CN106216956B - The manufacture method of vehicle transmission central siphon - Google Patents
The manufacture method of vehicle transmission central siphon Download PDFInfo
- Publication number
- CN106216956B CN106216956B CN201610684722.2A CN201610684722A CN106216956B CN 106216956 B CN106216956 B CN 106216956B CN 201610684722 A CN201610684722 A CN 201610684722A CN 106216956 B CN106216956 B CN 106216956B
- Authority
- CN
- China
- Prior art keywords
- strip
- erw
- welding
- cold
- manufacture method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 47
- 230000005540 biological transmission Effects 0.000 title claims abstract description 34
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 24
- 238000003466 welding Methods 0.000 claims abstract description 57
- 238000007127 saponification reaction Methods 0.000 claims abstract description 45
- 230000008569 process Effects 0.000 claims abstract description 29
- 238000005097 cold rolling Methods 0.000 claims abstract description 21
- 238000012545 processing Methods 0.000 claims abstract description 18
- 238000005554 pickling Methods 0.000 claims abstract description 11
- 238000013000 roll bending Methods 0.000 claims abstract description 11
- 238000005096 rolling process Methods 0.000 claims abstract description 10
- 238000010622 cold drawing Methods 0.000 claims abstract description 8
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 38
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims description 30
- VEXZGXHMUGYJMC-UHFFFAOYSA-N Hydrochloric acid Chemical compound Cl VEXZGXHMUGYJMC-UHFFFAOYSA-N 0.000 claims description 20
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 claims description 16
- 229910052757 nitrogen Inorganic materials 0.000 claims description 15
- 238000011010 flushing procedure Methods 0.000 claims description 13
- 238000001035 drying Methods 0.000 claims description 11
- 239000007788 liquid Substances 0.000 claims description 11
- 239000000314 lubricant Substances 0.000 claims description 10
- 239000000843 powder Substances 0.000 claims description 10
- 239000000344 soap Substances 0.000 claims description 10
- 238000004381 surface treatment Methods 0.000 claims description 8
- IHBCFWWEZXPPLG-UHFFFAOYSA-N [Ca].[Zn] Chemical compound [Ca].[Zn] IHBCFWWEZXPPLG-UHFFFAOYSA-N 0.000 claims description 7
- 239000003795 chemical substances by application Substances 0.000 claims description 7
- 206010053615 Thermal burn Diseases 0.000 claims description 6
- 229910000712 Boron steel Inorganic materials 0.000 claims description 5
- 230000006835 compression Effects 0.000 claims description 5
- 238000007906 compression Methods 0.000 claims description 5
- 230000007717 exclusion Effects 0.000 claims description 5
- 239000007789 gas Substances 0.000 claims description 5
- 238000003622 knife milling Methods 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 5
- 238000003801 milling Methods 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 5
- 238000012946 outsourcing Methods 0.000 claims description 5
- 235000021110 pickles Nutrition 0.000 claims description 5
- 239000002893 slag Substances 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 3
- 238000005406 washing Methods 0.000 claims description 2
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 claims 1
- 238000007664 blowing Methods 0.000 claims 1
- 238000007598 dipping method Methods 0.000 claims 1
- 229910052698 phosphorus Inorganic materials 0.000 claims 1
- 239000011574 phosphorus Substances 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 abstract description 17
- 239000010959 steel Substances 0.000 abstract description 17
- 238000012360 testing method Methods 0.000 abstract description 8
- 238000009661 fatigue test Methods 0.000 abstract description 5
- 230000004927 fusion Effects 0.000 abstract description 5
- 239000007769 metal material Substances 0.000 abstract description 2
- 238000005520 cutting process Methods 0.000 abstract 1
- 230000006872 improvement Effects 0.000 description 5
- 238000005507 spraying Methods 0.000 description 4
- 208000037656 Respiratory Sounds Diseases 0.000 description 3
- 238000005461 lubrication Methods 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000004807 localization Effects 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- YOTAZFFJSGIRTR-UHFFFAOYSA-N [Zn].[P].[Ca] Chemical compound [Zn].[P].[Ca] YOTAZFFJSGIRTR-UHFFFAOYSA-N 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Extraction Processes (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Abstract
The present invention relates to a kind of manufacture method of vehicle transmission central siphon, belong to metal material processing technical field.A kind of manufacture method of vehicle transmission central siphon, it is characterised in that including the step such as strip cutting, pickling processes, cold rolling, roll bending formation and welding, the processing of weld seam sublimate, phosphatization, saponification process and cold drawing treatment.Transmission shaft tube intensity height, the good toughness of manufacture method processing of the present invention, weld strength is high, and higher obdurability can be still kept after larger plastic deformation is born.Flattening test reaches 90 degree and the flat fusion line flawless of 0 degree of total head after steel pipe welding;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft dynamic balancing index.
Description
Technical field
The present invention relates to a kind of manufacture method of vehicle transmission central siphon, belong to metal material processing technical field.
Background technology
Since reform and opening-up, Chinese Auto Industry development is swift and violent, into after the new century, either yield and sales volume, more
It is that explosive growth is presented, after particularly breaking through 18,000,000 to production and marketing in 2010, China has become the vapour of global maximum
Car production and consumption state, the automobile market in China is considered as future development market with the largest potentiality.Automobile industry turns into its people
Economic important pillar industry, form than more complete industrial system, also turned into and embody the significant of national competitiveness
Industry.
Most domestic car enterprise is continuously improving the localization rate of parts and components of auto-parts, is improving the competition of oneself always at present
Power.Although the level of most domestic auto parts and components supplier, it can not still supply the key zero of the high automobile such as benz, BMW
Part and the engine and gearbox for obscuring energy technology, but generally skill level greatly improves, and one not
Holding the trend ignored is, key parts technical ability has progressively shifted to China with market, and at the same time, Chinese automobile parts are
Start to enter into international market on a large scale, and the merger for enthusiastically participating in international automobile fitting industry is integrated.
Now, the production domesticization of auto-parts has begun to crucial spare and accessory parts develop since common spare and accessory parts, from low
End vehicle starts to develop to high-end vehicle.Think to most people in the industry all tendentiousness, as domestic automobile producer adds one after another
The big production domesticization dynamics of local production, drops many times plus domestic automobile price, and to keep profit margin, China of changing the line of production goes forward side by side one
It is clearly the shortcut that can not be detoured that step, which improves the localization rate of parts and components,.
Automobile using steel pipe is an important component of auto-parts, therefore applicant researches and develops be directed to researching and developing always
The automobile using steel pipe of import can be substituted, fills up the breach of domestic the type product, to promote the domestic of Automobile Parts Industry
Change process.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of manufacturer of vehicle transmission central siphon
Method, using transmission shaft tube intensity height, the good toughness of this method processing, weld strength is high, after larger plastic deformation is born still
Higher obdurability can be kept.
According to technical scheme provided by the invention:The manufacture method of vehicle transmission central siphon, it is characterised in that including following step
Suddenly:
1), strip cut:By the wide coil of strip of outsourcing, slitting is into strip on slitter, according to needed for transmission shaft tube product
Diameter determines the width of strip;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath
In pickle use hydrochloric acid, strip is first sent into cold rinse bank after overpickling and uses high pressure water washing, is then re-fed into hot water storgae
Scald, dried again after going out hot water storgae;
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling
Required thickness subtracts 0.05 ~ 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle,
Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 170 ~ 200KW, speed of welding
For 14 ~ 18m/min, amount of compression is 1.5 ~ 2.0mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed
High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld
Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile
When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed
Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification
Reason, the ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, welded pipe end is rolled to required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing
Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make
Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 1 ~ 3 is carried out according to different technological requirements
It is secondary, to obtain required size.
As a further improvement on the present invention, the step 1)In coil of strip material be boron steel.
As a further improvement on the present invention, the step 2)In, the concentration of hydrochloric acid is 120 ~ 160g/L in descaling bath;It is cold
Flushing temperature in tank is 10 ~ 30 DEG C, and flushing pressure is 8 ~ 10kg/cm2;Temperature is scalded as 90 ~ 100 DEG C in hot water storgae;
Strip is 30 ~ 40m/ minutes by the speed of descaling bath, the speed of cold rinse bank and hot water storgae and drying, and drying temperature is 100 ~
120℃。
As a further improvement on the present invention, the step 6)In phosphating solution be volumetric concentration be 10 ~ 11% zinc calcium phosphorus
Change liquid, the temperature of phosphating solution is 65 ~ 75 DEG C, and dip time of the ERW in phosphating solution is 25 ~ 30 minutes.
As a further improvement on the present invention, the step 6)In saponification liquor composition include lubricant, water and soap powder, its
In, the mass ratio of lubricant and water is 1:(18~20), soap powder dosage is 50 ~ 60KG/ ton saponification liquors, and saponification liquor temperature is 65 ~ 75
DEG C, dip time of the ERW in saponification liquor is 10 ~ 25 minutes.
As a further improvement on the present invention, the manufacture method also includes surface treatment step, and surface treatment step exists
After cold drawing treatment step, the concrete operations of surface treatment step are:Rust remover spraying is covered in the surface of ERW, so
The surface of ERW is blown with high temperature compressed air afterwards, while rust remover is blown away, high temperature compressed air will
The rust remover drying of ERW surface residual, one layer of rust remover diaphragm is formed on the surface of welded tube.
The present invention compared with prior art, has the following advantages that:The transmission shaft tube intensity height of manufacture method processing of the present invention,
Good toughness, weld strength is high, and higher obdurability can be still kept after larger plastic deformation is born.Flattening test after steel pipe welding
Reach 90 degree and the flat fusion line flawless of 0 degree of total head;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test time
Number is more than 75000 times, meets power transmission shaft dynamic balancing index.
Embodiment
With reference to specific embodiment, the invention will be further described.
Embodiment 1
The vehicle transmission central siphon of Φ 76 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:According to the diameter needed for transmission shaft tube product, by thickness 3.5mm × width 1280mm of outsourcing
Coil of strip on slitter slitting into width be 237mm strip;The material of the strip is boron steel, and its yield strength is 340-
480MPa, tensile strength 550-700MPa, elongation percentage are >=22%;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath
In pickle use hydrochloric acid, the concentration of hydrochloric acid is 120g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing
Wash, the flushing temperature in cold rinse bank is 10 DEG C, flushing pressure 10kg/cm2;Then it is re-fed into hot water storgae to scald, scalds temperature
For 100 DEG C, dried again after going out hot water storgae, drying temperature is 100 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and heat
The speed of tank and the speed of drying are 30m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling
Required thickness subtracts 0.05mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle,
Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 170KW, and speed of welding is
14m/min, amount of compression 1.5mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed
High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld
Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile
When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed
Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification
Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 10%, and the temperature of phosphating solution is 75 DEG C, and ERW exists
Dip time in phosphating solution is 25 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication
The mass ratio of agent and water is 1:18, soap powder dosage is 50KG/ ton saponification liquors, and saponification liquor temperature is 75 DEG C, and ERW is in saponification
Dip time in liquid is 10 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight
Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing
Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make
Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with
To required size;
8), surface treatment:Rust remover spraying is covered in the surface of ERW, then with high temperature compressed air to vertical masonry joint
The surface of welded tube is blown, and while rust remover is blown away, high temperature compressed air is by the derusting of ERW surface residual
Agent is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
9), verification test:After steel pipe welding prepared by embodiment 1 flattening test reach 90 degree and 0 degree of flat fusion line of total head without
Crackle;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft and moves
Balance index.
Embodiment 2
The vehicle transmission central siphon of Φ 76 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:According to the diameter needed for transmission shaft tube product, by thickness 3.5mm × width 1280mm of outsourcing
Coil of strip on slitter slitting into width be 237mm strip;The material of the strip is boron steel, and its yield strength is 340-
480MPa, tensile strength 550-700MPa, elongation percentage are >=22%;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath
In pickle use hydrochloric acid, the concentration of hydrochloric acid is 140g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing
Wash, the flushing temperature in cold rinse bank is 20 DEG C, flushing pressure 9kg/cm2;Then it is re-fed into hot water storgae to scald, scalding temperature is
95 DEG C, dried again after going out hot water storgae, drying temperature is 110 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and hot water storgae
Speed and drying speed be 35m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling
Required thickness subtracts 0.08mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle,
Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 185KW, and speed of welding is
16m/min, amount of compression 1.8mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed
High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld
Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile
When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed
Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification
Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 11%, and the temperature of phosphating solution is 70 DEG C, and ERW exists
Dip time in phosphating solution is 28 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication
The mass ratio of agent and water is 1:19, soap powder dosage is 55KG/ ton saponification liquors, and saponification liquor temperature is 70 DEG C, and ERW is in saponification
Dip time in liquid is 20 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight
Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing
Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make
Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with
To required size;
8), surface treatment:Rust remover spraying is covered in the surface of ERW, then with high temperature compressed air to vertical masonry joint
The surface of welded tube is blown, and while rust remover is blown away, high temperature compressed air is by the derusting of ERW surface residual
Agent is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
9), verification test:After steel pipe welding prepared by embodiment 2 flattening test reach 90 degree and 0 degree of flat fusion line of total head without
Crackle;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft and moves
Balance index.
Embodiment 3
The vehicle transmission central siphon of Φ 76 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:According to the diameter needed for transmission shaft tube product, by thickness 3.5mm × width 1280mm of outsourcing
Coil of strip on slitter slitting into width be 237mm strip;The material of the strip is boron steel, and its yield strength is 340-
480MPa, tensile strength 550-700MPa, elongation percentage are >=22%;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath
In pickle use hydrochloric acid, the concentration of hydrochloric acid is 160g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing
Wash, the flushing temperature in cold rinse bank is 30 DEG C, flushing pressure 8kg/cm2;Then it is re-fed into hot water storgae to scald, scalding temperature is
90 DEG C, dried again after going out hot water storgae, drying temperature is 120 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and hot water storgae
Speed and drying speed be 40m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to transmission shaft tube product after cold rolling
Required thickness subtracts 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into progress roll bending in continuous pressure roller forming machine to process into circle,
Cheng Yuanhou strip is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 200KW, and speed of welding is
18m/min, amount of compression 2.0mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed
High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld
Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile
When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed
Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification
Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 11%, and the temperature of phosphating solution is 65 DEG C, and ERW exists
Dip time in phosphating solution is 30 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication
The mass ratio of agent and water is 1:20, soap powder dosage is 60KG/ ton saponification liquors, and saponification liquor temperature is 65 DEG C, and ERW is in saponification
Dip time in liquid is 25 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight
Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing
Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make
Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with
To required size;
8), surface treatment:Rust remover spraying is covered in the surface of ERW, then with high temperature compressed air to vertical masonry joint
The surface of welded tube is blown, and while rust remover is blown away, high temperature compressed air is by the derusting of ERW surface residual
Agent is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
9), verification test:After steel pipe welding prepared by embodiment 3 flattening test reach 90 degree and 0 degree of flat fusion line of total head without
Crackle;After realizing steel pipe finish rolling, necking deformation rate 1.86%, steel pipe fatigue test number is more than 75000 times, meets power transmission shaft and moves
Balance index.
Zinc calcium phosphorization liquid used in the present invention can use commercially available conventional Zinc-calcium series phosphatating liquid, in the various embodiments described above
Employed in for Jiangyin brocade it is grand chemical treatment Co., Ltd production zinc calcium phosphorization liquid.
Lubricant used in saponification liquor of the present invention can use commercially available conventional lubricant, in the various embodiments described above
The used lubricant for the production of the factory of Shanghai chemical industry seven.
Claims (6)
1. the manufacture method of vehicle transmission central siphon, it is characterised in that comprise the following steps:
1), strip cut:By the wide coil of strip of outsourcing, slitting is into strip on slitter, according to the diameter needed for transmission shaft tube product
Determine the width of strip;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, in descaling bath
Pickle uses hydrochloric acid, and strip is first sent into cold rinse bank after overpickling and uses high pressure water washing, is then re-fed into hot water storgae and scalds,
Dried again after going out hot water storgae;
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to needed for transmission shaft tube product after cold rolling
Thickness subtract 0.05 ~ 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into continuous pressure roller forming machine and carries out roll bending into circle processing, Cheng Yuan
Strip afterwards is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 170 ~ 200KW, speed of welding is 14 ~
18m/min, amount of compression are 1.5 ~ 2.0mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially in distance
High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be carried for welding process
Supplied gas is protected, and reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile in vertical masonry joint
When welded tube not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including remove welded tube outer surface outer burr and
Burr inside welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, carries out phosphatization, saponification process, phosphorus
Change, carry out dog in the ERW feeding head rolling machine after saponification, welded pipe end is rolled to required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the termination after pinching processing, together
When mandrel is inserted in welded tube, then make welded tube pass through with tapered minimum-value aperture be less than welded tube external diameter die hole, make welded tube
Inside and outside caliber uniform shrinkage is deformed, and is extended on welded tube length direction, and cold-drawn 1 ~ 3 time is carried out according to different technological requirements,
To obtain required size.
2. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 1)In coil of strip material
Matter is boron steel.
3. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 2)In, descaling bath
The concentration of middle hydrochloric acid is 120 ~ 160g/L;Flushing temperature in cold rinse bank is 10 ~ 30 DEG C, and flushing pressure is 8 ~ 10kg/cm2;Heat
Temperature is scalded as 90 ~ 100 DEG C in tank;Strip is equal by the speed of descaling bath, the speed of cold rinse bank and hot water storgae and drying
For 30 ~ 40m/ minutes, drying temperature is 100 ~ 120 DEG C.
4. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 6)In phosphating solution
It is the zinc calcium phosphorization liquid that volumetric concentration is 10 ~ 11%, the temperature of phosphating solution is 65 ~ 75 DEG C, dipping of the ERW in phosphating solution
Time is 25 ~ 30 minutes.
5. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The step 6)In saponification liquor
Composition includes lubricant, water and soap powder, wherein, the mass ratio of lubricant and water is 1:(18~20), soap powder dosage is 50 ~ 60KG/
Ton saponification liquor, saponification liquor temperature are 65 ~ 75 DEG C, and dip time of the ERW in saponification liquor is 10 ~ 25 minutes.
6. the manufacture method of vehicle transmission central siphon as claimed in claim 1, it is characterised in that:The manufacture method also includes table
Face processing step, after cold drawing treatment step, the concrete operations of surface treatment step are surface treatment step:Rust remover is sprayed
Apply and be covered in the surface of ERW, then the surface of ERW is blown with high temperature compressed air, by rust remover
While blowing away, high temperature compressed air dries the rust remover of ERW surface residual, and forming one layer on the surface of welded tube removes
Become rusty agent diaphragm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610684722.2A CN106216956B (en) | 2016-08-18 | 2016-08-18 | The manufacture method of vehicle transmission central siphon |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610684722.2A CN106216956B (en) | 2016-08-18 | 2016-08-18 | The manufacture method of vehicle transmission central siphon |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106216956A CN106216956A (en) | 2016-12-14 |
| CN106216956B true CN106216956B (en) | 2018-03-30 |
Family
ID=57553213
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610684722.2A Active CN106216956B (en) | 2016-08-18 | 2016-08-18 | The manufacture method of vehicle transmission central siphon |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106216956B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110524205A (en) * | 2018-05-23 | 2019-12-03 | 上海航浩汽车零部件有限公司 | Camshaft central siphon and its manufacturing method |
| CN109093334A (en) * | 2018-10-09 | 2018-12-28 | 仪征常众汽车部件有限公司 | A kind of high-strength vehicle transmission shaft tube ERW welding procedure |
| CN114682892A (en) * | 2020-12-28 | 2022-07-01 | 无锡苏嘉法斯特汽车零配件有限公司 | Manufacturing method of welded steel pipe for automobile transmission shaft |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN87104077A (en) * | 1987-06-03 | 1988-12-14 | 李振明 | Cold drawing process of high frequency electric welding thin wall steel pipe |
| EP1001856A1 (en) * | 1997-08-06 | 2000-05-24 | SMS Demag AG | METHOD FOR PRODUCING WELDED Cu AND Cu ALLOY PIPES |
| CN101130197A (en) * | 2006-09-26 | 2008-02-27 | 李永立 | Cold drawing and cold rolling production method of high-precision seamless steel tube |
| CN102764958A (en) * | 2012-07-13 | 2012-11-07 | 江苏中友精密制管有限公司 | Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe |
| CN103591118A (en) * | 2013-11-19 | 2014-02-19 | 无锡苏嘉法斯特汽车零配件有限公司 | Manufacturing technology of transmission shaft tube |
| CN103894798A (en) * | 2014-03-31 | 2014-07-02 | 张家港保税区亚信汽车零部件科技有限公司 | Manufacturing method of precisely-welded pipe |
-
2016
- 2016-08-18 CN CN201610684722.2A patent/CN106216956B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN87104077A (en) * | 1987-06-03 | 1988-12-14 | 李振明 | Cold drawing process of high frequency electric welding thin wall steel pipe |
| EP1001856A1 (en) * | 1997-08-06 | 2000-05-24 | SMS Demag AG | METHOD FOR PRODUCING WELDED Cu AND Cu ALLOY PIPES |
| CN101130197A (en) * | 2006-09-26 | 2008-02-27 | 李永立 | Cold drawing and cold rolling production method of high-precision seamless steel tube |
| CN102764958A (en) * | 2012-07-13 | 2012-11-07 | 江苏中友精密制管有限公司 | Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe |
| CN103591118A (en) * | 2013-11-19 | 2014-02-19 | 无锡苏嘉法斯特汽车零配件有限公司 | Manufacturing technology of transmission shaft tube |
| CN103894798A (en) * | 2014-03-31 | 2014-07-02 | 张家港保税区亚信汽车零部件科技有限公司 | Manufacturing method of precisely-welded pipe |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106216956A (en) | 2016-12-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106216957B (en) | The manufacture method of torsion beam of automobile welded still pipe | |
| CN102527767B (en) | Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder | |
| CN103591118B (en) | The manufacturing process of transmission shaft tube | |
| CN107052076A (en) | A kind of method of chuck plug hot rolling heavy caliber titanium or titanium alloy thin-wall seamless pipe | |
| CN102873098B (en) | Manufacturing method for ultrathin-wall titanium tubing | |
| CN106216956B (en) | The manufacture method of vehicle transmission central siphon | |
| CN104551667A (en) | Cold-rolled high-hardness seamless steel pipe manufacturing method | |
| CN104551669A (en) | Production method of cold-drawn high-precision seamless steel tube | |
| CN104325262B (en) | The automobile absorber processing method of pipe with small pipe diameter thick-walled pipe | |
| CN104338779A (en) | A method for manufacturing a high-precision cold-drawn steel pipe | |
| CN105363825A (en) | Manufacturing method of cold-drawn high-precision cylinder barrel pipe | |
| CN107159801A (en) | A kind of pipeline engineering is with large-caliber thin-walled gapless stainless steel tube production technology | |
| CN106216959B (en) | The manufacture method of automobile frame welded still pipe | |
| CN104759834A (en) | Hot-rolled high-strength oil pipe manufacturing method | |
| CN106181261B (en) | The manufacture method of thin-wall high intensity frame tube | |
| CN104759832A (en) | Manufacturing method of hot-rolled high-collapse-resistance petroleum pipe | |
| CN105364412A (en) | Manufacturing method of cold-drawn high-strength fine-boring rolled pipe | |
| CN108421842A (en) | The processing method of hexagonal alloy seamless steel pipe in outer circle | |
| CN107142473A (en) | A kind of phosphating solution and the method and phosphating plant that the online phosphatization of steel wire is carried out using the phosphating solution | |
| CN106216955B (en) | special steel transmission shaft tube manufacturing process | |
| CN104759835A (en) | Manufacturing method of hot-rolled high-precision petroleum pipe | |
| CN105033584B (en) | A kind of heat-resistance stainless steel method of manufacturing seamless steel pipe | |
| CN115254968A (en) | A kind of manufacturing process of 316L seamless stainless steel pipe | |
| CN106269980B (en) | A kind of preparation process of seamless steel pipe | |
| CN102728652A (en) | Manufacturing method of dual-metal seamless steel pipe with outer-layer low-carbon steel and inner-layer bearing steel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |