CN106219404A - Blast furnace refractory brick construction circular crane - Google Patents
Blast furnace refractory brick construction circular crane Download PDFInfo
- Publication number
- CN106219404A CN106219404A CN201610793629.5A CN201610793629A CN106219404A CN 106219404 A CN106219404 A CN 106219404A CN 201610793629 A CN201610793629 A CN 201610793629A CN 106219404 A CN106219404 A CN 106219404A
- Authority
- CN
- China
- Prior art keywords
- crane
- hanging scaffold
- rotating mechanism
- blast furnace
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011449 brick Substances 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 230000007246 mechanism Effects 0.000 claims abstract description 29
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 230000000630 rising effect Effects 0.000 claims abstract description 10
- 210000004907 gland Anatomy 0.000 claims description 8
- 230000005855 radiation Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims 2
- 238000012856 packing Methods 0.000 claims 2
- 235000005983 Crescentia cujete Nutrition 0.000 claims 1
- 235000009797 Lagenaria vulgaris Nutrition 0.000 claims 1
- 244000174681 Michelia champaca Species 0.000 claims 1
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 abstract description 7
- 229910052799 carbon Inorganic materials 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000009471 action Effects 0.000 abstract description 3
- 239000000725 suspension Substances 0.000 description 15
- 230000006835 compression Effects 0.000 description 7
- 238000007906 compression Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C11/00—Trolleys or crabs, e.g. operating above runways
- B66C11/08—Trolleys or crabs, e.g. operating above runways with turntables
- B66C11/10—Trolleys or crabs, e.g. operating above runways with turntables equipped with jibs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/12—Chain or like hand-operated tackles with or without power transmission gearing between operating member and lifting rope, chain or cable
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
Description
技术领域technical field
本发明属于冶金炼铁高炉耐火砖砌筑技术领域,具体为高炉耐火砖施工用环形吊车。The invention belongs to the technical field of building refractory bricks for metallurgical ironmaking blast furnaces, and in particular relates to a ring crane for the construction of refractory bricks for blast furnaces.
背景技术Background technique
由于冶金技术的发展,炼铁高炉的容积被做得越来越大,从原来的小高炉做到2500m3,而后一直做到4000m3,甚至做到了5000m3高炉,这样不仅降低了炼铁成本,节约了能源,也保护了环境。随着环境要求越来越高,能耗高、污染严重的小高炉将逐渐被淘汰,取而代之的将是大高炉的出现。由于小高炉的耐火砖体积小、重量轻,用人工及小型常用机械就能解决耐火砖的运输及砌筑问题,对于大型高炉,炉缸碳砖的重量达到1.5t左右,甚至更重,必须要用特殊的起重机械来解决大型碳砖的运输及吊装问题,而目前,由于其工艺的特殊性,这些特殊的起重机械在市场上也无法购得。Due to the development of metallurgical technology, the volume of the ironmaking blast furnace has been made larger and larger, from the original small blast furnace to 2500m3, and then to 4000m3, and even to 5000m3 blast furnace, which not only reduces the cost of ironmaking, but also saves energy and protect the environment. As the environmental requirements become higher and higher, small blast furnaces with high energy consumption and serious pollution will gradually be eliminated and replaced by large blast furnaces. Due to the small size and light weight of refractory bricks in small blast furnaces, the transportation and masonry problems of refractory bricks can be solved by labor and small common machinery. For large blast furnaces, the weight of hearth carbon bricks reaches about 1.5t, or even heavier. It is necessary to use special hoisting machinery to solve the transportation and hoisting problems of large-scale carbon bricks, but at present, due to the particularity of its technology, these special hoisting machinery cannot be purchased on the market.
高炉炉体一般由炉底、炉缸、炉腹、炉腰、炉身、炉喉、大料钟、大料斗等部分组成,以2500m3高炉为例,高炉炉缸处内壁最大直径14m,满铺碳砖;炉腹和炉腰处收身,直径变小;在炉身段,直径又由大变小,直到炉喉,从炉腹、炉腰一直到炉喉处内壁砌筑一层耐火砖,砖的砌筑高度在40m左右。必须要设计一种起重机,起重量大于1.5t,吊装范围在高炉内任意一点,而且起重臂的直径要根据高炉的直径变化而变化,在高度方向,为了防止绞绳,起重高度还不能超过10米,这就要求起重臂在高度方向还要移动,满足工艺的要求。The blast furnace body is generally composed of furnace bottom, hearth, bosh, furnace body, furnace throat, large material bell, large hopper and other parts. Taking a 2500m3 blast furnace as an example, the inner wall of the blast furnace hearth has a maximum diameter of 14m and is fully paved. Carbon bricks; the bosh and the furnace waist are closed, and the diameter becomes smaller; in the furnace body section, the diameter changes from large to small until the furnace throat, and a layer of refractory bricks is built from the furnace bosh, furnace waist to the inner wall of the furnace throat. The brick masonry height is about 40m. It is necessary to design a crane with a lifting capacity greater than 1.5t, and the hoisting range is at any point in the blast furnace, and the diameter of the boom needs to change according to the diameter of the blast furnace. In the height direction, in order to prevent rope twisting, the lifting height cannot More than 10 meters, which requires the boom to move in the height direction to meet the requirements of the process.
发明内容Contents of the invention
本发明就是设计高炉耐火砖施工用环形吊车,能把碳砖和耐火砖吊装到高炉内任意一点,操作更便捷,安全高效,使技术效益最大化。The present invention is to design a circular crane for blast furnace refractory brick construction, which can hoist carbon bricks and refractory bricks to any point in the blast furnace, and is more convenient to operate, safe and efficient, and maximizes technical benefits.
为了解决上述技术问题,本发明提供了如下的技术方案:In order to solve the problems of the technologies described above, the present invention provides the following technical solutions:
本发明所提供的高炉耐火砖施工用环形吊车,由自升系统提升钢丝绳、手扳葫芦、自升系统保险钢丝绳、操作吊盘、固定装置、旋转机构、圆形轨道、旋转小车、起重臂、水平行走小车、起升装置组成。The circular crane for the construction of blast furnace refractory bricks provided by the present invention is composed of self-elevating system hoisting wire rope, lever block, self-elevating system safety wire rope, operating suspension pan, fixing device, rotating mechanism, circular track, rotating trolley, and lifting arm , Horizontal walking trolley and lifting device.
所述吊盘作为环形吊车提升和固定环形轨道、旋转机构、起重臂的本体,在垂直方向由自升系统提升钢丝绳和自升系统保险钢丝绳固定,自升系统提升钢丝绳和自升系统保险钢丝绳的组数根据吊盘的大小由设计确定,在水平方向由固定装置固定;旋转机构安装在吊盘的正中间,轨道按照旋转半径安装在吊盘的下方,旋转小车安装在轨道上,沿作轨道旋转,起重臂安装在旋转机构和旋转小车的下方,水平行走小车安装在起重臂上,起升装置安装在水平行走小车的下方。选择砌筑工位,操作自升系统提升绳,并且固定自升系统提升绳和自升系统保险绳,在圆周方向固定好固定装置,启动旋转小车,开动起重小车就可完成吊运耐火砖的工作。The suspension pan is used as a ring crane to lift and fix the body of the ring track, the rotating mechanism and the boom, and is fixed in the vertical direction by the lifting wire rope of the jacking system and the safety wire rope of the jacking system, and the lifting wire rope of the jacking system and the safety wire rope of the jacking system The number of groups is determined by the design according to the size of the hanging pan, and is fixed by the fixing device in the horizontal direction; the rotating mechanism is installed in the middle of the hanging pan, the track is installed under the hanging pan according to the radius of rotation, and the rotating trolley is installed on the track. The track rotates, the lifting arm is installed under the rotating mechanism and the rotating trolley, the horizontal traveling trolley is installed on the boom, and the lifting device is installed under the horizontal traveling trolley. Select the masonry station, operate the hoisting rope of the self-elevating system, and fix the hoisting rope of the self-elevating system and the safety rope of the self-elevating system, fix the fixing device in the circumferential direction, start the rotating trolley, and start the hoisting trolley to complete the hoisting of refractory bricks work.
作为本发明的一种优选技术方案,所述的自升系统提升钢丝绳由人工插制,选用与自升系统保险绳同型号,捆绑于吊盘上;提升钢丝绳通过自升系统保险绳的临时固定,不断地收放手扳葫芦保证吊盘的提升,其连接的手扳葫芦及其附件由市场直接采购。As a preferred technical solution of the present invention, the hoisting wire rope of the self-elevating system is inserted manually, and is selected to be of the same type as the safety rope of the self-elevating system, and bound to the suspension pan; the hoisting wire rope is temporarily fixed by the safety rope of the self-elevating system , continuously retract and release the lever block to ensure the lifting of the suspension pan, and the connected lever block and its accessories are directly purchased by the market.
作为本发明的一种优选技术方案,所述的自升系统保险钢丝绳由人工插制。As a preferred technical solution of the present invention, the safety wire rope of the self-elevating system is manually inserted.
作为本发明的一种优选技术方案,所述的吊盘由环形梁、辐射梁、次梁及铺板等组成,根据荷载计算得出环形梁、辐射梁、次梁及铺板的型号和大小。As a preferred technical solution of the present invention, the suspension pan is composed of ring beams, radiating beams, secondary beams and planks, and the models and sizes of the ring beams, radiating beams, secondary beams and planks are calculated according to the load.
作为本发明的一种优选技术方案,所述的固定装置为带梯形螺纹的螺栓付,梯形螺母焊接在吊盘的辐射梁上,通过调节梯形螺杆,使之与高炉本体炉壁顶紧,保证整个吊盘稳定不动。As a preferred technical solution of the present invention, the fixing device is a bolt with trapezoidal thread, and the trapezoidal nut is welded on the radiation beam of the hanging pan. By adjusting the trapezoidal screw rod, it is tightened with the furnace wall of the blast furnace body to ensure The whole hanging pan is stable.
作为本发明的一种优选技术方案,所述的旋转机构支承梁为槽钢制作的钢构件。As a preferred technical solution of the present invention, the supporting beam of the rotating mechanism is a steel member made of channel steel.
作为本发明的一种优选技术方案,所述的轨道由市场采购的工字钢制作,弯成园弧状,分节组装。As a preferred technical solution of the present invention, the track is made of I-beam purchased from the market, bent into an arc shape, and assembled in sections.
作为本发明的一种优选技术方案,所述的旋转小车、水平行走小车、起升装置根据荷载计算确定,在市场采购。As a preferred technical solution of the present invention, the rotating trolley, horizontal traveling trolley and lifting device are determined according to load calculation and purchased in the market.
作为本发明的一种优选技术方案,所述的起重臂根据荷载计算确定,在市场采购,在其上装有各种方向限位装置。As a preferred technical solution of the present invention, the boom is determined according to load calculation, purchased from the market, and equipped with various direction limiting devices.
作为本发明的一种优选技术方案,所述的旋转机构为特别制作的带有轴向受力轴承的滚动装置,并装有防松脱装置,它主要由轴、旋转机构支座、平面向心球轴承、轴向向心轴承、压紧螺母、止推压盖组成。垂直荷载通过轴传至平面向心球轴承、旋转机构支座;轴向向心轴承保证轴的垂直度。在施工过程中,旋转小车可以顺时针旋转,也可以逆时针旋转,会造成压紧螺母松脱,止推压盖能保证压紧螺母始终保持压紧状态。As a preferred technical solution of the present invention, the rotating mechanism is a specially made rolling device with an axial force bearing, and is equipped with an anti-loosening device. It is mainly composed of a shaft, a rotating mechanism support, a plane direction Consists of core ball bearings, axial radial bearings, compression nuts, and thrust glands. The vertical load is transmitted to the plane radial ball bearing and the support of the rotating mechanism through the shaft; the axial radial bearing ensures the verticality of the shaft. During the construction process, the rotating trolley can rotate clockwise or counterclockwise, which will cause the compression nut to loosen, and the thrust gland can ensure that the compression nut is always kept in a compressed state.
本发明的优点是:通过单个杆件组装成吊盘本体,吊盘本体可以通过设计的自升装置完成自升动作带动整个环形吊车自升,满足炉缸碳砖和炉壁处耐火砖砌筑不断升高的要求。通过增加或减少吊盘的搁板圈,变化吊盘的直径和起重臂的长度,可以完成起重幅度的变化,满足高炉在高度方向直径的变化。该装置的吊盘作为设备自升装置的一个平台,操作简单、方便、安全;整套设备简单,制作方便、安装方便,易于就地取材。The advantage of the present invention is that: the suspension pan body is assembled into a single rod, and the suspension pan body can complete the self-elevation action through the designed self-elevating device to drive the entire ring crane to self-elevate, satisfying the need for carbon bricks in the hearth and refractory bricks on the furnace wall. Rising demands. By increasing or decreasing the shelf ring of the hanging pan, changing the diameter of the hanging pan and the length of the boom, the change of the lifting range can be completed to meet the change of the diameter of the blast furnace in the height direction. The suspension plate of the device is used as a platform for the self-elevating device of the equipment, which is simple, convenient and safe to operate; the whole set of equipment is simple, convenient to manufacture and install, and easy to obtain local materials.
附图说明Description of drawings
图1本发明高炉耐火砖施工用环形吊车示意图。Fig. 1 is a schematic diagram of a circular crane for blast furnace refractory brick construction of the present invention.
其中:1.自升系统提升绳、2.手扳葫芦、3.自升系统保险绳、5.吊盘、5.固定装置、6.园行轨道、7.旋转机构支承梁、8.旋转机构、9.旋转小车、10.起重臂、11.水平行走小车、12.起升装置、13.高炉本体。Among them: 1. Lifting rope of self-elevating system, 2. Lever hoist, 3. Safety rope of self-elevating system, 5. Hanging plate, 5. Fixing device, 6. Park track, 7. Supporting beam of rotating mechanism, 8. Rotation Mechanism, 9. Rotating trolley, 10. Lifting arm, 11. Horizontal walking trolley, 12. Lifting device, 13. Blast furnace body.
图2本发明旋转机构示意图。Fig. 2 is a schematic diagram of the rotation mechanism of the present invention.
其中:14.轴、15.油封Ⅰ、16.旋转机构支座、17.平面向心球轴承、18.内套Ⅰ、19.外套Ⅰ、20.轴向向心轴承Ⅰ、21.外套Ⅱ、22.内套Ⅱ、23.轴向向心轴承Ⅱ、24.内套Ⅲ、25.压紧螺母、26.压盖、27.油封Ⅱ、28.止推压盖、29.可调垫圈、30.螺栓Ⅰ、31.螺栓Ⅱ。Among them: 14. Shaft, 15. Oil seal Ⅰ, 16. Rotary mechanism support, 17. Plane radial ball bearing, 18. Inner sleeve Ⅰ, 19. Outer cover Ⅰ, 20. Axial radial bearing Ⅰ, 21. Outer cover Ⅱ , 22. Inner sleeve II, 23. Axial radial bearing II, 24. Inner sleeve III, 25. Compression nut, 26. Gland, 27. Oil seal II, 28. Thrust gland, 29. Adjustable washer , 30. Bolt I, 31. Bolt II.
具体实施方式detailed description
以下结合具体实施方式对本发明作进一步说明,但本发明的保护范围不仅限于下述实施例的内容。The present invention will be further described below in conjunction with specific embodiments, but the scope of protection of the present invention is not limited to the content of the following examples.
如图1-2所示,高炉耐火砖施工用环形吊车,由自升系统提升钢丝绳1、手扳葫芦2、自升系统保险钢丝绳3、操作吊盘4、固定装置5、旋转机构8、圆形轨道6、旋转小车9、起重臂10、水平行走小车11、起升装置12组成。As shown in Figure 1-2, the circular crane used for the construction of blast furnace refractory bricks, the self-elevating system lifts the steel wire rope 1, the lever block 2, the self-elevating system safety wire rope 3, the operating suspension plate 4, the fixing device 5, the rotating mechanism 8, the circular Shaped track 6, rotating dolly 9, boom 10, horizontal walking dolly 11, hoisting device 12 form.
所述吊盘4作为环形吊车提升和固定环形轨道6、旋转机构8、起重臂10的本体,在垂直方向由自升系统提升钢丝绳1和自升系统保险钢丝绳3固定,自升系统提升钢丝绳1和自升系统保险钢丝绳3的组数根据吊盘4的大小由设计确定,在水平方向由固定装置5固定;旋转机构8安装在吊盘4的正中间,轨道6按照旋转半径安装在吊盘4的下方,旋转小车9安装在轨道上,沿作轨道6旋转,起重臂10安装在旋转机构8和旋转小车9的下方,水平行走小车11安装在起重臂上,起升装置12安装在水平行走小车11的下方。选择砌筑工位,操作自升系统提升绳,并且固定自升系统提升绳和自升系统保险绳,在圆周方向固定好固定装置,启动旋转小车,开动起重小车就可完成吊运耐火砖的工作。The suspension pan 4 is used as a ring crane to lift and fix the body of the ring track 6, the rotating mechanism 8, and the boom 10, and is fixed in the vertical direction by the self-elevating system hoisting wire rope 1 and the self-elevating system safety wire rope 3, and the jacking system hoisting wire rope 1 and the number of sets of safety wire ropes 3 of the self-elevating system are determined by the design according to the size of the hanging pan 4, and are fixed by the fixing device 5 in the horizontal direction; Below the disk 4, the rotating trolley 9 is installed on the track and rotates along the working track 6. The lifting arm 10 is installed under the rotating mechanism 8 and the rotating trolley 9, the horizontal walking trolley 11 is installed on the boom, and the lifting device 12 Be installed under the horizontal walking dolly 11. Select the masonry station, operate the hoisting rope of the self-elevating system, and fix the hoisting rope of the self-elevating system and the safety rope of the self-elevating system, fix the fixing device in the circumferential direction, start the rotating trolley, and start the hoisting trolley to complete the hoisting of refractory bricks work.
所述的自升系统提升钢丝绳1由人工插制,选用与自升系统保险绳3同型号,捆绑于吊盘上;提升钢丝绳1通过自升系统保险绳3的临时固定,不断地收放手扳葫芦2保证吊盘的提升,其连接的手扳葫芦及其附件由市场直接采购。The lifting wire rope 1 of the self-elevating system is manually inserted, and is selected to be of the same model as the safety rope 3 of the self-elevating system, and is bound on the suspension pan; The hoist 2 guarantees the lifting of the suspension pan, and the lever hoist and its accessories connected to it are purchased directly from the market.
所述的自升系统保险钢丝绳3由人工插制。The self-elevating system safety wire rope 3 is manually inserted.
所述的吊盘4由环形梁、辐射梁、次梁及铺板等组成,根据荷载计算得出环形梁、辐射梁、次梁及铺板的型号和大小。The hanging pan 4 is composed of ring beams, radiating beams, secondary beams and planks, and the models and sizes of the ring beams, radiating beams, secondary beams and planks are calculated according to the load.
所述的固定装置5为带梯形螺纹的螺栓付,梯形螺母焊接在吊盘的辐射梁上,通过调节梯形螺杆,使之与高炉本体炉壁13顶紧,保证整个吊盘稳定不动。The fixing device 5 is a bolt with trapezoidal thread, and the trapezoidal nut is welded on the radiation beam of the hanging pan. By adjusting the trapezoidal screw rod, it is tightened with the furnace wall 13 of the blast furnace body to ensure the stability of the entire hanging pan.
所述的旋转机构支承梁7为槽钢制作的钢构件。The supporting beam 7 of the rotating mechanism is a steel member made of channel steel.
所述的轨道6由市场采购的工字钢制作,弯成园弧状,分节组装。Described track 6 is made by the I-beam of market purchase, is bent into garden arc shape, and is assembled in sections.
所述的旋转小车9、水平行走小车11、起升装置12根据荷载计算确定,在市场采购。The rotating trolley 9, the horizontal traveling trolley 11, and the hoisting device 12 are determined according to load calculations and purchased in the market.
所述的起重臂10根据荷载计算确定,在市场采购,在其上装有各种方向限位装置。Described jib 10 is determined according to load calculation, is purchased in the market, and various direction limiting devices are housed thereon.
所述的旋转机构8为特别制作的带有轴向受力轴承的滚动装置,并装有防松脱装置,如图2所示,它主要由轴14、旋转机构支座16、平面向心球轴承17、轴向向心轴承20、轴向向心轴承Ⅱ23、压紧螺母25、止推压盖28组成。垂直荷载通过轴14传至平面向心球轴承17、旋转机构支座16;轴向向心轴承20、轴向向心轴承Ⅱ23保证轴14的垂直度。在施工过程中,旋转小车9可以顺时针旋转,也可以逆时针旋转,会造成压紧螺母25松脱,止推压盖28能保证压紧螺母25始终保持压紧状态。The rotating mechanism 8 is a specially made rolling device with an axially stressed bearing, and is equipped with an anti-loosening device. As shown in Figure 2, it is mainly composed of a shaft 14, a rotating mechanism support 16, a plane centripetal Ball bearing 17, axial centripetal bearing 20, axial centripetal bearing II 23, compression nut 25, thrust gland 28 are formed. The vertical load is transmitted to the plane centripetal ball bearing 17 and the rotating mechanism support 16 through the shaft 14; the axial centripetal bearing 20 and the axial centripetal bearing II 23 ensure the perpendicularity of the shaft 14. In the construction process, the rotating trolley 9 can rotate clockwise or counterclockwise, which will cause the compression nut 25 to loosen, and the thrust gland 28 can ensure that the compression nut 25 remains in a compressed state all the time.
本发明的优点是:通过单个杆件组装成吊盘本体,吊盘本体可以通过设计的自升装置完成自升动作带动整个环形吊车自升,满足炉缸碳砖和炉壁处耐火砖砌筑不断升高的要求。通过增加或减少吊盘的搁板圈,变化吊盘的直径和起重臂的长度,可以完成起重幅度的变化,满足高炉在高度方向直径的变化。该装置的吊盘作为设备自升装置的一个平台,操作简单、方便、安全;整套设备简单,制作方便、安装方便,易于就地取材。The advantage of the present invention is that: the suspension pan body is assembled into a single rod, and the suspension pan body can complete the self-elevation action through the designed self-elevating device to drive the entire ring crane to self-elevate, satisfying the need for carbon bricks in the hearth and refractory bricks on the furnace wall. Rising demands. By increasing or decreasing the shelf ring of the hanging pan, changing the diameter of the hanging pan and the length of the boom, the change of the lifting range can be completed to meet the change of the diameter of the blast furnace in the height direction. The suspension plate of the device is used as a platform for the self-elevating device of the equipment, which is simple, convenient and safe to operate; the whole set of equipment is simple, convenient to manufacture and install, and easy to obtain local materials.
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that: the above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, it still The technical solutions recorded in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610793629.5A CN106219404B (en) | 2016-08-31 | 2016-08-31 | Blast furnace refractory brick construction circular crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610793629.5A CN106219404B (en) | 2016-08-31 | 2016-08-31 | Blast furnace refractory brick construction circular crane |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106219404A true CN106219404A (en) | 2016-12-14 |
| CN106219404B CN106219404B (en) | 2018-04-03 |
Family
ID=58073879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610793629.5A Active CN106219404B (en) | 2016-08-31 | 2016-08-31 | Blast furnace refractory brick construction circular crane |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106219404B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107310933A (en) * | 2017-06-24 | 2017-11-03 | 安徽普伦智能装备有限公司 | A kind of material distributes conveying device |
| CN112897062A (en) * | 2021-01-21 | 2021-06-04 | 江苏理工学院 | Automatic carrying device for refractory bricks |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07172317A (en) * | 1993-10-26 | 1995-07-11 | Toda Constr Co Ltd | Moving device for hoist |
| CN2782644Y (en) * | 2005-03-29 | 2006-05-24 | 中国第五冶金建设公司炉窑工程分公司 | Single straight beam hoist with circular track |
| CN102992191A (en) * | 2011-09-15 | 2013-03-27 | 上海科轻起重机有限公司 | Crane trolley structure |
| RU133109U1 (en) * | 2013-04-03 | 2013-10-10 | Открытое акционерное общество Научно-производственное объединение "ВНИИПТМАШ" | CRANE LOADING CART |
| CN203728437U (en) * | 2013-12-20 | 2014-07-23 | 广东明阳风电产业集团有限公司 | Cabin maintaining crane for wind generating set |
| CN103979412A (en) * | 2014-04-04 | 2014-08-13 | 建华建材(安徽)有限公司 | Steel reinforcement cage hanger |
-
2016
- 2016-08-31 CN CN201610793629.5A patent/CN106219404B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07172317A (en) * | 1993-10-26 | 1995-07-11 | Toda Constr Co Ltd | Moving device for hoist |
| CN2782644Y (en) * | 2005-03-29 | 2006-05-24 | 中国第五冶金建设公司炉窑工程分公司 | Single straight beam hoist with circular track |
| CN102992191A (en) * | 2011-09-15 | 2013-03-27 | 上海科轻起重机有限公司 | Crane trolley structure |
| RU133109U1 (en) * | 2013-04-03 | 2013-10-10 | Открытое акционерное общество Научно-производственное объединение "ВНИИПТМАШ" | CRANE LOADING CART |
| CN203728437U (en) * | 2013-12-20 | 2014-07-23 | 广东明阳风电产业集团有限公司 | Cabin maintaining crane for wind generating set |
| CN103979412A (en) * | 2014-04-04 | 2014-08-13 | 建华建材(安徽)有限公司 | Steel reinforcement cage hanger |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107310933A (en) * | 2017-06-24 | 2017-11-03 | 安徽普伦智能装备有限公司 | A kind of material distributes conveying device |
| CN112897062A (en) * | 2021-01-21 | 2021-06-04 | 江苏理工学院 | Automatic carrying device for refractory bricks |
| CN112897062B (en) * | 2021-01-21 | 2023-07-07 | 江苏理工学院 | Automatic carrying device for refractory bricks |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106219404B (en) | 2018-04-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201214594Y (en) | Loop crane hoisting disk device for blast furnace inner lining construction | |
| CN104003287A (en) | Umbrella type variable diameter platform device for industry kiln | |
| CN105000503A (en) | Construction method for sliding and replacing whole body of jacking and revolving bearing of revolved body of stacker-reclaimer | |
| CN103468850B (en) | Advance integrated installing method of converter | |
| CN105177202B (en) | A kind of blast furnace overhaul method | |
| CN106219404B (en) | Blast furnace refractory brick construction circular crane | |
| CN103557693B (en) | Rotary kiln barrel mounting method | |
| CN103342321B (en) | The integral replacing hanging method of in-service nuclear power station steam generator | |
| CN201261692Y (en) | Hoisting tool for building large-sized blast furnace bottom and furnace hearth | |
| CN209210234U (en) | One kind is for the moveable hanging apparatus of metallurgical large-tonnage overhead traveling crane | |
| CN206502573U (en) | A kind of hoistable platform for blast furnace building construction | |
| CN207172039U (en) | Hanging scaffold platform in special steel cylinder furnace shell | |
| CN106049848A (en) | Adjustable anti-shaking moving platform and mounting method | |
| CN206521755U (en) | A kind of dismounting device of building foundation pit prestressing force shaped steel combination inner bracing member | |
| CN203402879U (en) | Rotatable and portable elevator | |
| CN115838129A (en) | A method for dismantling tower cranes for expansion of large factory buildings | |
| JP4592860B2 (en) | Blast furnace component installation method | |
| CN104652804A (en) | Operating platform and construction method for going up and down freely in blast furnace | |
| CN104178595B (en) | The replacing options of steelshop cleaning shaft | |
| JPH01168803A (en) | Method and device for repairing blast furnace | |
| CN204148500U (en) | A kind of walk by table frame | |
| CN106282456B (en) | A kind of furnace bottom carbon brick builds the construction method of feeding by laying bricks or stones | |
| CN105671245B (en) | A kind of method of utilization hoist engine flip-over type installing converter | |
| CN218879954U (en) | Device for building bottom bricks in blast furnace maintenance | |
| CN206530037U (en) | A kind of elevating platform assembly for Construction of Silo |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20161214 Assignee: Ma'anshan ZhongMetallurgical Development Real Estate Co.,Ltd. Assignor: CHINA MCC17 GROUP Co.,Ltd. Contract record no.: X2024980045207 Denomination of invention: Circular crane for construction of blast furnace refractory bricks Granted publication date: 20180403 License type: Common License Record date: 20250102 |
|
| EE01 | Entry into force of recordation of patent licensing contract |