CN106169160A - A kind of electricity abnormity diagnosis based on critical point power system and electricity complementing method - Google Patents
A kind of electricity abnormity diagnosis based on critical point power system and electricity complementing method Download PDFInfo
- Publication number
- CN106169160A CN106169160A CN201610381255.6A CN201610381255A CN106169160A CN 106169160 A CN106169160 A CN 106169160A CN 201610381255 A CN201610381255 A CN 201610381255A CN 106169160 A CN106169160 A CN 106169160A
- Authority
- CN
- China
- Prior art keywords
- month
- ins
- outs
- electricity
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
技术领域technical field
本发明电量数据监测技术领域,涉及一种基于关口电量系统的电量异常诊断及电量补全方法。The technical field of power data monitoring of the present invention relates to a power abnormality diagnosis and power supplement method based on a gateway power system.
背景技术Background technique
关口系统为各项关口电量指标数据的计算、监控和管理提供了平台,实现网损率、购供售电量、母平、变损、线路线损、站用电等多种数据的统计与分析及现场设备实时在线监测,可为优化电网结构、提高线损精益化管理水平提供了数据基础和分析手段。但目前关口系统应用的过程中,由于采集失败、换表、底码突变等问题造成了部分关口数据异常,影响了数据质量及进一步深化应用。The gateway system provides a platform for the calculation, monitoring and management of various gateway power index data, and realizes the statistics and analysis of various data such as network loss rate, purchase, supply and sale of electricity, bus level, variable loss, line line loss, and station power consumption. And real-time online monitoring of field equipment can provide a data basis and analysis means for optimizing the power grid structure and improving the lean management level of line loss. However, in the current application process of the gateway system, due to problems such as collection failure, table change, and base code mutation, some of the gateway data are abnormal, which affects the data quality and further deepens the application.
发明内容Contents of the invention
本发明所要解决的技术问题是提供一种能够对异常类型进行自动电量补全、实现电量数据的自动补全的基于关口电量系统的电量异常诊断及电量补全方法。The technical problem to be solved by the present invention is to provide a power abnormality diagnosis and power supplement method based on the gateway power system, which can automatically complete the abnormal type and realize the automatic completion of power data.
为解决上述技术问题所采用的技术方案是:一种基于关口电量系统的电量异常诊断及电量补全方法,其方法如下:根据关口电量系统的电量数据与电网结构、电流潮流、历史电量之间的逻辑关系进行电量异常诊断,根据异常类型进行自动电量补全,实现电量数据的自动补全;在数据库内组建了各项数据的存储表;The technical solution adopted to solve the above-mentioned technical problems is: a power abnormality diagnosis and power supply method based on the gateway power system. Diagnose power abnormality according to the logical relationship, and perform automatic power completion according to the abnormal type, so as to realize automatic power data completion; set up a storage table for various data in the database;
(1)如出现底码数据为0或空值采集异常情况,将该异常数据剔除,用三天之内的正常数据进行替代;(1) If the bottom code data is 0 or the abnormal collection of empty values occurs, the abnormal data will be eliminated and replaced with normal data within three days;
(2)如果正有止码小于正有起码或反有止码小于反有起码且正有止码大于反有起码或反有止码大于正有起码,判定正反电量交互,交换起码正反底码后重新计算;(2) If the positive and stop code is less than the positive and negative minimum or the negative and negative minimum is less than the negative minimum and the positive and positive stop is greater than the negative minimum or the reverse and negative minimum is greater than the positive and negative power interaction, exchange the minimum positive and negative Recalculate after bottom code;
(3)统计月末及月初底码值,当出现正反向月末底码值小于月初底码值的情况判定为换表,防止出现异常电量,按下面公式进行计算,进行电量补全;(3) Count the end-of-month and the end-of-month code values. When the positive and negative end-of-month code values are smaller than the beginning-of-month code values, it is determined to change the meter to prevent abnormal power. Calculate according to the following formula to complete the power supply;
当月电量=(月中最大值-月初底码值+月末底码值-月中最小值)*倍率Electricity of the current month = (maximum value in the middle of the month - code value at the end of the month + code value at the end of the month - minimum value in the middle of the month) * magnification
(4)当出现(本月末底码值-本月初底码值)>3*(上月末底码值-上月初底码值)且(本月末底码值-本月初底码值)>3*(前2月末底码值-前2月初底码值)时,判定底码突变,采用三天之内的正常数据进行替代。(4) When (the end of this month's code value - this month's bottom code value)>3*(the last month's end code value-the previous month's code value) and (the current month's end code value-the current month's code value)>3 *(Base code value at the end of the previous 2 months-Base code value at the beginning of the previous February), it is determined that the bottom code has changed suddenly, and the normal data within three days is used to replace it.
本发明的有益效果是:本发明可有效提高采集数据质量,提升数据可用率,网损率、购供售电量、母平、变损、线路线损、站用电等多种数据可用率,使系统在提高管理效率和经营效益中发挥更大的作用。The beneficial effects of the present invention are: the present invention can effectively improve the quality of collected data, improve data availability, network loss rate, purchase, supply and sale of electricity, bus level, variable loss, line line loss, station power consumption and other data availability, Make the system play a greater role in improving management efficiency and operating benefits.
附图说明Description of drawings
图1为关口系统数据结构及采集要素关系。Figure 1 shows the data structure of the gateway system and the relationship between the collection elements.
图2为电量异常诊断及电量补全方法流程图。FIG. 2 is a flow chart of a method for diagnosing abnormal electricity and replenishing electricity.
具体实施方式detailed description
下面根据附图1-2和实施例对本发明作进一步说明。The present invention will be further described below according to accompanying drawings 1-2 and embodiments.
本发明方法如下:根据关口电量系统的电量数据与电网结构、电流潮流、历史电量之间的逻辑关系进行电量异常诊断,根据异常类型进行自动电量补全,实现电量数据的自动补全;在数据库内组建了各项数据的存储表;The method of the present invention is as follows: according to the logical relationship between the power data of the gateway power system and the grid structure, the current flow, and the historical power, the power abnormality diagnosis is performed, and the automatic power completion is performed according to the abnormal type, so as to realize the automatic completion of the power data; in the database The storage table of various data is built in the internal;
(1)如出现底码数据为0或空值采集异常情况,将该异常数据剔除,用三天之内的正常数据进行替代;(1) If the bottom code data is 0 or the abnormal collection of empty values occurs, the abnormal data will be eliminated and replaced with normal data within three days;
(2)如果正有止码小于正有起码或反有止码小于反有起码且正有止码大于反有起码或反有止码大于正有起码,判定正反电量交互,交换起码正反底码后重新计算;(2) If the positive and stop code is less than the positive and negative minimum or the negative and negative minimum is less than the negative minimum and the positive and positive stop is greater than the negative minimum or the reverse and negative minimum is greater than the positive and negative power interaction, exchange the minimum positive and negative Recalculate after bottom code;
(3)统计月末及月初底码值,当出现正反向月末底码值小于月初底码值的情况判定为换表,防止出现异常电量,按下面公式进行计算,进行电量补全;(3) Count the end-of-month and the end-of-month code values. When the positive and negative end-of-month code values are smaller than the beginning-of-month code values, it is determined to change the meter to prevent abnormal power. Calculate according to the following formula to complete the power supply;
当月电量=(月中最大值-月初底码值+月末底码值-月中最小值)*倍率Electricity of the current month = (maximum value in the middle of the month - code value at the end of the month + code value at the end of the month - minimum value in the middle of the month) * magnification
(4)当出现(本月末底码值-本月初底码值)>3*(上月末底码值-上月初底码值)且(本月末底码值-本月初底码值)>3*(前2月末底码值-前2月初底码值)时,判定底码突变,采用三天之内的正常数据进行替代。(4) When (the end of this month's code value - this month's bottom code value)>3*(the last month's end code value-the previous month's code value) and (the current month's end code value-the current month's code value)>3 *(Base code value at the end of the previous 2 months-Base code value at the beginning of the previous February), it is determined that the bottom code has changed suddenly, and the normal data within three days is used to replace it.
本发明是基于关口电量系统,通过分析系统电量数据与电网结构、电流潮流、历史电量之间的逻辑关系进行电量异常诊断,根据异常类型进行自动电量补全,实现电量数据的自动补全。如图1所示。The present invention is based on the gateway electric quantity system, by analyzing the logical relationship between the electric quantity data of the system and the grid structure, the current flow, and the historical electric quantity, the electric quantity abnormality diagnosis is carried out, and the electric quantity is automatically supplemented according to the abnormal type, so as to realize the automatic completion of the electric quantity data. As shown in Figure 1.
在数据库内组建了各项数据的存储表,各表对应关系可反映电网结构的逻辑关系,通过图中所示的字段进行对应(图中字段皆为下级表的字段,对应上级表的主键,如电表表的DEV_ID字段,其中部分数据与绕组表的tw_id字段数据对应,另一部分数据与线端表的acln_dot_id字段数据对应)。组建概念清晰、符合实际的数据结构后即可以此为基础进行各项数据之间的逻辑判断。The storage tables of various data are set up in the database, and the corresponding relationship between each table can reflect the logical relationship of the power grid structure, and the fields shown in the figure are used for correspondence (the fields in the figure are all fields of the lower-level table, corresponding to the primary key of the upper-level table, For example, in the DEV_ID field of the ammeter table, part of the data corresponds to the tw_id field data of the winding table, and the other part of the data corresponds to the acln_dot_id field data of the line end table). After establishing a data structure with a clear concept and in line with reality, it can be used as a basis for logical judgments between various data.
一块关口系统表计最基本有正向有功、反向有功、正向无功、反向无功4项数据,计算常用的就是正、反向有功两项数据。所有从母线中流出的潮流为正向有功,所有流入母线的潮流为反向有功。所有流入主变的潮流为正向有功,所有流出主变的潮流为反向有功。如主变高压侧表所计量的正向有功为从母线流出的潮流,也是流入主变的潮流。若电量值体现的潮流方向与实际潮流方向相反则认为电量存在异常。A gateway system meter basically has four items of data: forward active power, reverse active power, forward reactive power, and reverse reactive power. Forward and reverse active power are commonly used for calculation. All power flows flowing out of the bus are forward active power, and all power flows flowing into the bus are reverse active power. All power flows flowing into the main transformer are positive active power, and all power flows flowing out of the main transformer are reverse active power. For example, the positive active power measured by the high-voltage side meter of the main transformer is the flow flowing out from the busbar and also the flow flowing into the main transformer. If the power flow direction reflected by the power value is opposite to the actual power flow direction, it is considered that the power is abnormal.
1.采集失败,如出现底码数据为0或空值采集异常情况,将该异常数据剔除,用三天之内的正常数据进行替代1. The collection fails. If the bottom code data is 0 or the abnormal collection of empty values occurs, the abnormal data will be removed and replaced with normal data within three days
2.正反电量设置,当(正有止码小于正有起码或反有止码小于反有起码)且(正有止码大于反有起码或反有止码大于正有起码)时判定正反电量交互,交换起码正反底码后重新计算。2. Positive and negative power setting, when (the positive and negative limit code is less than the positive and negative minimum value or the reverse and negative limit is less than the negative minimum) and (the positive and negative limit is greater than the negative minimum or the negative limit is greater than the positive and negative minimum) to determine positive Negative power interaction, recalculate after exchanging at least positive and negative bottom codes.
3.换表,统计月末及月初底码值,当出现正反向月末底码值小于月初底码值的情况判定换表,防止出现异常电量,按下面公式进行计算,进行电量补全。3. Change the meter, count the end-of-month and beginning-of-month code values, and determine to change the meter when the forward and reverse month-end code values are less than the beginning-of-month code value, to prevent abnormal power, calculate according to the following formula, and complete the power supply.
当月电量=(月中最大值-月初底码值+月末底码值-月中最小值)*倍率Electricity of the current month = (maximum value in the middle of the month - code value at the end of the month + code value at the end of the month - minimum value in the middle of the month) * magnification
4.底码突变,当出现(本月末底码值-本月初底码值)>3*(上月末底码值-上月初底码值)且(本月末底码值-本月初底码值)>3*(前2月末底码值-前2月初底码值)判定底码突变时,采用三天之内的正常数据进行替代。4. The bottom code changes, when (the bottom code value at the end of this month-the bottom code value at the beginning of this month)>3*(the bottom code value at the end of last month-the bottom code value at the beginning of last month) and (the bottom code value at the end of this month-the bottom code value at the beginning of this month )>3*(the bottom code value at the end of the previous February - the bottom code value at the beginning of the previous February) to determine the mutation of the bottom code, use the normal data within three days to replace it.
以上所述实施方式仅为本发明的优选实施例,而并非本发明可行实施例的穷举。对于本领域一般技术人员而言,在不背离本发明原理和精神的前提下对其所作出的任何显而易见的改动,都应当被认为包含在本发明的权利要求保护范围之内。The implementation manners described above are only preferred embodiments of the present invention, rather than an exhaustive list of feasible embodiments of the present invention. For those skilled in the art, any obvious changes made without departing from the principle and spirit of the present invention should be considered to be included in the protection scope of the claims of the present invention.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610381255.6A CN106169160A (en) | 2016-06-01 | 2016-06-01 | A kind of electricity abnormity diagnosis based on critical point power system and electricity complementing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610381255.6A CN106169160A (en) | 2016-06-01 | 2016-06-01 | A kind of electricity abnormity diagnosis based on critical point power system and electricity complementing method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106169160A true CN106169160A (en) | 2016-11-30 |
Family
ID=57359162
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610381255.6A Pending CN106169160A (en) | 2016-06-01 | 2016-06-01 | A kind of electricity abnormity diagnosis based on critical point power system and electricity complementing method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106169160A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111125635A (en) * | 2019-11-29 | 2020-05-08 | 广东电网有限责任公司 | A method, device, terminal and storage medium for filling in user table code data |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7437545B2 (en) * | 2005-07-19 | 2008-10-14 | International Business Machines Corporation | Apparatus and system for the autonomic configuration of a storage device |
| CN103049522A (en) * | 2012-12-19 | 2013-04-17 | 中国电力科学研究院 | Automatic substitution method for multi-data sources of electric quantity |
| CN104200395A (en) * | 2014-08-22 | 2014-12-10 | 国家电网公司 | Technology for achieving missing data intelligent automatic additional recording based on automatic additional recording strategy definition |
| CN104901425A (en) * | 2015-06-26 | 2015-09-09 | 国家电网公司 | Wide area measurement system adaptive time-delay compensation method |
| CN105049460A (en) * | 2014-12-19 | 2015-11-11 | 国网电力科学研究院 | Smart preservation technology for power quality data |
-
2016
- 2016-06-01 CN CN201610381255.6A patent/CN106169160A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7437545B2 (en) * | 2005-07-19 | 2008-10-14 | International Business Machines Corporation | Apparatus and system for the autonomic configuration of a storage device |
| CN103049522A (en) * | 2012-12-19 | 2013-04-17 | 中国电力科学研究院 | Automatic substitution method for multi-data sources of electric quantity |
| CN104200395A (en) * | 2014-08-22 | 2014-12-10 | 国家电网公司 | Technology for achieving missing data intelligent automatic additional recording based on automatic additional recording strategy definition |
| CN105049460A (en) * | 2014-12-19 | 2015-11-11 | 国网电力科学研究院 | Smart preservation technology for power quality data |
| CN104901425A (en) * | 2015-06-26 | 2015-09-09 | 国家电网公司 | Wide area measurement system adaptive time-delay compensation method |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111125635A (en) * | 2019-11-29 | 2020-05-08 | 广东电网有限责任公司 | A method, device, terminal and storage medium for filling in user table code data |
| CN111125635B (en) * | 2019-11-29 | 2023-04-18 | 广东电网有限责任公司 | User table data filling method, device, terminal and storage medium |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106772205B (en) | Method and device for monitoring abnormity of terminal equipment of electric power metering automation system | |
| CN110659273B (en) | Data abnormity monitoring and repairing method of distributed big data acquisition platform | |
| CN103177341A (en) | Line loss lean comprehensive management system and method | |
| CN105844367A (en) | Sensitivity factor based calculating method for power grid node marginal pricing | |
| CN102419834B (en) | Enterprise energy settlement system | |
| CN108182194A (en) | The management method that a kind of gridding based on power grid GIS divides | |
| CN102637288A (en) | Method for analysis of line loss in distribution-room area of power supply enterprise | |
| CN107886252A (en) | Electricity electricity charge review method, system and terminal device | |
| CN111047369A (en) | Electric power spot market monitoring and analyzing device and system | |
| CN114528951A (en) | Distribution network line single line diagram abnormity diagnosis and analysis method, system and device | |
| CN107748956A (en) | A kind of appraisal procedure of power distribution network typical wiring non-integer segmentation reliability | |
| CN108256723A (en) | Coal changes the assessment of economic benefit method and terminal device for being electrically accessed power grid | |
| CN111598380B (en) | Distribution line negative loss reason distinguishing method | |
| CN112485514A (en) | Method for evaluating uncertainty of power consumption of electric balance | |
| CN113112136A (en) | Comprehensive evaluation method and system for reliability of power distribution network | |
| CN110929220A (en) | Method and device for calculating index weight of distribution network | |
| CN111915130A (en) | An Evaluation Method of Electric Energy Meter Suppliers Based on Improved Grey Correlation | |
| CN104463367B (en) | A kind of flow-optimized method of the electricity transaction being related to transmission path | |
| CN106169160A (en) | A kind of electricity abnormity diagnosis based on critical point power system and electricity complementing method | |
| CN114152909A (en) | Medium-high voltage misalignment analysis system based on big data | |
| CN114385720A (en) | A measurement and marketing system data verification and visualization system and verification method | |
| CN111541301A (en) | Power distribution network line variation relation checking method based on fluctuation rate | |
| CN106971255A (en) | A kind of distribution automation schemes synthesis assessment system | |
| CN118428749A (en) | A method and system for evaluating the development level of new power systems | |
| CN113644834B (en) | A method and system for evaluating loss of a modular multilevel converter |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161130 |
|
| RJ01 | Rejection of invention patent application after publication |