CN106903007A CN201710170770.4A CN201710170770A CN106903007A CN 106903007 A CN106903007 A CN 106903007A CN 201710170770 A CN201710170770 A CN 201710170770A CN 106903007 A CN106903007 A CN 106903007A
Authority
CN
China
Prior art keywords
vehicle
powder
preheating furnace
curing oven
production system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710170770.4A
Other languages
Chinese (zh)
Inventor
刘凤良
李茂津
陈克春
肖会高
张松明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin You Fa Steel Pipe Group PLC
Tianjin Youfa Pipeline Technology Co Ltd
Tianjin Youfa Steel Pipe Group Co Ltd
Original Assignee
Tianjin You Fa Steel Pipe Group PLC
Tianjin Youfa Pipeline Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin You Fa Steel Pipe Group PLC, Tianjin Youfa Pipeline Technology Co Ltd filed Critical Tianjin You Fa Steel Pipe Group PLC
Priority to CN201710170770.4A priority Critical patent/CN106903007A/en
Publication of CN106903007A publication Critical patent/CN106903007A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B5/00Electrostatic spraying apparatus; Spraying apparatus with means for charging the spray electrically; Apparatus for spraying liquids or other fluent materials by other electric means
    • B05B5/08Plant for applying liquids or other fluent materials to objects
    • B05B5/12Plant for applying liquids or other fluent materials to objects specially adapted for coating the interior of hollow bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0207Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the work being an elongated body, e.g. wire or pipe
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/20Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/90Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
    • B05B16/95Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth the objects or other work to be sprayed lying on, or being held above the conveying means, i.e. not hanging from the conveying means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B5/00Electrostatic spraying apparatus; Spraying apparatus with means for charging the spray electrically; Apparatus for spraying liquids or other fluent materials by other electric means
    • B05B5/08Plant for applying liquids or other fluent materials to objects
    • B05B5/081Plant for applying liquids or other fluent materials to objects specially adapted for treating particulate materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/02Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by baking
    • B05D3/0254After-treatment
    • B05D3/0272After-treatment with ovens

Landscapes

  • Coating Apparatus (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)
  • Electrostatic Spraying Apparatus (AREA)

Abstract

The invention provides a kind of pipe plastic coating production system, including two tracks;Preheating furnace is vehicle-mounted, preheating furnace, vehicle-mounted plastic-coated, outer EP electrostatic sprayings room, outer PE powder sprinkling devices and interior button powder is vehicle-mounted is located on the first track, curing oven and curing oven is vehicle-mounted is located on the second track, preheating furnace is vehicle-mounted and curing oven it is vehicle-mounted coordinated by helical gear and tooth bar move, outer EP electrostatic sprayings room upper end is connected with outer EP dedusters, outer PE powder sprinkling devices include powder device and outer PE waterfalls dusting case on outer PE powder pump, the interior button vehicle-mounted button powder device including vehicle frame and towards preheating furnace direction of powder, it is vehicle-mounted that the steel pipe on plastic-coated is vehicle-mounted is transferred to curing oven by hanger tool.The present invention is driven using the cooperation of helical teeth wheel and rack, temperature higher in preheating furnace and curing oven is avoided for damage that motor is caused, square tube, steel plate and Limit Bearing constitute spacing for tooth bar so that not readily disengaged from out between helical gear and tooth bar.

Description

A kind of pipe plastic coating production system
Technical field
The invention belongs to steel pipe technical field of processing equipment, more particularly, to a kind of pipe plastic coating production system.
Background technology
The plastic coating method of heavy caliber plastic-coated steel has heating in medium frequency this set operation, induction Heating Coil electricity mostly in the market Consumption is very big, causes heavy caliber plastic-coated steel cost very high.Steel pipe internal-surface uses spraying coating process, and compressed air is uniform with powder Mixing, then sprays from nozzle, is adsorbed onto workpiece steel tube surface, causes powder airborne dust serious, influences shopwork environment.Powder Feeding uses vacuum feeder mostly, and expensive, effect is less desirable.Whole machine layout footprint is big, in particular for The factory building of large span, Standard Factory Room is difficult to meet equipment requirement.
The content of the invention
In view of this, the present invention is directed to propose a kind of pipe plastic coating production system, solves big mouth present in prior art Pipe plastic coating occupation area of equipment in footpath is big, the problems such as energy consumption and human cost high.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
A kind of pipe plastic coating production system, include that preheating furnace is vehicle-mounted successively according to production procedure, preheating furnace, plastic-coated are vehicle-mounted, Outer EP electrostatic sprayings room, outer PE powder sprinkling devices, vehicle-mounted interior button powder, curing oven and curing oven are vehicle-mounted;
The preheating furnace is vehicle-mounted, preheating furnace, vehicle-mounted plastic-coated, outer EP electrostatic sprayings room, outer PE powder sprinkling devices and interior button powder car Carry be located at the first track on, the curing oven and curing oven it is vehicle-mounted positioned at it is adjacent with first track and be arranged in parallel second On track, the preheating furnace is vehicle-mounted and curing oven it is vehicle-mounted coordinated by helical gear and tooth bar move.The preheating furnace car Be loaded under the cooperation of helical teeth wheel and rack and carry steel pipe by preheating furnace, steel pipe by hanger tool be moved to plastic-coated it is vehicle-mounted on, apply By outer EP electrostatic sprayings room and outer PE powder sprinkling devices, the interior button powder is vehicle-mounted to stretch into interior button powder powder groove to the vehicle-mounted steel pipe that carries of modeling Carry out buckleing powder operation in steel pipe, on vehicle-mounted the first track returned between preheating furnace and outer EP electrostatic sprayings room of subsequent plastic-coated, so Afterwards hanger tool by steel pipe from plastic-coated it is vehicle-mounted on be transferred to curing oven it is vehicle-mounted on, then curing oven it is vehicle-mounted carries steel pipe enter solidification Stove.
Further, the outer EP electrostatic sprayings room upper end is connected with outer EP dedusters, and the outer PE powder sprinkling devices include Powder device and outer PE waterfalls dusting case on outer PE powder pump, powder device connects the PE entrances of outer PE waterfalls dusting case on the outer PE powder pump. The materials such as the dust that outer EP dedusters give birth to outer EP electrostatic sprayings house property are removed in time, environmental protection.
Further, the preheating furnace and curing oven are respectively arranged at two ends with drive device, the two ends drive device it Between distance respectively less than preheating furnace is vehicle-mounted and the vehicle-mounted length of curing oven, the drive device includes motor, rotating shaft and tiltedly Gear, the motor drives axis of rotation, and the two ends of the rotating shaft are connected with bearing block, and placement is set between the bearing block and ground The two ends for having spring, the rotating shaft are provided with helical gear, and the bearing block has two split axle bearings, and the rotating shaft is led to split axle bearing Bearing connection is crossed, the helical gear is located between two split axle bearings, and the helical gear is vehicle-mounted with preheating furnace respectively and curing oven The vehicle-mounted tooth bar being provided below is engaged.Because preheating furnace and solidification in-furnace temperature are higher, so by preheating furnace and solidification Motor, rotating shaft and the helical gear that the two ends of stove are set coordinate preheating furnace vehicle-mounted and the vehicle-mounted following tooth bar of curing oven is driven, The vehicle-mounted damage caused with the vehicle-mounted self-contained electric equipment of curing oven of preheating furnace is avoided, preheating furnace is vehicle-mounted or curing oven is vehicle-mounted Helical gear of the gear respectively at least with preheating furnace or curing oven wherein one end be in contact, once because preheating furnace is vehicle-mounted and solidification After the vehicle-mounted gear of stove is not contacted with helical gear, preheating furnace is vehicle-mounted and the vehicle-mounted power that can lose driving of curing oven, therefore The distance between two ends drive device is respectively less than preheating furnace is vehicle-mounted and the vehicle-mounted length of curing oven.Put between bearing block and ground Spring is equipped with, lower spring end is contacted with ground, upper end contacts with below bearing block, when production line works, bearing block Upper and lower floating can be produced, the effect of spring is to play cushioning effect for bearing block.Bearing block both sides are provided with supporting plate, described Supporting plate inner side is fixed with vertical Fang Jian, and the both sides of bearing block set fluted, the Fang Jian and groove fit, for branch Fagging plays position-limiting action.
Further, the preheating furnace it is vehicle-mounted it is vehicle-mounted with curing oven below be fixed with square tube, institute along the direction of motion is parallel State and be fixed with steel plate along square tube setting direction below square tube, the steel plate is arranged below tooth bar, the top of the split axle bearing Side is provided with fixing axle respectively inwards, and the fixing axle is provided with Limit Bearing, and the Limit Bearing is close to the top of steel plate And respectively positioned at the both sides of square tube, the width of the width more than square tube of the steel plate.Preheating furnace is vehicle-mounted and curing oven is vehicle-mounted below Be fixed with square tube, be fixed with steel plate wider below square tube, and steel plate it is wide go out square tube both sides above again and Limit Bearing It is in contact, be limited in steel plate below Limit Bearing by Limit Bearing, and square tube is located between Limit Bearing, therefore Limit Bearing pair Be also carried out in the horizontal direction of square tube it is spacing, hence for preheating furnace is vehicle-mounted and curing oven it is vehicle-mounted carried out it is spacing.
Further, the interior button vehicle-mounted button powder device including vehicle frame and towards preheating furnace direction of powder, the button powder dress Support bar and interior button powder powder groove including level are put, one end of the support bar is connected with the vertical adjustment device on vehicle frame, institute State the part on support bar towards preheating furnace direction and be fixed with interior button powder powder groove, the vertical adjustment device includes two along rail The lifting column that road direction is set, is provided with leading screw in the lifting column, the support bar simultaneously with two lifting columns on Sliding block is connected by bearing, and the upper end of the lifting column sets adjusting handle and drives leading screw to rotate.Hand is adjusted when work Wheel regulation screw mandrel is rotated, and support bar can be moved up and down and be adjusted height under the drive of the sliding block of lead screw pair, simultaneously because Support bar is connected with the sliding block on two lifting columns by bearing simultaneously, and support bar not only can highly be adjusted and can also carried out Rotate, because interior button powder powder groove is fixedly connected with support bar, therefore interior button powder powder groove can also realize that height is adjusted and rotated, and enter Row blanking.
Further, the interior button powder powder groove is matrix, and the opening direction of the interior button powder powder groove is away from support bar.When interior During button powder powder groove turns from top to bottom with support bar, powder is dropped on steel pipe inner wall from interior button powder powder groove.
Further, the support bar is made up of some end to end point of bars, and the described point of axial line of bar overlaps, institute State point bar to be gradually reduced to away from vehicle frame direction radius from vehicle frame, described point of bar is fixedly connected with interior button powder powder groove.Support bar Internally button powder powder groove serves supporting role, the connection of different radii point bar, in order to allow the support bar away from vehicle frame one end to subtract Light weight, is unlikely to weigh very much, but can also play a supporting role simultaneously.
Further, the outer PE waterfalls dusting case includes waterfall case body, and the upper end open of the waterfall case body sets There are PE entrances, lower end is provided with PE outlets, and the PE exits are fixed with the portable plate that adjustable PE exports size, and the PE goes out The washboard that can be moved back and forth along steel pipe movement direction is provided with below mouthful, the lower outside of the waterfall case body is provided with vibration Motor, the vibrating motor is connected with electrical apparatus control system.
Further, the preheating furnace is vehicle-mounted and the vehicle-mounted both sides of curing oven are equipped with vehicle-mounted wheel, the vehicle-mounted wheel It is engaged with the first track and the second track respectively.The two ends of the preheating furnace and curing oven are equipped with openable door.
Further, the plastic-coated it is vehicle-mounted on along the first orbital direction be provided with drive steel pipe rotate tumbler, institute State the vehicle-mounted following two ends of plastic-coated and be equipped with the plastic-coated wheel coordinated with the first track, the plastic-coated wheel of described wherein one end passes through Electric rotating machine and rotating shaft drive.
Relative to prior art, pipe plastic coating production system of the present invention has the advantage that:
Pipe plastic coating production system of the present invention, while meeting the needs of production, reduces the number of equipment With take volume, coordinated using helical teeth wheel and rack and be driven, it is to avoid motor enters higher in preheating furnace and curing oven Temperature constitutes the position-limiting action for tooth bar for the damage that motor is caused, square tube, steel plate and Limit Bearing so that helical teeth Not readily disengaged from out between wheel and tooth bar, interior button powder is vehicle-mounted to be stretched into steel pipe by by interior button powder powder groove, is realized to steel pipe inner wall Plastic-coated.
Brief description of the drawings
The accompanying drawing for constituting a part of the invention is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate, for explaining the present invention, not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the top view of the pipe plastic coating production system described in the embodiment of the present invention;
Fig. 2 is that preheating furnace is vehicle-mounted in pipe plastic coating production system described in the embodiment of the present invention, preheating furnace, curing oven, solid Change the vehicle-mounted top view of stove;
Fig. 3 is that plastic-coated is vehicle-mounted, outer EP electrostatic sprayings room, outer PE in pipe plastic coating production system described in the embodiment of the present invention Powder sprinkling device and the interior vehicle-mounted top view of button powder;
Fig. 4 is the vehicle-mounted front view of interior button powder in the pipe plastic coating production system described in the embodiment of the present invention;
Fig. 5 is that the vehicle-mounted cooperation with drive device of preheating furnace is shown in pipe plastic coating production system described in the embodiment of the present invention It is intended to;
Fig. 6 is the front view of the pipe plastic coating production system China and foreign countries PE waterfall dusting casees described in the embodiment of the present invention;
Fig. 7 is the side view of the pipe plastic coating production system China and foreign countries PE waterfall dusting casees described in the embodiment of the present invention.
Description of reference numerals:
1- preheating furnaces are vehicle-mounted;2- preheating furnaces;3- plastic-coateds are vehicle-mounted;The outer EP electrostatic sprayings rooms of 4-;The outer PE powder sprinkling devices of 5-;In 6- Button powder is vehicle-mounted;601- vehicle frames;602- support bars;Button powder powder groove in 603-;604- lifting columns;605- adjusting handles;7- solidifies Stove;8- curing ovens are vehicle-mounted;The tracks of 9- first;The tracks of 10- second;The outer EP dedusters of 11-;Powder device on the outer PE powder pumps of 12-;Outside 13- PE waterfall dusting casees;1301- waterfall case bodies;1302-PE entrances;1303-PE is exported;1304- portable plates;1305- washboards; 1306- vibrating motors;14- drive devices;1401- motors;1402- rotating shafts;1403- helical gears;15- split axle bearings;16- teeth Bar;17- square tubes;18- steel plates;19- fixing axles;20- Limit Bearings;The vehicle-mounted wheels of 21-;22- plastic-coated wheels;23- electric rotating machines; 24- plastic-coated rotating shafts;25-.
Specific embodiment
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score, The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " are Based on orientation shown in the drawings or position relationship, it is for only for ease of and describes the present invention and simplify to describe, rather than instruction or dark Showing the device or element of meaning must have specific orientation, with specific azimuth configuration and operation therefore it is not intended that right Limitation of the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying phase To importance or the implicit quantity for indicating indicated technical characteristic.Thus, the feature for defining " first ", " second " etc. can To express or implicitly include one or more this feature.In the description of the invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi Two connections of element internal.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As shown in Fig. 1~7, a kind of pipe plastic coating production system includes preheating furnace vehicle-mounted 1, pre- according to production procedure successively Hot stove 2, plastic-coated vehicle-mounted 3, outer EP electrostatic sprayings room 4, outer PE powder sprinkling devices 5, interior button powder vehicle-mounted 6, curing oven 7 and curing oven are vehicle-mounted 8;
The preheating furnace vehicle-mounted 1, preheating furnace 2, plastic-coated vehicle-mounted 3, outer EP electrostatic sprayings room 4, outer PE powder sprinkling devices 5 and interior button Powder vehicle-mounted 6 is located on the first track 9, and the curing oven 7 and curing oven vehicle-mounted 8 are positioned at adjacent and parallel with first track 9 On the second track 10 for setting, the preheating furnace vehicle-mounted 1 and curing oven vehicle-mounted 8 by helical gear 1403 and tooth bar 16 coordinate into Row movement.
The above-mentioned outer upper end of EP electrostatic sprayings room 4 is connected with outer EP dedusters 11, and the outer PE powder sprinkling devices 5 include outer PE powder Powder device 12 and outer PE waterfalls dusting case 13 on pump, powder device 12 connects the PE entrances of outer PE waterfalls dusting case 13 on the outer PE powder pump 1302。
Above-mentioned preheating furnace 2 and curing oven 7 are respectively arranged at two ends with drive device 14, between the two ends drive device 14 Respectively less than preheating furnace vehicle-mounted 1 and the length of curing oven vehicle-mounted 8, the drive device 14 includes motor 1401, rotating shaft to distance 1402 and helical gear 1403, the motor 1401 drives rotating shaft 1402 to rotate, and the two ends of the rotating shaft 1402 are connected with bearing block, Set between the bearing block and ground and be placed with spring, the two ends of the rotating shaft 1402 are provided with helical gear 1403, and the bearing block has Two split axle bearings 15, the rotating shaft 1402 is connected with split axle bearing 15 by bearing, and the helical gear 1403 is located at two points Between bearing block 15, the helical gear 1403 respectively vehicle-mounted with preheating furnace 1 and the tooth bar 16 that is provided below of curing oven vehicle-mounted 8 match Close.
Above-mentioned preheating furnace vehicle-mounted 1 vehicle-mounted with curing oven 8 is fixed with square tube 17, the square tube along the direction of motion is parallel below 17 are fixed with steel plate 18 along the setting direction of square tube 17 below, and the steel plate 18 is arranged below tooth bar 16, the split axle bearing 15 Side is provided with fixing axle 19 respectively inwards on top, the fixing axle 19 is provided with Limit Bearing 20, and the Limit Bearing 20 is tight It is affixed on the top of steel plate 18 and respectively positioned at the both sides of square tube 17, the width of the width more than square tube 17 of the steel plate 18.
Above-mentioned interior button powder vehicle-mounted 6 includes vehicle frame 601 and the button powder device towards preheating furnace direction, and the button powder device includes Vertical adjustment device phase on the support bar 602 of level and interior button powder powder groove 603, one end of the support bar 602 and vehicle frame 601 Even, the part on the support bar 602 towards the direction of preheating furnace 2 is fixed with interior button powder powder groove 603, the vertical adjustment device Including the lifting column 604 that two direction along ng a paths are set, leading screw is provided with the lifting column 604, the support bar 602 is same When be connected by bearing with the sliding block on two lifting columns 604, the upper end of the lifting column 604 sets adjusting handle 605 Leading screw is driven to rotate.
Above-mentioned interior button powder powder groove 603 is matrix, and the opening direction of the interior button powder powder groove 603 is away from support bar 602.
Above-mentioned support bar 602 is made up of some end to end point of bars, and the described point of axial line of bar overlaps, described point of bar It is gradually reduced to away from the direction radius of vehicle frame 601 from vehicle frame 601, described point of bar is fixedly connected with interior button powder powder groove 603.
Above-mentioned outer PE waterfalls dusting case 13 includes waterfall case body 1301, and the upper end open of the waterfall case body 1301 sets There are PE entrances 1302, lower end is provided with PE outlets 1303, and being fixed with adjustable PE at the PE outlets 1303 exports 1303 sizes Portable plate 1304, the lower section of PE outlet 1303 is provided with the washboard 1305 that can be moved back and forth along steel pipe movement direction, institute The lower outside for stating waterfall case body 1301 is provided with vibrating motor 1306, the vibrating motor 1306 and electrical apparatus control system phase Even.
The both sides of above-mentioned preheating furnace vehicle-mounted 1 and curing oven vehicle-mounted 8 are equipped with vehicle-mounted wheel 21, and the vehicle-mounted wheel 21 is distinguished It is engaged with the first track 9 and the second track 10.The two ends of the preheating furnace 2 and curing oven 7 are equipped with openable door 25.
The direction of first track 9 is provided with the tumbler that drive steel pipe is rotated, the plastic-coated car on above-mentioned plastic-coated vehicle-mounted 3 Carry the two ends below 3 and be equipped with the plastic-coated wheel 22 coordinated with the first track 9, the plastic-coated wheel 22 of described wherein one end is by rotation Rotating motor 23 and plastic-coated rotating shaft 24 drive.
Steel pipe is placed on preheating furnace vehicle-mounted 1, the drive of the helical gear 1403 in motor 1401 of the front end of preheating furnace 2 is close to Under rotated, tooth bar 16 is moved forward while helical gear 1403 is rotated, and preheating furnace vehicle-mounted 1 is moved to preheating furnace 2 therewith, Preheating furnace vehicle-mounted 1 enters preheating furnace 2 with steel pipe, after preheating, with the rotation of helical gear 1403, before preheating furnace vehicle-mounted 1 End is slowly close to the helical gear 1403 positioned at the rear end of preheating furnace 2, when the tooth bar 16 at the two ends of preheating furnace vehicle-mounted 1 can contact helical teeth When taking turns 1403, i.e., moved under four drives of helical gear 1403, the rear end of preheating furnace vehicle-mounted 1 slowly is departing from close The helical gear 1403 of the front end of preheating furnace 2, only moves in the case where the helical gear 1403 of the rear end of preheating furnace 2 drives, and rolls preheating furnace 2 away from.
Steel pipe is moved on plastic-coated vehicle-mounted 3 by hanger tool, and plastic-coated vehicle-mounted 3 carries steel pipe by outer EP electrostatic sprayings room 4 With outer PE waterfalls dusting case 13, the plastic-coated of outer wall of steel pipe is carried out, interior button powder powder groove 603 is stretched into steel pipe by the interior button powder vehicle-mounted 6 In carry out detaining powder operation, subsequent plastic-coated vehicle-mounted 3 is returned on the first track 9 between preheating furnace 2 and outer EP electrostatic sprayings room 4, so Be transferred to steel pipe from plastic-coated vehicle-mounted 3 on curing oven vehicle-mounted 8 by hanger tool afterwards, and then curing oven vehicle-mounted 8 carries steel pipe entrance Curing oven 7.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (10)

1. a kind of pipe plastic coating production system, it is characterised in that:Include preheating furnace vehicle-mounted (1), preheating successively according to production procedure Stove (2), plastic-coated vehicle-mounted (3), outer EP electrostatic sprayings room (4), outer PE powder sprinkling devices (5), it is interior button powder vehicle-mounted (6), curing oven (7) and Curing oven is vehicle-mounted (8);
The preheating furnace vehicle-mounted (1), preheating furnace (2), plastic-coated vehicle-mounted (3), outer EP electrostatic sprayings room (4), outer PE powder sprinkling devices (5) With interior button powder vehicle-mounted (6) on the first track (9), the curing oven (7) and curing oven vehicle-mounted (8) positioned at first rail Road (9) is adjacent and the second track (10) for be arrangeding in parallel on, the preheating furnace vehicle-mounted (1) and curing oven vehicle-mounted (8) are by oblique Gear (1403) and tooth bar (16) cooperation are moved.
2. pipe plastic coating production system according to claim 1, it is characterised in that:On the outer EP electrostatic sprayings room (4) End is connected with outer EP dedusters (11), and the outer PE powder sprinkling devices (5) are spread including powder device (12) on outer PE powder pump and outer PE waterfalls Powder case (13), powder device (12) connects the PE entrances (1302) of outer PE waterfalls dusting case (13) on the outer PE powder pump.
3. pipe plastic coating production system according to claim 1 and 2, it is characterised in that:The preheating furnace (2) and curing oven (7) be respectively arranged at two ends with the distance between drive device (14), described two ends drive device (14) is respectively less than preheating furnace Vehicle-mounted (1) and the length of curing oven vehicle-mounted (8), the drive device (14) includes motor (1401), rotating shaft (1402) and helical teeth Wheel (1403), the motor (1401) drives rotating shaft (1402) to rotate, and the two ends of the rotating shaft (1402) are connected with bearing block, institute To state set between bearing block and ground and be placed with spring, the two ends of the rotating shaft (1402) are provided with helical gear (1403), the bearing block There are two split axle bearings (15), the rotating shaft (1402) is connected with split axle bearing (15) by bearing, the helical gear (1403) Between two split axle bearings (15), the helical gear (1403) is respectively under (1) vehicle-mounted with preheating furnace and curing oven vehicle-mounted (8) The tooth bar (16) that face is set is engaged.
4. pipe plastic coating production system according to claim 3, it is characterised in that:The preheating furnace vehicle-mounted (1) and solidification Stove vehicle-mounted (8) is fixed with square tube (17) along the direction of motion is parallel below, and the square tube (17) is below along square tube (17) setting side To being fixed with steel plate (18), the steel plate (18) is arranged below tooth bar (16), the top of the split axle bearing (15) respectively to Inner side is provided with fixing axle (19), and the fixing axle (19) is provided with Limit Bearing (20), and the Limit Bearing (20) is close to The top of steel plate (18) and respectively positioned at the both sides of square tube (17), the width of the width of the steel plate (18) more than square tube (17).
5. pipe plastic coating production system according to claim 1, it is characterised in that:The interior button powder vehicle-mounted (6) is including car Frame (601) and buckle powder device towards preheating furnace direction, the button powder device includes horizontal support bar (602) and interior detains powder powder Groove (603), one end of the support bar (602) is connected with the vertical adjustment device on vehicle frame (601), the support bar (602) On towards preheating furnace (2) direction part be fixed with it is interior button powder powder groove (603), the vertical adjustment device include two along rail The lifting column (604) that road direction is set, is provided with leading screw, the support bar (602) in the lifting column (604) while with two Sliding block on individual lifting column (604) is connected by bearing, and the upper end of the lifting column (604) sets adjusting handle (605) Leading screw is driven to rotate.
6. pipe plastic coating production system according to claim 5, it is characterised in that:Interior button powder powder groove (603) is recessed Type, the opening direction of interior button powder powder groove (603) is away from support bar (602).
7. the pipe plastic coating production system according to claim 5 or 6, it is characterised in that:The support bar (602) is by some End to end point of bar composition of root, the described point of axial line of bar overlaps, and described point of bar is from vehicle frame (601) to away from vehicle frame (601) Direction radius is gradually reduced, and described point of bar is fixedly connected with interior button powder powder groove (603).
8. pipe plastic coating production system according to claim 2, it is characterised in that:Outer PE waterfalls dusting case (13) bag Waterfall case body (1301) is included, the upper end open of the waterfall case body (1301) is provided with PE entrances (1302), and lower end is provided with PE Outlet (1303), described PE outlets (1303) place is fixed with the portable plate (1304) that adjustable PE exports (1303) size, institute State PE outlets (1303) lower sections and be provided with the washboard (1305) that can be moved back and forth along steel pipe movement direction, the waterfall case body (1301) lower outside is provided with vibrating motor (1306), and the vibrating motor (1306) is connected with electrical apparatus control system.
9. pipe plastic coating production system according to claim 1, it is characterised in that:The preheating furnace vehicle-mounted (1) and solidification The both sides of stove vehicle-mounted (8) are equipped with vehicle-mounted wheel (21), the vehicle-mounted wheel (21) respectively with the first track (9) and the second track (10) it is engaged.
10. pipe plastic coating production system according to claim 1, it is characterised in that:Along first on the plastic-coated vehicle-mounted (3) Track (9) direction is provided with the tumbler for driving steel pipe to rotate, and the plastic-coated vehicle-mounted (3) two ends below are equipped with and first The plastic-coated wheel (22) that track (9) coordinates, the plastic-coated wheel (22) of described wherein one end is by electric rotating machine (23) and plastic-coated Rotating shaft (24) drives.
CN201710170770.4A 2017-03-21 2017-03-21 A kind of pipe plastic coating production system Pending CN106903007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710170770.4A CN106903007A (en) 2017-03-21 2017-03-21 A kind of pipe plastic coating production system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710170770.4A CN106903007A (en) 2017-03-21 2017-03-21 A kind of pipe plastic coating production system

Publications (1)

Publication Number Publication Date
CN106903007A true CN106903007A (en) 2017-06-30

Family

ID=59193808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710170770.4A Pending CN106903007A (en) 2017-03-21 2017-03-21 A kind of pipe plastic coating production system

Country Status (1)

Country Link
CN (1) CN106903007A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108080196A (en) * 2017-12-30 2018-05-29 天津昕田管道科技有限公司 Environment friendly and pollution-free steel pipe is inside and outside to apply coating line
CN108214929A (en) * 2017-12-05 2018-06-29 海隆管道工程技术服务有限公司 Large Diameter Pipeline concrete weight coating steel pipe application system and technique
CN110961302A (en) * 2019-12-20 2020-04-07 浙江巨丰管业有限公司 Anticorrosive treatment device for gas pipeline processing
CN112371410A (en) * 2020-10-22 2021-02-19 东风汽车股份有限公司 Mixed flow coating line and mixed flow coating method for standard compartment and van vehicle
CN113522608A (en) * 2021-07-08 2021-10-22 湖南天卓管业有限公司 Intelligent epoxy powder anti-corrosion spiral steel pipe production equipment
CN115318472A (en) * 2022-10-13 2022-11-11 合肥荣弘科技有限公司 Panel beating electrostatic spraying equipment
CN119973278A (en) * 2024-12-31 2025-05-13 西安奥杰电热设备工程有限责任公司 A periodic aluminum brazing furnace

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0501264A2 (en) * 1991-02-27 1992-09-02 AXIS S.p.A. Apparatus for applying a powdered coating to a workpiece
CN101922862A (en) * 2009-03-03 2010-12-22 福建省万旗科技陶瓷有限公司 Three-section four-door long-tunnel energy-saving type microwave sintering furnace
CN202452826U (en) * 2011-12-28 2012-09-26 贵阳铝镁设计研究院有限公司 Traverse vehicle at kiln entrance end
CN203316338U (en) * 2013-07-16 2013-12-04 天津市乾丰防腐保温工程有限公司 Novel intelligent full-automatic steel tube inside and outside plastic coating production line
CN203711291U (en) * 2013-12-23 2014-07-16 北京四伟管道科技有限公司 Automatic plastic coating device for internal anticorrosion of steel pipe
CN204648902U (en) * 2015-04-11 2015-09-16 深圳市信宇人科技有限公司 Vacuum tunnel formula baking box Special material transfer bogie
CN205949234U (en) * 2016-08-10 2017-02-15 高密天一机械科技有限公司 Large -diameter steel pipe plastic -coated rotary device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0501264A2 (en) * 1991-02-27 1992-09-02 AXIS S.p.A. Apparatus for applying a powdered coating to a workpiece
CN101922862A (en) * 2009-03-03 2010-12-22 福建省万旗科技陶瓷有限公司 Three-section four-door long-tunnel energy-saving type microwave sintering furnace
CN202452826U (en) * 2011-12-28 2012-09-26 贵阳铝镁设计研究院有限公司 Traverse vehicle at kiln entrance end
CN203316338U (en) * 2013-07-16 2013-12-04 天津市乾丰防腐保温工程有限公司 Novel intelligent full-automatic steel tube inside and outside plastic coating production line
CN203711291U (en) * 2013-12-23 2014-07-16 北京四伟管道科技有限公司 Automatic plastic coating device for internal anticorrosion of steel pipe
CN204648902U (en) * 2015-04-11 2015-09-16 深圳市信宇人科技有限公司 Vacuum tunnel formula baking box Special material transfer bogie
CN205949234U (en) * 2016-08-10 2017-02-15 高密天一机械科技有限公司 Large -diameter steel pipe plastic -coated rotary device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108214929A (en) * 2017-12-05 2018-06-29 海隆管道工程技术服务有限公司 Large Diameter Pipeline concrete weight coating steel pipe application system and technique
CN108080196A (en) * 2017-12-30 2018-05-29 天津昕田管道科技有限公司 Environment friendly and pollution-free steel pipe is inside and outside to apply coating line
CN108080196B (en) * 2017-12-30 2024-05-14 天津昕田管道科技有限公司 Environment-friendly pollution-free steel pipe internal and external plastic coating production line
CN110961302A (en) * 2019-12-20 2020-04-07 浙江巨丰管业有限公司 Anticorrosive treatment device for gas pipeline processing
CN112371410A (en) * 2020-10-22 2021-02-19 东风汽车股份有限公司 Mixed flow coating line and mixed flow coating method for standard compartment and van vehicle
CN113522608A (en) * 2021-07-08 2021-10-22 湖南天卓管业有限公司 Intelligent epoxy powder anti-corrosion spiral steel pipe production equipment
CN115318472A (en) * 2022-10-13 2022-11-11 合肥荣弘科技有限公司 Panel beating electrostatic spraying equipment
CN115318472B (en) * 2022-10-13 2022-12-09 合肥荣弘科技有限公司 Sheet metal electrostatic spraying equipment
CN119973278A (en) * 2024-12-31 2025-05-13 西安奥杰电热设备工程有限责任公司 A periodic aluminum brazing furnace

Similar Documents

Publication Publication Date Title
CN106903007A (en) A kind of pipe plastic coating production system
CN104563458B (en) Fully automatic wall surface and shed surface spray coating grinding device
CN105922005B (en) Cylinder head automatic assembly line suitable for high-power marine medium seed diesel engine
CN107542253A (en) A kind of construction wall spray equipment
CN107497629A (en) A kind of polishing paint spraying apparatus of metal door and window lockset
CN206028002U (en) Novel oil tank mechanical rust removal , automatic spraying system
CN206122068U (en) Automatic dip -coating equipment
CN114046020A (en) Indoor spraying robot
CN206642931U (en) A kind of automatic spraying device
CN110508427A (en) An automatic spraying equipment suitable for rotating bodies
CN102441659A (en) Automatic nine-station casting machine for engine cylinder liner blank
CN110586364B (en) Industrial spraying robot based on video acquisition
CN112523473B (en) Automatic multifunctional wall whitewashing machine and application
CN110644738A (en) Spraying robot
CN108816579A (en) A kind of construction timber equipment for spraying
CN107053824A (en) Silk-screen printing all-in-one for the polychrome chromatography of fire extinguisher surface
CN108097488A (en) A kind of recyclable powder spraying device and its working method
CN207513114U (en) A kind of construction wall spray equipment
CN201011113Y (en) Multifunctional coating machine
CN107322771A (en) Rotary automatic glaze spraying machine and glaze spraying method
CN206345911U (en) A kind of thermal spraying apparatus and a kind of thermal spray system
CN206604670U (en) A kind of large-diameter steel pipe applies coating line
CN114769032B (en) Annular quick paint spraying system
CN108274322B (en) A kind of architectural engineering terrace sanding machine
CN105289877A (en) Automatic rotary table type spraying production line for adhesive tape

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170630