CN106437132A - Derrick men quick-mounting working platform and manufacturing and mounting method thereof - Google Patents
Derrick men quick-mounting working platform and manufacturing and mounting method thereof Download PDFInfo
- Publication number
- CN106437132A CN106437132A CN201610991435.6A CN201610991435A CN106437132A CN 106437132 A CN106437132 A CN 106437132A CN 201610991435 A CN201610991435 A CN 201610991435A CN 106437132 A CN106437132 A CN 106437132A
- Authority
- CN
- China
- Prior art keywords
- workbench
- plate
- latch closure
- mounting
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 8
- 238000000034 method Methods 0.000 title claims abstract description 8
- 239000000725 suspension Substances 0.000 claims description 19
- 238000009434 installation Methods 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000005452 bending Methods 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 11
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention relates to a derrick men quick-mounting working platform and a manufacturing and mounting method thereof. The derrick men quick-mounting working platform is suitable for being mounted on a single-row scaffold; the single-row scaffold consists of a transverse rod and a vertical rod on a facade; the derrick men quick-mounting working platform comprises a working platform plate, a horizontal fastener and a vertical fastener, wherein the working platform plate is arranged horizontally; one side of the working platform plate is fixed on the transverse rod through the horizontal fastener, and the other side of the working platform plate is suspended; one end or two ends of the working platform plate are fixedly connected with the vertical rod through the vertical fastener; the vertical fastener consists of a lock catch and a connecting rod part; the vertical rod above the working platform plate is locked by the lock catch; the connecting rod part is in cable-stayed connection between the vertical rod and the working platform plate; one end of the connecting rod part is fixedly connected with the lock catch; the other end of the connecting rod part is fixedly connected with an extended end of the working platform plate. By adopting the derrick men quick-mounting working platform, a working platform can be rapidly, conveniently and firmly erected on the single-row scaffold, construction of operators can be facilitated, and the construction efficiency and the construction security can be greatly improved.
Description
Technical field
The present invention relates to a kind of workbench, more particularly, to a kind of frame work quick-mounting workbench being applied to single-row of scaffold
And its fabrication and installation method.
Background technology
In construction, workman construction when with job platform usually rely on the scaffold system built come reality
Existing.Due in conventional construction, sometimes only with single-row of scaffold, even with double-pole scaffold be also first set up single again
Set up another row;Scaffold is successively set up from bottom to top, when setting up one layer of scaffold above workman be typically only capable to stand in following
On the cross bar of one layer of scaffold, hand steered vertical rod walking or operation;Because cross bar area is little, there is the danger stepping on sky, especially exist
When ice and snow environment or rainy day construction, there are major safety risks.
Content of the invention
The invention provides a kind of frame work quick-mounting workbench and its fabrication and installation method, may be implemented on single-row of scaffold
Quickly, conveniently, set up workbench securely, facilitate workman to construct, substantially increase security when efficiency of construction and construction.
In order to achieve the above object, the present invention employs the following technical solutions realization:
A kind of frame work quick-mounting workbench it is adaptable to install on single-row of scaffold, described single-row of scaffold by cross bar and
Vertical rod forms in a facade;Including workbench plate, horizontal firmware and vertical firmware;Workbench plate level sets
Put, its side is fixed on cross bar by horizontal firmware, and opposite side is hanging;The one or both ends of workbench plate are passed through vertical
Firmware is fixedly connected with vertical rod;Vertical firmware is formed with connecting rod by latching, and is locked above workbench plate
Vertical rod on, between vertical rod and workbench plate, its one end is fixedly connected connecting rod oblique pull with lock, the other end and work
The overhanging end of landing slab is fixedly connected.
Described workbench plate is steel grating.
Described horizontal firmware is inverted U-shaped suspension member, and its bending radius is cross bar diameter+3~5mm;Multiple inverted U-shaped suspension member edges
Workbench plate side is uniformly arranged, and one end of inverted U-shaped suspension member is welded with workbench plate side.
Described lock is made up of fixing latch closure, movable latch closure, link bolt and fixing bolt;Fixing latch closure and movable latch closure
One end pass through that link bolt is hinged, the other end is set fixing locking plate and movable locking plate respectively and is locked by fixing bolt
Fixing;The minimum diameter of fixing latch closure and movable latch closure fastening rear catch main body is less than the external diameter 3~5mm of vertical rod.
A kind of fabrication and installation method of frame work quick-mounting workbench, comprises the steps:
Make frame work quick-mounting workbench;
1) determine the longitudinal size of workbench plate according to single-row of scaffold vertical pole's span, its lateral dimension be 400~
600mm, workbench plate adopts steel grating to make to mitigate weight;
2) workbench plate side weld several inverted U-shaped suspension members it is ensured that the top of inverted U-shaped suspension member in the same plane,
So that the workbench plate after installing keeps horizontality;
3) one or both ends in workbench plate are welded to connect rod member, the angle between connecting rod and workbench plate
For 45 °;The other end of connecting rod and the fixing latch closure welding near workbench plate side;
4), after being connected fixing latch closure by link bolt with the hinged end of movable latch closure, frame work quick-mounting workbench is made
Complete;
Installing rack work quick-mounting workbench;
1) workbench plate is suspended on the cross bar of single-row of scaffold by the several inverted U-shaped suspension member of side;
2) movable latch closure is latched main body around link bolt rotating opening, then lock main body set is attached in vertical rod, then
Movable latch closure is rotated backward, so that lock main body is fastened in vertical rod;
3) with fixing bolt, movable latch closure is tight with retainer ring padlock, so that lock is securely seated between in vertical rod;
4), after the completion of a side lock is fixing, determine whether fixing another side lock as needed;After lock is all fixed, frame
Work quick-mounting workbench is installation.
Compared with prior art, the invention has the beneficial effects as follows:
1) may be implemented on single-row of scaffold quick, convenient, set up workbench securely, facilitate workman to construct, significantly
Improve security when efficiency of construction and construction;
2) structure is simple, small volume, lightweight it is easy to be used in turn;
3) reusable, utilization rate is high, highly versatile.
Brief description
Fig. 1 is the mounting structure schematic diagram of frame work quick-mounting workbench of the present invention.
Fig. 2 is the structural representation of lock of the present invention.
In figure:1. cross bar 2. vertical rod 3. workbench plate 4. inverted U-shaped suspension member 5. connecting rod 6. locks 61. are fixing
The movable locking plate of the fixing locking plate of movable latch closure 63. link bolt, 64. fixing bolt 65. of latch closure 62. 66.
Specific embodiment
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described further:
As shown in figure 1, a kind of frame work quick-mounting workbench of the present invention is it is adaptable to install, institute on single-row of scaffold
State single-row of scaffold to be made up of in a facade cross bar 1 and vertical rod 2;Including workbench plate 3, horizontal firmware and vertically steady
Firmware;Workbench plate 3 is horizontally disposed with, and its side is fixed on cross bar 1 by horizontal firmware, and opposite side is hanging;Work is flat
The one or both ends of platen 3 are fixedly connected with vertical rod 2 by vertical firmware;Vertical firmware is by latching 6 and 5 groups of connecting rod
Become, lock 6 is locked in the vertical rods 2 of workbench plate 3 top, connecting rod 5 oblique pull between vertical rod 2 and workbench plate 3,
Its one end is fixedly connected with lock 6, and the other end is fixedly connected with the overhanging end of workbench plate 3.
Described workbench plate 3 is steel grating.
Described horizontal firmware is inverted U-shaped suspension member 4, and its bending radius is cross bar diameter+3~5mm;Multiple inverted U-shaped suspension members 4
It is uniformly arranged along workbench plate 3 side, one end of inverted U-shaped suspension member 4 is welded with workbench plate 3 side.
As shown in Fig. 2 described lock 6 is by fixing latch closure 61, movable latch closure 62, link bolt 63 and 64 groups of fixing bolt
Become;One end of fixing latch closure 61 and movable latch closure 62 is hinged by link bolt 63, and the other end sets fixing locking plate respectively
65 be locked with movable locking plate 66 and by fixing bolt 64;Fixing latch closure 61 and movable latch closure 62 fasten rear catch main body
Minimum diameter is less than the external diameter 3~5mm of vertical rod 2.
A kind of fabrication and installation method of frame work quick-mounting workbench, comprises the steps:
Make frame work quick-mounting workbench;
1) determine the longitudinal size of workbench plate 3 according to single-row of scaffold vertical rod 2 spacing, its lateral dimension be 400~
600mm, workbench plate 3 adopts steel grating to make to mitigate weight;
2) several inverted U-shaped suspension members 4 are welded it is ensured that the top of inverted U-shaped suspension member 4 is in same plane in workbench plate 3 side
Interior, so that the workbench plate 3 after installing keeps horizontality;
3) one or both ends in workbench plate 3 are welded to connect rod member 5, between connecting rod 5 and workbench plate 3
Angle is 45 °;The other end of connecting rod 5 is welded with the fixing latch closure 61 near workbench plate 3 side;
4), after being connected fixing latch closure 61 by link bolt 63 with the hinged end of movable latch closure 62, the work of frame work quick-mounting is flat
Platform completes;
Installing rack work quick-mounting workbench;
1) workbench plate 3 is suspended on the cross bar 1 of single-row of scaffold by the several inverted U-shaped suspension member 4 of side;
2) movable latch closure 62 is latched 6 main bodys around link bolt 63 rotating opening, be then attached to vertical rod by latching 6 main body sets
Appropriate location on 2, more movable latch closure 62 is rotated backward, so that lock 6 main body is fastened in vertical rod 2;
3) with fixing bolt 64, movable latch closure 62 is locked with fixing latch closure 61, make lock 6 be securely seated between vertical rod 2
On;
4), after the completion of a side lock 6 is fixing, determine whether fixing another side lock 6 as needed;Lock 6 is all fixed
Afterwards, frame work quick-mounting workbench is installation.
In the present invention, workbench plate 3 is the main body of frame work quick-mounting workbench, is also subject to the portion of frame work work load
Part, its rigidity, intensity should reach corresponding design requirement.The setting height(from bottom) of workbench plate 3 can concordant with cross bar 1 can also
Slightly below cross bar 1 is arranged.
Horizontal firmware one end and workbench plate 3 weld, and its bending side hangs on cross bar 1, to workbench plate 3
Main support acts on.
For preventing horizontal firmware from leading to workbench plate 3 to overturn because of load excessive curved side shedding deformation, it is provided with perpendicular
To firmware, it passes through the connecting rod 5 of oblique pull and buckles vertical rod 2 together with lock 6, and vertical firmware is common with horizontal firmware
Effect, makes the horizontal stability of workbench plate 3 further enhance the security it is ensured that when constructing.
Lock 6 main body of vertical firmware is made up of two semicircular latch closures, is referred to as fixing latch closure 61 and activity
Latch closure 62.It is fixing with workbench plate 3, if limited it is impossible to arrange by field condition that fixing latch closure 61 passes through connecting rod 5
Connecting rod 5 is welded it is also possible to latch closure 61 directly will be fixed with workbench plate 3.
Fixing locking plate 65 and movable locking plate 66 are radially arranged along latching 6 main bodys, and fixing latch closure 61 is fastened with movable latch closure 62
After in vertical rod 2, fix the bolt hole automatic alignment on locking plate 65 and movable locking plate 66, now fixing bolt 64 is sequentially passed through
Lock 6 can be locked in vertical rod 2 for fixing locking plate 65 and movable locking plate 66.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto,
Any those familiar with the art the invention discloses technical scope in, technology according to the present invention scheme and its
Inventive concept equivalent or change in addition, all should be included within the scope of the present invention.
Claims (5)
1. it is adaptable to install on single-row of scaffold, described single-row of scaffold by cross bar and stands a kind of frame work quick-mounting workbench
Bar forms in a facade;It is characterized in that, including workbench plate, horizontal firmware and vertical firmware;Workbench
Plate level is arranged, and its side is fixed on cross bar by horizontal firmware, and opposite side is hanging;The one or both ends of workbench plate
It is fixedly connected with vertical rod by vertical firmware;Vertical firmware is formed with connecting rod by latching, and is locked at work flat
In vertical rod above platen, between vertical rod and workbench plate, its one end is fixedly connected connecting rod oblique pull with lock, another
End is fixedly connected with the overhanging end of workbench plate.
2. a kind of frame work quick-mounting workbench according to claim 1 is it is characterised in that described workbench plate is steel lattice
Plate.
3. a kind of frame work quick-mounting workbench according to claim 1 is it is characterised in that described horizontal firmware is U
Shape suspension member, its bending radius is cross bar diameter+3~5mm;Multiple inverted U-shaped suspension members are uniformly arranged along workbench plate side, U
One end of shape suspension member is welded with workbench plate side.
4. a kind of frame work quick-mounting workbench according to claim 1 it is characterised in that described lock by fix latch closure,
Movable latch closure, link bolt and fixing bolt composition;One end of fixing latch closure and movable latch closure is hinged on one by link bolt
Rise, the other end is set fixing locking plate and movable locking plate respectively and is locked by fixing bolt;Fixing latch closure and movable latch closure button
The minimum diameter closing rear catch main body is less than the external diameter 3~5mm of vertical rod.
5. a kind of frame work quick-mounting workbench according to claim 1 fabrication and installation method it is characterised in that include as
Lower step:
Make frame work quick-mounting workbench;
1) determine the longitudinal size of workbench plate according to single-row of scaffold vertical pole's span, its lateral dimension is 400~600mm,
Workbench plate adopts steel grating to make to mitigate weight;
2) workbench plate side weld several inverted U-shaped suspension members it is ensured that the top of inverted U-shaped suspension member in the same plane so that
Workbench plate after installation keeps horizontality;
3) one or both ends in workbench plate are welded to connect rod member, and the angle between connecting rod and workbench plate is
45°;The other end of connecting rod and the fixing latch closure welding near workbench plate side;
4), after being connected fixing latch closure by link bolt with the hinged end of movable latch closure, frame work quick-mounting workbench has made
Become;
Installing rack work quick-mounting workbench;
1) workbench plate is suspended on the cross bar of single-row of scaffold by the several inverted U-shaped suspension member of side;
2) movable latch closure is latched main body around link bolt rotating opening, then lock main body set is attached in vertical rod, then will live
Rotating ring button rotates backward, and so that lock main body is fastened in vertical rod;
3) with fixing bolt, movable latch closure is tight with retainer ring padlock, so that lock is securely seated between in vertical rod;
4), after the completion of a side lock is fixing, determine whether fixing another side lock as needed;After lock is all fixed, frame work speed
Dress workbench is installation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610991435.6A CN106437132A (en) | 2016-11-10 | 2016-11-10 | Derrick men quick-mounting working platform and manufacturing and mounting method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610991435.6A CN106437132A (en) | 2016-11-10 | 2016-11-10 | Derrick men quick-mounting working platform and manufacturing and mounting method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106437132A true CN106437132A (en) | 2017-02-22 |
Family
ID=58206866
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610991435.6A Pending CN106437132A (en) | 2016-11-10 | 2016-11-10 | Derrick men quick-mounting working platform and manufacturing and mounting method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106437132A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107152158A (en) * | 2017-06-21 | 2017-09-12 | 上海森大机械制造有限公司 | A kind of fixed scaffold |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2193399Y (en) * | 1994-04-08 | 1995-03-29 | 张殿茂 | Simple scaffold board for building construction |
| CN1191921A (en) * | 1997-02-25 | 1998-09-02 | 日钢计划株式会社 | Connecting fastening for steel pipe |
| CN2713057Y (en) * | 2004-06-09 | 2005-07-27 | 王斌 | Suspended mounting rack |
| DE202006012140U1 (en) * | 2006-08-08 | 2006-10-26 | Kehrle, Rolf | Walkable pavement for e.g. constructional scaffold, has profile support module including primary adhesive unit that is adapted to another adhesive unit of another support module, where support modules are connected by connecting unit |
| US20100224447A1 (en) * | 2009-03-06 | 2010-09-09 | Athos Construction Products, Inc. | Integrated plank and toeboard system |
| CN202706514U (en) * | 2012-06-16 | 2013-01-30 | 四川华祥工程建设有限公司 | Simple scaffold board |
| CN203821821U (en) * | 2014-04-17 | 2014-09-10 | 浙江鸿安建设有限公司 | Crossed connecting piece for steel pipe scaffold |
| CN205476417U (en) * | 2016-04-06 | 2016-08-17 | 天津鼎维固模架工程股份有限公司 | Hang footboard suitable for scaffold |
| CN206245710U (en) * | 2016-11-10 | 2017-06-13 | 中国三冶集团有限公司 | A kind of frame work quick-mounting workbench |
-
2016
- 2016-11-10 CN CN201610991435.6A patent/CN106437132A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2193399Y (en) * | 1994-04-08 | 1995-03-29 | 张殿茂 | Simple scaffold board for building construction |
| CN1191921A (en) * | 1997-02-25 | 1998-09-02 | 日钢计划株式会社 | Connecting fastening for steel pipe |
| CN2713057Y (en) * | 2004-06-09 | 2005-07-27 | 王斌 | Suspended mounting rack |
| DE202006012140U1 (en) * | 2006-08-08 | 2006-10-26 | Kehrle, Rolf | Walkable pavement for e.g. constructional scaffold, has profile support module including primary adhesive unit that is adapted to another adhesive unit of another support module, where support modules are connected by connecting unit |
| US20100224447A1 (en) * | 2009-03-06 | 2010-09-09 | Athos Construction Products, Inc. | Integrated plank and toeboard system |
| CN202706514U (en) * | 2012-06-16 | 2013-01-30 | 四川华祥工程建设有限公司 | Simple scaffold board |
| CN203821821U (en) * | 2014-04-17 | 2014-09-10 | 浙江鸿安建设有限公司 | Crossed connecting piece for steel pipe scaffold |
| CN205476417U (en) * | 2016-04-06 | 2016-08-17 | 天津鼎维固模架工程股份有限公司 | Hang footboard suitable for scaffold |
| CN206245710U (en) * | 2016-11-10 | 2017-06-13 | 中国三冶集团有限公司 | A kind of frame work quick-mounting workbench |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107152158A (en) * | 2017-06-21 | 2017-09-12 | 上海森大机械制造有限公司 | A kind of fixed scaffold |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109881585B (en) | Assembled working platform for high pier construction | |
| CN201598820U (en) | Single-point suspension external hanging rack | |
| CN105908960B (en) | Scaffold for large space construction | |
| WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
| CN103397782B (en) | Frame type steel work is installed construction method and the construction equipment of tie-beam | |
| CN105781096A (en) | Safety hanging basket for high-altitude operation and construction method thereof | |
| CN206245710U (en) | A kind of frame work quick-mounting workbench | |
| CN203808815U (en) | Cat ladder subassembly and engineering machine tool that has this cat ladder subassembly | |
| CN106437132A (en) | Derrick men quick-mounting working platform and manufacturing and mounting method thereof | |
| CN205574235U (en) | Bulk freighter wing tank section construction stores pylon | |
| CN205188839U (en) | Movably -assembled anti -collision bridge wall construction hanging basket | |
| CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
| CN209411641U (en) | Frame type capacitive device repairing frame | |
| CN203383516U (en) | Construction device for installing connecting beam on frame type steel structure | |
| CN202467148U (en) | Hanging basket for construction | |
| CN206625600U (en) | A kind of steel construction equipped with safety net hook | |
| CN202744163U (en) | Semi-automatic unhooking lifting device | |
| CN211369478U (en) | Door type structural hanging basket suspension structure mounting system | |
| CN205874981U (en) | Strand draws quick draw bail of ware with dragging | |
| CN211338598U (en) | Ring rail hoisting device for installing high-rise curtain wall | |
| JP5996890B2 (en) | Scaffolding equipment | |
| CN201695592U (en) | An inverted color steel tile quick installation platform | |
| CN219100689U (en) | Attachment structure suitable for super high floor attached lifting scaffold | |
| CN206928695U (en) | The supporting construction that a kind of engineering construction uses | |
| CN205063310U (en) | Multi -functional operation platform of liftable formula in elevartor shaft |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170222 |
|
| RJ01 | Rejection of invention patent application after publication |