CN106216956B CN201610684722.2A CN201610684722A CN106216956B CN 106216956 B CN106216956 B CN 106216956B CN 201610684722 A CN201610684722 A CN 201610684722A CN 106216956 B CN106216956 B CN 106216956B
Authority
CN
China
Prior art keywords
strip
erw
welding
cold
manufacture method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610684722.2A
Other languages
Chinese (zh)
Other versions
CN106216956A (en
Inventor
王来福
俞峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI SUJIA FASITE AUTO PARTS Co Ltd
Original Assignee
WUXI SUJIA FASITE AUTO PARTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI SUJIA FASITE AUTO PARTS Co Ltd filed Critical WUXI SUJIA FASITE AUTO PARTS Co Ltd
Priority to CN201610684722.2A priority Critical patent/CN106216956B/en
Publication of CN106216956A publication Critical patent/CN106216956A/en
Application granted granted Critical
Publication of CN106216956B publication Critical patent/CN106216956B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metal Extraction Processes (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

The present invention relates to a kind of manufacture method of vehicle transmission central siphon, belong to metal material processing technical field.A kind of manufacture method of vehicle transmission central siphon, it is characterised in that including the step such as strip cutting, pickling processes, cold rolling, roll bending formation and welding, the processing of weld seam sublimate, phosphatization, saponification process and cold drawing treatment.Transmission shaft tube intensity height, the good toughness of manufacture method processing of the present invention, weld strength is high, and higher obdurability can be still kept after larger plastic deformation is born.Flattening test reaches 90 degree and the flat fusion line flawless of 0 degree of total head after steel pipe welding;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft dynamic balancing index.

Description

The manufacture method of vehicle transmission central siphon
Technical field
The present invention relates to a kind of manufacture method of vehicle transmission central siphon, belong to metal material processing technical field.
Background technology
Since reform and opening-up, Chinese Auto Industry development is swift and violent, into after the new century, either yield and sales volume, more It is that explosive growth is presented, after particularly breaking through 18,000,000 to production and marketing in 2010, China has become the vapour of global maximum Car production and consumption state, the automobile market in China is considered as future development market with the largest potentiality.Automobile industry turns into its people Economic important pillar industry, form than more complete industrial system, also turned into and embody the significant of national competitiveness Industry.
Most domestic car enterprise is continuously improving the localization rate of parts and components of auto-parts, is improving the competition of oneself always at present Power.Although the level of most domestic auto parts and components supplier, it can not still supply the key zero of the high automobile such as benz, BMW Part and the engine and gearbox for obscuring energy technology, but generally skill level greatly improves, and one not Holding the trend ignored is, key parts technical ability has progressively shifted to China with market, and at the same time, Chinese automobile parts are Start to enter into international market on a large scale, and the merger for enthusiastically participating in international automobile fitting industry is integrated.
Now, the production domesticization of auto-parts has begun to crucial spare and accessory parts develop since common spare and accessory parts, from low End vehicle starts to develop to high-end vehicle.Think to most people in the industry all tendentiousness, as domestic automobile producer adds one after another The big production domesticization dynamics of local production, drops many times plus domestic automobile price, and to keep profit margin, China of changing the line of production goes forward side by side one It is clearly the shortcut that can not be detoured that step, which improves the localization rate of parts and components,.
Automobile using steel pipe is an important component of auto-parts, therefore applicant researches and develops be directed to researching and developing always The automobile using steel pipe of import can be substituted, fills up the breach of domestic the type product, to promote the domestic of Automobile Parts Industry Change process.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of manufacturer of vehicle transmission central siphon Method, using transmission shaft tube intensity height, the good toughness of this method processing, weld strength is high, after larger plastic deformation is born still Higher obdurability can be kept.
According to technical scheme provided by the invention:The manufacture method of vehicle transmission central siphon, it is characterised in that including following step Suddenly:
1), strip cut:By the wide coil of strip of outsourcing, slitting is into strip on slitter, according to needed for transmission shaft tube product Diameter determines the width of strip;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, strip is first sent into cold rinse bank after overpickling and uses high pressure water washing, is then re-fed into hot water storgae Scald, dried again after going out hot water storgae;
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling Required thickness subtracts 0.05 ~ 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle, Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 170 ~ 200KW, speed of welding For 14 ~ 18m/min, amount of compression is 1.5 ~ 2.0mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason, the ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, welded pipe end is rolled to required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 1 ~ 3 is carried out according to different technological requirements It is secondary, to obtain required size.
As a further improvement on the present invention, the step 1)In coil of strip material be boron steel.
As a further improvement on the present invention, the step 2)In, the concentration of hydrochloric acid is 120 ~ 160g/L in descaling bath;It is cold Flushing temperature in tank is 10 ~ 30 DEG C, and flushing pressure is 8 ~ 10kg/cm2;Temperature is scalded as 90 ~ 100 DEG C in hot water storgae; Strip is 30 ~ 40m/ minutes by the speed of descaling bath, the speed of cold rinse bank and hot water storgae and drying, and drying temperature is 100 ~ 120℃。
As a further improvement on the present invention, the step 6)In phosphating solution be volumetric concentration be 10 ~ 11% zinc calcium phosphorus Change liquid, the temperature of phosphating solution is 65 ~ 75 DEG C, and dip time of the ERW in phosphating solution is 25 ~ 30 minutes.
As a further improvement on the present invention, the step 6)In saponification liquor composition include lubricant, water and soap powder, its In, the mass ratio of lubricant and water is 1:(18~20), soap powder dosage is 50 ~ 60KG/ ton saponification liquors, and saponification liquor temperature is 65 ~ 75 DEG C, dip time of the ERW in saponification liquor is 10 ~ 25 minutes.
As a further improvement on the present invention, the manufacture method also includes surface treatment step, and surface treatment step exists After cold drawing treatment step, the concrete operations of surface treatment step are:Rust remover spraying is covered in the surface of ERW, so The surface of ERW is blown with high temperature compressed air afterwards, while rust remover is blown away, high temperature compressed air will The rust remover drying of ERW surface residual, one layer of rust remover diaphragm is formed on the surface of welded tube.
The present invention compared with prior art, has the following advantages that:The transmission shaft tube intensity height of manufacture method processing of the present invention, Good toughness, weld strength is high, and higher obdurability can be still kept after larger plastic deformation is born.Flattening test after steel pipe welding Reach 90 degree and the flat fusion line flawless of 0 degree of total head;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test time Number is more than 75000 times, meets power transmission shaft dynamic balancing index.
Embodiment
With reference to specific embodiment, the invention will be further described.
Embodiment 1
The vehicle transmission central siphon of Φ 76 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:According to the diameter needed for transmission shaft tube product, by thickness 3.5mm × width 1280mm of outsourcing Coil of strip on slitter slitting into width be 237mm strip;The material of the strip is boron steel, and its yield strength is 340- 480MPa, tensile strength 550-700MPa, elongation percentage are >=22%;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, the concentration of hydrochloric acid is 120g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing Wash, the flushing temperature in cold rinse bank is 10 DEG C, flushing pressure 10kg/cm2;Then it is re-fed into hot water storgae to scald, scalds temperature For 100 DEG C, dried again after going out hot water storgae, drying temperature is 100 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and heat The speed of tank and the speed of drying are 30m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling Required thickness subtracts 0.05mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle, Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 170KW, and speed of welding is 14m/min, amount of compression 1.5mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 10%, and the temperature of phosphating solution is 75 DEG C, and ERW exists Dip time in phosphating solution is 25 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication The mass ratio of agent and water is 1:18, soap powder dosage is 50KG/ ton saponification liquors, and saponification liquor temperature is 75 DEG C, and ERW is in saponification Dip time in liquid is 10 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with To required size;
8), surface treatment:Rust remover spraying is covered in the surface of ERW, then with high temperature compressed air to vertical masonry joint The surface of welded tube is blown, and while rust remover is blown away, high temperature compressed air is by the derusting of ERW surface residual Agent is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
9), verification test:After steel pipe welding prepared by embodiment 1 flattening test reach 90 degree and 0 degree of flat fusion line of total head without Crackle;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft and moves Balance index.
Embodiment 2
The vehicle transmission central siphon of Φ 76 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:According to the diameter needed for transmission shaft tube product, by thickness 3.5mm × width 1280mm of outsourcing Coil of strip on slitter slitting into width be 237mm strip;The material of the strip is boron steel, and its yield strength is 340- 480MPa, tensile strength 550-700MPa, elongation percentage are >=22%;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, the concentration of hydrochloric acid is 140g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing Wash, the flushing temperature in cold rinse bank is 20 DEG C, flushing pressure 9kg/cm2;Then it is re-fed into hot water storgae to scald, scalding temperature is 95 DEG C, dried again after going out hot water storgae, drying temperature is 110 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and hot water storgae Speed and drying speed be 35m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling Required thickness subtracts 0.08mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle, Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 185KW, and speed of welding is 16m/min, amount of compression 1.8mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 11%, and the temperature of phosphating solution is 70 DEG C, and ERW exists Dip time in phosphating solution is 28 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication The mass ratio of agent and water is 1:19, soap powder dosage is 55KG/ ton saponification liquors, and saponification liquor temperature is 70 DEG C, and ERW is in saponification Dip time in liquid is 20 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with To required size;
8), surface treatment:Rust remover spraying is covered in the surface of ERW, then with high temperature compressed air to vertical masonry joint The surface of welded tube is blown, and while rust remover is blown away, high temperature compressed air is by the derusting of ERW surface residual Agent is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
9), verification test:After steel pipe welding prepared by embodiment 2 flattening test reach 90 degree and 0 degree of flat fusion line of total head without Crackle;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft and moves Balance index.
Embodiment 3
The vehicle transmission central siphon of Φ 76 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:According to the diameter needed for transmission shaft tube product, by thickness 3.5mm × width 1280mm of outsourcing Coil of strip on slitter slitting into width be 237mm strip;The material of the strip is boron steel, and its yield strength is 340- 480MPa, tensile strength 550-700MPa, elongation percentage are >=22%;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, the concentration of hydrochloric acid is 160g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing Wash, the flushing temperature in cold rinse bank is 30 DEG C, flushing pressure 8kg/cm2;Then it is re-fed into hot water storgae to scald, scalding temperature is 90 DEG C, dried again after going out hot water storgae, drying temperature is 120 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and hot water storgae Speed and drying speed be 40m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling Required thickness subtracts 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle, Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 200KW, and speed of welding is 18m/min, amount of compression 2.0mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 11%, and the temperature of phosphating solution is 65 DEG C, and ERW exists Dip time in phosphating solution is 30 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication The mass ratio of agent and water is 1:20, soap powder dosage is 60KG/ ton saponification liquors, and saponification liquor temperature is 65 DEG C, and ERW is in saponification Dip time in liquid is 25 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with To required size;
8), surface treatment:Rust remover spraying is covered in the surface of ERW, then with high temperature compressed air to vertical masonry joint The surface of welded tube is blown, and while rust remover is blown away, high temperature compressed air is by the derusting of ERW surface residual Agent is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
9), verification test:After steel pipe welding prepared by embodiment 3 flattening test reach 90 degree and 0 degree of flat fusion line of total head without Crackle;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft and moves Balance index.
Zinc calcium phosphorization liquid used in the present invention can use commercially available conventional Zinc-calcium series phosphatating liquid, in the various embodiments described above Employed in for Jiangyin brocade it is grand chemical treatment Co., Ltd production zinc calcium phosphorization liquid.
Lubricant used in saponification liquor of the present invention can use commercially available conventional lubricant, in the various embodiments described above The used lubricant for the production of the factory of Shanghai chemical industry seven.

Claims (6)

1. the manufacture method of vehicle transmission central siphon, it is characterised in that comprise the following steps:
1), strip cut:By the wide coil of strip of outsourcing, slitting is into strip on slitter, according to the diameter needed for transmission shaft tube product Determine the width of strip;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, in descaling bath Pickle uses hydrochloric acid, and strip is first sent into cold rinse bank after overpickling and uses high pressure water washing, is then re-fed into hot water storgae and scalds, Dried again after going out hot water storgae;
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to needed for transmission shaft tube product after cold rolling Thickness subtract 0.05 ~ 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into continuous pressure roller forming machine and carries out roll bending into circle processing, Cheng Yuan Strip afterwards is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 170 ~ 200KW, speed of welding is 14 ~ 18m/min, amount of compression are 1.5 ~ 2.0mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially in distance High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be carried for welding process Supplied gas is protected, and reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile in vertical masonry joint When welded tube not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including remove welded tube outer surface outer burr and Burr inside welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, carries out phosphatization, saponification process, phosphorus Change, carry out dog in the ERW feeding head rolling machine after saponification, welded pipe end is rolled to required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the termination after pinching processing, together When mandrel is inserted in welded tube, then make welded tube pass through with tapered minimum-value aperture be less than welded tube external diameter die hole, make welded tube Inside and outside caliber uniform shrinkage is deformed, and is extended on welded tube length direction, and cold-drawn 1 ~ 3 time is carried out according to different technological requirements, To obtain required size.
2. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 1)In coil of strip material Matter is boron steel.
3. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 2)In, descaling bath The concentration of middle hydrochloric acid is 120 ~ 160g/L;Flushing temperature in cold rinse bank is 10 ~ 30 DEG C, and flushing pressure is 8 ~ 10kg/cm2;Heat Temperature is scalded as 90 ~ 100 DEG C in tank;Strip is equal by the speed of descaling bath, the speed of cold rinse bank and hot water storgae and drying For 30 ~ 40m/ minutes, drying temperature is 100 ~ 120 DEG C.
4. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 6)In phosphating solution It is the zinc calcium phosphorization liquid that volumetric concentration is 10 ~ 11%, the temperature of phosphating solution is 65 ~ 75 DEG C, dipping of the ERW in phosphating solution Time is 25 ~ 30 minutes.
5. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 6)In saponification liquor Composition includes lubricant, water and soap powder, wherein, the mass ratio of lubricant and water is 1:(18~20), soap powder dosage is 50 ~ 60KG/ Ton saponification liquor, saponification liquor temperature are 65 ~ 75 DEG C, and dip time of the ERW in saponification liquor is 10 ~ 25 minutes.
6. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The manufacture method also includes table Face processing step, after cold drawing treatment step, the concrete operations of surface treatment step are surface treatment step:Rust remover is sprayed Apply and be covered in the surface of ERW, then the surface of ERW is blown with high temperature compressed air, by rust remover While blowing away, high temperature compressed air dries the rust remover of ERW surface residual, and forming one layer on the surface of welded tube removes Become rusty agent diaphragm.
CN201610684722.2A 2016-08-18 2016-08-18 The manufacture method of vehicle transmission central siphon Active CN106216956B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610684722.2A CN106216956B (en) 2016-08-18 2016-08-18 The manufacture method of vehicle transmission central siphon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610684722.2A CN106216956B (en) 2016-08-18 2016-08-18 The manufacture method of vehicle transmission central siphon

Publications (2)

Publication Number Publication Date
CN106216956A CN106216956A (en) 2016-12-14
CN106216956B true CN106216956B (en) 2018-03-30

Family

ID=57553213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610684722.2A Active CN106216956B (en) 2016-08-18 2016-08-18 The manufacture method of vehicle transmission central siphon

Country Status (1)

Country Link
CN (1) CN106216956B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110524205A (en) * 2018-05-23 2019-12-03 上海航浩汽车零部件有限公司 Camshaft central siphon and its manufacturing method
CN109093334A (en) * 2018-10-09 2018-12-28 仪征常众汽车部件有限公司 A kind of high-strength vehicle transmission shaft tube ERW welding procedure
CN114682892A (en) * 2020-12-28 2022-07-01 无锡苏嘉法斯特汽车零配件有限公司 Manufacturing method of welded steel pipe for automobile transmission shaft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104077A (en) * 1987-06-03 1988-12-14 李振明 Cold drawing process of high frequency electric welding thin wall steel pipe
EP1001856A1 (en) * 1997-08-06 2000-05-24 SMS Demag AG METHOD FOR PRODUCING WELDED Cu AND Cu ALLOY PIPES
CN101130197A (en) * 2006-09-26 2008-02-27 李永立 Cold drawing and cold rolling production method of high-precision seamless steel tube
CN102764958A (en) * 2012-07-13 2012-11-07 江苏中友精密制管有限公司 Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe
CN103591118A (en) * 2013-11-19 2014-02-19 无锡苏嘉法斯特汽车零配件有限公司 Manufacturing technology of transmission shaft tube
CN103894798A (en) * 2014-03-31 2014-07-02 张家港保税区亚信汽车零部件科技有限公司 Manufacturing method of precisely-welded pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104077A (en) * 1987-06-03 1988-12-14 李振明 Cold drawing process of high frequency electric welding thin wall steel pipe
EP1001856A1 (en) * 1997-08-06 2000-05-24 SMS Demag AG METHOD FOR PRODUCING WELDED Cu AND Cu ALLOY PIPES
CN101130197A (en) * 2006-09-26 2008-02-27 李永立 Cold drawing and cold rolling production method of high-precision seamless steel tube
CN102764958A (en) * 2012-07-13 2012-11-07 江苏中友精密制管有限公司 Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe
CN103591118A (en) * 2013-11-19 2014-02-19 无锡苏嘉法斯特汽车零配件有限公司 Manufacturing technology of transmission shaft tube
CN103894798A (en) * 2014-03-31 2014-07-02 张家港保税区亚信汽车零部件科技有限公司 Manufacturing method of precisely-welded pipe

Also Published As

Publication number Publication date
CN106216956A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106216957B (en) The manufacture method of torsion beam of automobile welded still pipe
CN102527767B (en) Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN103591118B (en) The manufacturing process of transmission shaft tube
CN107052076A (en) A kind of method of chuck plug hot rolling heavy caliber titanium or titanium alloy thin-wall seamless pipe
CN102873098B (en) Manufacturing method for ultrathin-wall titanium tubing
CN106216956B (en) The manufacture method of vehicle transmission central siphon
CN104551667A (en) Cold-rolled high-hardness seamless steel pipe manufacturing method
CN104551669A (en) Production method of cold-drawn high-precision seamless steel tube
CN104325262B (en) The automobile absorber processing method of pipe with small pipe diameter thick-walled pipe
CN104338779A (en) A method for manufacturing a high-precision cold-drawn steel pipe
CN105363825A (en) Manufacturing method of cold-drawn high-precision cylinder barrel pipe
CN107159801A (en) A kind of pipeline engineering is with large-caliber thin-walled gapless stainless steel tube production technology
CN106216959B (en) The manufacture method of automobile frame welded still pipe
CN104759834A (en) Hot-rolled high-strength oil pipe manufacturing method
CN106181261B (en) The manufacture method of thin-wall high intensity frame tube
CN104759832A (en) Manufacturing method of hot-rolled high-collapse-resistance petroleum pipe
CN105364412A (en) Manufacturing method of cold-drawn high-strength fine-boring rolled pipe
CN108421842A (en) The processing method of hexagonal alloy seamless steel pipe in outer circle
CN107142473A (en) A kind of phosphating solution and the method and phosphating plant that the online phosphatization of steel wire is carried out using the phosphating solution
CN106216955B (en) special steel transmission shaft tube manufacturing process
CN104759835A (en) Manufacturing method of hot-rolled high-precision petroleum pipe
CN105033584B (en) A kind of heat-resistance stainless steel method of manufacturing seamless steel pipe
CN115254968A (en) A kind of manufacturing process of 316L seamless stainless steel pipe
CN106269980B (en) A kind of preparation process of seamless steel pipe
CN102728652A (en) Manufacturing method of dual-metal seamless steel pipe with outer-layer low-carbon steel and inner-layer bearing steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant