CN106836604B - 大跨度斜屋面的制作方法 - Google Patents
大跨度斜屋面的制作方法 Download PDFInfo
- Publication number
- CN106836604B CN106836604B CN201710082961.5A CN201710082961A CN106836604B CN 106836604 B CN106836604 B CN 106836604B CN 201710082961 A CN201710082961 A CN 201710082961A CN 106836604 B CN106836604 B CN 106836604B
- Authority
- CN
- China
- Prior art keywords
- lattice
- prestressed
- steel bars
- concrete
- grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 6
- 230000002787 reinforcement Effects 0.000 claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 14
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 12
- 238000005485 electric heating Methods 0.000 claims description 20
- 210000002435 tendon Anatomy 0.000 claims description 15
- 238000004873 anchoring Methods 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 9
- 239000002002 slurry Substances 0.000 claims description 9
- 238000010276 construction Methods 0.000 claims description 5
- 238000010438 heat treatment Methods 0.000 claims description 4
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 3
- 230000002457 bidirectional effect Effects 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 238000005056 compaction Methods 0.000 claims description 3
- 238000001816 cooling Methods 0.000 claims description 3
- 229910052802 copper Inorganic materials 0.000 claims description 3
- 239000010949 copper Substances 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 3
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710082961.5A CN106836604B (zh) | 2017-02-07 | 2017-02-07 | 大跨度斜屋面的制作方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710082961.5A CN106836604B (zh) | 2017-02-07 | 2017-02-07 | 大跨度斜屋面的制作方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106836604A CN106836604A (zh) | 2017-06-13 |
| CN106836604B true CN106836604B (zh) | 2022-08-12 |
Family
ID=59128992
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710082961.5A Active CN106836604B (zh) | 2017-02-07 | 2017-02-07 | 大跨度斜屋面的制作方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106836604B (zh) |
Family Cites Families (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB643866A (en) * | 1947-07-03 | 1950-09-27 | Frank Victor Berk | Improvements in and relating to the construction of concrete roof constructions for buildings |
| GB1196403A (en) * | 1966-09-03 | 1970-06-24 | Geo Sands & Son Ltd | Improvements in or relating to Building Structures |
| CN1128900C (zh) * | 2001-10-26 | 2003-11-26 | 上海磁悬浮交通发展有限公司 | 预应力轨道梁及其制造方法 |
| HRP20020208B1 (en) * | 2002-03-08 | 2011-02-28 | Mara-Institut D.O.O. | Doubly prestressed roof-ceiling construction with grid flat soffit for extremely large spans |
| CN1219955C (zh) * | 2003-07-04 | 2005-09-21 | 贵州工业大学 | 大跨度建筑物屋盖或楼盖的建筑方法及其双重网格梁结构 |
| DE20314252U1 (de) * | 2003-09-11 | 2003-11-20 | HVG-Haaß Vertriebsgesellschaft für Bauelemente mbH, 64331 Weiterstadt | Bauelement für eine Dachkonstruktion |
| CN2923870Y (zh) * | 2006-07-07 | 2007-07-18 | 贵州大学 | 大跨度大柱距拟肋型楼盖式预应力钢网格屋盖 |
| CN100572011C (zh) * | 2007-08-31 | 2009-12-23 | 中铁二局股份有限公司 | 后张法预应力混凝土箱梁整孔预制施工方法 |
| HU228967B1 (hu) * | 2008-11-19 | 2013-07-29 | Loeglen Kft | Könnyûsúlyú épületszerkezet, és eljárás annak elõállítására |
| CN103321444B (zh) * | 2013-06-14 | 2015-09-09 | 罗海军 | 混凝土楼板加固施工方法 |
| CN103397655B (zh) * | 2013-08-03 | 2015-11-25 | 朱奎 | 预应力筏板基础施工方法 |
| CN103410329B (zh) * | 2013-08-30 | 2015-04-15 | 南通八建集团有限公司 | 大跨度地下室混凝土顶板结构扁管有粘结预应力施工方法 |
| CN103469805B (zh) * | 2013-09-10 | 2015-07-29 | 叶长青 | 预应力筏板基础的施工方法 |
| CN104790660A (zh) * | 2015-04-03 | 2015-07-22 | 四川雅豪房地产开发有限公司 | 椭圆形楼盖的井字梁施工方法 |
| CN107191004B (zh) * | 2016-03-10 | 2019-06-04 | 叶长青 | 砖柱加固施工方法 |
| CN108560799A (zh) * | 2016-03-26 | 2018-09-21 | 叶香雄 | 设置拱梁的商务楼顶层结构 |
-
2017
- 2017-02-07 CN CN201710082961.5A patent/CN106836604B/zh active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN106836604A (zh) | 2017-06-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104727441B (zh) | 一种预应力装配式混凝土梁柱节点构造及其施工方法 | |
| CN102979221B (zh) | 一种配置交叉斜向体内预应力的剪力墙结构及其施工方法 | |
| CN104328847B (zh) | 一种内斜支撑装配式混凝土剪力墙预制构件的施工方法 | |
| CN102418425B (zh) | 现浇加腋梁的预制整浇房屋结构体系及其施工方法 | |
| CN102425105A (zh) | 纵向不抗剪螺杆式抗拔连接件及其施工方法 | |
| CN202990170U (zh) | 一种配置交叉斜向体内预应力的剪力墙结构 | |
| CN108678225A (zh) | 内置预应力筋钢管混凝土边框内藏钢板组合剪力墙及作法 | |
| CN104562918B (zh) | 自锚式悬索桥锚固跨现浇混凝土箱梁及其施工方法 | |
| CN106948481A (zh) | 基于部分高强筋的预制装配混凝土框架梁柱连接节点 | |
| CN204715195U (zh) | 一种钢梁–混凝土板组合连续梁桥负弯矩区抗裂构造 | |
| CN106592777A (zh) | 装配式钢‑混结合梁柱节点结构及其实施方法 | |
| CN206289536U (zh) | 一种混凝土箱梁横桥向预应力结构 | |
| CN106032701A (zh) | 一种钢筋混凝土柱的自平衡整体式模板拼装结构 | |
| KR20130005928A (ko) | 교량의 정모멘트 구간에 사용되는 프리스트레스트 콘크리트를 이용한 강박스 합성거더의 제작방법 | |
| CN109024888A (zh) | 装配式pvc-frp管混凝土柱-钢筋混凝土梁自复位环梁节点 | |
| CN102561199A (zh) | 一种独柱混凝土桥墩负弯矩拉力区竖向抗裂的方法 | |
| JP2003138523A (ja) | 張弦桁橋の構築方法 | |
| CN105569265A (zh) | 无粘结钢绞线预应力减小梁截面高度技术 | |
| CN105625571B (zh) | 一种采用中强预应力筋的预制混凝土梁柱节点 | |
| CN119163140B (zh) | 一种设置ecc-不锈钢绞线网局部增强的预制柱-基础连接节点 | |
| CN106836604B (zh) | 大跨度斜屋面的制作方法 | |
| CN105019662A (zh) | 预应力施工中的无粘结预应力钢绞线断筋处理方法 | |
| KR101734304B1 (ko) | 효율적인 강재-콘크리트 합성거더의 제작방법, 이를 이용한 연속교량 시공방법, 및 그에 의해 시공된 연속교량 | |
| CN204475145U (zh) | 自锚式悬索桥锚固跨现浇混凝土箱梁 | |
| KR102077385B1 (ko) | 프리스트레스트 강합성 거더 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240423 Address after: No. 98-1, Group 2, Yuying Village, Longshi Town, Hechuan District, Chongqing, 401544 Patentee after: Zeng Bin Country or region after: China Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4 Patentee before: Ye Changqing Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240426 Address after: 401320, No. 24-36 Jiaolong Road, Lijiatuo Street, Banan District, Chongqing (double number) Patentee after: Chongqing Kaitou Construction Engineering Co.,Ltd. Country or region after: China Address before: No. 98-1, Group 2, Yuying Village, Longshi Town, Hechuan District, Chongqing, 401544 Patentee before: Zeng Bin Country or region before: China |
|
| TR01 | Transfer of patent right |