CN106287203A - A kind of novel double fluid gauge LNG filling machine - Google Patents

A kind of novel double fluid gauge LNG filling machine Download PDF

Info

Publication number
CN106287203A
CN106287203A CN201610806834.0A CN201610806834A CN106287203A CN 106287203 A CN106287203 A CN 106287203A CN 201610806834 A CN201610806834 A CN 201610806834A CN 106287203 A CN106287203 A CN 106287203A
Authority
CN
China
Prior art keywords
lng
gas
storage tank
gauge
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610806834.0A
Other languages
Chinese (zh)
Inventor
刘亚俊
占树言
叶嘉坤
谢文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201610806834.0A priority Critical patent/CN106287203A/en
Publication of CN106287203A publication Critical patent/CN106287203A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/02Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/04Indicating or measuring of parameters as input values

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

本发明提供一种新型双流量计LNG加气机,用于将LNG储罐的LNG加注至LNG储气容器;包括依次连接的液相流量计、控制阀和加液枪;所述液相流量计的输入端与LNG储罐连接,加液枪的输出端与LNG储气容器连接;还包括依次连接的回气枪和气相流量计,所述回气枪的输入端与LNG储气容器连接,气相流量计的输出端与LNG储罐连接;还包括用于控制加气过程并计算流量的电子计控制器,所述电子计控制器分别与LNG储罐、液相流量计、气相流量计、控制阀信号连接。本发明新型双流量计LNG加气机,可实现LNG储气容器的余气回收,并通过气体超声波流量计实现余气回气量的计量功能,从而不仅降低LNG储气容器的内部压力,保证LNG顺利加注,而且可提高LNG加气机的加注计量精度。

The invention provides a novel double-flow meter LNG filling machine, which is used for filling LNG from an LNG storage tank into an LNG gas storage container; it includes a liquid phase flow meter, a control valve, and a liquid filling gun connected in sequence; the liquid phase The input end of the flowmeter is connected with the LNG storage tank, and the output end of the liquid filling gun is connected with the LNG gas storage container; it also includes an air return gun and a gas phase flowmeter connected in sequence, and the input end of the air return gun is connected with the LNG gas storage container, The output end of the gas phase flowmeter is connected with the LNG storage tank; it also includes an electronic meter controller for controlling the gas filling process and calculating the flow rate, and the electronic meter controller is respectively connected with the LNG storage tank, the liquid phase flowmeter, the gas phase flowmeter, Control valve signal connection. The novel double-flow meter LNG refueling machine of the present invention can realize the residual gas recovery of the LNG gas storage container, and realize the metering function of the residual gas return volume through the gas ultrasonic flowmeter, thereby not only reducing the internal pressure of the LNG gas storage container, but also ensuring that the LNG It can be filled smoothly, and can improve the filling and metering accuracy of the LNG dispenser.

Description

一种新型双流量计LNG加气机A New Double Flow Meter LNG Dispenser

技术领域technical field

本发明涉及加气机技术领域,更具体地说,涉及一种新型双流量计LNG加气机。The invention relates to the technical field of gas dispensers, and more specifically relates to a novel double-flow meter LNG gas dispenser.

背景技术Background technique

随着我国LNG汽车产业的不断发展,LNG加气站不断增加,LNG加气机的技术和应用也在高速发展,市场需求越来越大,对LNG加气机性能的要求越来越高。With the continuous development of my country's LNG automobile industry, the number of LNG filling stations continues to increase, and the technology and application of LNG filling machines are also developing at a high speed. The market demand is increasing, and the requirements for the performance of LNG filling machines are getting higher and higher.

工作时,LNG加气机的加液枪插入车载LNG储气瓶的进液口,使得LNG液体从加气机进液管道流向加液枪,然后进入车载LNG储气瓶。此时,车载LNG储气瓶内已经气化的LNG蒸发气使得内部压力大,不仅会大大影响LNG加注的顺畅性,而且会影响LNG加气机加注的计量精度。因此,如何提高LNG加气机的加注计量精度,是现阶段LNG加注行业研究的一个重要课题。When working, the liquid filling gun of the LNG dispenser is inserted into the liquid inlet of the vehicle-mounted LNG gas storage cylinder, so that the LNG liquid flows from the liquid inlet pipe of the gas dispenser to the liquid filling gun, and then enters the vehicle-mounted LNG gas storage cylinder. At this time, the vaporized LNG vapor in the vehicle-mounted LNG storage cylinder makes the internal pressure high, which will not only greatly affect the smoothness of LNG filling, but also affect the metering accuracy of the LNG filling machine. Therefore, how to improve the filling metering accuracy of the LNG filling machine is an important topic in the research of the LNG filling industry at this stage.

另外,LNG即液化天然气,是天然气经过净化后,通过压缩升温,在混合制冷剂的作用下,冷却移走热量,再节流膨胀而得到的,常压下温度-162℃;由于LNG是天然气在超低温状态下冷却液化的产物,因此它受热后极易气化。因此为了防止LNG气化也是现阶段需要解决的一个重要问题。In addition, LNG is liquefied natural gas, which is obtained by compressing and heating up natural gas after purification, cooling and removing heat under the action of mixed refrigerant, and then throttling and expanding. The temperature at normal pressure is -162°C; The liquefied product is cooled at an ultra-low temperature, so it is easily vaporized when heated. Therefore, in order to prevent LNG gasification is also an important problem that needs to be solved at this stage.

发明内容Contents of the invention

本发明的目的在于克服现有技术中的缺点与不足,提供一种新型双流量计LNG加气机,该LNG加气机可实现LNG储气容器的余气回收并计量的功能,从而不仅降低LNG储气容器的内部压力,保证LNG顺利加注,而且可提高LNG加气机的加注计量精度。The purpose of the present invention is to overcome the shortcomings and deficiencies in the prior art, and provide a novel double-flow meter LNG dispenser, which can realize the function of recovering and measuring the residual gas of the LNG gas storage container, thereby not only reducing the The internal pressure of the LNG gas storage container ensures the smooth filling of LNG, and can improve the filling and metering accuracy of the LNG gas dispenser.

为了达到上述目的,本发明通过下述技术方案予以实现:一种新型双流量计LNG加气机,用于将LNG储罐的LNG加注至LNG储气容器;其特征在于:包括依次连接的液相流量计、控制阀和加液枪;所述液相流量计的输入端与LNG储罐连接,加液枪的输出端与LNG储气容器连接;还包括依次连接的回气枪和气相流量计,所述回气枪的输入端与LNG储气容器连接,气相流量计的输出端与LNG储罐连接;还包括用于控制加气过程并计算流量的电子计控制器,所述电子计控制器分别与LNG储罐、液相流量计、气相流量计、控制阀信号连接。In order to achieve the above object, the present invention is achieved through the following technical solutions: a novel dual-flowmeter LNG filling machine, which is used to fill the LNG of the LNG storage tank to the LNG gas storage container; it is characterized in that: it includes sequentially connected A liquid phase flowmeter, a control valve and a filling gun; the input end of the liquid phase flowmeter is connected to the LNG storage tank, and the output end of the liquid filling gun is connected to the LNG gas storage container; it also includes a sequentially connected air return gun and a gas phase flow rate meter, the input end of the air return gun is connected with the LNG gas storage container, and the output end of the gas phase flowmeter is connected with the LNG storage tank; it also includes an electronic meter controller for controlling the gas filling process and calculating the flow rate, and the electronic meter controls The devices are respectively connected to the LNG storage tank, the liquid phase flowmeter, the gas phase flowmeter and the control valve for signal connection.

在上述方案中,本发明通过回气枪和气相流量计分别与LNG储气容器和LNG储罐连接,则形成一个回流通道,使得LNG储气容器的余气回流至LNG储罐,实现LNG储气容器的余气回收,从而降低LNG储气容器内部的压力,保证LNG能够顺利加注。同时,可通过气相流量计测量得到LNG储气容器余气的回气量。加气过程中,加气机的电子计控器自动控制加气过程,并根据液相流量计和气相流量计输出的流量信号进行运算,LNG储罐加注到LNG储气容器中的LNG质量为液相流量计的计量值和气相流量计的计量值之差。相对于传统加气机只测得加液量作为加气机的加注量来说,本发明设置与电子计控器信号连接的气相流量计,将加液量与回气量的差值作为LNG加气机的加注量,这样会使得加气机的计量精度更加精确。In the above scheme, the present invention connects the LNG gas storage container and the LNG storage tank through the air return gun and the gas phase flowmeter respectively, and then forms a return flow channel, so that the residual gas of the LNG gas storage container flows back to the LNG storage tank, realizing LNG gas storage The residual gas in the container is recovered, thereby reducing the pressure inside the LNG gas storage container and ensuring the smooth filling of LNG. At the same time, the return gas volume of the residual gas in the LNG gas storage container can be obtained by measuring the gas phase flowmeter. During the gas filling process, the electronic controller of the gas dispenser automatically controls the gas filling process, and calculates according to the flow signals output by the liquid phase flowmeter and the gas phase flowmeter. It is the difference between the measurement value of the liquid phase flowmeter and the measurement value of the gas phase flowmeter. Compared with the traditional gas filling machine, which only measures the amount of liquid added as the filling amount of the gas filling machine, the present invention sets a gas phase flowmeter connected to the signal of the electronic controller, and uses the difference between the amount of liquid added and the amount of returned gas as the LNG filling amount. Filling volume of the gas dispenser, which will make the metering accuracy of the gas dispenser more accurate.

所述液相流量计为科里奥利质量流量计。The liquid phase flowmeter is a Coriolis mass flowmeter.

所述气相流量计为气体超声波流量计。本发明使用气体超声波流量计,从使用性能角度来看,其计量的精确度不受被测流体的温度、压力、密度和黏度的影响,长期精度稳定性好,使用灵活且寿命长,维护方便等优点。而且,完全能够满足LNG加气机回气计量的要求。从经济的角度看,其价格成本相对于其它流量计来讲极其低廉,这一点对于LNG加气机的国产化发展极为重要。The gas phase flowmeter is a gas ultrasonic flowmeter. The invention uses a gas ultrasonic flowmeter. From the perspective of performance, its measurement accuracy is not affected by the temperature, pressure, density and viscosity of the measured fluid. It has good long-term precision stability, flexible use, long life, and convenient maintenance. Etc. Moreover, it can fully meet the requirements of LNG dispenser return gas metering. From an economic point of view, its price and cost are extremely low compared to other flowmeters, which is extremely important for the localization of LNG dispensers.

本发明还包括内部预冷回路;所述内部预冷回路由LNG储罐、液相流量计和控制阀依次连接,并且控制阀输出端与LNG储罐连接形成。The present invention also includes an internal precooling circuit; the internal precooling circuit is sequentially connected by an LNG storage tank, a liquid phase flow meter and a control valve, and the output end of the control valve is connected with the LNG storage tank to form.

本发明还包括外部预冷回路;所述外部预冷回路由LNG储罐、液相流量计、控制阀和加液枪依次连接,并且加液枪的输出端与LNG储罐连接形成。The present invention also includes an external precooling circuit; the external precooling circuit is sequentially connected by an LNG storage tank, a liquid phase flow meter, a control valve and a filling gun, and the output end of the filling gun is connected with the LNG storage tank to form.

本发明通过内部预冷回路和外部预冷回路实现加气机的预冷循环:为了将加气机系统管路的温度(加气机不工作的情况下,系统管路温度可视为常温)降低,当加气机内部管路充满液体、且相关状态参数达到冷却要求(管路温度达到零下120℃)后预冷结束(整个预冷时间大约2到3分钟),从而可以避免LNG介质汽化,防止气液两相流的发生。在整个预冷阶段加气机的液相流量计不计量。The present invention realizes the pre-cooling cycle of the gas dispenser through the internal pre-cooling circuit and the external pre-cooling circuit: in order to adjust the temperature of the pipeline of the gas dispenser system (when the gas dispenser is not working, the temperature of the system pipeline can be regarded as normal temperature) Reduced, when the internal pipeline of the dispenser is filled with liquid and the relevant state parameters meet the cooling requirements (pipeline temperature reaches minus 120°C), the precooling ends (the entire precooling time is about 2 to 3 minutes), so that the vaporization of the LNG medium can be avoided , to prevent the occurrence of gas-liquid two-phase flow. During the whole pre-cooling stage, the liquid flow meter of the dispenser does not measure.

所述控制阀为低温气动紧急切断阀。The control valve is a cryogenic pneumatic emergency cut-off valve.

所述LNG储罐和液相流量计之间的管道设置有放散装置;所述放散装置由截止阀V1、安全阀SV1、压力表PG、压力传感器P以及外围管道连接组成;所述压力表PG和压力传感器P均与LNG储罐和液相流量计之间的管道连接。若管道压力过大可通过放散装置实现超压放散。The pipeline between the LNG storage tank and the liquid phase flowmeter is provided with a release device; the release device is composed of a stop valve V1, a safety valve SV1, a pressure gauge PG, a pressure sensor P and peripheral pipeline connections; the pressure gauge PG and the pressure sensor P are connected to the pipeline between the LNG storage tank and the liquid phase flowmeter. If the pipeline pressure is too high, the excess pressure can be released through the release device.

所述LNG储罐和气相流量计之间设置有安全阀。A safety valve is arranged between the LNG storage tank and the gas phase flowmeter.

本发明还包括具有预置和打印功能的辅助装置;所述辅助装置与电子计控器信号连接。The invention also includes an auxiliary device with preset and printing functions; the auxiliary device is connected with the electronic counter for signal.

本发明新型双流量计LNG加气机是这样工作的:The novel dual-flow meter LNG dispenser of the present invention works like this:

1、将LNG加气机的加液枪插到LNG加气机的大循环枪口上,按下加气机键盘上的“预冷”键,加气机开始预冷。LNG液体内部预冷回路和外部预冷回路回到LNG储罐,当加气机内部管路充满液体、且相关状态参数达到冷却要求后预冷结束,此阶段加气机不计量。1. Insert the filling gun of the LNG dispenser into the large circulation nozzle of the LNG dispenser, press the "pre-cooling" key on the keyboard of the dispenser, and the dispenser starts to pre-cool. The LNG liquid internal pre-cooling circuit and external pre-cooling circuit return to the LNG storage tank. When the internal pipeline of the gas dispenser is filled with liquid and the relevant state parameters meet the cooling requirements, the pre-cooling ends. The gas dispenser does not measure at this stage.

2、预冷结束后,将LNG加气机的加液枪插入车载LNG储气容器进液口,回气枪插入LNG储气容器回气口,按下LNG加气机键盘上的“加气”键,加气机开始加气。LNG液体从加气机进液管道流向液相流量计、控制阀和加液枪,然后进入车载LNG储气容器;车载LNG储气容器内已经气化的LNG蒸发气经回气枪、气相流量计及回气管路回到LNG储罐。LNG加气机的加注量为液相流量计与气相流量计的计量值之差,加气机会自动计算差值并显示。当汽车LNG储气瓶加满LNG后加气机自动停机(也可提前手动停机或定额加气)。2. After the pre-cooling is over, insert the liquid filling gun of the LNG dispenser into the liquid inlet of the vehicle-mounted LNG gas storage container, insert the return gun into the gas return port of the LNG gas storage container, and press the "Refill" button on the keyboard of the LNG dispenser , the dispenser starts filling. The LNG liquid flows from the liquid inlet pipe of the dispenser to the liquid phase flowmeter, control valve and liquid filling gun, and then enters the vehicle-mounted LNG gas storage container; the vaporized LNG vaporized gas in the vehicle-mounted LNG gas storage container passes through the air return gun and gas phase flowmeter And the return gas pipeline returns to the LNG storage tank. The filling amount of the LNG gas dispenser is the difference between the measured values of the liquid phase flowmeter and the gas phase flowmeter, and the gas dispenser will automatically calculate and display the difference. When the vehicle LNG gas storage cylinder is filled with LNG, the gas filling machine will automatically stop (it can also be manually stopped in advance or fixed gas filling).

3、LNG加气机停机后从车载LNG储气容器先取下回气枪,再取下加液枪,将加液枪插入LNG加气机的加液枪座,完成加气。3. After the LNG dispenser stops, remove the return air gun from the vehicle-mounted LNG gas storage container, then remove the liquid filling gun, insert the liquid filling gun into the liquid filling gun seat of the LNG dispenser, and complete the gas filling.

在整个加气过程中,液相流量计和气相流量计测出流经LNG加气机的流体密度和质量等参数的物理信号,由信号转换器转换成电脉冲信号传送到电子计控制器,LNG加气机上的压力传感器和压力表可以将LNG加气机的工作状态传输给LNG加气站服务器,使其对整个加气过程进行监控,自动完成加气工作。During the entire gas filling process, the liquid phase flowmeter and gas phase flowmeter measure the physical signals of the fluid density and quality flowing through the LNG gas dispenser, which are converted into electrical pulse signals by the signal converter and sent to the electronic meter controller. The pressure sensor and pressure gauge on the LNG dispenser can transmit the working status of the LNG dispenser to the server of the LNG refueling station, so that it can monitor the entire refueling process and complete the refueling work automatically.

与现有技术相比,本发明具有如下优点与有益效果:Compared with the prior art, the present invention has the following advantages and beneficial effects:

1、本发明新型双流量计LNG加气机,可实现LNG储气容器的余气回收,并通过气体超声波流量计实现余气回气量的计量功能,从而不仅降低LNG储气容器的内部压力,保证LNG顺利加注,而且可提高LNG加气机的加注计量精度,同时其价格成本相对于其它流量计来讲极其低廉。1. The new double-flow meter LNG filling machine of the present invention can realize the recovery of residual gas in the LNG gas storage container, and realize the measurement function of the residual gas return volume through the gas ultrasonic flowmeter, thereby not only reducing the internal pressure of the LNG gas storage container, It can ensure the smooth filling of LNG, and can improve the filling and metering accuracy of the LNG dispenser. At the same time, its price and cost are extremely low compared with other flow meters.

2、本发明通过内部预冷回路和外部预冷回路实现加气机的预冷循环,从而可以避免LNG介质汽化,防止气液两相流的发生。2. The present invention realizes the pre-cooling cycle of the dispenser through the internal pre-cooling circuit and the external pre-cooling circuit, thereby avoiding the vaporization of the LNG medium and preventing the occurrence of gas-liquid two-phase flow.

附图说明Description of drawings

图1是本发明新型双流量计LNG加气机的工作流程图;Fig. 1 is the working flow chart of novel double flow meter LNG dispenser of the present invention;

图2是本发明新型双流量计LNG加气机的工作原理图;Fig. 2 is a working principle diagram of the novel double-flowmeter LNG dispenser of the present invention;

具体实施方式detailed description

下面结合附图与具体实施方式对本发明作进一步详细的描述。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

实施例Example

如图1和图2所示,本发明新型双流量计LNG加气机,是用于将LNG储罐的LNG加注至LNG储气容器的,该LNG加气机包括依次连接的液相流量计、低温气动紧急切断阀作为控制阀、加液软管和加液枪,依次连接的回气枪、回气软管和气相流量计,以及用于控制加气过程并计算流量的电子计控制器;其中,液相流量计的输入端与LNG储罐连接,加液枪的输出端与LNG储气容器连接,回气枪的输入端与LNG储气容器连接,气相流量计的输出端与LNG储罐连接,电子计控制器分别与LNG储罐、液相流量计、气相流量计,控制阀信号连接。As shown in Fig. 1 and Fig. 2, the novel double-flow meter LNG filling machine of the present invention is used to fill the LNG of the LNG storage tank to the LNG gas storage container, and the LNG filling machine includes liquid phase flow rates connected in sequence Meter, low temperature pneumatic emergency shut-off valve as control valve, liquid filling hose and liquid filling gun, return air gun, return air hose and gas phase flowmeter connected in sequence, and electronic meter controller for controlling the filling process and calculating the flow rate Wherein, the input end of the liquid phase flowmeter is connected with the LNG storage tank, the output end of the liquid filling gun is connected with the LNG gas storage container, the input end of the air return gun is connected with the LNG gas storage container, and the output end of the gas phase flowmeter is connected with the LNG storage tank. The tank is connected, and the electronic meter controller is respectively connected with the LNG storage tank, the liquid phase flow meter, the gas phase flow meter, and the control valve signal.

本发明的液相流量计为科里奥利质量流量计,气相流量计为气体超声波流量计。本发明使用气体超声波流量计,从使用性能角度来看,其计量的精确度不受被测流体的温度、压力、密度和黏度的影响,长期精度稳定性好,使用灵活且寿命长,维护方便等优点。而且,完全能够满足LNG加气机回气计量的要求。从经济的角度看,其价格成本相对于其它流量计来讲极其低廉,这一点对于LNG加气机的国产化发展极为重要。The liquid phase flowmeter of the present invention is a Coriolis mass flowmeter, and the gas phase flowmeter is a gas ultrasonic flowmeter. The invention uses a gas ultrasonic flowmeter. From the perspective of performance, its measurement accuracy is not affected by the temperature, pressure, density and viscosity of the measured fluid. It has good long-term precision stability, flexible use, long life, and convenient maintenance. Etc. Moreover, it can fully meet the requirements of LNG dispenser return gas metering. From an economic point of view, its price and cost are extremely low compared to other flowmeters, which is extremely important for the localization of LNG dispensers.

本发明还包括内部预冷回路和外部预冷回路,其中,内部预冷回路由LNG储罐、液相流量计和控制阀依次连接,并且控制阀输出端与LNG储罐连接形成。而外部预冷回路由LNG储罐、液相流量计、控制阀、加液软管和加液枪依次连接,并且加液枪的输出端与LNG储罐连接形成。本发明通过内部预冷回路和外部预冷回路实现加气机的预冷循环:为了将加气机系统管路的温度(加气机不工作的情况下,系统管路温度可视为常温)降低,当加气机内部管路充满液体、且相关状态参数达到冷却要求(管路温度达到零下120℃)后预冷结束(整个预冷时间大约2到3分钟),从而可以避免LNG介质汽化,防止气液两相流的发生。在整个预冷阶段加气机的液相流量计不计量。The present invention also includes an internal precooling circuit and an external precooling circuit, wherein the internal precooling circuit is sequentially connected by an LNG storage tank, a liquid phase flowmeter and a control valve, and the output end of the control valve is connected to the LNG storage tank to form. The external pre-cooling circuit is connected in sequence by the LNG storage tank, liquid phase flow meter, control valve, liquid filling hose and liquid filling gun, and the output end of the liquid filling gun is connected to the LNG storage tank to form. The present invention realizes the pre-cooling cycle of the gas dispenser through the internal pre-cooling circuit and the external pre-cooling circuit: in order to adjust the temperature of the pipeline of the gas dispenser system (when the gas dispenser is not working, the temperature of the system pipeline can be regarded as normal temperature) Reduced, when the internal pipeline of the dispenser is filled with liquid and the relevant state parameters meet the cooling requirements (pipeline temperature reaches minus 120°C), the precooling ends (the entire precooling time is about 2 to 3 minutes), so that the vaporization of the LNG medium can be avoided , to prevent the occurrence of gas-liquid two-phase flow. During the whole pre-cooling stage, the liquid flow meter of the dispenser does not measure.

本发明的LNG储罐和液相流量计之间的管道设置有放散装置,该放散装置由截止阀V1、安全阀SV1、压力表PG、压力传感器P以及外围管道连接组成,其中,压力表PG和压力传感器P均与LNG储罐和液相流量计之间的管道连接。若管道压力过大可通过放散装置实现超压放散。而LNG储罐和气相流量计之间设置有安全阀。The pipeline between the LNG storage tank and the liquid phase flowmeter of the present invention is provided with a release device, and the release device is composed of a stop valve V1, a safety valve SV1, a pressure gauge PG, a pressure sensor P and peripheral pipeline connections, wherein the pressure gauge PG and the pressure sensor P are connected to the pipeline between the LNG storage tank and the liquid phase flowmeter. If the pipeline pressure is too high, the excess pressure can be released through the release device. A safety valve is provided between the LNG storage tank and the gas phase flowmeter.

本发明还包括具有预置和打印功能的辅助装置,该辅助装置与电子计控器信号连接。The present invention also includes an auxiliary device with preset and printing functions, and the auxiliary device is connected with the electronic counter for signal.

本发明新型双流量计LNG加气机是这样工作的:The novel dual-flow meter LNG dispenser of the present invention works like this:

1、将LNG加气机的加液枪插到LNG加气机的大循环枪口上,按下加气机键盘上的“预冷”键,加气机开始预冷。LNG液体内部预冷回路和外部预冷回路回到LNG储罐,当加气机内部管路充满液体、且相关状态参数达到冷却要求后预冷结束,此阶段加气机不计量。1. Insert the filling gun of the LNG dispenser into the large circulation nozzle of the LNG dispenser, press the "pre-cooling" key on the keyboard of the dispenser, and the dispenser starts to pre-cool. The LNG liquid internal pre-cooling circuit and external pre-cooling circuit return to the LNG storage tank. When the internal pipeline of the gas dispenser is filled with liquid and the relevant state parameters meet the cooling requirements, the pre-cooling ends. The gas dispenser does not measure at this stage.

2、预冷结束后,将LNG加气机的加液枪插入车载LNG储气容器进液口,回气枪插入LNG储气容器回气口,按下LNG加气机键盘上的“加气”键,加气机开始加气。LNG液体从加气机进液管道流向液相流量计M1、控制阀GV1、加液软管和加液枪LN,然后进入车载LNG储气容器;车载LNG储气容器内已经气化的LNG蒸发气经回气枪GN、回气软管、气相流量计M2及回气管路回到LNG储罐。LNG加气机的加注量为液相流量计M1与气相流量计M2的计量值之差,加气机会自动计算差值并显示。当汽车LNG储气瓶加满LNG后加气机自动停机(也可提前手动停机或定额加气)。2. After the pre-cooling is over, insert the liquid filling gun of the LNG dispenser into the liquid inlet of the vehicle-mounted LNG gas storage container, insert the return gun into the gas return port of the LNG gas storage container, and press the "Refill" button on the keyboard of the LNG dispenser , the dispenser starts filling. The LNG liquid flows from the liquid inlet pipe of the gas dispenser to the liquid phase flowmeter M1, the control valve GV1, the liquid filling hose and the liquid filling gun LN, and then enters the vehicle-mounted LNG gas storage container; the gasified LNG in the vehicle-mounted LNG gas storage container evaporates The gas returns to the LNG storage tank through the gas return gun GN, the gas return hose, the gas phase flowmeter M2 and the gas return pipeline. The filling amount of the LNG dispenser is the difference between the measured values of the liquid phase flowmeter M1 and the gas phase flowmeter M2, and the gas dispenser will automatically calculate and display the difference. When the vehicle LNG gas storage cylinder is filled with LNG, the gas filling machine will automatically stop (it can also be manually stopped in advance or fixed gas filling).

3、LNG加气机停机后从车载LNG储气容器先取下回气枪GN,再取下加液枪LN,将加液枪LN插入LNG加气机的加液枪座LNK,完成加气。3. After the LNG dispenser stops, remove the return air gun GN from the vehicle-mounted LNG gas storage container, then remove the liquid filling gun LN, insert the liquid filling gun LN into the liquid filling gun seat LNK of the LNG dispenser, and complete the filling.

在整个加气过程中,液相流量计M1和气相流量计M2测出流经LNG加气机的流体密度和质量等参数的物理信号,由信号转换器转换成电脉冲信号传送到电子计控制器,LNG加气机上的压力传感器P和压力表PG可以将LNG加气机的工作状态传输给LNG加气站服务器,使其对整个加气过程进行监控,自动完成加气工作。During the entire gas filling process, the liquid phase flowmeter M1 and the gas phase flowmeter M2 measure the physical signals of the fluid density and quality flowing through the LNG gas dispenser, which are converted into electrical pulse signals by the signal converter and sent to the electronic meter for control. The pressure sensor P and pressure gauge PG on the LNG filling machine can transmit the working status of the LNG filling machine to the LNG filling station server, so that it can monitor the entire filling process and automatically complete the filling work.

上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。The above-mentioned embodiment is a preferred embodiment of the present invention, but the embodiment of the present invention is not limited by the above-mentioned embodiment, and any other changes, modifications, substitutions, combinations, Simplifications should be equivalent replacement methods, and all are included in the protection scope of the present invention.

Claims (9)

1. a novel double fluid gauge LNG filling machine, for filling the LNG of LNG storage tank to LNG air container;Its feature exists In: include liquid phase stream gauge, control valve and the liquid feeding rifle being sequentially connected with;The input of described liquid phase stream gauge is with LNG storage tank even Connecing, the outfan of liquid feeding rifle is connected with LNG air container;Also include the gentle multi-phase flowmeter of return-air rifle being sequentially connected with, described time The input of air gun is connected with LNG air container, and the outfan of gas phase flow rate meter is connected with LNG storage tank;Also include for controlling The electrometer controller of fueling process calculated flow rate, described electrometer controller respectively with LNG storage tank, liquid phase stream gauge, gas Multi-phase flowmeter, control valve signal connect.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: described liquid phase stream amount is calculated as section Li Aoli mass flowmenter.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: described gas phase flow rate is calculated as gas Body ultrasonic flowmeter.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: also include internal pre-cold loop; The pre-cold loop in described inside is sequentially connected with by LNG storage tank, liquid phase stream gauge and control valve, and control valve outfan stores up with LNG Tank connects formation.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: also include outside pre-cold loop; The pre-cold loop in described outside is sequentially connected with by LNG storage tank, liquid phase stream gauge, control valve and liquid feeding rifle, and the output of liquid feeding rifle End is connected formation with LNG storage tank.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: described control valve is low wet Dynamic quick action emergency valve.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: described LNG storage tank and liquid phase stream Pipeline between gauge is provided with bleeding device;Described bleeding device is passed by stop valve V1, relief valve SV1, Pressure gauge PG, pressure Sensor P and peripheral conduits connect composition;Described Pressure gauge PG and pressure transducer P all with LNG storage tank and liquid phase stream gauge it Between pipeline connect.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: described LNG storage tank and gas phase stream Relief valve it is provided with between gauge.
Novel double fluid gauge LNG filling machine the most according to claim 1, it is characterised in that: also include having preset and beat The auxiliary device of print function;Described auxiliary device is connected with electronics controlling device signal.
CN201610806834.0A 2016-09-06 2016-09-06 A kind of novel double fluid gauge LNG filling machine Pending CN106287203A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610806834.0A CN106287203A (en) 2016-09-06 2016-09-06 A kind of novel double fluid gauge LNG filling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610806834.0A CN106287203A (en) 2016-09-06 2016-09-06 A kind of novel double fluid gauge LNG filling machine

Publications (1)

Publication Number Publication Date
CN106287203A true CN106287203A (en) 2017-01-04

Family

ID=57709800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610806834.0A Pending CN106287203A (en) 2016-09-06 2016-09-06 A kind of novel double fluid gauge LNG filling machine

Country Status (1)

Country Link
CN (1) CN106287203A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113446513A (en) * 2021-06-30 2021-09-28 成都渝能能源设备有限公司 LNG (liquefied Natural gas) dispenser adopting single return gas metering and method
CN114992511A (en) * 2022-06-29 2022-09-02 厚普清洁能源(集团)股份有限公司 Gas cylinder gas filling quality determination method and gas filling system
CN117287625A (en) * 2023-09-25 2023-12-26 北京航天试验技术研究所 Correction method, correction system and flowmeter for liquid hydrogen filling amount

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968160A (en) * 2009-07-28 2011-02-09 北京长征天民高科技有限公司 Gas dispensation automatic control method and liquefied natural gas vehicle gas dispenser
CN204005208U (en) * 2014-06-17 2014-12-10 北京航天发射技术研究所 LNG Liquefied natural gas LNG refueling system and LNG filling machine thereof
JP2015075150A (en) * 2013-10-08 2015-04-20 日本ドライケミカル株式会社 Liquefied carbon dioxide recovery method
CN204829260U (en) * 2015-07-28 2015-12-02 托肯恒山科技(广州)有限公司 LNG that can accurately measure adds mechanism of qi
CN105605416A (en) * 2015-12-25 2016-05-25 江苏现代造船技术有限公司 Marine liquefied natural gas (LNG) filling machine
CN206206998U (en) * 2016-09-06 2017-05-31 华南理工大学 A kind of new double fluid gauge LNG filling machines

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968160A (en) * 2009-07-28 2011-02-09 北京长征天民高科技有限公司 Gas dispensation automatic control method and liquefied natural gas vehicle gas dispenser
JP2015075150A (en) * 2013-10-08 2015-04-20 日本ドライケミカル株式会社 Liquefied carbon dioxide recovery method
CN204005208U (en) * 2014-06-17 2014-12-10 北京航天发射技术研究所 LNG Liquefied natural gas LNG refueling system and LNG filling machine thereof
CN204829260U (en) * 2015-07-28 2015-12-02 托肯恒山科技(广州)有限公司 LNG that can accurately measure adds mechanism of qi
CN105605416A (en) * 2015-12-25 2016-05-25 江苏现代造船技术有限公司 Marine liquefied natural gas (LNG) filling machine
CN206206998U (en) * 2016-09-06 2017-05-31 华南理工大学 A kind of new double fluid gauge LNG filling machines

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113446513A (en) * 2021-06-30 2021-09-28 成都渝能能源设备有限公司 LNG (liquefied Natural gas) dispenser adopting single return gas metering and method
CN113446513B (en) * 2021-06-30 2022-06-14 成都渝能能源设备有限公司 LNG (liquefied Natural gas) dispenser adopting single return gas metering and method
CN114992511A (en) * 2022-06-29 2022-09-02 厚普清洁能源(集团)股份有限公司 Gas cylinder gas filling quality determination method and gas filling system
CN114992511B (en) * 2022-06-29 2024-04-30 厚普清洁能源(集团)股份有限公司 Method for determining gas filling quality of gas storage bottle and gas filling system
CN117287625A (en) * 2023-09-25 2023-12-26 北京航天试验技术研究所 Correction method, correction system and flowmeter for liquid hydrogen filling amount

Similar Documents

Publication Publication Date Title
CN201992346U (en) Liquefied natural gas injection machine
CN103629525A (en) Intelligent high-precision LNG filling metering device
CN106287203A (en) A kind of novel double fluid gauge LNG filling machine
CN103307444A (en) Liquefied natural gas (LNG) dispenser with high precision of metering
CN106123984A (en) Hydrogen Fuel-cell Vehicles hydrogen-consuming volume real-time displaying device and detection method thereof
CN216524275U (en) Mass method liquid hydrogen flow standard device driven by liquid hydrogen pump
CN206206998U (en) A kind of new double fluid gauge LNG filling machines
CN104880385B (en) A kind of anhydrous fracturing fluid test system of carbon dioxide and method of testing
CN114088168B (en) A mass-method liquid hydrogen flow standard device driven by a liquid hydrogen pump
CN204330095U (en) Supercritical CO 2flowmeter prover
CN202938010U (en) Automatic filling system
CN204785534U (en) LNG liquid feeding car flows
CN104568082A (en) Supercritical CO2 flowmeter calibration device and calibration method thereof
CN201364178Y (en) Fuel consumption rate measuring device for real ship
CN204829260U (en) LNG that can accurately measure adds mechanism of qi
KR20190038625A (en) Method and apparatus for detecting the amount of gas in a calibratable manner
CN201093164Y (en) Liquefied natural gas dispenser
CN105020579A (en) Single-flow double-metering liquefied natural gas filling machine
CN205117702U (en) Total pump characteristic test platform that shows
CN101761773A (en) Liquefied natural gas dispenser
CN207831994U (en) A kind of accurate filling system of heat-pipe working medium
CN204829278U (en) Liquefied natural gas of two measurements of single current volume adds mechanism of qi
CN206876310U (en) A kind of cryogenic fluid transfer pipeline leaks heat test device
CN104215305A (en) Full-automatic supersonic nozzle high flow standard device
CN104315332B (en) A precise metering device for liquefied natural gas filling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104