CN106438216A - 分段直塔筒预应力混凝土风机塔架及其安装方法 - Google Patents
分段直塔筒预应力混凝土风机塔架及其安装方法 Download PDFInfo
- Publication number
- CN106438216A CN106438216A CN201610929742.1A CN201610929742A CN106438216A CN 106438216 A CN106438216 A CN 106438216A CN 201610929742 A CN201610929742 A CN 201610929742A CN 106438216 A CN106438216 A CN 106438216A
- Authority
- CN
- China
- Prior art keywords
- concrete
- tower
- straight
- straight tower
- segments
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011513 prestressed concrete Substances 0.000 title claims abstract description 45
- 238000009434 installation Methods 0.000 title claims description 16
- 238000000034 method Methods 0.000 title claims description 8
- 239000004567 concrete Substances 0.000 claims abstract description 51
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 20
- 239000010959 steel Substances 0.000 claims abstract description 20
- 239000011178 precast concrete Substances 0.000 claims description 40
- 230000011218 segmentation Effects 0.000 claims description 24
- 239000003638 chemical reducing agent Substances 0.000 claims description 11
- 230000000712 assembly Effects 0.000 claims description 6
- 238000000429 assembly Methods 0.000 claims description 6
- 230000005484 gravity Effects 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 3
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 4
- 238000010248 power generation Methods 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610929742.1A CN106438216A (zh) | 2016-10-31 | 2016-10-31 | 分段直塔筒预应力混凝土风机塔架及其安装方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610929742.1A CN106438216A (zh) | 2016-10-31 | 2016-10-31 | 分段直塔筒预应力混凝土风机塔架及其安装方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106438216A true CN106438216A (zh) | 2017-02-22 |
Family
ID=58177280
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610929742.1A Pending CN106438216A (zh) | 2016-10-31 | 2016-10-31 | 分段直塔筒预应力混凝土风机塔架及其安装方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106438216A (zh) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109763942A (zh) * | 2019-02-21 | 2019-05-17 | 江苏金海新能源科技有限公司 | 一种预应力混凝土风机塔架及其施工方法 |
| CN113494425A (zh) * | 2020-04-07 | 2021-10-12 | 上海夏凯建筑科技有限公司 | 塔架及塔架构件 |
| CN119467223A (zh) * | 2024-11-19 | 2025-02-18 | 贵州大学 | 一种装配式预应力钢混混合塔架结构及施工方法 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101725475A (zh) * | 2008-10-15 | 2010-06-09 | 天津万联管道工程有限公司 | 具有预制钢筋混凝土基柱的风力发电塔筒 |
| US20140033628A1 (en) * | 2012-08-03 | 2014-02-06 | James D. Lockwood | Precast concrete post tensioned segmented wind turbine tower |
| CN105179183A (zh) * | 2015-09-11 | 2015-12-23 | 中国航空规划设计研究总院有限公司 | 一种预应力混凝土风电塔架体系及其施工方法 |
-
2016
- 2016-10-31 CN CN201610929742.1A patent/CN106438216A/zh active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101725475A (zh) * | 2008-10-15 | 2010-06-09 | 天津万联管道工程有限公司 | 具有预制钢筋混凝土基柱的风力发电塔筒 |
| US20140033628A1 (en) * | 2012-08-03 | 2014-02-06 | James D. Lockwood | Precast concrete post tensioned segmented wind turbine tower |
| CN105179183A (zh) * | 2015-09-11 | 2015-12-23 | 中国航空规划设计研究总院有限公司 | 一种预应力混凝土风电塔架体系及其施工方法 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109763942A (zh) * | 2019-02-21 | 2019-05-17 | 江苏金海新能源科技有限公司 | 一种预应力混凝土风机塔架及其施工方法 |
| CN113494425A (zh) * | 2020-04-07 | 2021-10-12 | 上海夏凯建筑科技有限公司 | 塔架及塔架构件 |
| CN119467223A (zh) * | 2024-11-19 | 2025-02-18 | 贵州大学 | 一种装配式预应力钢混混合塔架结构及施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8307593B2 (en) | Tower with adapter section | |
| EP0891487B1 (de) | Stillgelegter schornstein als turm für eine windturbine | |
| CN201326524Y (zh) | 风力发电机组混合式塔筒 | |
| CN102312799A (zh) | 具有张紧缆索的塔架 | |
| CN206917805U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
| CN1842632A (zh) | 用于风能设备的塔柱 | |
| CN105008636A (zh) | 滑动模板成形的混凝土塔 | |
| CN105179183A (zh) | 一种预应力混凝土风电塔架体系及其施工方法 | |
| CN103114604A (zh) | 预应力混凝土圆筒型风力发电机组基础 | |
| CN106438216A (zh) | 分段直塔筒预应力混凝土风机塔架及其安装方法 | |
| CN105297766A (zh) | 可更换式预应力锚栓风机基础 | |
| CN206468489U (zh) | 一种预应力混凝土塔螺栓与钢绞线连接转换装置 | |
| CN206190458U (zh) | 全向预应力抗疲劳组合钢结构风塔 | |
| CN205841102U (zh) | 钢混组合式塔筒 | |
| CN107351228A (zh) | 一种预制风电塔架用模具装备及其施工工艺 | |
| CN207905996U (zh) | 一种风力机塔筒加固装置 | |
| CN207047885U (zh) | 一种体外预应力混凝土风机塔架空心基础 | |
| CN202788126U (zh) | 一种锚栓式柱脚人字形构架 | |
| CN206221172U (zh) | 分段直塔筒预应力混凝土风机塔架 | |
| CN206313716U (zh) | 一种山地灌注桩调节立柱光伏电站支架 | |
| CN205205849U (zh) | 可更换式预应力锚栓风机基础 | |
| CN206707932U (zh) | 预应力抗疲劳组合结构风塔 | |
| CN204783489U (zh) | 一种格构式风力发电机塔架 | |
| CN202391647U (zh) | 一种风力发电机 | |
| CN204385762U (zh) | 一种岩石锚杆基础结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20200403 Address after: No. 36 Yancheng City Funing 224400 Jiangsu province Xin Road Economic Development Zone Applicant after: Jiangsu Jinhai wind tower Technology Co.,Ltd. Address before: No. 36 Yancheng City Avenue GCL 224400 Funing County in Jiangsu Province Economic Development Zone Applicant before: JIANGSU JINHAI NEW ENERGY TECHNOLOGY Co.,Ltd. Applicant before: INNER MONGOLIA OF GIMHAE NEW ENERGY TECHNOLOGY Co.,Ltd. Applicant before: SHANGHAI NIUANJIE NEW ENERGY TECHNOLOGY Co.,Ltd. |
|
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170222 |