CN106300436B - A kind of hydroelectric power plant's simultaneous interconnecting control method and device - Google Patents

A kind of hydroelectric power plant's simultaneous interconnecting control method and device Download PDF

Info

Publication number
CN106300436B
CN106300436B CN201610814175.5A CN201610814175A CN106300436B CN 106300436 B CN106300436 B CN 106300436B CN 201610814175 A CN201610814175 A CN 201610814175A CN 106300436 B CN106300436 B CN 106300436B
Authority
CN
China
Prior art keywords
simultaneous interconnecting
false
setting value
closing position
pressing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610814175.5A
Other languages
Chinese (zh)
Other versions
CN106300436A (en
Inventor
唐亚波
段凯
江加河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN DATANG INTERNATIONAL GANZI HYDROPOWER DEVELOPMENT Co Ltd
Original Assignee
SICHUAN DATANG INTERNATIONAL GANZI HYDROPOWER DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN DATANG INTERNATIONAL GANZI HYDROPOWER DEVELOPMENT Co Ltd filed Critical SICHUAN DATANG INTERNATIONAL GANZI HYDROPOWER DEVELOPMENT Co Ltd
Priority to CN201610814175.5A priority Critical patent/CN106300436B/en
Publication of CN106300436A publication Critical patent/CN106300436A/en
Application granted granted Critical
Publication of CN106300436B publication Critical patent/CN106300436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/40Synchronising a generator for connection to a network or to another generator
    • H02J3/42Synchronising a generator for connection to a network or to another generator with automatic parallel connection when synchronisation is achieved

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of hydroelectric power plant's simultaneous interconnecting control methods, on the basis of using disconnecting switch state as simultaneous interconnecting operation judges condition, increase Rule of judgment of the false soft pressing plate state of contemporary trials as false simultaneous interconnecting experiment, the monitoring of normal simultaneous interconnecting and false simultaneous interconnecting experiment can not only be realized simultaneously, ensure the normal operations such as synchronous loop, synchronous device and unit, and the monitoring of influence and computer supervisory control system to disconnecting switch position to disconnecting switch position signal can be avoided;In addition, it is used as the Rule of judgment whether crew base load is set simultaneously by disconnecting switch state and the false soft pressing plate state of contemporary trials, it avoids to be not positioned in closing a floodgate in disconnecting switch and the situation of crew base load is set, eliminate because of unit safety hidden danger caused by maloperation and flow are slipped.

Description

A kind of hydroelectric power plant's simultaneous interconnecting control method and device
Technical field
The invention belongs to intelligent power grid technology fields, are related to a kind of hydroelectric power plant's simultaneous interconnecting control method and device.
Background technology
With the development of electric system, network connection is more and more closer, and capacity is increasing.To power plant or substation During the closing operation of middle breaker, need to operate by normal simultaneous interconnecting and realize, normal simultaneous interconnecting refer to synchronous point (every Leave pass) systems (power grid and generator) of both sides has existed electrical link, it is further added by a circuit simply by operation (synchronous loop for using automatic synchronizing paralleling mode, then further includes to carry out speed governing to generator, adjust in synchronous loop The synchronous device of pressure), make that disconnecting switch both sides system voltage amplitude is equal, frequency is equal, phase difference of voltage zero, sequential one Cause, voltage waveform are identical, and the end of synchronous loop is breaker.
The experiment of false simultaneous interconnecting is that a kind of method with simulation carries out false parallel operation, during experiment during disconnecting switch separating brake Breaker closing makes the voltage of generator enter in synchronous loop, check synchronous device whether action message, it is grid-connected switch control Whether circuit intact and whether the combined floodgate feedback time of grid-connected switch meets the requirements.
At present, hydroelectric power plant realizes the control of simultaneous interconnecting using computer supervisory control system, is controlled including normal simultaneous interconnecting It is controlled with false simultaneous interconnecting.For normal simultaneous interconnecting, need detection and isolation switch that can just send out breaker conjunction after combined floodgate is Lock order, while generating set (abbreviation unit) setting basic load (general active P will be given after breaker closingGFor 5MW, nothing Work(QGFor 5MW).And close circuit breaker, usual power plant maintenance personnel meeting in disconnecting switch separating brake are needed for false simultaneous interconnecting Think to force setting disconnecting switch switching signal (i.e. signal is forced to be set as 1) in computer supervisory control system database, so Perform close circuit breaker order again afterwards, problems with can be brought by doing so:(1) due to being in computer supervisory control system database Think to force setting disconnecting switch switching signal, changing for computer supervisory control system database other signals may be caused in this way Become, so as to cause misprogramming;(2) since disconnecting switch signal has changed, the true position shape of disconnecting switch can not be monitored State;(3) since disconnecting switch is not closed a floodgate, unit is that really and on power grid, it is negative that this results in monitoring system setting basis Meeting Load adjustment after lotus, increases unit guide vane opening, but the load on unit can not increase always, and guide vane opening is caused constantly to increase Unit is caused to overrun greatly.
Invention content
For current Supervisory Computer Control System For Hydroelectic Power Plant, existing monitoring property is poor in terms of simultaneous interconnecting control flow, accidentally grasps Make the problems such as possibility is big, the purpose of the present invention is intended to provide a kind of hydroelectric power plant's simultaneous interconnecting control method, strengthens to keeping apart The monitoring of open and-shut mode is closed, and avoids issuable maloperation.
Another object of the present invention is to provide a kind of hydroelectric power plant's simultaneous interconnecting control device.
Since simultaneous interconnecting includes two kinds of situations of normal simultaneous interconnecting and false simultaneous interconnecting experiment, normal simultaneous interconnecting is hair Life is closed a floodgate in disconnecting switch after (being judged according to disconnecting switch switching signal), when false simultaneous interconnecting is tested, is kept apart Pass is not closed a floodgate, in order to avoid in the prior art because by the mandatory a variety of skills for being set as switching signal and bringing of disconnecting switch signal Art hidden danger can be introduced into another variable and sentence as judge whether to whether breaker in the experiment of false simultaneous interconnecting close a floodgate Broken strip part;The present invention increases the judgement the item whether false soft pressing plate of contemporary trials closes a floodgate as breaker in false simultaneous interconnecting experiment Part will not generate any influence to disconnecting switch signal in this way, not interfere with the normal monitoring to disconnecting switch naturally also.This hair It is bright further by the adjustment to crew base charge setting procedure, avoid in false simultaneous interconnecting experiment process because computer is supervised Control default crew base load and lead to unit to meet crew base load and non-normal working, lead to unit guide vane Aperture constantly increase even causes unit to overrun, and influences unit service life.
The vacation soft pressing plate of contemporary trials refers to put into the one of power plant computer supervisory control system in simultaneous interconnecting operates A variable, for as whether performing the judgement object of false simultaneous interconnecting operation;The false soft pressing plate input of contemporary trials refer to by The variate-value that operations staff is set the soft pressing plate of false contemporary trials by monitoring system.
To reach first purpose of the invention, the present invention provides a kind of hydroelectric power plant's simultaneous interconnecting control method, including with Lower step:
Step 101, simultaneous interconnecting operation requests are received;
Step 102, whether detection and isolation switch is placed in closing position, if being placed in closing position, 104 is entered step, if not having It is placed in closing position and enters step 103;
Step 103, judge whether the soft pressing plate input of false contemporary trials is the first setting value, if the first setting value, into Enter step 104, if not the first setting value, the failure of simultaneous interconnecting operation requests, flow terminate;
Step 104, according to simultaneous interconnecting operation requests, breaker closing order is performed, subsequently into step 105;
Step 105, judge whether breaker is placed in closing position, if being placed in closing position enters step 106, if not putting In closing position, the failure of simultaneous interconnecting operation requests, flow terminates;
Step 106, whether detection and isolation switch is placed in closing position, if being placed in closing position enters step 107, if not having Closing position is placed in, then crew base load is set for 0MW, then completes simultaneous interconnecting operation, flow terminates;
Step 107, judge whether the soft pressing plate input of false contemporary trials is the second setting value, if the second setting value, if Crew base load is put as operating power, then completes simultaneous interconnecting operation, flow terminates;If not the second setting value, setting Crew base load is 0MW, then completes simultaneous interconnecting operation, and flow terminates.
Above-mentioned hydroelectric power plant's simultaneous interconnecting control method, the simultaneous interconnecting operation requests include the operation of normal simultaneous interconnecting please The false simultaneous interconnecting operation requests of summation, by hydroelectric power plant's simultaneous interconnecting control method, can both realize to normal simultaneous interconnecting The control of operation can also realize the control operated to false simultaneous interconnecting;When disconnecting switch is placed in closing position, acquiescence performs Be the operation of normal simultaneous interconnecting, then perform breaker closing order;When disconnecting switch is not positioned in closing position, need Further judge whether to perform according to the soft pressing plate input of false contemporary trials is false simultaneous interconnecting test operation, if the examination of the false same period When testing soft pressing plate input as the first setting value, give tacit consent to execution is false simultaneous interconnecting operation, then performs breaker closing life It enables;If the false soft pressing plate input of contemporary trials is not the first setting value, simultaneous interconnecting operation requests failure, flow terminates, needs It checks synchronous loop, synchronous device or resets the soft pressing plate input of false contemporary trials.
Above-mentioned hydroelectric power plant's simultaneous interconnecting control method, first setting value are to judge whether false simultaneous interconnecting operation holds The value gone and set, compared with the soft pressing plate input of false contemporary trials, whether comparison result is used as performs false simultaneous interconnecting The Rule of judgment of operation;Second setting value is the value set to determine how setting crew base load, same with vacation Phase tests soft pressing plate input and compares, and comparison result is as the Rule of judgment for how setting crew base load;Described first Setting value and the second setting value are unequal.
Above-mentioned hydroelectric power plant's simultaneous interconnecting control method after open circuit combined floodgate order has been performed, is needed to crew base load It is configured, before being configured to crew base load, first disconnecting switch state and the false soft pressing plate of contemporary trials is put into Value carries out dual judgement, and it just can be to prevent generator unit by crew base load setting that only the two condition, which is all met the requirements, The operating power (including active power and reactive power) of inverse probability operation (absorbing active power from power grid), as long as wherein one A condition is unsatisfactory for requiring, and is just 0MW by crew base load setting, ensures that unit is in off working state.
To reach second object of the present invention, the present invention provides a kind of hydroelectric power plant's simultaneous interconnecting control device, including
Receiving module, for receiving simultaneous interconnecting operation requests;
Whether the first judgment module is placed in closing position for detection and isolation switch, if being placed in closing position, starts and perform Module, if being not positioned in closing position starts the second judgment module;
Second judgment module, for judging whether the soft pressing plate input of false contemporary trials is the first setting value, if first Setting value starts execution module, if not the first setting value, the failure of simultaneous interconnecting operation requests, flow terminate;
Execution module, according to simultaneous interconnecting operation requests, performs breaker closing order, then starts third and judges mould Block;
Third judgment module for judging whether breaker is placed in closing position, if being placed in closing position, starts the 4th and sentences Disconnected module, if being not positioned in closing position, simultaneous interconnecting operation requests failure, flow terminates;
Whether the 4th judgment module is placed in closing position for detection and isolation switch, if being placed in closing position, starts the 5th Judgment module if being not positioned in closing position, sets crew base load as 0MW, then completes simultaneous interconnecting operation, flow Terminate;
5th judgment module, for judging whether the soft pressing plate input of false contemporary trials is the second setting value, if second Setting value, setting crew base load are operating power, then complete simultaneous interconnecting operation, and flow terminates;If not second sets Definite value, setting crew base load are 0MW, then complete simultaneous interconnecting operation, and flow terminates.
Compared with prior art, the invention has the advantages that:
1st, due to simultaneous interconnecting control method in hydroelectric power plant's of the present invention, normal simultaneous interconnecting and the false same period be can be achieved at the same time simultaneously The monitoring of experiment is netted, ensures the normal operations such as synchronous loop, synchronous device and unit;
2nd, due to simultaneous interconnecting control method in hydroelectric power plant's of the present invention, judged whether by the soft pressing plate input of false contemporary trials Breaker closing order is performed, avoids influence to disconnecting switch position signal and computer supervisory control system to keeping apart off-position The monitoring put;
3rd, due to simultaneous interconnecting control method in hydroelectric power plant's of the present invention, pass through disconnecting switch state and the soft pressing plate of false contemporary trials State as whether the Rule of judgment of crew base load is set, avoids simultaneously and is not positioned in combined floodgate in disconnecting switch The situation of crew base load is set, is eliminated because of unit safety hidden danger caused by maloperation and flow are slipped.
Description of the drawings
Fig. 1 is this grid-connected schematic diagram of hydroelectric power plant's hydrogenerator.
Fig. 2 is simultaneous interconnecting control method flow chart in hydroelectric power plant's of the present invention.
Wherein, 1- generators G, 2- disconnecting switch QS, 3- circuit breaker Q F, 4- network system.
Specific embodiment
Clear, complete description is carried out to the technical solution of various embodiments of the present invention below with reference to attached drawing, it is clear that retouched The part of the embodiment that embodiment is only the present invention is stated, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill obtained all other embodiment under the premise of creative work is not made, belongs to this hair Bright protected range.
The grid-connected simultaneous interconnecting operations to network system 4 of generator G 1 are divided into normal simultaneous interconnecting operation and the false same period simultaneously Net operation.Fig. 1 is the grid-connected schematic diagram of hydroelectric power plant's hydrogenerator, as shown in the figure, when normal simultaneous interconnecting operates, generator G 1 outlet side disconnecting switch QS 2 needs in-place closing, is then controlled by computer supervisory control system and 1 outlet sides of generator G break Device QF 3 in-place closings in road complete the normal grid-connected of generator G 1;When carrying out false simultaneous interconnecting experiment, generator G 1 is exported Side disconnecting switch QS 2 needs, in open position, then to control the open circuit of 1 outlet sides of generator G by computer supervisory control system 3 in-place closings of device QF complete the false simultaneous interconnecting experiment of generator G 1.
Based on 1 grid-connected operation principles of generator G, a kind of hydroelectric power plant's simultaneous interconnecting control method is present embodiments provided, such as Shown in Fig. 2, include the following steps:
Step 101, simultaneous interconnecting operation requests are received;Simultaneous interconnecting operation requests for normal simultaneous interconnecting operation requests or Person's vacation simultaneous interconnecting operation requests.
Step 102, whether detection and isolation switch is placed in closing position, if being placed in closing position, 104 is entered step, if not having It is placed in closing position and enters step 103;Can whether closing position be placed in come detection and isolation switch by disconnecting switch signal, For example, set disconnecting switch switching signal as " 1 ", disconnecting switch opening signal be " 0 ";When disconnecting switch signal is " 1 ", say Bright disconnecting switch is in "on" position, and what acquiescence performed at this time is normal simultaneous interconnecting operation, just may be used after needing breaker closing To complete normal simultaneous interconnecting, generator enters working condition;When disconnecting switch signal is " 0 ", illustrate that disconnecting switch is in Opening state cannot need to enter step 103 in conjunction with the examination of the false same period to whether being that false contemporary trials operation judges at this time Soft pressing plate input is tested to be judged.
Step 103, judge whether the soft pressing plate input of false contemporary trials is the first setting value, if the first setting value, into Enter step 104, if not the first setting value, the failure of simultaneous interconnecting operation requests, flow terminate;First setting value is false to judge The value whether simultaneous interconnecting operation performs and set, compared with the soft pressing plate input of false contemporary trials, comparison result conduct Whether the Rule of judgment of false simultaneous interconnecting operation is performed;Second setting value is set to determine how setting crew base load Value, compared with the soft pressing plate input of false contemporary trials, comparison result is as the judgement for how setting crew base load Condition;First setting value and the second setting value are unequal;Operations staff oneself can set, and the first setting value is in the present embodiment " 1 ", the second setting value are " 0 ";If disconnecting switch is in an open state, power station operations staff is needed through operation panel in computer The soft pressing plate variate-value of the false contemporary trials of monitoring system input (namely by operation panel, link associated databases, the false same period is tried Soft pressing plate input variable is tested to be configured), computer supervisory control system needs to judge the soft pressing plate input of above-mentioned false contemporary trials at this time Value is compared with " 1 ", if the soft pressing plate input of false contemporary trials is " 1 ", acquiescence performs false simultaneous interconnecting test operation, needs to break Road device can just complete false simultaneous interconnecting experiment after closing a floodgate;If the soft pressing plate input of false contemporary trials is not " 1 ", simultaneous interconnecting behaviour Make request failure, flow terminates, and needs to check synchronous loop, synchronous device or resets the soft pressing plate input of false contemporary trials It is worth for " 1 ".
Step 104, according to simultaneous interconnecting operation requests, breaker closing order is performed, subsequently into step 105;It performs After complete breaker closing order, it is also necessary to which generator crew base load is set.
Step 105, judge whether breaker is placed in closing position, if being placed in closing position enters step 106, if not putting In closing position, the failure of simultaneous interconnecting operation requests, flow terminates;Before generator crew base load is set, elder generation is needed Setting condition is judged, then determining, how crew base load is set according to Rule of judgment;It is disconnected firstly the need of judging Whether road device is placed in closing position namely judges whether breaker closing order execution succeeds;Can by breaker signal come Whether detection and isolation switch is placed in closing position, for example, setting breaker closing signal and being as " 1 ", breaker opening signal “0”;When breaker signal is " 1 ", illustrate that breaker is in "on" position, also needing at this time will be to disconnecting switch state and vacation The soft pressing plate input of contemporary trials is judged;When breaker signal is " 0 ", illustrate that breaker is in opening state, open circuit Device, which closes a floodgate, orders execution unsuccessful, illustrates that breaker circuit is problematic, needs to exit simultaneous interconnecting operating process, investigate out open circuit Breaker closing order is re-executed after device obstacle again.
Step 106, whether detection and isolation switch is placed in closing position, if being placed in closing position enters step 107, if not having Closing position is placed in, then crew base load is set for 0MW, then completes simultaneous interconnecting operation, flow terminates;It can be before It states disconnecting switch signal and carrys out detection and isolation switch in "on" position or opening state, if disconnecting switch signal is " 1 ", explanation Disconnecting switch in order to ensure there is not maloperation, while is also needed to further combined with the soft pressing plate of false contemporary trials in "on" position Input is judged;If disconnecting switch signal is " 0 ", illustrate that disconnecting switch in opening state, is needed at this time by crew base Charge is set as 0MW, avoids leading to unit due to computer supervisory control system sets crew base load to meet crew base Load and non-normal working cause the constantly increase of unit guide vane opening even unit to be caused to overrun.
Step 107, judge whether the soft pressing plate input of false contemporary trials is the second setting value, if the second setting value, if Crew base load is put as operating power, then completes simultaneous interconnecting operation, flow terminates;If not the second setting value, setting Crew base load is 0MW, then completes simultaneous interconnecting operation, and flow terminates;As previously mentioned, the present embodiment vacation contemporary trials are soft The second setting value of pressing plate is " 0 ", when disconnecting switch is in closing position, power station operations staff is needed to be counted by operation panel The soft pressing plate variate-value of the false contemporary trials of machine monitoring system input is calculated, computer supervisory control system needs to judge above-mentioned false same period examination at this time Soft pressing plate input is tested compared with " 0 ", if the soft pressing plate input of false contemporary trials is " 0 ", setting crew base load is work The rate of doing work, operating power can be set according to generator unit and power grid concrete condition, general to set crew base charge For 5MW (i.e. active-power PsG+For 5MW, reactive power QGFor 5MW);It, will if the soft pressing plate input of false contemporary trials is not " 0 " Crew base charge is set as 0MW, avoids leading to unit due to computer supervisory control system sets crew base load to meet Crew base load and non-normal working cause the constantly increase of unit guide vane opening even unit to be caused to overrun.
Above-mentioned hydroelectric power plant's simultaneous interconnecting control method provided in this embodiment can realize the normal simultaneous interconnecting to generator Operation and the Row control of false simultaneous interconnecting test operation are used as Rule of judgment by the state for increasing the soft pressing plate of false contemporary trials To avoid false simultaneous interconnecting experiment is existing in the process from needing power plant maintenance personnel artificially forced quarantine switch conjunction in the database Gate position signal and the problem of can not monitor disconnecting switch actual position state and after breaker closing because of setting unit base Unit caused by plinth load is wrong is overrun problem, so as to eliminate because of unit safety hidden danger caused by maloperation and flow loophole.
The present embodiment is the same period after " 1 " in "on" position or the soft pressing plate of false contemporary trials in detection and isolation switch Device needs the data such as voltage, the frequency of generator and power grid are obtained about according to computer supervisory control system, to generator into Row speed governing, pressure regulation to generator voltage and frequency multiplexed grid-connected conditions, then by breaker closing, the reality in relation to this partial content Existing mode is the ordinary skill in the art, if power station does not have automatic paralleling device, can by artificial regulator generator voltage and Rotating speed is realized.
The present embodiment is based on above-mentioned hydroelectric power plant's simultaneous interconnecting control method, further a kind of hydroelectric power plant's simultaneous interconnecting control dress It puts, for each step of the above method, the module of above-mentioned function is realized in design one, which includes:
Receiving module, for receiving simultaneous interconnecting operation requests;
Whether the first judgment module is placed in closing position for detection and isolation switch, if being placed in closing position, starts and perform Module, if being not positioned in closing position starts the second judgment module;
Second judgment module, for judging whether the soft pressing plate input of false contemporary trials is the first setting value, if first Setting value starts execution module, if not the first setting value, the failure of simultaneous interconnecting operation requests, flow terminate;
Execution module, according to simultaneous interconnecting operation requests, performs breaker closing order, then starts third and judges mould Block;
Third judgment module for judging whether breaker is placed in closing position, if being placed in closing position, starts the 4th and sentences Disconnected module, if being not positioned in closing position, simultaneous interconnecting operation requests failure, flow terminates;
Whether the 4th judgment module is placed in closing position for detection and isolation switch, if being placed in closing position, starts the 5th Judgment module if being not positioned in closing position, sets crew base load as 0MW, then completes simultaneous interconnecting operation, flow Terminate;
5th judgment module, for judging whether the soft pressing plate input of false contemporary trials is the second setting value, if second Setting value, setting crew base load are operating power, then complete simultaneous interconnecting operation, and flow terminates;If not second sets Definite value, setting crew base load are 0MW, then complete simultaneous interconnecting operation, and flow terminates.
Those of ordinary skill in the art will understand that embodiment here, which is to help reader, understands the present invention's Principle, it should be understood that protection scope of the present invention is not limited to such specific embodiments and embodiments.This field it is common Technical staff can make the various other various tools for not departing from essence of the invention according to these technical inspirations disclosed by the invention Body deforms and combination, these deformations and combination are still within the scope of the present invention.

Claims (6)

1. a kind of hydroelectric power plant's simultaneous interconnecting control method, it is characterised in that:Include the following steps:
Step 101, simultaneous interconnecting operation requests are received;
Step 102, whether detection and isolation switch is placed in closing position, if being placed in closing position, 104 is entered step, if not putting 103 are entered step in closing position;
Step 103, judge whether the soft pressing plate input of false contemporary trials is the first setting value, if the first setting value, into step Rapid 104, if not the first setting value, the failure of simultaneous interconnecting operation requests, flow terminate;
Step 104, according to simultaneous interconnecting operation requests, breaker closing order is performed, subsequently into step 105;
Step 105, judge whether breaker is placed in closing position, if being placed in closing position enters step 106, if being not positioned in closing Gate position, the failure of simultaneous interconnecting operation requests, flow terminate;
Step 106, whether detection and isolation switch is placed in closing position, if being placed in closing position enters step 107, if being not positioned in Closing position, then set crew base load as 0MW, then completes simultaneous interconnecting operation, and flow terminates;
Step 107, judge whether the soft pressing plate input of false contemporary trials is the second setting value, if the second setting value, machine is set Group basic load is operating power, then completes simultaneous interconnecting operation, and flow terminates;If not the second setting value, sets unit Basic load is 0MW, then completes simultaneous interconnecting operation, and flow terminates;
The false soft pressing plate of contemporary trials refers to put into a variable of power plant computer supervisory control system in simultaneous interconnecting operates, and uses In as whether performing the operation of false simultaneous interconnecting or how to set the judgement object of crew base load;The false soft pressure of contemporary trials Plate input refers to the change set by operations staff by power plant computer supervisory control system to the soft pressing plate of false contemporary trials Magnitude.
2. simultaneous interconnecting control method in hydroelectric power plant's according to claim 1, it is characterised in that:The simultaneous interconnecting operation please It asks including normal simultaneous interconnecting operation requests and false simultaneous interconnecting operation requests.
3. simultaneous interconnecting control method in hydroelectric power plant's according to claim 1 or 2, it is characterised in that:First setting value Be to judge whether false simultaneous interconnecting operation performs the value set, compared with the soft pressing plate input of false contemporary trials, than Whether relatively result is as performing the Rule of judgment of false simultaneous interconnecting operation;Second setting value is to determine how setting unit Basic load and the value set, compared with the soft pressing plate input of false contemporary trials, how comparison result is as setting unit The Rule of judgment of basic load;First setting value and the second setting value are unequal.
4. a kind of hydroelectric power plant's simultaneous interconnecting control device, it is characterised in that:Including
Receiving module, for receiving simultaneous interconnecting operation requests;
Whether the first judgment module is placed in closing position for detection and isolation switch, if being placed in closing position, starts and perform mould Block, if being not positioned in closing position starts the second judgment module;
Second judgment module, for judging whether the soft pressing plate input of false contemporary trials is the first setting value, if the first setting Value starts execution module, if not the first setting value, the failure of simultaneous interconnecting operation requests, flow terminate;
Execution module according to simultaneous interconnecting operation requests, performs breaker closing order, then starts third judgment module;
Third judgment module for judging whether breaker is placed in closing position, if being placed in closing position, starts the 4th and judges mould Block, if being not positioned in closing position, simultaneous interconnecting operation requests failure, flow terminates;
Whether the 4th judgment module is placed in closing position for detection and isolation switch, if being placed in closing position, starts the 5th and judges Module if being not positioned in closing position, sets crew base load as 0MW, then completes simultaneous interconnecting operation, flow knot Beam;
5th judgment module, for judging whether the soft pressing plate input of false contemporary trials is the second setting value, if the second setting Value, setting crew base load are operating power, then complete simultaneous interconnecting operation, and flow terminates;If not the second setting value, It is 0MW to set crew base load, then completes simultaneous interconnecting operation, and flow terminates;
The vacation soft pressing plate of contemporary trials refers to a change of the input power plant computer supervisory control system in simultaneous interconnecting operates Amount, for as whether performing the operation of false simultaneous interconnecting or how to set the judgement object of crew base load;False same period examination Soft pressing plate input is tested to refer to set the soft pressing plate of false contemporary trials by power plant computer supervisory control system by operations staff The variate-value arrived.
5. simultaneous interconnecting control device in hydroelectric power plant's according to claim 4, it is characterised in that:The simultaneous interconnecting operation please It asks including normal simultaneous interconnecting operation requests and false simultaneous interconnecting operation requests.
6. simultaneous interconnecting control device in hydroelectric power plant's according to claim 4 or 5, it is characterised in that:First setting value Be to judge whether false simultaneous interconnecting operation performs the value set, compared with the soft pressing plate input of false contemporary trials, than Whether relatively result is as performing the Rule of judgment of false simultaneous interconnecting operation;Second setting value is to determine how setting unit Basic load and the value set, compared with the soft pressing plate input of false contemporary trials, how comparison result is as setting unit The Rule of judgment of basic load;First setting value and the second setting value are unequal.
CN201610814175.5A 2016-09-11 2016-09-11 A kind of hydroelectric power plant's simultaneous interconnecting control method and device Active CN106300436B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610814175.5A CN106300436B (en) 2016-09-11 2016-09-11 A kind of hydroelectric power plant's simultaneous interconnecting control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610814175.5A CN106300436B (en) 2016-09-11 2016-09-11 A kind of hydroelectric power plant's simultaneous interconnecting control method and device

Publications (2)

Publication Number Publication Date
CN106300436A CN106300436A (en) 2017-01-04
CN106300436B true CN106300436B (en) 2018-07-06

Family

ID=57709899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610814175.5A Active CN106300436B (en) 2016-09-11 2016-09-11 A kind of hydroelectric power plant's simultaneous interconnecting control method and device

Country Status (1)

Country Link
CN (1) CN106300436B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107134809B (en) * 2017-05-19 2023-06-02 山东中实易通集团有限公司 Automatic synchronization grid-connection system and grid-connection method for power plant
CN108072834B (en) * 2017-12-14 2020-11-06 云南电网有限责任公司文山供电局 Synchronous intelligent detection method, device and system for realizing remote closing grid connection
CN110112788B (en) * 2019-05-17 2022-12-06 中国能源建设集团安徽电力建设第一工程有限公司 Debugging method for synchronization system of power plant
CN110277801B (en) * 2019-07-01 2020-10-30 珠海格力电器股份有限公司 Power control method and device for microgrid
CN111934353B (en) * 2020-07-03 2022-07-05 华电电力科学研究院有限公司 Method for obtaining false synchronization grid-connected signals of unit and optimizing synchronization grid-connected signals
CN114415020B (en) * 2022-01-20 2023-03-14 广东韶钢松山股份有限公司 Test method for dynamic debugging of generator

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203261047U (en) * 2013-05-21 2013-10-30 兰州电机股份有限公司 Generator simulation grid connection apparatus
CN103683317A (en) * 2012-09-21 2014-03-26 哈尔滨帕特尔科技股份有限公司 New type self-synchronization grid connection device
CN104065104A (en) * 2014-06-26 2014-09-24 国家电网公司 Micro grid rapid grid connection method based on three-phase independent regulation

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7183667B2 (en) * 2003-12-19 2007-02-27 Square D Company Method and apparatus for power inverter synchronization

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683317A (en) * 2012-09-21 2014-03-26 哈尔滨帕特尔科技股份有限公司 New type self-synchronization grid connection device
CN203261047U (en) * 2013-05-21 2013-10-30 兰州电机股份有限公司 Generator simulation grid connection apparatus
CN104065104A (en) * 2014-06-26 2014-09-24 国家电网公司 Micro grid rapid grid connection method based on three-phase independent regulation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
一起非同期并网事故的分析与防范措施;张聪泰;《科技创业家》;20121216;全文 *
发电机DCS同期并网的问题及对策;陈乃鹏 等;《电力系统保护与控制》;20090801;全文 *
大型机组假同期不成供原因分析及处理;张宏杰 等;《水电站机电技术》;20050630;全文 *

Also Published As

Publication number Publication date
CN106300436A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106300436B (en) A kind of hydroelectric power plant's simultaneous interconnecting control method and device
Tomsovic et al. An expert system as a dispatchers' aid for the isolation of line section faults
Poudel et al. Real-time cyber physical system testbed for power system security and control
Aliyan et al. Decision tree analysis to identify harmful contingencies and estimate blackout indices for predicting system vulnerability
Papic et al. Survey of tools for risk assessment of cascading outages
Hotta et al. Implementation of a real-time expert system for a restoration guide in a dispatching center
Tariq et al. Instability detection and prevention in smart grids under asymmetric faults
CN104463696A (en) Power grid operating risk recognition and prevention method and system
Guo et al. A review on simulation models of cascading failures in power systems
CN109725214A (en) A kind of energy-accumulating power station primary frequency modulation Online Transaction Processing and method
Das et al. Prediction and control of transient stability using system integrity protection schemes
CN104091622A (en) Method and system for evaluating availability ratio of nuclear power plant digital control system
CN106487004B (en) Intelligent troubleshooting method for hidden dangers of primary and secondary system operation in smart substations
Vaiman et al. Risk assessment of cascading outages: Part I—Overview of methodologies
Caire et al. Vulnerability analysis of coupled heterogeneous critical infrastructures: A Co-simulation approach with a testbed validation
CN112180192A (en) Power electronic equipment field test detection method
Majidi et al. New design of intelligent load shedding algorithm based on critical line overloads to reduce network cascading failure risks
Castillo et al. Cyber-physical emulation and optimization of worst-case cyber attacks on the power grid
Li et al. A summary of relay protection-based simulation for Dynamic Performance and Reliability Assessment
Chatterjee et al. Prediction of line contingency catastrophic failures using synchrophasor measurements
Alsabban et al. Analysis and verification of islanding detection techniques for grid-integrated pv systems
Batchu et al. Transient stability assessment and enhancement in the realm of power system dynamic security analysis: A review and scope of methods
Yang et al. A comprehensive approach for bulk power system reliability assessment
Pazdcrin et al. Platform for testing IEC 61850 control systems using real-time simulator
Sass et al. Critical contingency management based on characteristic fault pattern for AC-HVDC-systems

Legal Events

Date Code Title Description