CN106560560A - Rolling-mat closure hydropower station building method - Google Patents
Rolling-mat closure hydropower station building method Download PDFInfo
- Publication number
- CN106560560A CN106560560A CN201610339723.3A CN201610339723A CN106560560A CN 106560560 A CN106560560 A CN 106560560A CN 201610339723 A CN201610339723 A CN 201610339723A CN 106560560 A CN106560560 A CN 106560560A
- Authority
- CN
- China
- Prior art keywords
- framework
- dam body
- volume
- straw mat
- hydropower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
“卷席截流”水电站建筑的方法,是用沉井技术在流水中建筑坝体通过“卷席截流”截断流水,省去导流、截流、围堰等,能快速建成水电站,工期缩短投资减少开挖量减少非常环保。本发明用于建筑贯流水电站,有多少水就发多少电,不要水库的水电站,如长江中游的葛洲坝水电站,装机271万千瓦,减少征地,不占用农田和村庄,迅速建起水电站快速发电,是本发明优点。本发明可应用在江河堤坝口,堵口之用。本发明可在任何河段建筑水电站,还可建高坝水电站,前景很好,对“一带一路”基础建设快速提供水电电力,对各国带来快速发展起到很大帮助,中国水电集团有本发明定能战胜外国水电集团赢得竞争。The method of "rolling sweep interception" hydropower station construction is to use caisson technology to build a dam body in the flowing water and intercept the flowing water through "rolling sweep interception", which saves diversion, closure, cofferdam, etc., can quickly build a hydropower station, shorten the construction period and reduce investment The reduction in excavation is very environmentally friendly. The present invention is used in the construction of tubular hydropower stations, which can generate as much electricity as there is water. Hydropower stations without reservoirs, such as the Gezhouba Hydropower Station in the middle reaches of the Yangtze River, have an installed capacity of 2.71 million kilowatts, reduce land acquisition, and do not occupy farmland and villages. The hydropower station can be quickly built to generate electricity quickly. It is the advantage of the present invention. The present invention can be applied in the mouth of river embankment, the usefulness of plugging mouth. The invention can build a hydropower station in any river section, and can also build a high-dam hydropower station. The prospect is very good. It can quickly provide hydropower and electricity for the infrastructure construction of the "Belt and Road", and it will greatly help the rapid development of various countries. China Hydropower Group has its own Inventions are sure to win the competition over foreign hydropower groups.
Description
本发明涉及一种“卷席截流”水电站建筑的方法。 The invention relates to a method for "sweeping and intercepting" a hydropower station building.
现在建筑水电站方法之一,首先导流、截流、围堰,接着进行抽干围堰中间的水,露出河床,挖掉河床的泥土沙石,挖到岩层,再进行水电站坝体浇灌,直至坝体及各项工程完成,蓄水发电。这种建筑水电站缺点①施工周期长,导流、截流、围堰工程费用高。②土石方开挖量大,耗费资金多。③开挖面积大,植被破坏大,不环保。 One of the current methods of building a hydropower station is to first divert, intercept, and cofferdam, and then drain the water in the middle of the cofferdam to expose the river bed, dig out the soil and sand on the river bed, dig to the rock formation, and then water the dam body of the hydropower station until the dam The body and various projects are completed, water storage and power generation. Disadvantages of this kind of building hydropower station 1) The construction period is long, and the engineering cost of diversion, closure and cofferdam is high. ②The excavation volume of earth and rock is large, which consumes a lot of money. ③The excavation area is large, the vegetation is destroyed greatly, and it is not environmentally friendly.
本发明的目的是解决上述建筑水电站的缺点,提供一种不用导流,不用截流,不用围堰,可直接在流水中用沉井施工方法建筑起新型“卷席截流”水电站及其建筑方法。优点:①建筑水电站不要导流、不要截流、不要围堰,就缩短建筑水电站工期和减少投资。②建坝用沉井技术,开挖面积少,同时减少导流、截流、围堰等工程,生态破坏少,很环保。 The purpose of the present invention is to solve the above-mentioned shortcoming of construction hydropower station, provide a kind of without diversion, without closure, without cofferdam, can directly use caisson construction method to build a new type of "rolling sweep closure" hydropower station and its construction method in running water. Advantages: ① Construction of hydropower stations does not require diversion, interception, or cofferdams, which shortens the construction period and reduces investment. ②The caisson technology is used for dam construction, with less excavation area, and at the same time reduces diversion, closure, cofferdam and other projects, less ecological damage, and is very environmentally friendly.
附图说明: Description of drawings:
下面结合附图与实际施工中实际过程与本发明中的特点图示出来。 Below in conjunction with accompanying drawing and actual construction, actual process and characteristic diagram among the present invention come out.
(图1)①混凝土框架坝体。②混凝土冲沙闸坝体。③混凝土水轮机、发电机坝体。④混凝土挡沙坝体。以上混凝土坝体预制成型或现场浇灌,在建造水电站河段,利用沉井技术把各坝体沉下,沉到河床,清除沙石、泥土,固化岩层把各混凝土坝体沉到岩层与岩层牢固相接,坝体之间也牢固相接。 (Figure 1) ①Concrete frame dam body. ②Concrete flushing gate dam body. ③ Concrete water turbine and generator dam. ④Concrete sand retaining dam body. The above concrete dams are prefabricated or poured on site. In the river section where the hydropower station is constructed, the dams are sunk by caisson technology to the river bed, sand and soil are removed, and the rock formation is solidified to sink the concrete dams to the rock formation and the rock formation is firm. The dam bodies are also firmly connected.
(图2)图1完成施工后,再建造⑥船闸⑦过鱼闸,⑤左附坝、⑤右附坝。连接成为整体卷席截流后挡水之用。 (Fig. 2) After Fig. 1 completes the construction, build ⑥ ship lock ⑦ fish lock, ⑤ left attached dam, ⑤ right attached dam. The connection becomes the purpose of retaining water after interception of the whole roll.
(图3)“卷席框架”构造和组装后并把浮体卷在卷席中,固定在 “卷席框架”下方。 (Fig. 3) After the "rolling mat frame" is constructed and assembled, the floating body is rolled in the rolling mat and fixed below the "rolling mat frame".
(图4)组装后的“卷席框架”安装在①混凝土框架坝体上游侧。 (Figure 4) The assembled "rolling mat frame" is installed on the upstream side of the concrete frame dam body.
(图5)启动后的“卷席框架”浮体升起卷席展开金属框架全部封满,把河水全部截断水位上升,升到设计水位时启动水轮机带动发电机发电。 (Figure 5) After starting, the "rolling mat frame" floating body rises and the rolling mat unfolds to completely seal the metal frame, cut off all the river water and raise the water level, and when it reaches the design water level, start the water turbine to drive the generator to generate electricity.
本发明通过如下技术方案来完成,利用沉井技术把预制成型或现场制作的①混凝土框架坝体②混凝土冲沙闸坝体③混凝土水轮机、水轮机、发电机坝体。④混凝土挡沙坝体。分别放到建水电站河段,沉下,沉到河床,清除泥土、沙石及风化岩层与岩层牢固相接,坝体之间也牢固相接(图1),河面较宽,一个单元框架坝体不够拦水,可用几个或多个单元框架坝体,相互连接来完成并在河流两岸建起付⑤左付坝⑤右付坝、⑥船闸⑦过鱼闸。与坝体相互连接来完成挡水工作(图2)。此时河流流水从框架坝体中的框架孔中流到下游去此时河流水位没有上涨。 The present invention is accomplished through the following technical schemes, using caisson technology to prefabricate or make on-site ① concrete frame dam body ② concrete sand-washing sluice dam body ③ concrete water turbine, water turbine, generator dam body. ④Concrete sand retaining dam body. Put them into the river section where the hydropower station will be built, sink down, and sink to the river bed, remove the soil, sand and rocks and weathered rocks to connect firmly with the rock layers, and the dam bodies are also firmly connected (Figure 1). The river surface is wide, and a unit frame dam If the body is not enough to stop water, several or more unit frame dams can be connected to complete and build ⑤ left dam, ⑤ right dam, ⑥ ship lock, and ⑦ fish lock on both banks of the river. Connect with the dam body to complete the water retaining work (Figure 2). This moment, the river water flowed downstream from the frame hole in the frame dam body and the river water level did not rise this moment.
草席可以卷起成为筒状,也可以展开成平面,本发明利用草席卷起和展开的原理在草席上面的边装一个圆柱浮体在草席后面放一个框架,草席下边固定在框架下边,圆柱浮体卷在草席中,草席卷成圆柱,固定在框架下方,并把它垂直放在流水中,只要打开固定,能自动完成截断流水工作。草席是草编织的,草席材料不结实,把草席材料改变成结实,坚固耐磨、耐酸、耐腐、防老化,能卷成圆柱,又能展开成平面,选用合成橡胶材料,代替草席材料这种改变材料的草席称为卷席,这种“卷席安装在金属框架上,成卷席框架”、“卷席框架”构造(图3)由金属框架E,卷席F,圆柱浮体G三根固定杆A1、A2、A3,三股固定绳C1、C2、C3,金属框架上方三根固定杆A1、A2、A3,穿过金属框架内部直插框架下方三个方孔B1、B2、B3内,金属框架下方,左、中、右位置,固定绳,一头固定在金属框架下边,另一头有 个方孔。卷席框架下方有一排螺丝孔眼D1D2D3D4D5D6。在卷席上面边安装一个圆柱浮体G(能拆能装)浮体尺寸卷席上面边尺寸一样长。卷席下面边有一排孔眼D`1D`2D`3D`4D`5D`6。对准金属框架孔眼D1D2D3D4D5D6用螺丝固定紧,卷席浮体、金属框架组装成“卷席框架”截流装置。再把圆柱浮体转动向流水来的方向转动卷席转在圆柱浮体外面,形成一个圆柱,转至框架下方用固定绳C1、C2、C3,分别绕在浮体卷席两端与中间,固定绳头C1、C2、C3分别插入B1、B2、B3方孔内,再用固定杆A1、A2、A3头插入C1、C2、C3孔内进行固定,圆柱浮体与卷席转成筒状用固定绳C1、C2、C3固定在“金属框架”下方,以上经过操作后就是组装完毕的“卷席框架”,整体安装在沉如水中的混凝土框架坝体上游侧。卷席框架面积尺寸要等于混凝土框架尺寸。此时河流先流过卷席框架孔洞(由于卷席卷成筒状,金属框架露出孔洞),再流经混凝土框架孔洞,流到下游去,此时河流水位仍没有上涨,(图4)。水电站各项工程完成后需要蓄水发电时,只要同时拉开,升起固定杆A1、A2、A3,这时杆头离开固定绳头的方孔,固定绳C1、C2、C3松开,此时水下卷席框架下方的浮体开始上浮顶开固定绳C1、C2、C3,带动卷席展开,受流水流动压力卷席展开后被按在金属框架上,浮体上升一点卷席展开一点就被水流按在金属框架上一点,直至卷席把金属框架全部封满,水无法流到下游去,此时,河流水位迅速上涨,坝体上游荷载增加压力增大,混凝土框架支撑金属框架重力及全部水位上涨的荷载,水位上涨到设计水位时启动水轮机带动发电机发电,流水全部封着时水下就无流速,此时派潜水员到水下把卷席另三个边,用压边扳H,固定在金属框架边上不能有渗水出现,再把圆柱浮体拆下运上岸去下次再用。“卷席截流水电站建筑的方法”就完成(图5)。 The straw mat can be rolled up into a cylindrical shape, and can also be unfolded into a plane. The invention uses the principle of rolling up and unfolding the straw mat to install a cylindrical floating body on the side of the straw mat and put a frame behind the straw mat, and the bottom of the straw mat is fixed on the lower side of the frame. , The cylindrical floating body is rolled in the straw mat, the grass mat is rolled into a cylinder, fixed under the frame, and put it vertically in the running water, as long as it is opened and fixed, it can automatically complete the work of cutting off the flowing water. The straw mat is made of grass, and the mat material is not strong. Change the straw mat material to be strong, durable, acid-resistant, corrosion-resistant, anti-aging, can be rolled into a cylinder, and can be unfolded into a plane. Use synthetic rubber material to replace Straw mat material This kind of straw mat that changes the material is called a roll mat. This "roll mat is installed on a metal frame to form a roll mat frame", and the "roll mat frame" structure (Figure 3) consists of a metal frame E, a roll mat F , cylindrical floating body G three fixed rods A1, A2, A3, three fixed ropes C1, C2, C3, three fixed rods A1, A2, A3 above the metal frame, through the inside of the metal frame and directly inserted into the three square holes B1, B2 below the frame , In B3, below the metal frame, left, middle, and right positions, fixed ropes, one end is fixed under the metal frame, and the other end has a square hole. There is a row of screw holes D1D2D3D4D5D6 under the mat frame. A cylinder floating body G (dismountable and adornable) is installed on the upper side of the rolling mat. A row of eyelets D`1D`2D`3D`4D`5D`6 are arranged on the lower side of the mat. Align the hole D1D2D3D4D5D6 of the metal frame and fix it tightly with screws, and assemble the floating body and the metal frame into a "rolling mat frame" intercepting device. Then turn the cylindrical floating body to the direction of the flowing water, turn the mat and turn it outside the cylindrical floating body to form a cylinder, turn it to the bottom of the frame and use fixed ropes C1, C2, C3 to wrap around the two ends and the middle of the floating body mat respectively, and fix the rope head Insert C1, C2, and C3 into the square holes of B1, B2, and B3 respectively, and then insert the heads of fixing rods A1, A2, and A3 into the holes of C1, C2, and C3 to fix them. . The size of the mat frame area should be equal to the size of the concrete frame. At this time, the river first flows through the hole of the roll mat frame (because the roll sweep is rolled into a tube shape, the metal frame exposes the hole), then flows through the concrete frame hole, and flows to the downstream. When the various projects of the hydropower station need to store water and generate electricity, as long as they are pulled apart at the same time, the fixing rods A1, A2 and A3 are raised, and at this time the rod heads leave the square holes of the fixing rope heads, and the fixing ropes C1, C2 and C3 are loosened. When the floating body under the underwater mat frame starts to float up, the fixed ropes C1, C2, and C3 are opened to drive the mat to unfold. Under the pressure of flowing water, the mat is unfolded and pressed on the metal frame. When the floating body rises a little, the mat is unfolded The water flow presses a little on the metal frame until the metal frame is completely sealed by the rolling mat, and the water cannot flow downstream. At this time, the water level of the river rises rapidly, and the upstream load of the dam body increases. When the water level rises to the load, when the water level rises to the design water level, start the turbine to drive the generator to generate electricity. When the flowing water is completely sealed, there will be no flow velocity underwater. At this time, send divers to the other three sides of the roll seat underwater, and use the pressure side to pull H. Fix it on the side of the metal frame so that no water seepage occurs, and then remove the cylindrical floating body and transport it to the shore for reuse next time. "The method of sweeping and closing the hydropower station building" just completes (Fig. 5).
本发明可在任何河段建筑水电站。 The present invention can construct hydropower stations in any river section.
本发明还可以应用在江河堤坝决口,堵口之用。 The present invention can also be applied to the crevice and blocking of river embankments.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610339723.3A CN106560560B (en) | 2016-05-16 | 2016-05-16 | Construction method of Juanxi interception hydropower station |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610339723.3A CN106560560B (en) | 2016-05-16 | 2016-05-16 | Construction method of Juanxi interception hydropower station |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106560560A true CN106560560A (en) | 2017-04-12 |
| CN106560560B CN106560560B (en) | 2019-09-03 |
Family
ID=58485567
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610339723.3A Active CN106560560B (en) | 2016-05-16 | 2016-05-16 | Construction method of Juanxi interception hydropower station |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106560560B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109881634A (en) * | 2019-03-08 | 2019-06-14 | 河海大学 | A rapid emergency rescue method for dam breach in flood season using geosynthetic material to intercept flow |
| CN111851427A (en) * | 2020-07-22 | 2020-10-30 | 桂林生 | A new type of closure and cofferdam dam body of a hydropower station and a construction method for the dam body |
| CN113389164A (en) * | 2021-06-28 | 2021-09-14 | 温瑞强 | Downstream river course protector for hydraulic engineering |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2880912Y (en) * | 2005-09-12 | 2007-03-21 | 吴金南 | High-efficiency hydropower generation device for hydropower stations |
| US20090058092A1 (en) * | 2007-09-04 | 2009-03-05 | Chun-Shan Chen | Self-supported power generation device |
| CN105545576A (en) * | 2015-08-07 | 2016-05-04 | 仲杏英 | wave power system |
| CN105544478A (en) * | 2012-11-20 | 2016-05-04 | 李宏江 | Device for solving water source deficiency of hydropower station and improving benefits of hydropower station |
-
2016
- 2016-05-16 CN CN201610339723.3A patent/CN106560560B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2880912Y (en) * | 2005-09-12 | 2007-03-21 | 吴金南 | High-efficiency hydropower generation device for hydropower stations |
| US20090058092A1 (en) * | 2007-09-04 | 2009-03-05 | Chun-Shan Chen | Self-supported power generation device |
| CN105544478A (en) * | 2012-11-20 | 2016-05-04 | 李宏江 | Device for solving water source deficiency of hydropower station and improving benefits of hydropower station |
| CN105545576A (en) * | 2015-08-07 | 2016-05-04 | 仲杏英 | wave power system |
Non-Patent Citations (1)
| Title |
|---|
| 肖焕雄等: "《水利工程施工分册》", 31 January 2004, 中国水利水电出版社 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109881634A (en) * | 2019-03-08 | 2019-06-14 | 河海大学 | A rapid emergency rescue method for dam breach in flood season using geosynthetic material to intercept flow |
| CN111851427A (en) * | 2020-07-22 | 2020-10-30 | 桂林生 | A new type of closure and cofferdam dam body of a hydropower station and a construction method for the dam body |
| WO2022016603A1 (en) * | 2020-07-22 | 2022-01-27 | 桂林生 | New-type closure and coffer dam body of hydropower station, and dam body construction method |
| CN113389164A (en) * | 2021-06-28 | 2021-09-14 | 温瑞强 | Downstream river course protector for hydraulic engineering |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106560560B (en) | 2019-09-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111851427A (en) | A new type of closure and cofferdam dam body of a hydropower station and a construction method for the dam body | |
| CN203429606U (en) | Sediment retaining bank reconstructed from temporary cofferdam | |
| CN106560560B (en) | Construction method of Juanxi interception hydropower station | |
| CN203977437U (en) | The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam | |
| CN212896448U (en) | Scour prevention is bridge pile foundation structure under water | |
| CN204551500U (en) | Novel cofferdam in a kind of super thick soft foundation | |
| CN215165198U (en) | A foot protection structure for cofferdam along embankment in strong tidal area | |
| CN108018854A (en) | A kind of Ecotype Concrete support pile | |
| CN208604552U (en) | For the stake woods dam under complex geological condition | |
| CN218291864U (en) | An underground pumped energy storage system based on moats or natural water sources | |
| CN110700206A (en) | A maintenance system and implementation method of a large water deep scoop stilling pool | |
| CN207794060U (en) | A kind of Ecotype Concrete support pile | |
| CN207727520U (en) | Vacuum electroosmosis well point reduces the device of earth and rockfill dam saturation | |
| CN110528627A (en) | A kind of shallow sea reservoir and its method of construction | |
| CN217325279U (en) | Annual construction cofferdam type of hydropower station diversion tunnel inlet | |
| CN215518588U (en) | Permanent face combined retaining wall structure | |
| CN212200477U (en) | River-blocking weir gate anti-impact sinking well group and connecting structure comprising same | |
| CN210636421U (en) | Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation | |
| CN211200274U (en) | A prefabricated channel revetment structure | |
| CN114991077A (en) | Circulation backfill type slope water and soil conservation structure | |
| CN113186878A (en) | Soft soil foundation diversion canal construction method for water taking in rivers | |
| CN108677880A (en) | For the stake woods dam under complex geological condition | |
| CN204401567U (en) | Device for preventing stone from entering tail canal of factory building | |
| CN120493386B (en) | Design method of diversion tunnel structure for ultra-high arch dam | |
| TWM644832U (en) | Power generation system having potential energy drop subsurface water collected in submersible culvert |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251103 Address after: 332000 ARIS Jiujiang New World, No. 818 Qingnian Road, Lichuan District, Jiujiang City, Jiangxi Province Patentee after: Huayu Water Resources and Hydropower Development Co.,Ltd. In Lianxi District Jiujiang City Country or region after: China Address before: 332004, Jiangxi Province, Jiujiang City, Binjiang East Road No. 45, Guodian Company Jiujiang Power Plant staff dormitory building 35, unit 3, room 301 Patentee before: Guilin Sheng Country or region before: China |
|