CN106707160B - 转子绕组温升测试的修正方法 - Google Patents
转子绕组温升测试的修正方法 Download PDFInfo
- Publication number
- CN106707160B CN106707160B CN201610999866.7A CN201610999866A CN106707160B CN 106707160 B CN106707160 B CN 106707160B CN 201610999866 A CN201610999866 A CN 201610999866A CN 106707160 B CN106707160 B CN 106707160B
- Authority
- CN
- China
- Prior art keywords
- rotor windings
- temperature rise
- temperature
- unit
- rotor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
- G01R31/346—Testing of armature or field windings
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
Abstract
本发明提出一种转子绕组温升测试的修正方法,用以修正由于冷态电阻和热态电阻的测试位置不同,即冷、热状态电阻不是同一电阻而引起转子绕组温升测试的偏差问题;其修正方法是:在不同运行工况下,进行三次发电机温升试验;转子绕组输入功率的计算,转子绕组温升的计算;以转子绕组输入功率Pf为横坐标,以转子绕组温升Δt为纵坐标,把三次温升试验的转子绕组温升数据绘制在一张坐标图上;温升曲线线性延长,延长线交于纵轴,与纵轴的交点距离原点为h;当h>5k时,需要修正转子绕组温升,其修正值为h;转子绕组温升的测试值与修正值之差,作为转子绕组温升的实际值。
Description
技术领域:
本发明涉及一种转子绕组温升测试的修正方法。
背景技术
转子绕组热态温度是大型发电机重要的性能指标,它关系到转子的发热和散热、损耗和效率、发电机的能否正常运行、发电机的使用寿命等。由于发电机运行工况的温度环境不同,发电机专业引入“温升”的技术性能指标,即绕组温度与冷风温度之差来进行考核。
大型同步发电机转子绕组热态温度的测试方法是电阻法,即利用电阻阻值的变化与电阻温度的变化为特定比例关系来确定转子绕组热态温度。但是部分发电机的转子按照电阻法确定的转子绕组热态测试值偏高,且与设计计算值不吻合。有的发电机测试的转子绕组热态温度与定子绕组测试的温度相差30K,按照设计计算和实践经验,定子绕组与转子绕组温度偏差如此之大是不正常的。通过现场试验、分析研究,查找出引起这种误差是由于:转子绕组冷态电阻和热态电阻的测试位置不同,即转子绕组冷态电阻和热态电阻不是同一电阻,而利用同一电阻下的电阻法计算公式确定的温度必然会存在偏差。
发明内容
本发明提出一种转子绕组温升测试的修正方法,用以修正由于冷态电阻和热态电阻的测试位置不同而引起转子绕组温升测试的偏差问题,本发明的技术方案为:一种转子绕组温升测试的修正方法,
第一步,在不同运行工况下,进行三次发电机温升试验
在不同运行工况下,进行三次发电机温升试验;三次试验转子绕组输入功率在80%Pf1<Pf2<95%Pf1、80%Pf2<Pf3<95%Pf2范围内,且最大的功率点Pf1接近额定转子绕组输入功率PfN;其中Pf1、Pf2、Pf3为三次温升试验的转子绕组输入功率,PfN为额定转子绕组输入功率;
发电机温升试验时测试发电机输出功率、滑环处的转子绕组电压、转子绕组电流、每个空气冷却器的冷风温度;
第二步,转子绕组输入功率的计算,转子绕组温升的计算
a)转子绕组输入功率的计算
转子绕组输入功率是滑环处的转子绕组电压与转子绕组电流之积,
见公式(1):
Pf=Uf*If*10-3 (1)
式中:
Pf:转子绕组输入功率,单位:kW;
Uf:滑环处的转子绕组电压,单位:V;
If:转子绕组电流,单位:A;
b)冷风平均温度的计算
把所有空气冷却器的冷风温度取平均值,作为冷风平均温度,见计算公式(2):
式中:
冷风平均温度,单位:℃;
ti:所有空气冷却器的冷风温度,单位:℃;
n:所有空气冷却器数量;
c)转子绕组热态温度的计算
转子绕组热态温度利用转子绕组热态电阻及电阻法公式进行确定;发电机温升试验各部件达到热稳定后,把滑环处转子绕组电压与转子绕组电流的商,作为转子绕组热态电阻,见计算公式(3);
Rf2=Uf/If (3)
式中:
Rf2:转子绕组热态电阻,单位:Ω;
Uf:滑环处的转子绕组电压,单位:V;
If:转子绕组电流,单位:A;
按电阻法的计算公式确定转子绕组热态温度,电阻法公式见下式(4):
tf2=Rf2*(235+tf1)/Rf1-235 (4)
式中:
Rf1:转子绕组冷态电阻,单位:Ω;
Rf2:转子绕组热态电阻,单位:Ω;
tf1:对应Rf1转子绕组冷态温度,单位:℃;
tf2:转子绕组热态温度,单位:℃;
235:铜绕组导体材料在0℃时电阻温度系数的倒数;
d)转子绕组温升的计算
转子绕组热态温度与冷风平均温度的差值,作为转子绕组温升的测试值,见下式(5):
式中:
Δt:转子绕组温升的测试值,单位:k;
tf2:转子绕组热态温度,单位:℃;
冷风平均温度,单位:℃;
第三步,绘制转子绕组温升曲线,确定修正值
以转子绕组输入功率Pf为横坐标,以转子绕组温升Δt为纵坐标,把三次温升试验的转子绕组温升数据绘制在一张坐标图上,并把三点线性连接成曲线;该温升曲线线性延长,延长线交于纵轴,令交点与原点的距离为h,h即为修正值;
根据h的大小,判定是否需要修正的转子绕组温升,h为修正值,即曲线延长线的纵轴交点与原点的距离:
a)h≤5k,不需要修正转子绕组温升;
b)h>5k,需要修正转子绕组温升;
第四步,确定转子绕组温升的实际值
转子绕组温升的测试值与修正值之差,作为转子绕组温升的实际值;根据修正值h,转子绕组温升的实际值公式为:
Δt'=Δt–h (6)
式中:
Δt'——转子绕组温升的实际值,单位:k;
Δt——转子绕组温升的测试值,单位:k;
h——修正值,单位:k。
技术效果:
本发明涉及一种转子绕组温升测试的修正方法,用以修正由于冷态电阻和热态电阻的测试位置不同而引起转子绕组温升测试的偏差问题,本发明具有以下技术效果:
1)本发明针对电阻法测温在发电机转子应用的实际情况进行技术改进的;
旋转电机转子绕组冷态电阻和热态电阻的测试位置是不同的;转子绕组冷态电阻是旋转电机在冷状态下,使用双臂电桥等仪器测试的,一般在转子引线末端位置或者引线固定螺栓处如图1中所示,进行测试;热态电阻是在滑环上通过滑环处转子绕组电压和转子绕组电流确定的,由于滑环旋转,转子绕组电压电流随测点的变化而变化,热态电阻也随之变动,热态电阻是一个变动的数值。由于转子滑环是在旋转的特殊性,冷、热电阻的测试方法不同,冷、热状态电阻不是同一电阻,应用电阻法测温,必然引起转子绕组温升测试的偏差。
2)本发明提出三次温升试验是进行转子绕组温度修正的基础;
实际运行中,电机转子和冷风组成相对独立的热力系统;转子绕组输入功率引起转子绕组发热、温度的上升,一定的输入功率,引起一定的温升;当输入功率为零时,温升也接近为零;如果转子绕组在温升不为零,偏差很大,说明通过电阻法计算过程中产生偏差。
本发明提出了通过三次温升试验,三次转子绕组输入功率在80%Pf1<Pf2<95%Pf1、80%Pf2<Pf3<95%Pf2范围内,且最大的功率点Pf1接近额定转子输入功率PfN。这种技术方案最大试验工况接近额定工况,使修正后的数值接近实际工况,减少了偏差。
3)本发明确定了修正值,提出了转子绕组温度修正方法
本发明根据三次温升试验,以转子绕组输入功率Pf为横坐标,以转子绕组温升Δt为纵坐标,把三次温升试验的转子绕组温升数据绘制在一张坐标图上,并线性连接成曲线。该温升曲线向横坐标线性延长,延长线交于横轴于点a,令交点a与原点0的距离为h,h即为修正值。
不同的发电机,不同的转子结构和引线连接方式,冷、热态的电阻偏差也是不同的,有的电阻偏差略大,有的电阻偏差微小,电阻偏差大小引起温升偏差大小是不同的。如果h非常小,说明冷、热态的电阻偏差也非常小,则修正意义不大,还会产生误差。当h>5k,需要修正转子绕组温升,修正值为h。
转子绕组温升的测试值与修正值之差,作为转子绕组温升的实际值。根据修正值h,转子绕组温升的实际值公式为:Δt'=Δt–h。
附图说明
图1是滑环示意图。
图2是不需要修正的转子绕组温升图(h=2k)。
图3是需要修正的转子绕组温升图(h=13k)。
具体实施方式:
本发明提出一种转子绕组温升测试的修正方法,用以修正由于冷态电阻和热态电阻的测试位置不同,如图1所示,转轴1、滑环2、引线3、引线端部固定螺栓4;位置A:滑环处转子绕组电压测试位置;位置B:转子绕组冷态电阻测试位置,而引起转子绕组温升测试的偏差问题,本发明的具体实施方式如下:
第一步,在不同运行工况下,进行三次发电机温升试验
在不同运行工况下,进行三次发电机温升试验;三次试验转子绕组输入功率在80%Pf1<Pf2<95%Pf1、80%Pf2<Pf3<95%Pf2范围内,且最大的功率点Pf1接近额定转子绕组输入功率PfN;其中Pf1、Pf2、Pf3为三次温升试验的转子绕组输入功率,PfN为额定转子绕组输入功率;
发电机温升试验时测试发电机输出功率、滑环处的转子绕组电压、转子绕组电流、每个空气冷却器的冷风温度;
第二步,转子绕组输入功率的计算,转子绕组温升的计算
a)转子绕组输入功率的计算
转子绕组输入功率是滑环处的转子绕组电压与转子绕组电流之积,见公式(1):
Pf=Uf*If*10-3 (1)
式中:
Pf:转子绕组输入功率,单位:kW;
Uf:滑环处的转子绕组电压,单位:V;
If:转子绕组电流,单位:A;
b)冷风平均温度的计算
把所有空气冷却器的冷风温度取平均值,作为冷风平均温度,见计算公式(2):
式中:
冷风平均温度,单位:℃;
ti:所有空气冷却器的冷风温度,单位:℃;
n:所有空气冷却器数量;
c)转子绕组热态温度的计算
转子绕组热态温度利用转子绕组热态电阻及电阻法公式进行确定;发电机温升试验各部件达到热稳定后,把滑环处转子绕组电压与转子绕组电流的商,作为转子绕组热态电阻,见计算公式(3);
Rf2=Uf/If (3)
式中:
Rf2:转子绕组热态电阻,单位:Ω;
Uf:滑环处的转子绕组电压,单位:V;
If:转子绕组电流,单位:A;
按电阻法的计算公式确定转子绕组热态温度,电阻法公式见下式(4):
tf2=Rf2*(235+tf1)/Rf1-235 (4)
式中:
Rf1:转子绕组冷态电阻,单位:Ω;
Rf2:转子绕组热态电阻,单位:Ω;
tf1:对应Rf1转子绕组冷态温度,单位:℃;
tf2:转子绕组热态温度,单位:℃;
235:铜绕组导体材料在0℃时电阻温度系数的倒数;
d)转子绕组温升的计算
转子绕组热态温度与冷风平均温度的差值,作为转子绕组温升的测试值,见下式(5):
式中:
Δt:转子绕组温升的测试值,单位:k;
tf2:转子绕组热态温度,单位:℃;
冷风平均温度,单位:℃;
第三步,绘制转子绕组温升曲线,确定修正值
以转子绕组输入功率Pf为横坐标,以转子绕组温升Δt为纵坐标,把三次温升试验的转子绕组温升数据绘制在一张坐标图上,并把三点线性连接成曲线;该温升曲线线性延长,延长线交于纵轴,令交点与原点的距离为h,h即为修正值;
根据h的大小,判定是否需要修正的转子绕组温升,h为修正值,即曲线延长线的纵轴交点与原点的距离:
c)h≤5k,不需要修正转子绕组温升;
d)h>5k,需要修正转子绕组温升;
第四步,确定转子绕组温升的实际值
转子绕组温升的测试值与修正值之差,作为转子绕组温升的实际值;根据修正值h,转子绕组温升的实际值公式为:
Δt'=Δt–h (6)
式中:
Δt'——转子绕组温升的实际值,单位:k;
Δt——转子绕组温升的测试值,单位:k;
h——修正值,单位:k。
Claims (1)
1.一种转子绕组温升测试的修正方法,其特征是:
第一步,在不同运行工况下,进行三次发电机温升试验
在不同运行工况下,进行三次发电机温升试验;三次试验转子绕组输入功率在80%Pf1<Pf2<95%Pf1、80%Pf2<Pf3<95%Pf2范围内,且最大的功率点Pf1接近额定转子绕组输入功率PfN;其中Pf1、Pf2、Pf3为三次温升试验的转子绕组输入功率,PfN为额定转子绕组输入功率;
发电机温升试验时测试发电机输出功率、滑环处的转子绕组电压、转子绕组电流、每个空气冷却器的冷风温度;
第二步,转子绕组输入功率的计算,转子绕组温升的计算
a)转子绕组输入功率的计算
转子绕组输入功率是滑环处的转子绕组电压与转子绕组电流之积,见公式(1):
Pf=Uf*If*10-3 (1)
式中:
Pf:转子绕组输入功率,单位:kW;
Uf:滑环处的转子绕组电压,单位:V;
If:转子绕组电流,单位:A;
b)冷风平均温度的计算
把所有空气冷却器的冷风温度取平均值,作为冷风平均温度,见计算公式(2):
式中:
冷风平均温度,单位:℃;
ti:所有空气冷却器的冷风温度,单位:℃;
n:所有空气冷却器数量;
c)转子绕组热态温度的计算
转子绕组热态温度利用转子绕组热态电阻及电阻法公式进行确定;发电机温升试验各部件达到热稳定后,把滑环处转子绕组电压与转子绕组电流的商,作为转子绕组热态电阻,见计算公式(3);
Rf2=Uf/If (3)
式中:
Rf2:转子绕组热态电阻,单位:Ω;
Uf:滑环处的转子绕组电压,单位:V;
If:转子绕组电流,单位:A;
按电阻法的计算公式确定转子绕组热态温度,电阻法公式见下式(4):
tf2=Rf2*(235+tf1)/Rf1-235 (4)
式中:
Rf1:转子绕组冷态电阻,单位:Ω;
Rf2:转子绕组热态电阻,单位:Ω;
tf1:对应Rf1转子绕组冷态温度,单位:℃;
tf2:转子绕组热态温度,单位:℃;
235:铜绕组导体材料在0℃时电阻温度系数的倒数;
d)转子绕组温升的计算
转子绕组热态温度与冷风平均温度的差值,作为转子绕组温升的测试值,见下式(5):
式中:
Δt:转子绕组温升的测试值,单位:k;
tf2:转子绕组热态温度,单位:℃;
冷风平均温度,单位:℃;
第三步,绘制转子绕组温升曲线,确定修正值
以转子绕组输入功率Pf为横坐标,以转子绕组温升Δt为纵坐标,把三次温升试验的转子绕组温升数据绘制在一张坐标图上,并把三点线性连接成曲线;该温升曲线线性延长,延长线交于纵轴,令交点与原点的距离为h,h即为修正值;
根据h的大小,判定是否需要修正的转子绕组温升,h为修正值,即曲线延长线的纵轴交点与原点的距离:
a)h≤5k,不需要修正转子绕组温升;
b)h>5k,需要修正转子绕组温升;
第四步,确定转子绕组温升的实际值
转子绕组温升的测试值与修正值之差,作为转子绕组温升的实际值;根据修正值h,转子绕组温升的实际值公式为:
Δt'=Δt–h (6)
式中:
Δt'——转子绕组温升的实际值,单位:k;
Δt——转子绕组温升的测试值,单位:k;
h——修正值,单位:k。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610999866.7A CN106707160B (zh) | 2016-11-14 | 2016-11-14 | 转子绕组温升测试的修正方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610999866.7A CN106707160B (zh) | 2016-11-14 | 2016-11-14 | 转子绕组温升测试的修正方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106707160A CN106707160A (zh) | 2017-05-24 |
| CN106707160B true CN106707160B (zh) | 2019-02-15 |
Family
ID=58940917
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610999866.7A Active CN106707160B (zh) | 2016-11-14 | 2016-11-14 | 转子绕组温升测试的修正方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106707160B (zh) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113884218A (zh) * | 2021-10-12 | 2022-01-04 | 厦门钨业股份有限公司 | 电机稳态温升预测方法、装置、系统和存储介质 |
| CN114113836B (zh) * | 2021-11-15 | 2023-10-27 | 中煤科工集团沈阳研究院有限公司 | 一种隔离变压器的温升实验装置及方法 |
| CN115308551B (zh) * | 2022-08-22 | 2025-09-19 | 中车永济电机有限公司 | 一种列车牵引电机定子绝缘的测试评估方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB712562A (en) * | 1951-06-25 | 1954-07-28 | Asea Ab | Method and apparatus for thoroughly electrically heating large billets |
| JPS58202514A (ja) * | 1982-05-21 | 1983-11-25 | Hitachi Ltd | 自冷式変圧器巻線 |
| DE19630027A1 (de) * | 1996-07-25 | 1998-01-29 | Bosch Gmbh Robert | Anordnung zur Erfassung der Temperatur des Ankers eines Gleichstrommotors |
| CN101029915A (zh) * | 2006-09-11 | 2007-09-05 | 国电南瑞科技股份有限公司 | 交流感应电动机的绕组温度测量和过热保护方法 |
| KR20110066693A (ko) * | 2009-12-11 | 2011-06-17 | 한전케이디엔주식회사 | 중대형 고압모터 정적 감시장치 |
| CN102645287A (zh) * | 2012-05-15 | 2012-08-22 | 无锡艾柯威科技有限公司 | 一种电机绕组温升的检测方法 |
| CN102914378A (zh) * | 2011-08-02 | 2013-02-06 | 中广核工程有限公司 | 一种核电站基于dcs的发电机转子线圈温度监测的方法 |
-
2016
- 2016-11-14 CN CN201610999866.7A patent/CN106707160B/zh active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB712562A (en) * | 1951-06-25 | 1954-07-28 | Asea Ab | Method and apparatus for thoroughly electrically heating large billets |
| JPS58202514A (ja) * | 1982-05-21 | 1983-11-25 | Hitachi Ltd | 自冷式変圧器巻線 |
| DE19630027A1 (de) * | 1996-07-25 | 1998-01-29 | Bosch Gmbh Robert | Anordnung zur Erfassung der Temperatur des Ankers eines Gleichstrommotors |
| CN101029915A (zh) * | 2006-09-11 | 2007-09-05 | 国电南瑞科技股份有限公司 | 交流感应电动机的绕组温度测量和过热保护方法 |
| KR20110066693A (ko) * | 2009-12-11 | 2011-06-17 | 한전케이디엔주식회사 | 중대형 고압모터 정적 감시장치 |
| CN102914378A (zh) * | 2011-08-02 | 2013-02-06 | 中广核工程有限公司 | 一种核电站基于dcs的发电机转子线圈温度监测的方法 |
| CN102645287A (zh) * | 2012-05-15 | 2012-08-22 | 无锡艾柯威科技有限公司 | 一种电机绕组温升的检测方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106707160A (zh) | 2017-05-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Mirzaeva et al. | Advanced diagnosis of stator turn-to-turn faults and static eccentricity in induction motors based on internal flux measurement | |
| Jung et al. | Online diagnosis of induction motors using MCSA | |
| CN104422885A (zh) | 电动机实时在线测试系统 | |
| CN106707160B (zh) | 转子绕组温升测试的修正方法 | |
| Bonet-Jara et al. | Comprehensive analysis of principal slot harmonics as reliable indicators for early detection of interturn faults in induction motors of deep-well submersible pumps | |
| CN203981851U (zh) | 励磁式发电机故障模拟系统 | |
| CN101915623B (zh) | 一种无刷励磁发电机转子温度测算方法 | |
| CN100514835C (zh) | 同步发电机和同步电动机互馈系统的构建方法 | |
| CN116231972B (zh) | 绕线式感应水轮发电机转子绕组温度检测的系统与方法 | |
| Rehman et al. | Experimental research and analysis on rotor winding inter-turn short circuit fault in DFIG | |
| Sheikh et al. | An analytical and experimental approach to diagnose unbalanced voltage supply | |
| Sheikh et al. | A new method for detection of unbalance voltage supply in three phase induction motor | |
| Drif et al. | Rotor cage fault diagnostics in three-phase induction motors, by the instantaneous phase-angle signature analysis | |
| Ji et al. | Calculation of Loss and Temperature Rise of High Speed Permanent Magnet Synchronous Motor | |
| Kim et al. | Motor Efficiency Determination of SynRM and Measurement Uncertainty | |
| Pires et al. | Stator winding fault diagnosis in induction motors using the dq current trajectory mass center | |
| Rassõlkin et al. | Adjusted electrical equivalent circuit model of induction motor with broken rotor bars | |
| Zhang et al. | Loss characteristic analysis of small and medium-sized induction motors fed by PWM inverter based on the experiment measurements | |
| Li et al. | Inter-turn fault diagnosis of permanent magnet synchronous machine based on variational mode decomposition | |
| Albizuri-Txurruka et al. | Influence of Rotational Speed on the Frequency Response Analysis of the Field Winding of Large Hydrogenerators | |
| Salameh et al. | Commutation angle analysis of a double-output induction generator using a detailed dq model | |
| Al-Badri | Stray-Load Loss Approximation for Partial Loads | |
| Krishna et al. | Investigation on stator winding interturn fault in induction motor using the autotransformer based approach | |
| Hamatwi et al. | Evaluating the use of terminal currents and the controller signals in the diagnosis of eccentricity and interturn faults in a Micro-DFIG | |
| Vavilov et al. | Verification of the thermal model of an asynchronous traction motor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |