CN106355285A - 一种基于参数修正的用电负荷预测方法 - Google Patents
一种基于参数修正的用电负荷预测方法 Download PDFInfo
- Publication number
- CN106355285A CN106355285A CN201610803779.XA CN201610803779A CN106355285A CN 106355285 A CN106355285 A CN 106355285A CN 201610803779 A CN201610803779 A CN 201610803779A CN 106355285 A CN106355285 A CN 106355285A
- Authority
- CN
- China
- Prior art keywords
- load
- year
- industry
- growth rate
- month
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610803779.XA CN106355285B (zh) | 2016-09-06 | 2016-09-06 | 一种基于参数修正的用电负荷预测方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610803779.XA CN106355285B (zh) | 2016-09-06 | 2016-09-06 | 一种基于参数修正的用电负荷预测方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106355285A true CN106355285A (zh) | 2017-01-25 |
| CN106355285B CN106355285B (zh) | 2023-04-11 |
Family
ID=57858939
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610803779.XA Active CN106355285B (zh) | 2016-09-06 | 2016-09-06 | 一种基于参数修正的用电负荷预测方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106355285B (zh) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107679675A (zh) * | 2017-10-20 | 2018-02-09 | 江苏电力信息技术有限公司 | 一种基于移动加权平均的现金流入预测方法 |
| CN108169597A (zh) * | 2017-12-27 | 2018-06-15 | 卢志旭 | 一种评估用电设备损耗状态的方法 |
| CN109063926A (zh) * | 2018-08-24 | 2018-12-21 | 国网河北省电力有限公司沧州供电分公司 | 周期内计划发电量确定方法、系统及终端设备 |
| CN109783894A (zh) * | 2018-12-27 | 2019-05-21 | 国网浙江省电力有限公司台州供电公司 | 一种基于信息再修正的负荷协调预测方法 |
| CN109783716A (zh) * | 2019-01-21 | 2019-05-21 | 贵州黔源电力股份有限公司 | 一种电力供需数据自动提取和处理系统及方法 |
| CN111784083A (zh) * | 2020-08-06 | 2020-10-16 | 国网湖南省电力有限公司 | 基于电力大数据的预测模型建立方法及电网负荷调度方法 |
| CN113095556A (zh) * | 2021-03-31 | 2021-07-09 | 广西大学 | 一种考虑碳中和趋势的中长期负荷预测方法及系统 |
| CN113919972A (zh) * | 2021-10-13 | 2022-01-11 | 广西大学 | 一种基于水轮机综合特性曲的小水电站日负荷分配方法 |
| CN115271230A (zh) * | 2022-08-08 | 2022-11-01 | 广东电力信息科技有限公司 | 一种基于语音识别的催费方法和装置 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101145225A (zh) * | 2007-10-16 | 2008-03-19 | 刘吉成 | 中长期电力负荷预测及预警系统 |
| US20150039391A1 (en) * | 2011-08-16 | 2015-02-05 | Better Place GmbH | Estimation and management of loads in electric vehicle networks |
| CN105096010A (zh) * | 2015-09-07 | 2015-11-25 | 国网天津市电力公司 | 一种考虑需求侧管理的电网规划方法 |
| CN105590140A (zh) * | 2015-11-26 | 2016-05-18 | 国网北京市电力公司 | 电力系统短期负荷的预测方法和装置 |
-
2016
- 2016-09-06 CN CN201610803779.XA patent/CN106355285B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101145225A (zh) * | 2007-10-16 | 2008-03-19 | 刘吉成 | 中长期电力负荷预测及预警系统 |
| US20150039391A1 (en) * | 2011-08-16 | 2015-02-05 | Better Place GmbH | Estimation and management of loads in electric vehicle networks |
| CN105096010A (zh) * | 2015-09-07 | 2015-11-25 | 国网天津市电力公司 | 一种考虑需求侧管理的电网规划方法 |
| CN105590140A (zh) * | 2015-11-26 | 2016-05-18 | 国网北京市电力公司 | 电力系统短期负荷的预测方法和装置 |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107679675A (zh) * | 2017-10-20 | 2018-02-09 | 江苏电力信息技术有限公司 | 一种基于移动加权平均的现金流入预测方法 |
| CN108169597B (zh) * | 2017-12-27 | 2020-08-14 | 华北电力大学 | 一种评估用电设备损耗状态的方法 |
| CN108169597A (zh) * | 2017-12-27 | 2018-06-15 | 卢志旭 | 一种评估用电设备损耗状态的方法 |
| CN109063926A (zh) * | 2018-08-24 | 2018-12-21 | 国网河北省电力有限公司沧州供电分公司 | 周期内计划发电量确定方法、系统及终端设备 |
| CN109783894A (zh) * | 2018-12-27 | 2019-05-21 | 国网浙江省电力有限公司台州供电公司 | 一种基于信息再修正的负荷协调预测方法 |
| CN109783894B (zh) * | 2018-12-27 | 2023-09-01 | 国网浙江省电力有限公司台州供电公司 | 一种基于信息再修正的负荷协调预测方法 |
| CN109783716B (zh) * | 2019-01-21 | 2020-02-21 | 贵州黔源电力股份有限公司 | 一种电力供需数据自动提取和处理系统及方法 |
| CN109783716A (zh) * | 2019-01-21 | 2019-05-21 | 贵州黔源电力股份有限公司 | 一种电力供需数据自动提取和处理系统及方法 |
| CN111784083A (zh) * | 2020-08-06 | 2020-10-16 | 国网湖南省电力有限公司 | 基于电力大数据的预测模型建立方法及电网负荷调度方法 |
| CN111784083B (zh) * | 2020-08-06 | 2023-11-21 | 国网湖南省电力有限公司 | 基于电力大数据的预测模型建立方法及电网负荷调度方法 |
| CN113095556A (zh) * | 2021-03-31 | 2021-07-09 | 广西大学 | 一种考虑碳中和趋势的中长期负荷预测方法及系统 |
| CN113919972A (zh) * | 2021-10-13 | 2022-01-11 | 广西大学 | 一种基于水轮机综合特性曲的小水电站日负荷分配方法 |
| CN115271230A (zh) * | 2022-08-08 | 2022-11-01 | 广东电力信息科技有限公司 | 一种基于语音识别的催费方法和装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106355285B (zh) | 2023-04-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106355285B (zh) | 一种基于参数修正的用电负荷预测方法 | |
| Hilorme et al. | Smart grid concept as a perspective for the development of Ukrainian energy platform | |
| Huang et al. | Robust coordination expansion planning for active distribution network in deregulated retail power market | |
| CN101976841B (zh) | 电力系统各级负荷预测指标的均衡匹配方法 | |
| CN103793794B (zh) | 需求侧管理的自动需求响应评价系统及方法 | |
| CN104636822A (zh) | 一种基于elman神经网络的居民负荷预测方法 | |
| CN106845669A (zh) | 基于指数平滑法预测电网年持续负荷的方法 | |
| CN106532769A (zh) | 基于光伏并网不确定性的需求侧分时电价的优化方法 | |
| CN105243609A (zh) | 一种基于模糊层次分析的用户有序用电决策方法 | |
| CN103530701B (zh) | 一种基于季节指数法的用户月用电量预测方法和系统 | |
| CN104504619B (zh) | 两种考虑温度和经济增长因素的月度统调用电量预测方法 | |
| CN106503842A (zh) | 一种考虑关键指标和收益管理的分时电价定价方法 | |
| CN105631542A (zh) | 一种家庭用户智能用电模式调度方法 | |
| CN105205547A (zh) | 一种基于多种不确定因素相似度匹配的母线负荷预测算法 | |
| CN107480907A (zh) | 一种峰谷电价下含风电的省级电网购电配比的优化方法 | |
| CN103793788A (zh) | 一种有序用电管理方法 | |
| CN111342459A (zh) | 一种电力需量决策分析系统及方法 | |
| CN107769268A (zh) | 一种含小水电的地调范围日前预测省供负荷方法 | |
| Teo et al. | Advanced control strategy for an energy storage system in a grid‐connected microgrid with renewable energy generation | |
| CN104881718A (zh) | 基于多尺度经济先行指标的区域电力景气指数构建方法 | |
| CN105550792A (zh) | 一种动态尖峰电价机制的设计方法 | |
| CN103440597B (zh) | 可再生能源并网对电网经济运行影响的分析方法 | |
| CN119026818A (zh) | 一种源-网-荷电网碳指数评估方法、系统及设备 | |
| Kumar et al. | A demand and response management model using load forecasting technique for smart grid | |
| Erten et al. | Forecasting electricity consumption for accurate energy management in commercial buildings with deep learning models to facilitate demand response programs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Address after: Room 618 and 619, 6th floor, building 301, Guodian New Energy Institute, No. 9, Yingcai North 2nd Street, future science and Technology City, Changping District, Beijing 102209 Applicant after: Guoneng xinkong Internet Technology Co.,Ltd. Address before: Building 1, yard 16, West Fourth Ring Middle Road, Haidian District, Beijing 100039 Applicant before: BEIJING HUADIAN TIANREN ELECTRIC POWER CONTROL TECHNOLOGY Co.,Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: Room 618 and 619, 6th floor, building 301, Guodian New Energy Institute, No. 9, Yingcai North 2nd Street, future science and Technology City, Changping District, Beijing 102209 Patentee after: Guoneng Information Control Technology Co.,Ltd. Country or region after: China Address before: Room 618 and 619, 6th floor, building 301, Guodian New Energy Institute, No. 9, Yingcai North 2nd Street, future science and Technology City, Changping District, Beijing 102209 Patentee before: Guoneng xinkong Internet Technology Co.,Ltd. Country or region before: China |