CN106803004A CN201710045742.XA CN201710045742A CN106803004A CN 106803004 A CN106803004 A CN 106803004A CN 201710045742 A CN201710045742 A CN 201710045742A CN 106803004 A CN106803004 A CN 106803004A
Authority
CN
China
Prior art keywords
dam
data
construction
quality
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710045742.XA
Other languages
Chinese (zh)
Inventor
刘生智
路振刚
张晓光
孟继慧
王程鹏
石岩峰
叶红星
付拓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Easy-To-Use Viewpoint Science And Technology Ltd In Beijing
FENGMAN DAM RECONSTRUCTION ENGINEERING CONSTRUCTION BUREAU OF SONGHUAJIANG HYDROPOWER Co Ltd
State Grid Xinyuan Group Co Ltd
State Grid Corp of China SGCC
Original Assignee
Easy-To-Use Viewpoint Science And Technology Ltd In Beijing
FENGMAN DAM RECONSTRUCTION ENGINEERING CONSTRUCTION BUREAU OF SONGHUAJIANG HYDROPOWER Co Ltd
State Grid Xinyuan Group Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Easy-To-Use Viewpoint Science And Technology Ltd In Beijing, FENGMAN DAM RECONSTRUCTION ENGINEERING CONSTRUCTION BUREAU OF SONGHUAJIANG HYDROPOWER Co Ltd, State Grid Xinyuan Group Co Ltd, State Grid Corp of China SGCC filed Critical Easy-To-Use Viewpoint Science And Technology Ltd In Beijing
Priority to CN201710045742.XA priority Critical patent/CN106803004A/en
Publication of CN106803004A publication Critical patent/CN106803004A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本发明公开了一种基于三维施工模型的质量过程监控数据集成方法;操作步骤如下:步骤(1)建立大坝三维施工模型:按照大坝工程的划分标准,以大坝的单元工程为最小模型单元,建立大坝的三维施工模型;步骤(2)建立统一数据集成标准:建立大坝施工过程中质量过程监控数据的统一集成标准;步骤(3)集成多专业动态数据:通过集成技术实现多数据系统的融合,将不同的源数据转换成所需的数据格式和结构,提高了大坝施工中的质量过程监控的效率,提升大坝施工管理的水平。本发明通过以大坝三维施工模型为载体,将大坝施工过程中质量过程监控数据进行实时动态集成;实现在统一的大坝三维模型上动态集成多专业的质量过程数据,便于大坝的质量过程监控与管理。The invention discloses a quality process monitoring data integration method based on a three-dimensional construction model; the operation steps are as follows: step (1) establish a three-dimensional construction model of a dam: according to the division standard of a dam project, the unit project of the dam is taken as the minimum model unit, establish the 3D construction model of the dam; step (2) establish a unified data integration standard: establish a unified integration standard for the quality process monitoring data in the dam construction process; step (3) integrate multi-disciplinary dynamic data: realize multi-disciplinary The integration of data systems converts different source data into the required data format and structure, improves the efficiency of quality process monitoring during dam construction, and improves the level of dam construction management. The present invention uses the three-dimensional construction model of the dam as a carrier to dynamically integrate the quality process monitoring data in the dam construction process in real time; realizes the dynamic integration of multi-specialty quality process data on the unified three-dimensional model of the dam, and facilitates the quality control of the dam. Process monitoring and management.

Description

一种基于三维施工模型的质量过程监控数据集成方法A data integration method for quality process monitoring based on 3D construction model

技术领域technical field

本发明涉及一种数据集成方法,尤其是一种基于三维施工模型的质量过程监控数据集成方法。The invention relates to a data integration method, in particular to a three-dimensional construction model-based quality process monitoring data integration method.

背景技术Background technique

水利水电大坝工程施工系统涉及的专业多,在信息化过程中,各自建立了独立的管理系统,例如大坝碾压监控系统、混凝土温度控制系统等,各系统间数据无法进行共享,当需要对大坝进行整体的施工质量过程管理时,需要在不同的专业系统中进行查询,效率低下、使用不便,缺乏统一的数据标准和呈现方式对多专业的数据源进行集成与展现。The construction system of water conservancy and hydropower dam projects involves many disciplines. In the process of informatization, each has established an independent management system, such as the dam rolling monitoring system, concrete temperature control system, etc., and the data between the systems cannot be shared. When managing the overall construction quality process of the dam, it is necessary to query in different professional systems, which is inefficient, inconvenient to use, and lacks a unified data standard and presentation method to integrate and display multi-disciplinary data sources.

发明内容Contents of the invention

本发明的目的在于克服现有技术的不足,在此提供一种基于三维施工模型的质量过程监控数据集成方法;通过以大坝三维施工模型为载体,将大坝施工过程中质量过程监控数据进行实时动态集成;实现在统一的大坝三维模型上动态集成多专业的质量过程数据,便于大坝的质量过程监控与管理。The purpose of the present invention is to overcome the deficiencies in the prior art, a kind of quality process monitoring data integration method based on three-dimensional construction model is provided here; By using the three-dimensional construction model of the dam as a carrier, the quality process monitoring data in the dam construction process is carried out Real-time dynamic integration: Realize the dynamic integration of multi-disciplinary quality process data on the unified 3D model of the dam, which is convenient for the quality process monitoring and management of the dam.

本发明是这样实现的,构造一种基于三维施工模型的质量过程监控数据集成方法,其特征在于:操作步骤如下:The present invention is realized in this way, constructing a kind of quality process monitoring data integration method based on three-dimensional construction model, it is characterized in that: operation steps are as follows:

步骤(1)建立大坝三维施工模型:Step (1) Establish the 3D construction model of the dam:

按照大坝工程的划分标准,以大坝的单元工程为最小模型单元,建立大坝的三维施工模型;According to the division standard of the dam project, the three-dimensional construction model of the dam is established with the unit project of the dam as the smallest model unit;

步骤(2)建立统一数据集成标准:Step (2) Establish a unified data integration standard:

在步骤1的基础上建立大坝施工过程中质量过程监控数据的统一集成标准;数据集成标准的类型包括仓面设计、试验检测、碾压监控、温度监控、质量验评数据;仓面设计指仓面设计信息;试验检测指原材料检测信息、混凝土检测信息;碾压监控指碾压轨迹、碾压遍数、压实度、碾压速度监控信息;温度监控指出机口温度、入仓温度、浇筑温度、仓块内部温度信息;质量验评指工序三检表、工序验评表、单元验评表等数据。On the basis of step 1, a unified integration standard for quality process monitoring data in the dam construction process is established; the types of data integration standards include warehouse surface design, test detection, rolling monitoring, temperature monitoring, and quality inspection and evaluation data; warehouse surface design guidelines Warehouse surface design information; test detection refers to raw material detection information, concrete detection information; rolling monitoring refers to rolling track, rolling times, compaction degree, rolling speed monitoring information; temperature monitoring refers to machine mouth temperature, storage temperature, Pouring temperature, internal temperature information of the warehouse block; quality inspection and evaluation refers to data such as process three inspection table, process inspection evaluation table, and unit inspection evaluation table.

步骤(3)集成多专业动态数据:Step (3) Integrate multi-disciplinary dynamic data:

在步骤2的基础上通过集成技术实现多数据系统的融合,将不同的源数据转换成所需的数据格式和结构,提高了大坝施工中的质量过程监控的效率,提升大坝施工管理的水平。On the basis of step 2, the fusion of multiple data systems is realized through integration technology, and different source data are converted into the required data format and structure, which improves the efficiency of quality process monitoring during dam construction and improves the efficiency of dam construction management. Level.

本发明的优点在于:本发明所述的通过基于大坝三维施工模型的质量过程监控大数据集成技术,能够更加直观有效的进行工程施工质量过程管理,将施工设计数据、施工试验检测数据、碾压质量监控过程数据、混凝土温度控制数据进行实时动态集成,有效的进行大坝施工质量过程监控与管理,控制整体工程的施工质量,提升工程管理水平。The advantage of the present invention is that: the large data integration technology for quality process monitoring based on the three-dimensional construction model of the dam described in the present invention can more intuitively and effectively manage the engineering construction quality process, and integrate the construction design data, construction test detection data, milling Real-time dynamic integration of pressure quality monitoring process data and concrete temperature control data can effectively monitor and manage the dam construction quality process, control the construction quality of the overall project, and improve the project management level.

具体实施方式detailed description

下面将对本发明进行详细说明,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The present invention will be described in detail below, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Apparently, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

本发明通过改进提供一种基于三维施工模型的质量过程监控数据集成方法,操作步骤如下:The present invention provides a quality process monitoring data integration method based on a three-dimensional construction model through improvement, and the operation steps are as follows:

步骤(1)建立大坝三维施工模型:Step (1) Establish the 3D construction model of the dam:

按照大坝工程的划分标准,以大坝的单元工程为最小模型单元,建立大坝的三维施工模型;According to the division standard of the dam project, the three-dimensional construction model of the dam is established with the unit project of the dam as the smallest model unit;

步骤(2)建立统一数据集成标准:Step (2) Establish a unified data integration standard:

在步骤1的基础上建立大坝施工过程中质量过程监控数据的统一集成标准;数据集成标准的类型包括仓面设计、试验检测、碾压监控、温度监控、质量验评数据;仓面设计指仓面设计信息;试验检测指原材料检测信息、混凝土检测信息;碾压监控指碾压轨迹、碾压遍数、压实度、碾压速度监控信息;温度监控指出机口温度、入仓温度、浇筑温度、仓块内部温度信息;质量验评指工序三检表、工序验评表、单元验评表等数据。On the basis of step 1, a unified integration standard for quality process monitoring data in the dam construction process is established; the types of data integration standards include warehouse surface design, test detection, rolling monitoring, temperature monitoring, and quality inspection and evaluation data; warehouse surface design guidelines Warehouse surface design information; test detection refers to raw material detection information, concrete detection information; rolling monitoring refers to rolling track, rolling times, compaction degree, rolling speed monitoring information; temperature monitoring refers to machine mouth temperature, storage temperature, Pouring temperature, internal temperature information of the warehouse block; quality inspection and evaluation refers to data such as process three inspection tables, process inspection evaluation tables, and unit inspection evaluation tables.

步骤(3)集成多专业动态数据:Step (3) Integrate multi-disciplinary dynamic data:

在步骤2的基础上通过集成技术实现多数据系统的融合,将不同的源数据转换成所需的数据格式和结构,提高了大坝施工中的质量过程监控的效率,提升大坝施工管理的水平。On the basis of step 2, the fusion of multiple data systems is realized through integration technology, and different source data are converted into the required data format and structure, which improves the efficiency of quality process monitoring during dam construction and improves the efficiency of dam construction management. Level.

本发明所述的基于三维施工模型的质量过程监控数据集成方法;通过以大坝三维施工模型为载体,将大坝施工过程中质量过程监控数据进行实时动态集成;实现在统一的大坝三维模型上动态集成多专业的质量过程数据,便于大坝的质量过程监控与管理。The quality process monitoring data integration method based on the three-dimensional construction model described in the present invention uses the three-dimensional construction model of the dam as a carrier to carry out real-time dynamic integration of the quality process monitoring data in the construction process of the dam; it is realized in a unified three-dimensional model of the dam The dynamic integration of multi-disciplinary quality process data facilitates the quality process monitoring and management of the dam.

操作范例Operation example

以大坝施工过程的一个碾压混凝土仓面为例:Take a RCC silo surface during dam construction as an example:

1)施工前首先在系统中进行仓面设计,根据仓面设计中的桩号信息,系统生成单个仓的三维模型;1) Before construction, the warehouse surface design is first carried out in the system, and the system generates a 3D model of a single warehouse according to the pile number information in the warehouse surface design;

2)根据仓面设计中的工程量信息,系统生成相应的试验检测计划,完成的试验检测信息将录入到系统中进行统计分析;2) According to the engineering quantity information in the warehouse surface design, the system generates the corresponding test and inspection plan, and the completed test and inspection information will be entered into the system for statistical analysis;

3)碾压监控和温度监控信息是外部独立的监控系统,通过统一的数据集成标准接口,碾压及温度监控信息进入系统并与对应仓的三维模型相关联,实现碾压及温度的实时监控;3) Rolling monitoring and temperature monitoring information is an external independent monitoring system. Through a unified data integration standard interface, rolling and temperature monitoring information enters the system and is associated with the 3D model of the corresponding warehouse to realize real-time monitoring of rolling and temperature ;

4)完成的浇筑仓要进行质量验评,仓以单元工程的划分方式进行验评,对应的质量验评数据也基于三维模型集成,展现施工质量评定结果。4) The completed pouring warehouse needs to undergo quality inspection and evaluation. The warehouse is inspected and evaluated by dividing the unit project, and the corresponding quality inspection data is also integrated based on the 3D model to show the construction quality evaluation results.

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (1)

1.一种基于三维施工模型的质量过程监控数据集成方法,其特征在于:操作步骤如下:1. A quality process monitoring data integration method based on a three-dimensional construction model, characterized in that: the operation steps are as follows: 步骤(1)建立大坝三维施工模型:Step (1) Establish the 3D construction model of the dam: 按照大坝工程的划分标准,以大坝的单元工程为最小模型单元,建立大坝的三维施工模型;According to the division standard of the dam project, the three-dimensional construction model of the dam is established with the unit project of the dam as the smallest model unit; 步骤(2)建立统一数据集成标准:Step (2) Establish a unified data integration standard: 在步骤1的基础上建立大坝施工过程中质量过程监控数据的统一集成标准;数据集成标准的类型包括仓面设计、试验检测、碾压监控、温度监控、质量验评数据;仓面设计指仓面设计信息;试验检测指原材料检测信息、混凝土检测信息;碾压监控指碾压轨迹、碾压遍数、压实度、碾压速度监控信息;温度监控指出机口温度、入仓温度、浇筑温度、仓块内部温度信息;质量验评指工序三检表、工序验评表、单元验评表等数据;On the basis of step 1, a unified integration standard for quality process monitoring data in the dam construction process is established; the types of data integration standards include warehouse surface design, test detection, rolling monitoring, temperature monitoring, and quality inspection and evaluation data; warehouse surface design guidelines Warehouse surface design information; test detection refers to raw material detection information, concrete detection information; rolling monitoring refers to rolling track, rolling times, compaction degree, rolling speed monitoring information; temperature monitoring refers to machine mouth temperature, storage temperature, Pouring temperature, internal temperature information of the warehouse block; quality inspection and evaluation refers to data such as process three inspection table, process inspection evaluation table, and unit inspection evaluation table; 步骤(3)集成多专业动态数据:Step (3) Integrate multi-disciplinary dynamic data: 在步骤2的基础上通过集成技术实现多数据系统的融合,将不同的源数据转换成所需的数据格式和结构,提高了大坝施工中的质量过程监控的效率,提升大坝施工管理的水平。On the basis of step 2, the fusion of multiple data systems is realized through integration technology, and different source data are converted into the required data format and structure, which improves the efficiency of quality process monitoring during dam construction and improves the efficiency of dam construction management. Level.
CN201710045742.XA 2017-01-22 2017-01-22 A kind of Quality Process monitoring data integrated approach based on three-dimensional construction model Pending CN106803004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710045742.XA CN106803004A (en) 2017-01-22 2017-01-22 A kind of Quality Process monitoring data integrated approach based on three-dimensional construction model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710045742.XA CN106803004A (en) 2017-01-22 2017-01-22 A kind of Quality Process monitoring data integrated approach based on three-dimensional construction model

Publications (1)

Publication Number Publication Date
CN106803004A true CN106803004A (en) 2017-06-06

Family

ID=58988496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710045742.XA Pending CN106803004A (en) 2017-01-22 2017-01-22 A kind of Quality Process monitoring data integrated approach based on three-dimensional construction model

Country Status (1)

Country Link
CN (1) CN106803004A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107833023A (en) * 2017-11-26 2018-03-23 广东惠利普路桥信息工程有限公司 A data integration method
CN111733787A (en) * 2020-05-14 2020-10-02 中电建路桥集团有限公司 Method and system for detecting karst cave treatment effect in bridge pile foundation construction process
CN112926841A (en) * 2021-02-05 2021-06-08 国家电网有限公司 Engineering construction quality process data integration monitoring method and system
CN116150530A (en) * 2023-04-23 2023-05-23 星杓(成都)信息科技有限公司 Three-dimensional data management loading method and system based on visual field

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104318614A (en) * 2014-10-28 2015-01-28 北京中水科信息技术有限公司 Construction monitoring method and system based on three-dimensional simulation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104318614A (en) * 2014-10-28 2015-01-28 北京中水科信息技术有限公司 Construction monitoring method and system based on three-dimensional simulation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
ZHONG DENGHUA: "Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam", 《SCIENCE IN CHINA SERIES E: TECHNOLOGICAL SCIENCES》 *
崔博: "心墙堆石坝施工质量实时监控系统集成理论与应用", 《中国博士学位论文全文数据库 工程科技II辑》 *
钟桂良: "碾压混凝土坝仓面施工质量实时监控理论与应用", 《中国博士学位论文全文数据库 工程科技II辑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107833023A (en) * 2017-11-26 2018-03-23 广东惠利普路桥信息工程有限公司 A data integration method
CN111733787A (en) * 2020-05-14 2020-10-02 中电建路桥集团有限公司 Method and system for detecting karst cave treatment effect in bridge pile foundation construction process
CN111733787B (en) * 2020-05-14 2021-12-03 中电建路桥集团有限公司 Method and system for detecting karst cave treatment effect in bridge pile foundation construction process
CN112926841A (en) * 2021-02-05 2021-06-08 国家电网有限公司 Engineering construction quality process data integration monitoring method and system
CN116150530A (en) * 2023-04-23 2023-05-23 星杓(成都)信息科技有限公司 Three-dimensional data management loading method and system based on visual field
CN116150530B (en) * 2023-04-23 2023-07-11 星杓(成都)信息科技有限公司 Three-dimensional data management loading method and system based on visual field

Similar Documents

Publication Publication Date Title
CN106803004A (en) A kind of Quality Process monitoring data integrated approach based on three-dimensional construction model
CN104134173B (en) Based on the main distribution figure/analog integrated system remotely having access to information exchange
CN108009714A (en) A kind of electromechanical project generalized information management system and method based on BIM
CN105023086A (en) Digital city management data sharing system based on cloud calculation
CN103824157B (en) Storied household graph management system based on generic tree apportionment model
CN104134121A (en) Method for achieving visualization of power grid information system business data
CN104794221A (en) Multi-dimensional data analyzing system based on service objects
CN104657900A (en) A business support system for oil and gas pipeline regulation and its implementation method
CN108153917A (en) A real estate survey and database construction method for visually defining the relationship between people, land and housing
CN115203798A (en) A BIM lightweight modeling method for digital delivery
CN106557079A (en) A kind of configuration method and device
CN104537459A (en) BIM-based micro field system and method
CN102495916A (en) Multi-application-system panoramic modeling method based on object matching
CN116645306A (en) A multi-source data fusion method for natural resources
CN104240461A (en) Intelligent alarm three-dimensional figure dynamic display method for electrical power system
CN110766792A (en) Grid calculation order coding method based on ArcGIS hydrological analysis tool
CN102722373A (en) Method for recording painting process of a player by Flash painting software
CN105320498A (en) Configurable multi-layer production tracking visualization method based on graphs
CN105426527A (en) Method for unified data modeling in informatization surveying and mapping production equipment integration process
CN112015795A (en) A system and method for ad hoc query of large data volume
CN107392437A (en) Power marketing digitizes management and control index system and method for exhibiting data
CN112328666A (en) A smart building supervision operation and maintenance system based on cloud platform technology
CN108182055A (en) The information object modeling method and system of a kind of SCD file
CN104915492B (en) A kind of animation derived product fast integration design system
Park et al. Visualization of urban air pollution with cloud computing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170606