CN106894454A - 一种塔基基础后加固处理方法 - Google Patents
一种塔基基础后加固处理方法 Download PDFInfo
- Publication number
- CN106894454A CN106894454A CN201710112256.5A CN201710112256A CN106894454A CN 106894454 A CN106894454 A CN 106894454A CN 201710112256 A CN201710112256 A CN 201710112256A CN 106894454 A CN106894454 A CN 106894454A
- Authority
- CN
- China
- Prior art keywords
- muscle
- apeak
- processing method
- present
- column foot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 8
- 210000003205 muscle Anatomy 0.000 claims abstract description 20
- 239000003292 glue Substances 0.000 claims abstract description 8
- 238000004140 cleaning Methods 0.000 claims abstract description 4
- 239000004744 fabric Substances 0.000 claims abstract description 4
- 238000009415 formwork Methods 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 abstract description 11
- 230000000694 effects Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Foundations (AREA)
Abstract
本发明涉及了一种塔基基础后加固处理方法,包括如下步骤:A、钻孔并清理内孔壁,清理后注入直筋用胶水;B、将螺纹钢筋折弯成立锚筋,将立锚筋放入孔内,置放24小时,待胶水凝固;C、布筋,将上层钢筋与立锚筋绑扎固定;D、放支模后浇筑混凝土。本发明具有方法简单、操作方便、性能可靠的优点。
Description
技术领域:
本发明涉及一种塔基基础后加固处理方法。
背景技术:
塔机基础是塔式起重机的根本,实践证明有不少重大安全事故都是由于塔吊基础存在问题而引起的,它是影响塔吊整体稳定性的一个重要因素。塔机预埋式螺栓基础,一旦浇筑混凝土凝固后,预埋螺栓发生断裂就很难处理,处理不妥当对塔机的安全使用存在严重隐患。
发明内容:
为了克服现有加工技术的不足,提供一种方法简单、操作方便、性能可靠的塔基基础后加固处理方法。
发明的目的通过以下技术方案来实现:一种塔基基础后加固处理方法,包括如下步骤:
A、钻孔并清理内孔壁,清理后注入直筋用胶水;
B、将螺纹钢筋折弯成立锚筋,将立锚筋放入孔内,置放24小时,待胶水凝固;
C、布筋,将上层钢筋与立锚筋绑扎固定;
D、放支模后浇筑混凝土。
本发明与现有技术相比具有以下特点:
方法简单、操作方便、性能可靠。
具体实施方式:
为了加深对本发明的理解,下面将结合实施例对本发明作进一步详述,该实施例仅用于解释本发明,并不构成对本发明保护范围的限定。
本发明一种塔基基础后加固处理方法的具体实施方式:包括如下步骤:
A、钻孔并清理内孔壁,清理后注入直筋用胶水;
B、将螺纹钢筋折弯成立锚筋,将立锚筋放入孔内,置放24小时,待胶水凝固;
C、布筋,将上层钢筋与立锚筋绑扎固定;
D、放支模后浇筑混凝土。
本发明具有方法简单、操作方便、性能可靠的优点。
申请人又一声明,本发明通过上述实施例来说明本发明的实现方法及装置结构,但本发明并不局限于上述实施方式,即不意味着本发明必须依赖上述方法及结构才能实施。所属技术领域的技术人员应该明了,对本发明的任何改进,对本发明所选用实现方法等效替换及步骤的添加、具体方式的选择等,均落在本发明的保护范围和公开的范围之内。
本发明并不限于上述实施方式,凡采用和本发明相似结构及其方法来实现本发明目的的所有方式,均在本发明的保护范围之内。
Claims (1)
1.一种塔基基础后加固处理方法,其特征在于:包括如下步骤:
A、钻孔并清理内孔壁,清理后注入直筋用胶水;
B、将螺纹钢筋折弯成立锚筋,将立锚筋放入孔内,置放24小时,待胶水凝固;
C、布筋,将上层钢筋与立锚筋绑扎固定;
D、放支模后浇筑混凝土。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710112256.5A CN106894454A (zh) | 2017-02-28 | 2017-02-28 | 一种塔基基础后加固处理方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710112256.5A CN106894454A (zh) | 2017-02-28 | 2017-02-28 | 一种塔基基础后加固处理方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106894454A true CN106894454A (zh) | 2017-06-27 |
Family
ID=59184742
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710112256.5A Pending CN106894454A (zh) | 2017-02-28 | 2017-02-28 | 一种塔基基础后加固处理方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106894454A (zh) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE202010007750U1 (de) * | 2010-06-09 | 2010-08-19 | Hce Ingenieursgesellschaft Mbh | Ertüchtigtes Fundament |
| CN101899868A (zh) * | 2009-05-26 | 2010-12-01 | 内蒙古兴泰建筑有限责任公司 | 一种后植墙体拉结钢筋施工方法 |
| CN103938664A (zh) * | 2014-05-09 | 2014-07-23 | 南通庞源机械工程有限公司 | 一种塔机基础后加固的处理方法 |
| CN205604283U (zh) * | 2016-04-28 | 2016-09-28 | 福建江夏学院 | 一种建筑植筋混凝土柱 |
-
2017
- 2017-02-28 CN CN201710112256.5A patent/CN106894454A/zh active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101899868A (zh) * | 2009-05-26 | 2010-12-01 | 内蒙古兴泰建筑有限责任公司 | 一种后植墙体拉结钢筋施工方法 |
| DE202010007750U1 (de) * | 2010-06-09 | 2010-08-19 | Hce Ingenieursgesellschaft Mbh | Ertüchtigtes Fundament |
| CN103938664A (zh) * | 2014-05-09 | 2014-07-23 | 南通庞源机械工程有限公司 | 一种塔机基础后加固的处理方法 |
| CN205604283U (zh) * | 2016-04-28 | 2016-09-28 | 福建江夏学院 | 一种建筑植筋混凝土柱 |
Non-Patent Citations (1)
| Title |
|---|
| 卫龙武等: "《建筑物评估、加固与改造(第2版)》", 31 January 2006, 江苏科学技术出版社 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205063057U (zh) | 一种小型洞口的封堵装置 | |
| CN204492142U (zh) | 一种预埋螺杆连墙件 | |
| CN106894454A (zh) | 一种塔基基础后加固处理方法 | |
| CN203593556U (zh) | 高安全塔吊 | |
| CN203441377U (zh) | 管棚钻机简易操作滑动装置 | |
| CN103938664A (zh) | 一种塔机基础后加固的处理方法 | |
| CN204023791U (zh) | 地脚螺栓预埋装置 | |
| CN103410344B (zh) | 一种钢筋混凝土墙梁增强加固装置和墙梁增强方法 | |
| CN206571135U (zh) | 一种不影响施工的外脚手架连墙件 | |
| CN212428295U (zh) | 一种建筑特殊部位临时防护装置 | |
| CN202969304U (zh) | 一种栏杆 | |
| CN202610811U (zh) | 一种危岩外表裂隙拉结加固结构 | |
| CN206616851U (zh) | 一种钢管脚手架的连墙装置 | |
| CN106761542A (zh) | 水泥砂浆封孔工艺方法 | |
| CN205089034U (zh) | 等径杆立杆器 | |
| CN206053381U (zh) | 一种砼浇筑操作平台 | |
| CN206636223U (zh) | 一种模板拉杆的处理结构 | |
| CN105544533A (zh) | 桩板墙挖孔桩护壁贴板 | |
| CN205476414U (zh) | 一种可提高建筑施工安全性的可伸缩跳板 | |
| CN204608788U (zh) | 一种改进型变态混凝土加浆工作棒 | |
| CN104878951B (zh) | 埋入式可控卸荷器 | |
| CN204899256U (zh) | 一种建筑用楼梯曲型护角 | |
| CN210659183U (zh) | 一种用于保证检修人员安全的检修平台 | |
| CN203808485U (zh) | 附着式脚手架操作平台结构 | |
| CN204040301U (zh) | 一种弧形圈梁模板砌块 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170627 |