骤2具有以下方法。Even better, since the installation of the transformer may be on a flat hardened ground or on an uneven soft ground, different ground adjustment devices 9 are used in different ways, that is, step 2 has the following methods.
方法2.1,硬化地面上调整装置的调节:旋转调节丝杠调整底座的伸出长度来适应不同的高度;方法2.2,松软地面上调整装置的调节:首先,按压卡块使其缩进调节丝杠内部,然后,在调节丝杠上端的内部将固定针向下按压,固定针从底部探出后再从底座的下端往下拉,直至卡块到达推出孔并弹出推出孔,最后,调整调节丝杠至合适位置并将固定针插入松软的地面。Method 2.1, adjustment of the adjustment device on hard ground: rotate the adjustment screw to adjust the extension length of the base to suit different heights; method 2.2, adjustment of the adjustment device on soft ground: first, press the block to retract the adjustment screw Inside, then, press down the fixing pin on the inside of the upper end of the adjusting screw, the fixing pin protrudes from the bottom and then pull down from the lower end of the base until the block reaches the push-out hole and pops out of the push-out hole, finally, adjust the adjust screw to the proper location and insert the fixing pin into the soft ground.
步骤3,根据搁板2的高度调整连接杆13,将连接杆13最外侧螺孔内的蝶形螺栓拧入另一个连接杆13的合适的螺孔内。Step 3, adjust the connecting rod 13 according to the height of the shelf 2, and screw the butterfly bolt in the outermost screw hole of the connecting rod 13 into a suitable screw hole of another connecting rod 13 .
步骤4,将折叠护栏6拿到搁板2上,打开折叠护栏6并插入搁板2的护栏插孔21的内部。Step 4, take the foldable guardrail 6 onto the shelf 2 , open the foldable guardrail 6 and insert it into the guardrail socket 21 of the shelf 2 .
综上所述,仅为本发明的较佳实施例而已,并非用来限定本发明的范围,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本发明的技术性范围并不局限于说明书上的内容,凡依本发明的要求范围所述的形状、构造、特征及精神所谓的均等变化与修饰,均应包括与本发明的权利要求范围内。In summary, it is only a preferred embodiment of the present invention, and it is not used to limit the scope of the present invention. Through the above description, relevant workers can perform various tasks without departing from the scope of the technical idea of the present invention. changes and modifications. The technical scope of the present invention is not limited to the contents of the description, and all the so-called equivalent changes and modifications of the shape, structure, characteristics and spirit described in the scope of the claims of the present invention shall be included in the scope of the claims of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710310581.2A CN106914876A (en) | 2017-05-05 | 2017-05-05 | A kind of stand transformer dedicated and application method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710310581.2A CN106914876A (en) | 2017-05-05 | 2017-05-05 | A kind of stand transformer dedicated and application method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106914876A true CN106914876A (en) | 2017-07-04 |
Family
ID=59568492
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710310581.2A Pending CN106914876A (en) | 2017-05-05 | 2017-05-05 | A kind of stand transformer dedicated and application method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106914876A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109003530A (en) * | 2018-08-01 | 2018-12-14 | 赖子瑶 | Practical traning platform is used in a kind of teaching of electromechanical equipment |
| CN109664255A (en) * | 2019-01-24 | 2019-04-23 | 常州市武进信和精密机械有限公司 | Surface processing equipment flase floor component |
| CN110212439A (en) * | 2019-04-24 | 2019-09-06 | 贵州电网有限责任公司 | A kind of transportable transformer maintenance assistance platform |
| CN111762710A (en) * | 2020-05-22 | 2020-10-13 | 国网山东省电力公司宁津县供电公司 | A convenient hoisting installation device for the upper pole of the transformer |
| CN112182895A (en) * | 2020-10-10 | 2021-01-05 | 中际联合(天津)科技有限公司 | Automatic analysis method for arrangement scheme diagram of wind turbine tower ladder and anti-falling |
| CN112775889A (en) * | 2019-05-27 | 2021-05-11 | 胡方明 | Detachable screw interface board |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201549792U (en) * | 2009-07-09 | 2010-08-11 | 辽宁省电力有限公司营口供电公司 | 220 kV transformer maintenance workbench |
| CN202696011U (en) * | 2012-06-25 | 2013-01-23 | 吕军杰 | Maintenance platform of transformer substation |
| CN203510186U (en) * | 2013-10-15 | 2014-04-02 | 江苏精海变压器有限公司 | Rack of accessory box for manufacturing transformer |
| CN204688161U (en) * | 2015-06-16 | 2015-10-07 | 国家电网公司 | Multifunction power maintenance transport trolley |
| CN204827196U (en) * | 2015-07-07 | 2015-12-02 | 国网山东夏津县供电公司 | Special ladder of rack formula transformer |
| CN204954804U (en) * | 2015-09-10 | 2016-01-13 | 黄梅琴 | Electric power is with tool bogie of ascending a height that can be spacing |
| CN105649522A (en) * | 2016-03-29 | 2016-06-08 | 新都区大丰鹏宇机械厂 | Multifunctional herringbone ladder applied to transformer mounting and maintaining |
| JP2017073842A (en) * | 2015-10-05 | 2017-04-13 | 中国電力株式会社 | Movable cable frame |
| CN206663217U (en) * | 2017-05-05 | 2017-11-24 | 国网山东省电力公司威海市文登区供电公司 | A kind of stand transformer dedicated |
| CN107916889A (en) * | 2017-12-19 | 2018-04-17 | 唐晓腾 | One kind is emergent to have put down folding ladder |
| CN210483511U (en) * | 2019-06-18 | 2020-05-08 | 北京安盛生态园林有限公司 | Ladder for pruning garden trees |
-
2017
- 2017-05-05 CN CN201710310581.2A patent/CN106914876A/en active Pending
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201549792U (en) * | 2009-07-09 | 2010-08-11 | 辽宁省电力有限公司营口供电公司 | 220 kV transformer maintenance workbench |
| CN202696011U (en) * | 2012-06-25 | 2013-01-23 | 吕军杰 | Maintenance platform of transformer substation |
| CN203510186U (en) * | 2013-10-15 | 2014-04-02 | 江苏精海变压器有限公司 | Rack of accessory box for manufacturing transformer |
| CN204688161U (en) * | 2015-06-16 | 2015-10-07 | 国家电网公司 | Multifunction power maintenance transport trolley |
| CN204827196U (en) * | 2015-07-07 | 2015-12-02 | 国网山东夏津县供电公司 | Special ladder of rack formula transformer |
| CN204954804U (en) * | 2015-09-10 | 2016-01-13 | 黄梅琴 | Electric power is with tool bogie of ascending a height that can be spacing |
| JP2017073842A (en) * | 2015-10-05 | 2017-04-13 | 中国電力株式会社 | Movable cable frame |
| CN105649522A (en) * | 2016-03-29 | 2016-06-08 | 新都区大丰鹏宇机械厂 | Multifunctional herringbone ladder applied to transformer mounting and maintaining |
| CN206663217U (en) * | 2017-05-05 | 2017-11-24 | 国网山东省电力公司威海市文登区供电公司 | A kind of stand transformer dedicated |
| CN107916889A (en) * | 2017-12-19 | 2018-04-17 | 唐晓腾 | One kind is emergent to have put down folding ladder |
| CN210483511U (en) * | 2019-06-18 | 2020-05-08 | 北京安盛生态园林有限公司 | Ladder for pruning garden trees |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109003530A (en) * | 2018-08-01 | 2018-12-14 | 赖子瑶 | Practical traning platform is used in a kind of teaching of electromechanical equipment |
| CN109003530B (en) * | 2018-08-01 | 2020-11-10 | 赖子瑶 | Real standard platform is used in electromechanical device teaching |
| CN109664255A (en) * | 2019-01-24 | 2019-04-23 | 常州市武进信和精密机械有限公司 | Surface processing equipment flase floor component |
| CN109664255B (en) * | 2019-01-24 | 2022-04-05 | 常州市武进信和精密机械有限公司 | Grid plate assembly for surface treatment equipment |
| CN110212439A (en) * | 2019-04-24 | 2019-09-06 | 贵州电网有限责任公司 | A kind of transportable transformer maintenance assistance platform |
| CN112775889A (en) * | 2019-05-27 | 2021-05-11 | 胡方明 | Detachable screw interface board |
| CN111762710A (en) * | 2020-05-22 | 2020-10-13 | 国网山东省电力公司宁津县供电公司 | A convenient hoisting installation device for the upper pole of the transformer |
| CN111762710B (en) * | 2020-05-22 | 2022-01-18 | 国网山东省电力公司宁津县供电公司 | Convenient hoist and mount installation device of transformer upper boom |
| CN112182895A (en) * | 2020-10-10 | 2021-01-05 | 中际联合(天津)科技有限公司 | Automatic analysis method for arrangement scheme diagram of wind turbine tower ladder and anti-falling |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106914876A (en) | A kind of stand transformer dedicated and application method | |
| CN205027821U (en) | Capacitor bank monomer capacitance test line changing instrument | |
| CN206663217U (en) | A kind of stand transformer dedicated | |
| CN204437701U (en) | A kind of gas cylinder fixed support device | |
| CN109138821B (en) | A portable insulating ladder platform that can be assembled | |
| CN107317258A (en) | One kind is ascended a height operation simple platform | |
| CN217612564U (en) | Safety belt hanging device for overhauling transformer with voltage class of 110 kilovolt or more | |
| CN203412354U (en) | Cross arm clamp | |
| CN205846585U (en) | Transmission line of electricity stretches crossing frame | |
| CN205400254U (en) | Electric power security fence | |
| CN207211918U (en) | Internally lifting pole | |
| CN207499793U (en) | Transformer high-voltage bushing upkeep operation frame | |
| CN205534585U (en) | Support for oil and gas well drainage pipeline | |
| CN206111071U (en) | Distribution automation overhauls cat ladder of usefulness | |
| CN108928782A (en) | A kind of Mobile distribution line maintenance device | |
| CN205724638U (en) | Power line tension monolithic insulator changes auxiliary stand | |
| CN205029217U (en) | Overhaul test device | |
| CN205104688U (en) | High -voltage line wire support | |
| CN206250006U (en) | A kind of dry-type transformer installed cassette | |
| CN206147013U (en) | Capacitance of electric condenser volume measuring device is mended to cluster | |
| CN209963638U (en) | Overhead ground wire lifter | |
| CN205401955U (en) | Power line support is used in electric power facility planning | |
| CN206111069U (en) | Power maintenance tool | |
| CN110011234B (en) | Indoor cable termination installs and removes appurtenance | |
| CN206468101U (en) | A kind of folding portable fence |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20180530 Address after: 256300 Zhongxin village 2, Hua Gou Town, Gaoqing County, Zibo, Shandong Applicant after: Fan Shukai Address before: 264400 Longshan Road, Wendeng District, Weihai, Shandong Province, No. 17 Applicant before: STATE GRID SHANDONG ELECTRIC POWER COMPANY WEIHAI CITY WENDENG DISTRICT POWER SUPPLY Co. Applicant before: State Grid Corporation of China |
|
| AD01 | Patent right deemed abandoned | ||
| AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20240312 |