CN106166794A - A kind of preform production line - Google Patents
A kind of preform production line Download PDFInfo
- Publication number
- CN106166794A CN106166794A CN201610742818.XA CN201610742818A CN106166794A CN 106166794 A CN106166794 A CN 106166794A CN 201610742818 A CN201610742818 A CN 201610742818A CN 106166794 A CN106166794 A CN 106166794A
- Authority
- CN
- China
- Prior art keywords
- line
- production line
- station
- prefabricated component
- preform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 81
- 238000009434 installation Methods 0.000 claims abstract description 19
- 239000004567 concrete Substances 0.000 claims abstract description 13
- 238000009413 insulation Methods 0.000 claims abstract description 7
- 238000007493 shaping process Methods 0.000 claims abstract description 5
- 238000005520 cutting process Methods 0.000 claims description 34
- 238000012546 transfer Methods 0.000 claims description 13
- 238000005422 blasting Methods 0.000 claims description 7
- 239000007921 spray Substances 0.000 claims description 7
- 238000005266 casting Methods 0.000 claims description 6
- 239000003795 chemical substances by application Substances 0.000 claims description 5
- 238000005507 spraying Methods 0.000 claims description 3
- 238000012805 post-processing Methods 0.000 claims description 2
- 238000007599 discharging Methods 0.000 description 35
- 239000000463 material Substances 0.000 description 29
- 239000010410 layer Substances 0.000 description 28
- 238000002156 mixing Methods 0.000 description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 22
- 229910000831 Steel Inorganic materials 0.000 description 17
- 239000011210 fiber-reinforced concrete Substances 0.000 description 17
- 239000010959 steel Substances 0.000 description 17
- 239000004744 fabric Substances 0.000 description 13
- 230000007246 mechanism Effects 0.000 description 12
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 11
- 238000003756 stirring Methods 0.000 description 11
- 238000003860 storage Methods 0.000 description 11
- 239000011083 cement mortar Substances 0.000 description 10
- 239000000835 fiber Substances 0.000 description 10
- 239000004570 mortar (masonry) Substances 0.000 description 10
- 238000004140 cleaning Methods 0.000 description 7
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 description 6
- 239000011509 cement plaster Substances 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 229920001169 thermoplastic Polymers 0.000 description 3
- 239000004416 thermosoftening plastic Substances 0.000 description 3
- 239000000654 additive Substances 0.000 description 2
- 230000000996 additive effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 239000002365 multiple layer Substances 0.000 description 1
- 230000000474 nursing effect Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000002516 radical scavenger Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000010025 steaming Methods 0.000 description 1
- 238000013519 translation Methods 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/04—Producing shaped prefabricated articles from the material by tamping or ramming
- B28B1/045—Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/08—Producing shaped prefabricated articles from the material by vibrating or jolting
- B28B1/087—Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
- B28B1/0873—Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould the mould being placed on vibrating or jolting supports, e.g. moulding tables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/52—Producing shaped prefabricated articles from the material specially adapted for producing articles from mixtures containing fibres, e.g. asbestos cement
- B28B1/523—Producing shaped prefabricated articles from the material specially adapted for producing articles from mixtures containing fibres, e.g. asbestos cement containing metal fibres
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/14—Apparatus or processes for treating or working the shaped or preshaped articles for dividing shaped articles by cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/02—Feeding the unshaped material to moulds or apparatus for producing shaped articles
- B28B13/0215—Feeding the moulding material in measured quantities from a container or silo
- B28B13/023—Feeding the moulding material in measured quantities from a container or silo by using a feed box transferring the moulding material from a hopper to the moulding cavities
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/38—Treating surfaces of moulds, cores, or mandrels to prevent sticking
- B28B7/382—Devices for treating, e.g. sanding
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Structural Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
The present invention proposes a kind of preform production line, including decorative layer production line and body production line, described decorative layer production line includes pouring form wire, curing line, line of cut and post treatment line according to what preform production order was sequentially arranged, described post treatment line is provided with heat-insulation layer and installs station, described body production line is arranged at the side of described post treatment line, and described body production line includes body concrete layer shaping station.The preform production line of said structure, the body production line of prefabricated component is arranged at the side of post treatment line, after prefabricated part body and decorative layer have produced, without long distance transportation, in-site installation can be carried out, therefore, the body production line preferably resolving pre existing product excessively separates with decorative layer production line, causes the problem that body production line is high with decorative layer production line installation cost.
Description
Technical field
The present invention relates to building machinery field, particularly to a kind of preform production line.
Background technology
Wallboard prefabricated components mainly include sandwich wallboard at present, are divided into a page wall, outer page wall and guarantor therebetween
Temperature layer.Sandwich wallboard production line includes spaced fast pulley, directive wheel and circulates above fast pulley and directive wheel
Multiple moulds, the corresponding different operation position of each mould.Sandwich wallboard production line includes that at least two be arranged in parallel
Transfer lines between x wire and connection x wire, fast pulley and directive wheel are along x wire layout, and transfer lines is provided with horizontal stroke
Moving dolly, fast pulley and directive wheel are controlled by a set of control system, and cross traveling trolley is controlled by single control system.This sandwich
Wallboard production line is applicable to the thickness production more than 100mm wallboard, but for the thickness preform production less than 100mm, its
Relatively costly, control system is more complicated.
It addition, the preform production line used at present, there is also body production line and the decorative layer production line of prefabricated component
Excessively separate, cause the problem such as prefabricated part body and decorative layer installation cost height.
In sum, how providing one to solve, pre existing product production cost is higher, control system is complicated and pre-
The preform production line of one of the problems or problem such as product body and decorative layer installation cost height, has become those skilled in the art urgently
Need to solve the technical problem that.
Summary of the invention
The technical problem to be solved in the present invention is: production cost is low, production efficiency is high and the quality of production is good to provide one
Preform production line.
The solution of the present invention is achieved in that the present invention proposes a kind of preform production line, raw including decorative layer
Produce line and body production line, described decorative layer production line include according to preform production order be sequentially arranged pour form wire,
Curing line, line of cut and post treatment line, described post treatment line is provided with heat-insulation layer and installs station, and described body production line is arranged at
The side of described post treatment line, described body production line includes body concrete layer shaping station.
Another technical scheme of the present invention is on above-mentioned basis, described in pour form wire successively include spray work
Position, pour station and the station that vibrates.
Another technical scheme of the present invention is on above-mentioned basis, and described spray station is provided with for spraying for platform mould
First flush coater of coating release agent;The described station that pours is provided with the casting machine for pouring prefabricated component;The described station that vibrates sets
There is the vibrator for prefabricated component is vibrated.
Another technical scheme of the present invention is on above-mentioned basis, and described curing line includes precuring kiln and whole maintenance
Kiln, is connected by transfer lines between described precuring kiln and whole curing kilns.
Another technical scheme of the present invention is on above-mentioned basis, and described transfer lines includes conveying track, described fortune
First end of defeated track connects with described whole curing kilns, and described conveying track is provided with the fortune that can move back and forth on conveying track
Defeated dolly.
Another technical scheme of the present invention is that, on above-mentioned basis, described transfer lines also includes for prefabricated component is hung
The first loop wheel machine being filled on conveying track, described first loop wheel machine is arranged at the second end of described conveying track.
Another technical scheme of the present invention is, on above-mentioned basis, to be additionally provided with between described curing line and described line of cut
Surface disposing line, described surface disposing line is additionally provided with at least one for the shot-blasting machine that preform surfaces carries out Shot Blasting.
Another technical scheme of the present invention is on above-mentioned basis, described surface disposing line also include the second loop wheel machine and
Turntable, described second loop wheel machine is used for handling prefabricated component, and it is arranged at described surface disposing line one end near curing line;Described
Turntable is for rotating prefabricated component, and it is arranged at described surface disposing line one end near line of cut.
Another technical scheme of the present invention is on above-mentioned basis, described line of cut be provided with the first cutting work station and
It is respectively equipped with cutting machine in second cutting work station, and described first cutting work station and the second cutting work station;On described post treatment line
It is additionally provided with installation of embedded parts station, after described installation of embedded parts station is arranged at described heat-insulation layer installation station.
Another technical scheme of the present invention is on above-mentioned basis, described body production line and described post treatment line phase
To setting and parallel with post treatment line.
The preform production line of said structure, the body production line of prefabricated component is arranged at the side of post treatment line, prefabricated component
After body and decorative layer have produced, it is not necessary to long distance transportation, in-site installation can be carried out, therefore, preferably resolve existing
The body production line of prefabricated component excessively separates with decorative layer production line, causes body production line and decorative layer production line installation cost
High problem.
Accompanying drawing explanation
The accompanying drawing of the part constituting the present invention is used for providing a further understanding of the present invention, and the present invention's is schematic real
Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.
Fig. 1 is the overall structure schematic diagram of the present invention a kind of preform production line;
Fig. 2 is the part-structure schematic diagram of the present invention a kind of preform production line;
Fig. 3 is a kind of structural representation stirring apparatus for distributing in Fig. 1;
Fig. 4 is the structural representation of another kind of stirring apparatus for distributing in Fig. 1;
Fig. 5 is the structural representation of a kind of precuring kiln in Fig. 1;
Fig. 6 is the enlarged diagram in A portion in Fig. 5;
Fig. 7 is the structural representation of a kind of transport vehicle in Fig. 1;
Fig. 8 is another working state schematic representation of transport vehicle in Fig. 7;
Fig. 9 is the structural representation of a kind of nursing frame in Fig. 1;
Figure 10 is the structural representation of the first cutting machine in Fig. 1;
Figure 11 is the top view of Figure 10;
Figure 12 is the structural representation of the second cutting machine in Fig. 1;
Figure 13 is the top view of Figure 12;
Figure 14 is the structural representation of a kind of pipeline of the present invention;
Figure 15 is the top view of Figure 14;
Figure 16 is the structural representation of another kind pipeline of the present invention;
Figure 17 is the left view of Figure 16.
Reference corresponding relation is:
1 lapping machine 2 casting machine 3 vibrator
4 pipeline 5 precuring kiln 6 ingot strippers
7 first cleaning machine 8 first flush coaters 9 water stamper
10 first loop wheel machine 11 second loop wheel machine 12 shot-blasting machines
13 turntable 14 first line of cut 15 second lines of cut
16 second cleaning machine 17 air-dry machine 18 second flush coaters
19 whole curing kilns 20 positioner 21 elevator
22 thermoplastic machine 23 conveying tracks 24 pour form wire
25 surface disposing line 26 post treatment lines
101 103 moulds of cement plaster blender 102 cement mortar material distributing machine
104 first hopper 105 second hopper 106 first frames
107 operating room 108 mixing drum 109 storage tanks
110 first helical axis 111 steel fiber reinforced concrete blenders
112 steel fiber reinforced concrete material distributing machine 113 second helical axis
201 side plate 202 prefabricated component 203 bearings
204 first base 205 top board 206 fog rooms
207 water pipes
301 first bearing pin 302 second bearing pin 303 rollers
304 pedestal 305 the 3rd bearing pin 306 first support members
307 support seat 308 the 4th bearing pin 309 second support member
310 the 3rd support member 311 the 4th support member 312 vertical rods
313 the 5th support member 314 the 6th support member 315 oblique pull plates
316 underframe 317 pull bars
401 first crossbeam 402 second cross beam 403 the 3rd crossbeams
404 first cutter head 405 second cutter head 406 the 3rd cutter heads
407 first column 408 guide rail 409 second bases
410 first motor 411 second column 412 the 3rd columns
414 the 4th crossbeam 415 the 4th cutter head 416 second motors
417 the 3rd motors
501 cylinder 502 leg 503 conveyer belts
Detailed description of the invention
Describing the present invention below in conjunction with the accompanying drawings, the description of this part is only exemplary and explanatory, should not
Protection scope of the present invention is had any restriction effect.Additionally, those skilled in the art are according to the description of presents, can be right
In presents, the feature in embodiment and in different embodiment carries out respective combination.
The embodiment of the present invention is as follows, preform production line shown in Figure 1, and concrete station includes platform mould scavenger
Position, releasing agent spray station, first water smash station, mesh sheet lays station, second water and smash station, the pre-buried station of prefabricated component, precuring
Nurse position, demoulding station, whole maintenance station, handling station, ball blast station, rotation modified line station, cutting work station, prefabricated component clean
Station, dry tack free station, prefabricated component displacement station, gluing station, XPS (warming plate) install station, thermoplastic protection station and
Lifting station etc..It should be noted that the various stations of above-mentioned preform production line, the simply row of one of which specific embodiment
Lift, remaining embodiment can optionally add wherein part station composition production line according to the needs produced;On it addition,
The station stated simply is named according to function action, not with actual station position one_to_one corresponding, it is understood that there may be two with
The situation that upper station action completes on a station position, depending on specifically arranging beat with production line.Concrete equipment mainly wraps
Include be horizontally disposed with pipeline 4, can on pipeline 4 platform mould the 103, first cleaning machine 7, first flush coater 8 of movement, water stamper 9,
Lapping machine 1, casting machine 2, vibrator 3, ingot stripper 6, transport vehicle, precuring kiln the 5, first loop wheel machine 10, whole curing kilns 19, second hang
Machine 11, shot-blasting machine 12, turntable 13, line of cut, the second cleaning machine 16, air-dry machine the 17, second flush coater 18, positioner 20, liter
Fall machine 21, thermoplastic machine 22 and track 23 etc..
As in figure 2 it is shown, first platform mould 103 is positioned on pipeline 4, pipeline 4 is provided with multiple rotatable power
Unit, power unit includes motor and the transfer roller being connected with the output shaft of motor, when motor rotates, drives transfer roller to rotate, enters one
Step drives the platform mould 103 on pipeline 4 to move horizontally.By the first cleaning machine 7, platform mould 103 is carried out, in platform mould 103
Spot and Impurity removal clean, then by the first flush coater 8 even application releasing agent on platform mould 103 inwall, during this,
Platform mould 103 moves on pipeline 4 always, then carries out watering for the first time in platform mould 103 smashing by watering stamper 9, then passes through lapping
Machine 1 carries out grid cloth laying in platform mould 103, by casting machine 2, platform mould 103 carries out second time the most again and pours, and passes through
Vibrator 3 vibrates further, after having vibrated, just the built-in fittings such as reinforcing bar can be embedded in the prefabricated component 202 poured
In, carry out maintenance in prefabricated component 202 being delivered to precuring kiln 5 by transport vehicle afterwards.
Preform production line as shown in Figure 1, more specifically, including decorative layer production line and body production line, decoration
Layer production line includes pouring form wire 24, curing line, line of cut and post processing according to what prefabricated component 202 production sequence was sequentially arranged
Line 26, post treatment line 26 is provided with heat-insulation layer and installs station, and body production line is then arranged at the side of post treatment line 26, body
Production line specifically includes body concrete layer shaping station, by body concrete layer shaping station, completes body concrete layer
Production.When producing body concrete layer, the decorative layer that process line comes is transported to body production line, decorative layer is shifted
To bed die, mould of aiding the border areas, pour body concrete layer, finally give wallboard prefabricated component.
Further, pour form wire 24 to include spray station successively, pour station and the station that vibrates.More specifically,
Spray station is provided with for the first flush coater 8 for platform mould spraying releasing agent;Pour station to be provided with for pouring prefabricated component
The casting machine 2 of 202;The station that vibrates is provided with the vibrator 3 for vibrating prefabricated component 202.
Further, curing line includes precuring kiln 5 and whole curing kilns 19, logical between precuring kiln 5 and whole curing kilns 19
Cross transfer lines to connect.Transfer lines includes conveying track 23, and the first end of conveying track 23 connects with whole curing kilns 19, conveying track
23 are provided with the travelling bogie that can move back and forth on conveying track 23.Transfer lines also include for prefabricated component 202 lift to
The first loop wheel machine 10 on conveying track 23, the first loop wheel machine 10 is arranged at the second end of described conveying track 23.
Further, it is additionally provided with surface disposing line 25 between curing line and described line of cut, surface disposing line 25 also sets
There is at least one for the shot-blasting machine 12 that prefabricated component 202 surface is carried out Shot Blasting.Surface disposing line 25 also includes that second hangs
Machine 11 and turntable 13, the second loop wheel machine 11 is for handling prefabricated component 202, and the second loop wheel machine 11 is arranged at described surface disposing line 25 and leans on
One end of nearly curing line.Turntable 13 is for rotating prefabricated component 202, and it is arranged at described surface disposing line 25 near cutting
One end of secant.
Further, line of cut includes the first line of cut and the second line of cut, and the first line of cut is provided with the first cutting work
Position, the first cutting work station can carry out transverse cuts to prefabricated component 202;Second line of cut is provided with the second cutting work station, and second cuts
Cut station and can prefabricated component 202 be carried out longitudinally cutting.Additionally, be additionally provided with installation of embedded parts station, built-in fitting on post treatment line 26
After installation station is arranged at heat-insulation layer installation station.
For body production line, (not shown), preferably it is oppositely arranged with post treatment line 26, and flat with post treatment line 26
OK, this set-up mode, the installation effectiveness of prefabricated component 202 body and decorative layer can be effectively improved.
As it is shown on figure 3, in one embodiment, by stirring apparatus for distributing, cement mortar is stirred and cloth, stirs
Mix apparatus for distributing to include being horizontally placed on ground pipeline 4, cement plaster blender 101 and and cement plaster blender
101 with the use of cement mortar material distributing machine 102, pipeline 4 for transport platform mould 103, platform mould 103 can on pipeline 4 water
Translation is dynamic.Cement plaster blender 101 includes the mixing drum 108 for being stirred mortar and is arranged at mixing drum 108
The discharging opening of bottom, cement mortar material distributing machine 102 is then arranged at the lower section of discharging opening.Cement mortar material distributing machine 102 includes cloth
Material mouth, pipeline 4 is arranged at the lower section of cloth mouth, when mortar flows out from cloth mouth, can flow into the platform mould on pipeline 4
In 103, thus complete pouring of prefabricated component 202.The apparatus for distributing of said structure, first by cement plaster blender 101 to sand
Slurry is stirred, during after stirring, mortar flows into cement mortar material distributing machine 102 below, then by cement mortar material distributing machine 102
Mortar is delivered in the platform mould 103 on pipeline 4 below, thus completes prefabricated component 202 cloth.Cement plaster blender
101 include the first frame 106 being arranged on horizontal plane, and the first hopper 104 of being arranged in the first frame 106 and stirring
Cylinder 108, the first hopper 104 includes the charging aperture in the portion that is arranged on and is arranged at the discharging opening of its underpart, and the first hopper
104 from top to bottom its barrel dliameter taper into, discharging opening is positioned at above mixing drum 108.The discharge outlet of the first hopper 104 is additionally provided with
Feeding device, feeding device is horizontally or diagonally arranged, and the import of feeding device connects with discharging opening, and the outlet of feeding device is placed in
Above the charging aperture of mixing drum 108.In another kind of embodiment, the outlet of feeding device is direct with the charging aperture of mixing drum 108
Connecting, feeding device is directly delivered to the material in hopper in mixing drum 108.Feeding device is specially screw conveying device,
Including feeding tube and the first helical axis 110 of being arranged in feeding tube, the first helical axis 110 can rotate in feeding tube, and
The conveying to material is realized during rotating.Storage tank 109, specifically, storage tank 109 it is additionally provided with in first frame 106
Being placed in the top of mixing drum 108, storage tank 109 by pipeline or directly can connect with mixing drum 108, and it is used for storing various need
Additive in material to be added to.Being additionally provided with the second hopper 105 in cement mortar material distributing machine 102, the second hopper 105 is arranged at
The lower section of mixing drum 108.Being additionally provided with discharging portion on mixing drum 108, discharging portion is specifically arranged at the bottom of mixing drum 108, juxtaposition
In the top of the second hopper 105, mortar can flow out from discharging portion, and flows directly into the second hopper 105.Need explanation
It is that discharging portion can be oppositely arranged with the second hopper 105, it is also possible to directly contact is arranged or connected by pipeline and arranges, at this not
Make concrete restriction.It is additionally provided with discharging unit, discharging unit and the second hopper 105 in cement mortar material distributing machine 102 to connect, goes out material list
Unit is fixing with the second hopper 105 to be connected, and for convenience of cleaning, can also be detachable fixing connection between the two.More specifically,
Discharging unit includes the base plate being fixedly installed, and be arranged on base plate can the cover plate of folding, the discharge outlet of discharging unit
It is additionally provided with the shrouding that can open or close discharging opening.The first oil cylinder and the second oil cylinder it is additionally provided with in cement mortar material distributing machine 102, the
The upper end of one oil cylinder is flexibly connected with the second hopper 105, and the lower end of the first oil cylinder is flexibly connected with discharging unit, and the first oil cylinder is stretched
During contracting, the cover plate of discharging unit can be driven to move, or rotate around base plate.One end of second oil cylinder is flexibly connected with discharging unit,
The other end is flexibly connected with the shrouding of discharging unit, when the second oil cylinder stretches, shrouding can be driven to realize discharging opening opened or
Close.Additionally, the side of stirring apparatus for distributing is additionally provided with operating room 107.
As shown in Figure 4, in one embodiment, by stirring apparatus for distributing, steel fiber reinforced concrete is stirred and cloth
Material, stirring apparatus for distributing specifically include be horizontally placed on ground pipeline 4, steel fiber reinforced concrete blender 111 and with
Steel fiber reinforced concrete blender 111 with the use of steel fiber reinforced concrete material distributing machine 112, pipeline 4 for transport platform mould 103,
Platform mould 103 can move horizontally on pipeline 4.Fiber transporting device is arranged on the top of steel fiber reinforced concrete blender 111, uses
In fiber concrete being delivered in steel fiber reinforced concrete blender 111, steel fiber reinforced concrete blender 111 includes for fibre
The dimension mixing drum 108 that is stirred of concrete and the discharging opening being arranged at mixing drum 108 bottom, and steel fiber reinforced concrete cloth
Machine 112 is then arranged at the lower section of discharging opening.Steel fiber reinforced concrete material distributing machine 112 includes that cloth mouth, pipeline 4 are arranged at cloth mouth
Lower section, when mortar flows out from cloth mouth, can flow in the platform mould 103 on pipeline 4, thus complete prefabricated component 202
Pour.The apparatus for distributing of said structure, is first stirred mortar by steel fiber reinforced concrete blender 111, mortar after stirring
Flow in steel fiber reinforced concrete material distributing machine 112 below, then be delivered to it by 112 mortars of steel fiber reinforced concrete material distributing machine
In platform mould 103 on the pipeline 4 of lower section, thus complete prefabricated component 202 cloth.Steel fiber reinforced concrete blender 111 includes setting
The frame being placed on horizontal plane, and the first hopper 104 of being arranged in frame and mixing drum 108, the first hopper 104 includes setting
The charging aperture in portion placed on it and be arranged at the discharging opening of its underpart, and the first hopper 104 its barrel dliameter from top to bottom gradually becomes
Little, discharging opening is positioned at above mixing drum 108.Fiber transporting device is arranged at the discharge outlet of the first hopper 104, fiber conveying dress
Putting and horizontally or diagonally arrange, the import of fiber transporting device connects with discharging opening, and the outlet of fiber transporting device is placed in mixing drum
Above the charging aperture of 108.In another kind of embodiment, the outlet of described fiber transporting device is straight with the charging aperture of mixing drum 108
Connecing in succession, fiber transporting device directly can be delivered to the material in hopper in mixing drum 108.Feeding device is specially spiral transferring
Material device, including feeding tube and the second helical axis 113 of being arranged in feeding tube, the second helical axis 113 can be in feeding tube
Rotate, and realize the conveying to material during rotating.Storage tank 109, specifically, storage tank 109 it is additionally provided with in frame
Being placed in the top of mixing drum 108, storage tank 109 by pipeline or directly can connect with mixing drum 108, and it is used for storing various need
Additive in material to be added to.Being additionally provided with the second hopper 105 in steel fiber reinforced concrete material distributing machine 112, the second hopper 105 sets
It is placed in the lower section of mixing drum 108.Being additionally provided with discharging portion on mixing drum 108, discharging portion is specifically arranged at the bottom of mixing drum 108,
Being placed in the top of the second hopper 105, mortar can flow out from discharging portion, and flows directly into the second hopper 105.Need explanation
, discharging portion can be oppositely arranged with the second hopper 105, it is also possible to directly contact is arranged or connected by pipeline and arranges, at this
It is not especially limited.It is additionally provided with discharging unit, discharging unit and the second hopper 105 in steel fiber reinforced concrete material distributing machine 112 to connect,
Discharging unit and the second fixing connection of hopper 105, for convenience of cleaning, can also be detachable fixing connection between the two.More
Specifically, discharging unit includes the base plate being fixedly installed, and be arranged on base plate can the cover plate of folding, going out of discharging unit
It is additionally provided with, at material mouth, the shrouding that can open or close discharging opening.Fiber transporting device includes multiple horizontally disposed feeding tube, and
Multiple feeding tubes be arranged in parallel, are provided with rotatable second helical axis 113 in each transport tube, and the second helical axis 113 revolves
When turning, the material of conveying barrel moves, thus drives material to realize cloth through discharging unit.Additionally, stirring apparatus for distributing
Side be additionally provided with operating room 107.
Precuring kiln as shown in Figures 5 and 6, specifically includes horizontally disposed first base 204 and is arranged at first
Kiln body on base 204, kiln body includes that mutually isolated multiple fog rooms 206, multiple fog rooms 206 are set up in parallel, Mei Geyang
Position deposited by the prefabricated component vertically arranging multiple-layer horizontal state in protecting room 206, more specifically, as it can be seen, every layer of prefabricated component
202 deposit position is made up of multiple bearings 203, and bearing 203 specifically includes the first bearing and the second bearing being oppositely arranged, first
On the inwall of the left and right sides that seat and the second bearing are respectively provided with fog room 206, and, the first base of each fog room 206
204 are additionally provided with for prefabricated component 202 is transported into fog room 206 or the rail transported from fog room 206, it should be noted that
Rail may be disposed on horizontal plane, it is possible to is arranged on the first base 204.It is equipped with one or more in each fog room 206
Water pipe 207, meanwhile, is additionally provided with many steam pipes in each fog room 206, steam pipe connects with water pipe 207, heated after steaming
Steam in steam pipe can enter in water pipe 207, and under the effect of water vapour, water and vapour with predetermined temperature can be from being opened in water
Venthole on pipe 207 is emerged, the prefabricated component 202 in fog room 206 is carried out maintenance.The bottom of fog room 206 is additionally provided with
Cistern, one end of water pipe 207 connects with cistern, and cistern, for supplying water for water pipe 207, specifically can arrange water in pond
Pump, it is ensured that water pipe 207 has been in water state all the time.It is additionally provided with in cistern and adds hot charging for carry out heating for water or water vapour
Putting, heater is additionally provided with acoustic filter, acoustic filter is for reducing the noise of heater, and heater is arranged at water pipe 207
One end, and connect with water pipe 207.Being additionally provided with at least one temperature sensor in fog room 206, temperature sensor is used for perception
Temperature in fog room 206, and, temperature sensor is arranged on fog room 206 inwall, can be on the sidewall of both sides, also
The top of fog room 206 can be arranged at.Being additionally provided with at least one humidity sensor in fog room 206, humidity sensor is used for
Humidity in perception fog room 206, and, humidity sensor is arranged on fog room 206 inwall, can be the sidewall of both sides
On, it is also possible to it is arranged at the top of fog room 206.The porch of each fog room 206 is additionally provided with door, on the first base 204
Being provided with chute, the lower end of door is placed in chute, and can slidably reciprocate in chute.For the setting of door, real at another kind
Executing in example, door is arranged on the sidewall of fog room 206 also by hinge, or is arranged at the top of fog room 206, needs
Illustrate, when door is arranged at the top of fog room 206 by hinge, also can arrange at the top of fog room 206 simultaneously
The extensible members such as oil cylinder, for driving door to place around the top of fog room 206.Curing kilns also include the two pieces of phases being arranged at periphery
To the side plate 201 arranged, two blocks of side plates 201 are vertically arranged, and its lower end is arranged on the first base 204, two blocks of side plates 201 upper
End is additionally provided with top board 205, fixes and be connected between the two ends of top board 205 and the top of two blocks of side plates 201.It should be noted that with
The side that door is relative, i.e. the rear portion shown in figure, also is provided with shrouding.Being additionally provided with travel control device on rail, row kind controls
Device is for controlling transport vehicle parking spot on rail, and control transport vehicle time strictly according to the facts puts part position, pickup position etc..Right
In the first bearing being oppositely arranged and the second bearing, it is shaped as inverted trapezoidal, more specifically, and the shape on inwall after its installation
Shape is that chamfer is trapezoidal, and the first bearing and the second bearing are bolted or welding manner is fixed on fog room 206 inwall.
Transport vehicle as shown in Figure 7 and Figure 8, specifically includes moveable pedestal 304, supports seat 307 and is arranged at base
The support component that seat 304 and at least two supported between seat 307 are oppositely arranged, each support component at least includes the first support
Part 306 and the second support member 309, the first support member 306 and the first end of the second support member 309, i.e. lower end shown in figure divide
Be not flexibly connected with pedestal 304, the first support member 306 and the second end of the second support member 309, i.e. upper end shown in figure with
Support seat 307 connects.The prefabricated component transport vehicle of this structure, the first support member 306 and the second support member 309 can be extensible member, the
When one support member 306 and the second support member 309 extend simultaneously, the jacking to prefabricated component 202 can be realized.Certainly, first support
Part 306 and the second support member 309 can also be strut, and when the lower end of two struts moves closer to, it the most gradually uprises, it is achieved
Jacking to prefabricated component 202, on the contrary, when the lower end of two struts is gradually disengaged, it is highly gradually lowered.Prop up support component to be specially
Scissor type telescopic frame, the upper surface of pedestal 304 further respectively has the first bearing pin 301 and the second bearing pin 302, the first support member 306
Lower end be flexibly connected with pedestal 304 by the first bearing pin 301, the lower end of the second support member 309 is by the second bearing pin 302 and base
Seat 304 is flexibly connected, and is flexibly connected, specifically may be used between the two ends of the first support member 306 and between the two ends of the second support member 309
Connected by bearing pin.And the distance between the first bearing pin 301 and the second bearing pin 302 can be adjusted in real time.For convenience of installing
And dismounting, connection between the first support member 306 and the first bearing pin 301, between the second support member 309 and the second bearing pin 302
Connect the most optional detachable connection.First support member 306 and the second support member 309 are preferably oil cylinder or cylinder.When first
When support member 306 and the second support member 309 extend, the whole height of prefabricated component transport vehicle is higher, on the contrary, then and step-down.Need explanation
, in this embodiment, the jointed shaft between the first support member 306 and the second support member 309 can keep the first support member
306 and second stability between support member 309.It is further preferable that jointed shaft can be fixedly installed on the first support member 306,
Second support member 309 is provided with the chute coordinated with jointed shaft.It is additionally provided with driving means, in a kind of technical scheme on pedestal 304
In, driving means is horizontally placed on pedestal 304, its one end and the first support member 306 or the first end of the second support member 309,
I.e. lower end shown in figure is flexibly connected, and during driving means action, drives the first support member 306 or the second support member 309 times
End moves horizontally on pedestal 304.Or, the two ends of driving means respectively with the first support member 306 and the second support member 309
Lower end is flexibly connected, and during driving means elongation, the lower end of the first support member 306 and the second support member 309 is located remotely from each other, now,
The height reduction of prefabricated component transport vehicle.And when driving means shortens, the first support member 306 and lower end of the second support member 309
Close to each other, now, the height of prefabricated component transport vehicle uprises.For driving means, can be oil cylinder, it is also possible to for cylinder, go back
It can be other extensible member.Support member also includes the 3rd support member 310 and the 4th support member 311, one end of the 3rd support member 310
It is flexibly connected with the second end of the first support member 306, i.e. upper end shown in figure, one end of the 4th support member 311 and second
Second end of support member 309, i.e. upper end shown in figure are flexibly connected, and, with the 4th between the two ends of the 3rd support member 310
It is flexibly connected by jointed shaft between the two ends of support member 311.The upper end of the first support member 306 is provided with the 3rd bearing pin 305, the 3rd
Support member 310 is flexibly connected with the first support member 306 by the 3rd bearing pin 305, and the upper end of the second support member 309 is provided with the 4th bearing pin
308, the 4th support member 311 is flexibly connected with the second support member 309 by the 4th bearing pin 308.Support member also includes the 5th support
Part 313 and the 6th support member 314, one end of the 5th support member 313, specially lower end are movable with the upper end of the 3rd support member 310
Connecting, then upper end with the 4th support member 311, the lower end of the 6th support member 314 is flexibly connected, equally, and the 5th support member 313
Two ends between and the two ends of the 6th support member 314 between be flexibly connected by jointed shaft.It should be noted that except the 5th support
Beyond part 313 and the second support member 309, it is also possible to be arranged as required to more support member, to increase prefabricated component fortune further
The height of defeated car.Being additionally provided with multiple roller 303 moved for band moving base 304 on pedestal 304, the quantity of roller 303 is preferred
Being four, be respectively arranged on four angles of pedestal 304, ground can be laid and lay oneself on the railway tracks, roller 303 can be walked on laying oneself on the railway tracks.Need
To illustrate that, it is also possible to arranging actuating unit on pedestal 304, actuating unit can be motor, it is also possible to for other power
Unit.
Prefabricated component storage rack as shown in Figure 9, including horizontally disposed underframe 316, one end of underframe 316 and/or two ends
Being provided with many vertical rods 312, vertical rod 312 is vertically arranged, and its lower end is fixing with underframe 316 to be connected.Additionally, for increasing the strong of storage rack
Degree, storage rack also sets up oblique pull plate 315, oblique pull plate 315 be shaped as right angled triangle, one bar right-angle side and underframe 316
Fixing connection, another right-angle side is fixing with vertical rod 312 to be connected.Certainly, as other alternative, brace also can reach identical
Technique effect, one end of brace and underframe 316 is fixing to be connected, and the other end of brace is fixed with vertical rod 312 and is connected.Additionally, it is vertical
Can also arrange many pull bars 317 between bar 312, the two ends of pull bar 317 are fixing with vertical rod 312 respectively to be connected.Depositing of this structure
Storage frame, can store the prefabricated component 202 that polylith is vertically placed simultaneously, have compact conformation, and take up room little advantage.Need explanation
, for preventing adjacent prefabricated component 202 from sticking together, pull bar 317 can also arrange polylith dividing plate, the most adjacent prefabricated component
202 are separated by dividing plate.
The first line of cut 14 as shown in Figures 10 and 11, including pipeline 4 and cutting mechanism, cutting mechanism is arranged at defeated
The top of line sending 4, specifically includes horizontally disposed second base 409, and first can moved left and right on the second base 409
Frame and the second frame, and, the first frame is additionally provided with can in the first frame the first cutter sweep of movement, the second frame
On also be provided with equally can in the second frame the second cutter sweep of movement.Prefabricated component 202 on pipeline 4 need to be cut
Time, prefabricated component 202 can cut by the first frame and the second frame simultaneously, and, the first cutter sweep and the second cutting dress
Put and not only can move left and right with the first frame and the second frame respectively, also can respectively in the first frame and the second frame on back and forth
Mobile, therefore, from arbitrarily angled, prefabricated component 202 can be cut.First frame includes being vertically arranged on the second base 409
The first column 407 and be fixedly installed on the first crossbeam 401 at the first column 407 top, it is preferable that the first column 407
Quantity is two, and two first columns 407 are oppositely arranged, and first crossbeam 401 is horizontally disposed with, and its two ends are stood with two first respectively
The top of post 407 is fixing to be connected, and the first cutter sweep can move back and forth along first crossbeam 401.Same, the second frame includes erecting
The second column 411 being directly arranged on the second base 409 and the second cross beam 402 being fixedly installed on the second column 411 top,
Preferably, the quantity of the second column 411 is two, and two second columns 411 are oppositely arranged, and second cross beam 402 is horizontally disposed with, its
Two ends are fixing with the top of two second columns 411 respectively to be connected, and the second cutter sweep can move back and forth along second cross beam 402.
Cutter sweep also includes the 3rd frame that can move left and right on the second base 409, and the 3rd frame is provided with can be in the 3rd frame
3rd cutter sweep of upper movement.As shown in Figure 10, when using the second frame as benchmark, the second frame maintains static, the
One frame and the 3rd frame can move left and right along the second base 409 according to being sized, and now, the second cutter sweep can realize
Front and back cutting, the first cutter sweep and the 3rd cutter sweep the most both can realize front and back cutting, it is also possible to cut about realization.With
First frame is the same with the second frame, and the 3rd frame includes being vertically arranged at the 3rd column 412 on the second base 409 and consolidating
Surely the 3rd crossbeam 403 at the 3rd column 412 top it is arranged at, it is preferable that the quantity of the 3rd column 412 is two, two the 3rd
Column 412 is oppositely arranged, and the 3rd crossbeam 403 is horizontally disposed with, and its two ends are fixing with the top of two the 3rd columns 412 respectively to be connected
Connecing, the 3rd cutter sweep can move back and forth along the 3rd crossbeam 403.Stand for convenience of first column the 407, second column 411 and the 3rd
Post 412 moves, and in one embodiment, the upper surface of the second base 409 arranges two chutes, and two chutes be arranged in parallel,
The lower end of first column the 407, second column 411 and the 3rd column 412 is arranged in chute respectively, and, the first column 407,
Second column 411 and the 3rd column 412 can slidably reciprocate along draw-in groove.In another kind of embodiment, the second base 409 arranges two
Bar guide rail 408, two guide rails 408 be arranged in parallel, and the lower end of first column the 407, second column 411 and the 3rd column 412 is respectively
It is provided with the rail wheel coordinated with guide rail 408, i.e. first column the 407, second column 411 and the 3rd column 412 led by rolling rail wheel
Move left and right on rail 408.First cutter sweep includes the first extensible member and the first cutter head 404, and the upper end of the first extensible member is arranged
On first crossbeam 401, the first cutter head 404 is arranged at the lower end of the first extensible member, when the first extensible member stretches, drives the first cutter
404 move up and down.For the first extensible member, can be oil cylinder, can be cylinder, it is also possible to for other any possible stretching
Part.First extensible member is preferably oil cylinder, and the lower end of oil cylinder is provided with the first mounting seat for installing the first cutter head 404, the first cutter
404 are arranged in the first mounting seat, and the position that the first cutter head 404 is in the first mounting seat is adjustable, along with the first cutter head 404
The change of the position in the first mounting seat, the cut direction of prefabricated component 202 is changed by the first cutter head 404 the most therewith.Need
It is noted that the structure of the second cutter sweep, the 3rd cutter sweep and the first cutter sweep is consistent, the i.e. second cutter sweep
Second cutter head 405, the 3rd cutter head 406 of the 3rd cutter sweep is the most scalable, the second cutter head 405 and installation of the 3rd cutter head 406
The equal scalable in position.In first cutter sweep, the second cutter sweep and the 3rd cutter sweep, at least one is provided with and turns to machine
Structure, steering mechanism turns to for band dynamic cutter head, and i.e. when arranging steering mechanism on the first cutter sweep, steering mechanism can drive the
One cutter head 404 turns to around the lower end degree of doing of the first extensible member.For prevent prefabricated component 202 in cutting process because of stress sideslip,
Thus affect cutting accuracy, it is additionally provided with for for prefabricated on pipeline 4, in the first frame, in the second frame or in the 3rd frame
The guider that part 202 guides.Or all can arrange on pipeline 4, in the first frame, in the second frame and in the 3rd frame
Guider.The structure of guider can be varied, can be guide plate, it is also possible to for gathering sill, it is also possible to for other
Any possible guide frame.For fixing prefabricated component 202 further, in addition to guider, on pipeline 4, in the first frame,
The hold down gag for pushing down prefabricated component 202 it is additionally provided with in second frame or in the 3rd frame.Or on pipeline 4, first
It is equipped with hold down gag in frame, in the second frame and in the 3rd frame, compresses prefabricated component 202 from multiple angles, prevent prefabricated
Part 202 is beated because of stress in cutting process.The side of pipeline 4 is additionally provided with the motor for driving prefabricated component 202 to move,
The quantity of motor is preferably several, drives prefabricated component 202 to move from multiple directions.
The second line of cut 15 as shown in FIG. 12 and 13, including cutting mechanism and pipeline 4, cutting mechanism is arranged at defeated
The top of line sending 4, cutting mechanism includes the frame being fixedly installed, and the lower end of frame is fixedly installed on horizontal plane, or passes through seat
Son is arranged on horizontal plane, and frame arranges multiple cutter sweep, and multiple cutter sweep can move horizontally in frame.This knot
The prefabricated component cutting production line of structure, frame is fixedly installed, and multiple cutter sweeps are arranged in frame, and can move down in frame
Dynamic, when needing to cut prefabricated component 202, pipeline 4 drives prefabricated component 202 to move at a predetermined velocity, multiple cutter sweeps
Can simultaneously act on prefabricated component 202, thus complete the cutting to prefabricated component 202 from different perspectives.Frame includes being vertically arranged
In the column of horizontal plane, the quantity of column is preferably two, and two root posts be arranged in parallel, and it is horizontal that the top of two root posts is provided with the 4th
Beam 414, multiple cutter sweeps are arranged on the 4th crossbeam 414, and can move back and forth on the 4th crossbeam 414.Cutter sweep has
Body includes the first cutter sweep and the second cutter sweep, and the cross section of the 4th crossbeam 414 is rectangle, including two sides, lower surface and
Lower surface, two sides or the lower surface of the 4th crossbeam 414 be provided with chute, and the upper end of the first cutter sweep and the second cutter sweep sets
Being placed in chute, more specifically, the upper end of the first cutter sweep and the second cutter sweep can arrange roller, and is existed by roller
Move back and forth in chute.It should be noted that the cooperation between the first cutter sweep and the second cutter sweep and the 4th crossbeam 414
Mode can also be varied, and this is no longer going to repeat them.First cutter sweep includes the first extensible member and the first cutter head 404,
The upper end of the first extensible member is connected with the 4th crossbeam 414, and the first cutter head 404 is arranged at the lower end of the first extensible member, and first stretches
When part stretches, the first cutter head 404 can be driven to move up and down.First extensible member is preferably oil cylinder, and the lower end of oil cylinder is provided with for pacifying
Filling the first mounting seat of the first cutter head 404, the first cutter head 404 is arranged in the first mounting seat, and the first cutter head 404 is in the first peace
Position on dress seat is adjustable, and along with the change of first cutter head 404 position in the first mounting seat, the first cutter head 404 is to prefabricated
The cut direction of part 202 changes the most therewith.It should be noted that the structure one of the second cutter sweep and the first cutter sweep
Causing, the second cutter head 405 on the i.e. second cutter sweep is scalable, the installation site also scalable of the second cutter head 405.Cutter sweep
Also include the 3rd cutter sweep, and, the structure of the 3rd cutter sweep and the first cutter sweep and the second cutter sweep is the same, i.e.
The 3rd cutter head 406 on 3rd cutter sweep is scalable, the installation site also scalable of the 3rd cutter head 406.It should be noted that
4th cutter head 415 can also be set on the 4th crossbeam 414 and more have cutter head.First cutter sweep, the second cutter sweep and
In three cutter sweeps, at least one is provided with steering mechanism, and steering mechanism turns to, i.e. when the first cutter sweep for band dynamic cutter head
On time steering mechanism is set, steering mechanism can drive the first cutter head 404 to turn to around the lower end degree of doing of the first extensible member.Pre-for preventing
Product 202 in cutting process because of stress sideslip, thus affect cutting accuracy, pipeline 4 be additionally provided with for for prefabricated component
202 guiders guided, or all can arrange guider in frame, or are respectively provided with guiding in pipeline 4 and frame
Device.The structure of guider can be varied, can be guide plate, it is also possible to for gathering sill, it is also possible to any for other
Possible guide frame.For fixing prefabricated component 202 further, in addition to guider, pipeline 4 is additionally provided with for pushing down pre-
The hold down gag of product 202, or hold down gag is set in frame, or and it is equipped with compression in frame on pipeline 4
Device, compresses prefabricated component 202 from multiple angles, prevents prefabricated component 202 from beating because of stress in cutting process.For guiding dress
Putting, including at least one piece of guide plate, guide plate is fixedly installed on pipeline 4 and/or in frame by extensible member.For compressing
Device, including at least one block pressur plate, pressing plate is fixedly installed on pipeline 4 and/or in frame by extensible member.Except pipeline 4
Outside multiple second motors 416 of upper setting, one end of the 4th crossbeam 414 can also arrange multiple 3rd motor 417, the 3rd motor
417 are used for driving cutter sweep to move on the 4th crossbeam 414.
Such as Fig. 2,14 and Figure 15 preform production line, more specifically, preform production line includes pipeline 4 and arranges
Multiple moulds 103 on pipeline 4, pipeline 4 includes at least two horizontal production lines 26 be arrangeding in parallel, two horizontal lifes
The two ends producing line 26 are also respectively provided with the first longitudinal production line 24 and second longitudinal production line 25, and horizontal production line 26 includes two
Horizontally disposed crossbeam, arranges multiple rotatable cylinder 501 between crossbeam, platform mould 103 can be by cylinder 501 at pipeline 4
On move horizontally.More specifically, cylinder 501 includes that the first cylinder, the two ends of the first cylinder are respectively arranged on two crossbeams,
And the one or both ends of the first cylinder are additionally provided with the power set for driving cylinder 501 to rotate.Preferably, power set are
Motor, motor includes output shaft, and output shaft is fixing with the end of cylinder 501 to be connected, and when motor rotates, drives output shaft to rotate,
It is further driven to cylinder 501 rotate.In addition to the first cylinder, cylinder 501 also includes second tin roller, and the two ends of second tin roller are rotatable
Be arranged on two crossbeams, and the first cylinder and second tin roller interval are arranged, and second tin roller is arranged at adjacent two piece the
Between one cylinder.Be additionally provided with frictional layer on first cylinder and second tin roller, frictional layer be used for increasing platform mould 103 and cylinder 501 it
Between frictional force, be specifically as follows rubber layer, it is sheathed on or is embedded on the first cylinder and second tin roller.Need explanation
It is that the power set driving cylinder 501 to rotate can also be varied, will not enumerate at this.This set-up mode, pipeline
4 can realize stepless speed regulation, and the movement of prefabricated component 202 or platform mould 103 is the most steady.
As shown in Figure 16 and Figure 17, for pipeline 4, in another kind of embodiment, pipeline 4 includes two parallel horizontal strokes
Beam and for supporting the leg 502 of crossbeam, arranges multiple cylinder 501 between two crossbeams, cylinder 501 periphery arranges conveyer belt
503, i.e. wrapped up by 503 cylinders 501 of conveyer belt, the two ends of cylinder 501 arrange motor equally, when motor rotates, rolling
Cylinder 501 rotates, and is further driven to conveyer belt 503 and rotates, thus platform mould 103 or the prefabricated component 202 on driving conveying belt 503 revolves
Turn.Ibid, this set-up mode, pipeline 4 can realize stepless speed regulation equally, it is achieved to platform mould 103 or the steady fortune of prefabricated component 202
Defeated.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
1. a preform production line, it is characterised in that include decorative layer production line and body production line, described decorative layer produces
Line includes pouring form wire, curing line, line of cut and post treatment line, described rear place according to what preform production order was sequentially arranged
Reason line is provided with heat-insulation layer and installs station, and described body production line is arranged at the side of described post treatment line, and described body produces
Line includes body concrete layer shaping station.
Preform production line the most according to claim 1, it is characterised in that described in pour form wire successively include spray work
Position, pour station and the station that vibrates.
Preform production line the most according to claim 2, it is characterised in that described spray station is provided with for for platform mould
First flush coater of spraying releasing agent;The described station that pours is provided with the casting machine for pouring prefabricated component;The described station that vibrates
It is provided with the vibrator for prefabricated component is vibrated.
Preform production line the most according to claim 1, it is characterised in that described curing line includes precuring kiln and supports eventually
Protect kiln, connected by transfer lines between described precuring kiln and whole curing kilns.
Preform production line the most according to claim 4, it is characterised in that described transfer lines includes conveying track, described
First end of conveying track connects with described whole curing kilns, and described conveying track is provided with and can move back and forth on conveying track
Travelling bogie.
Preform production line the most according to claim 5, it is characterised in that described transfer lines also includes for prefabricated component
Lifting the first loop wheel machine to conveying track, described first loop wheel machine is arranged at the second end of described conveying track.
Preform production line the most according to claim 1, it is characterised in that between described curing line and described line of cut also
It is provided with surface disposing line, described surface disposing line is additionally provided with at least one for the throwing that preform surfaces is carried out Shot Blasting
Ball machine.
Preform production line the most according to claim 7, it is characterised in that described surface disposing line also includes the second loop wheel machine
And turntable, described second loop wheel machine is used for handling prefabricated component, and it is arranged at described surface disposing line one end near curing line;Institute
Stating turntable for rotating prefabricated component, it is arranged at described surface disposing line one end near line of cut.
Preform production line the most according to claim 1, it is characterised in that described line of cut is provided with the first cutting work station
It is respectively equipped with cutting machine with in the second cutting work station, and described first cutting work station and the second cutting work station;
Being additionally provided with installation of embedded parts station on described post treatment line, described installation of embedded parts station is arranged at described heat-insulation layer and installs
After station.
Preform production line the most according to claim 1, it is characterised in that described body production line and described post processing
Line is oppositely arranged, and parallel with post treatment line.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610742818.XA CN106166794A (en) | 2016-08-26 | 2016-08-26 | A kind of preform production line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610742818.XA CN106166794A (en) | 2016-08-26 | 2016-08-26 | A kind of preform production line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106166794A true CN106166794A (en) | 2016-11-30 |
Family
ID=57376955
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610742818.XA Pending CN106166794A (en) | 2016-08-26 | 2016-08-26 | A kind of preform production line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106166794A (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106827176A (en) * | 2017-02-27 | 2017-06-13 | 句容市新科预制构件有限公司 | A kind of precast concrete equipment |
| CN106938494A (en) * | 2016-12-29 | 2017-07-11 | 中民筑友科技投资有限公司 | A kind of production technology of decorative panel |
| CN108000695A (en) * | 2018-01-05 | 2018-05-08 | 河北益铁机电科技有限公司 | Pretensioning prestressed concrete track board assembly line pours vibrating system and its application |
| CN110815524A (en) * | 2019-10-23 | 2020-02-21 | 南京信息职业技术学院 | Precast concrete slab maintenance system |
| CN110815534A (en) * | 2019-09-27 | 2020-02-21 | 江苏元大建筑科技有限公司 | PC component production line |
| CN111452208A (en) * | 2020-06-02 | 2020-07-28 | 中交二航局第四工程有限公司安徽混凝土装配化构件分公司 | Section beam prefabricating assembly line adopting stub matching method |
| CN111844412A (en) * | 2020-06-23 | 2020-10-30 | 中建西部建设建材科学研究院有限公司 | Production process of ultrahigh-performance concrete-based large-hollow-rate wallboard |
| CN112108752A (en) * | 2020-09-18 | 2020-12-22 | 湖南三一快而居住宅工业有限公司 | Net piece automatic weld apparatus for producing |
| CN112277147A (en) * | 2020-10-30 | 2021-01-29 | 长沙远大模块集成科技有限公司 | Double-kiln double-distribution prefabricated part production line and production process |
| CN114800813A (en) * | 2022-03-23 | 2022-07-29 | 中交一公局第四工程有限公司 | Automatic production and processing device and method for prefabricated guardrail |
| CN116604698A (en) * | 2023-02-22 | 2023-08-18 | 恒尊建设集团有限公司 | A device for making concrete prefabricated parts |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3600481A (en) * | 1966-06-08 | 1971-08-17 | Walter Lanz | Method for more rapidly producing aeroconcrete building elements |
| JPH0435905A (en) * | 1990-05-31 | 1992-02-06 | Ig Tech Res Inc | Apparatus for successively manufacturing ceramic plate |
| CN101168265A (en) * | 2007-12-04 | 2008-04-30 | 陈延东 | Method for prefabricating thermal insulation slurry composite wall and floorslab |
| CN201979598U (en) * | 2011-03-01 | 2011-09-21 | 天津市星兆防水保温工程有限公司 | Production line of outer wall heat-preservation and decoration integral plate |
| CN103240800A (en) * | 2012-02-03 | 2013-08-14 | 济南高新开发区七星实业有限公司 | Composite insulation board production line |
| CN203317535U (en) * | 2013-07-05 | 2013-12-04 | 泉州市祥达机械制造有限公司 | Full automatic production line for composition insulation boards of walls |
| CN203821829U (en) * | 2014-05-20 | 2014-09-10 | 宋廷善 | Building compound insulated template and production line |
| CN203876032U (en) * | 2014-04-03 | 2014-10-15 | 深圳海龙建筑制品有限公司 | Automatic prefabricated part production system |
| CN104723449A (en) * | 2015-02-12 | 2015-06-24 | 沈阳卫德住宅工业化科技有限公司 | Automatic production line of building industrialization concrete precast members |
| CN105751366A (en) * | 2016-05-09 | 2016-07-13 | 杜嫣然 | Automatic production line for inorganic decorative sheet |
| CN105799051A (en) * | 2016-05-06 | 2016-07-27 | 许迪茗 | Production line for heat insulation and decoration integrated wallboards of outer wall structure |
| CN206030207U (en) * | 2016-08-26 | 2017-03-22 | 中民筑友科技投资有限公司 | Prefab production line |
-
2016
- 2016-08-26 CN CN201610742818.XA patent/CN106166794A/en active Pending
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3600481A (en) * | 1966-06-08 | 1971-08-17 | Walter Lanz | Method for more rapidly producing aeroconcrete building elements |
| JPH0435905A (en) * | 1990-05-31 | 1992-02-06 | Ig Tech Res Inc | Apparatus for successively manufacturing ceramic plate |
| CN101168265A (en) * | 2007-12-04 | 2008-04-30 | 陈延东 | Method for prefabricating thermal insulation slurry composite wall and floorslab |
| CN201979598U (en) * | 2011-03-01 | 2011-09-21 | 天津市星兆防水保温工程有限公司 | Production line of outer wall heat-preservation and decoration integral plate |
| CN103240800A (en) * | 2012-02-03 | 2013-08-14 | 济南高新开发区七星实业有限公司 | Composite insulation board production line |
| CN203317535U (en) * | 2013-07-05 | 2013-12-04 | 泉州市祥达机械制造有限公司 | Full automatic production line for composition insulation boards of walls |
| CN203876032U (en) * | 2014-04-03 | 2014-10-15 | 深圳海龙建筑制品有限公司 | Automatic prefabricated part production system |
| CN203821829U (en) * | 2014-05-20 | 2014-09-10 | 宋廷善 | Building compound insulated template and production line |
| CN104723449A (en) * | 2015-02-12 | 2015-06-24 | 沈阳卫德住宅工业化科技有限公司 | Automatic production line of building industrialization concrete precast members |
| CN105799051A (en) * | 2016-05-06 | 2016-07-27 | 许迪茗 | Production line for heat insulation and decoration integrated wallboards of outer wall structure |
| CN105751366A (en) * | 2016-05-09 | 2016-07-13 | 杜嫣然 | Automatic production line for inorganic decorative sheet |
| CN206030207U (en) * | 2016-08-26 | 2017-03-22 | 中民筑友科技投资有限公司 | Prefab production line |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106938494A (en) * | 2016-12-29 | 2017-07-11 | 中民筑友科技投资有限公司 | A kind of production technology of decorative panel |
| CN106938494B (en) * | 2016-12-29 | 2019-12-10 | 中民筑友科技投资有限公司 | Production process of decorative plate |
| CN106827176A (en) * | 2017-02-27 | 2017-06-13 | 句容市新科预制构件有限公司 | A kind of precast concrete equipment |
| CN108000695A (en) * | 2018-01-05 | 2018-05-08 | 河北益铁机电科技有限公司 | Pretensioning prestressed concrete track board assembly line pours vibrating system and its application |
| CN110815534A (en) * | 2019-09-27 | 2020-02-21 | 江苏元大建筑科技有限公司 | PC component production line |
| CN110815524A (en) * | 2019-10-23 | 2020-02-21 | 南京信息职业技术学院 | Precast concrete slab maintenance system |
| CN111452208A (en) * | 2020-06-02 | 2020-07-28 | 中交二航局第四工程有限公司安徽混凝土装配化构件分公司 | Section beam prefabricating assembly line adopting stub matching method |
| CN111452208B (en) * | 2020-06-02 | 2021-07-13 | 中交二航局第四工程有限公司 | A short-line matching method segment beam prefabrication line |
| CN111844412A (en) * | 2020-06-23 | 2020-10-30 | 中建西部建设建材科学研究院有限公司 | Production process of ultrahigh-performance concrete-based large-hollow-rate wallboard |
| CN112108752A (en) * | 2020-09-18 | 2020-12-22 | 湖南三一快而居住宅工业有限公司 | Net piece automatic weld apparatus for producing |
| CN112277147A (en) * | 2020-10-30 | 2021-01-29 | 长沙远大模块集成科技有限公司 | Double-kiln double-distribution prefabricated part production line and production process |
| CN114800813A (en) * | 2022-03-23 | 2022-07-29 | 中交一公局第四工程有限公司 | Automatic production and processing device and method for prefabricated guardrail |
| CN116604698A (en) * | 2023-02-22 | 2023-08-18 | 恒尊建设集团有限公司 | A device for making concrete prefabricated parts |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106166794A (en) | A kind of preform production line | |
| CN105538495B (en) | The production technology of complex heat-preservation Light trabses | |
| CN104191513B (en) | Automatic production line of small plastic-concrete components | |
| CN109624042B (en) | Prestressed pipe pile production system | |
| US9308669B2 (en) | Automated concrete structural member fabrication system | |
| US3523343A (en) | System for the production of cast concrete members | |
| CN203973737U (en) | The process units of complex heat-preservation Light trabs | |
| US9409311B1 (en) | Automated concrete structural member fabrication system, apparatus and method | |
| CN107538607A (en) | A kind of production line and production method of heat preservation dismounting-free formwork for building | |
| CN107747270A (en) | A kind of municipal equipment for the road surface roadbed repairing that cement concrete after rain can be recessed | |
| CN106335129A (en) | Automatic production system for leak joint plate for livestock breeding | |
| CN206030207U (en) | Prefab production line | |
| CN206030206U (en) | Prefab production line | |
| CN106272940A (en) | A kind of preform production line | |
| CN118621743A (en) | Slope lining slipform construction trolley and slope lining construction method | |
| CN206578964U (en) | A kind of Combined production line of heat preservation dismounting-free formwork for building | |
| CN117863341A (en) | Concrete prefabricated member processing device and processing method | |
| CN206186077U (en) | Prefab production line | |
| CN205255245U (en) | Building wallboard automatic production line | |
| CN206926070U (en) | A kind of preform production line | |
| CN107538608A (en) | A kind of Combined production line and production method of heat preservation dismounting-free formwork for building | |
| CN206030208U (en) | Prefab production line | |
| CN206030209U (en) | Prefab production line | |
| CN112405823A (en) | Leak board production line | |
| CN203818307U (en) | Concrete distributing device of prestressed centrifugal pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161130 |