CN105951832B - 海上柴油锤偏位打桩纠偏施工工艺 - Google Patents
海上柴油锤偏位打桩纠偏施工工艺 Download PDFInfo
- Publication number
- CN105951832B CN105951832B CN201610362451.9A CN201610362451A CN105951832B CN 105951832 B CN105951832 B CN 105951832B CN 201610362451 A CN201610362451 A CN 201610362451A CN 105951832 B CN105951832 B CN 105951832B
- Authority
- CN
- China
- Prior art keywords
- pile
- hammer
- diesel hammer
- deviation
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
海上柴油锤偏位打桩纠偏施工工艺及装备,包括如下步骤:(1)船舶就位;(2)施工准备;(3)吊桩;(4)吊锤;(5)施工。当发现桩身倾斜角度变大或者有变大的趋势时,停锤,调节纠偏液压缸向偏斜相反方向调整柴油锤作用点位置,人为造成柴油锤偏打的状况;当垂直度恢复至完全满足设计要求时停锤,重新调节纠偏液压缸,使柴油锤作用点与桩中心位置重合。本发明无需提前打设定位架,只需运用现有的打桩设备通过控制柴油锤的作用点位置就能实现纠偏,大大简化了施工的复杂程度,同时降低了工程成本。
Description
技术领域
本发明涉及一种在用柴油锤进行海上钢管桩施工时对钢管桩进行垂直度控制及纠偏的方法与装备。
背景技术
随着海上桩基向大管径、高精度方向发展,目前现有的钢管桩施工工艺方法在保证垂直度方面存在着较大的问题。主要体现在两个方面:1、如果单纯吊打,则难以保证高精度的要求;2、如果采用定位架方式,则大大增加施工作业的难度及工作量,且大大增加了工程造价,且往往需要多种作业船配合完成。
发明内容
本发明针对上述现有技术存在的不足,提出了一种利用柴油锤自身来对沉桩过程中钢管桩垂直度进行控制的施工工艺及装备。
本发明的柴油锤纠偏施工工艺,该施工工艺包括如下步骤:
1、船舶就位
2、施工准备
3、吊桩
4、吊锤
5、施工
当发现桩身倾斜角度变大或者有变大的趋势时,停锤,调节纠偏液压缸5向偏斜相反方向调整柴油锤作用点位置,人为造成柴油锤偏打的状况。
优选的是用调节纠偏液压缸向偏斜相反方向调整柴油锤作用点位置,人为造成柴油锤偏打的状况;
优选的是包含纠偏液压缸的锤笼装置。
本发明的有益效果是:无需提前打设定位架,只需运用现有的打桩设备通过控制柴油锤的作用点位置就能实现纠偏,大大简化了施工的复杂程度,同时降低了工程成本。
附图说明
附图一为本发明的柴油锤纠偏结构示意图
附图二为本发明的柴油锤偏位打桩纠偏施工工艺的示意图;
具体实施方式
为了能进一步了解本发明的结构、特征及其它目的,现结合所附较佳实施例详细说明如下,所说明的较佳实施例仅用于说明本发明的技术方案,并非限定本发明。
本发明的具体实施方式如下:
如图1至2所示,
该柴油锤偏位打桩纠偏施工工艺,包括如下步骤:
1、船舶就位
(1)打桩船、运桩船开至预定施工地点;
(2)调整船舶站位下锚,以方便作业拿桩及拿锤。
2、施工准备
(1)打开抱桩架上下两层液压抱桩器图一中的4,根据桩径调整各个液压器,保证有足够的空间放置钢管桩
(2)桩身上端安装倾斜测量仪;
3、吊桩
(1)借助运桩小车,打桩船单点起吊钢管桩
(2)将桩吊运至抱桩器内,关闭液压抱桩器
(3)根据倾斜测量仪调节桩身的垂直度
4、吊锤
(1)根据桩径调节锤笼内的纠偏液压缸;
(2)起吊带有锤笼的柴油冲击锤放置至桩顶位置;
(3)根据倾斜测量仪数据微调纠偏液压缸,使桩的垂直度满足设计要求;
(4)施工准备就绪
5、施工
(1)开动柴油锤开始施工,施工初始控制柴油锤的打击能,防止出现溜桩的情况;
(2)时时观测倾斜测量仪,观测桩身的垂直度;
(3)当发现桩身倾斜角度变大或者有变大的趋势时,停锤,调节纠偏液压缸5向偏斜相反方向调整柴油锤作用点位置,人为造成柴油锤偏打的状况;
(4)重新开动柴油锤施工,依旧是控制柴油锤的打击能,同时时时观测桩身的垂直度;
(5)当桩身垂直度恢复至满足设计要求时,停锤,静止一段时间观测桩的垂直度是否会发生变化,如若回弹则需重新开锤继续施工至垂直度不再变化为止;
(6)当垂直度恢复至完全满足设计要求时停锤,重新调节纠偏液压缸5,使柴油锤作用点与桩中心位置重合;
(7)继续施工;
(8)重复(1)-(6)过程直至施工完成。
Claims (2)
1.一种海上柴油锤偏位打桩纠偏施工工艺,其特征在于,该施工工艺包括如下步骤:
通过调整柴油锤锤笼中设置的纠偏液压缸,使柴油锤可以偏位打设钢管桩,时时调整桩垂直度,从而达到设计要求;
具体步骤为:
1、船舶就位
(1)打桩船、运桩船开至预定施工地点;
(2)调整船舶站位下锚,以方便作业拿桩及拿锤;
2、施工准备
(1)打开抱桩架上下两层液压抱桩器,根据桩径调整各个液压抱桩器,保证有足够的空间放置钢管桩;
(2)桩身上端安装倾斜测量仪;
3、吊桩
(1)借助运桩小车,打桩船单点起吊钢管桩;
(2)将桩吊运至液压抱桩器内,关闭液压抱桩器;
(3)根据倾斜测量仪调节桩身的垂直度;
4、吊锤
(1)根据桩径调节锤笼内的纠偏液压缸;
(2)起吊带有锤笼的柴油锤放置至桩顶位置;
(3)根据倾斜测量仪数据微调纠偏液压缸,使桩的垂直度满足设计要求;
(4)施工准备就绪;
5、施工
(1)开动柴油锤开始施工,施工初始控制柴油锤的打击能,防止出现溜桩的情况;
(2)时时观测倾斜测量仪,观测桩身的垂直度;
(3)当发现桩身倾斜角度变大或者有变大的趋势时,停锤,调节纠偏液压缸向倾斜相反方向调整柴油锤作用点位置,人为造成柴油锤偏打的状况;
(4)重新开动柴油锤施工,依旧是控制柴油锤的打击能,同时时时观测桩身的垂直度;
(5)当桩身垂直度恢复至满足设计要求时,停锤,静止一段时间观测桩的垂直度是否会发生变化,如若回弹则需重新开锤继续施工至垂直度不再变化为止;
(6)当垂直度恢复至完全满足设计要求时停锤,重新调节纠偏液压缸,使柴油锤作用点与桩中心位置重合;
(7)继续施工;
(8)重复(1)-(6)过程直至施工完成。
2.根据权利要求1所述的海上柴油锤偏位打桩纠偏施工工艺,其特征在于,替打与桩顶完全接触。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610362451.9A CN105951832B (zh) | 2016-05-27 | 2016-05-27 | 海上柴油锤偏位打桩纠偏施工工艺 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610362451.9A CN105951832B (zh) | 2016-05-27 | 2016-05-27 | 海上柴油锤偏位打桩纠偏施工工艺 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105951832A CN105951832A (zh) | 2016-09-21 |
| CN105951832B true CN105951832B (zh) | 2018-12-11 |
Family
ID=56910866
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610362451.9A Active CN105951832B (zh) | 2016-05-27 | 2016-05-27 | 海上柴油锤偏位打桩纠偏施工工艺 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105951832B (zh) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108193681A (zh) * | 2018-01-15 | 2018-06-22 | 南通双星自动化设备有限公司 | 一种用于海上风力发电机的打桩架机构 |
| CN109613939A (zh) * | 2019-01-15 | 2019-04-12 | 山东科技大学 | 一种防溜桩的桩体内气压调节装置 |
| NL2024525B1 (en) * | 2019-12-20 | 2021-09-02 | Ihc Holland Ie Bv | A system and a method for controlling a motion compensated pile guide for a floating vessel, and a vessel |
| CN111042229B (zh) * | 2019-12-26 | 2021-12-28 | 广东精铟海洋工程股份有限公司 | 一种打桩偏离实时检测与纠偏系统及方法 |
| CN111532983B (zh) * | 2020-05-29 | 2022-09-13 | 中交一航局第二工程有限公司 | 单点起吊立桩系统及立桩施工方法 |
| CN112265919B (zh) * | 2020-10-31 | 2025-04-25 | 上海广大基础工程有限公司 | 一种自平衡静钻根植桩吊装穿线装置及其施工方法 |
| CN112983276B (zh) * | 2021-03-19 | 2023-08-29 | 中建四局第一建设有限公司 | 基于大直径超长桩成孔钻机的纠偏装置、钻机及纠偏方法 |
| CN114622556B (zh) * | 2022-03-24 | 2023-08-08 | 中国电建市政建设集团有限公司 | 基于ai图像识别的cfg桩智能纠偏方法及纠偏装置 |
| CN116163304B (zh) * | 2023-03-28 | 2023-10-20 | 广东省源天工程有限公司 | 一种基于液压振动锤的智能打桩系统 |
| CN119061893B (zh) * | 2024-10-23 | 2025-09-09 | 中交广州航道局有限公司 | 一种钢管桩沉桩定位架及其定位方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2599075Y (zh) * | 2003-02-26 | 2004-01-14 | 夏树清 | 高效锤振式组合桩机 |
| DE102004031260A1 (de) * | 2004-06-29 | 2006-01-19 | Franki Grundbau Gmbh & Co.Kg | Vorrichtung und Verfahren zur Herstellung von Pfählen mit einem Rammbären |
| CN103243745A (zh) * | 2013-04-28 | 2013-08-14 | 江苏兴厦建筑安装有限公司 | 一种管桩纠偏复位的方法 |
| CN205000892U (zh) * | 2015-09-30 | 2016-01-27 | 广州市第二市政工程有限公司 | 具有测偏功能的自动冲孔桩机 |
-
2016
- 2016-05-27 CN CN201610362451.9A patent/CN105951832B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2599075Y (zh) * | 2003-02-26 | 2004-01-14 | 夏树清 | 高效锤振式组合桩机 |
| DE102004031260A1 (de) * | 2004-06-29 | 2006-01-19 | Franki Grundbau Gmbh & Co.Kg | Vorrichtung und Verfahren zur Herstellung von Pfählen mit einem Rammbären |
| CN103243745A (zh) * | 2013-04-28 | 2013-08-14 | 江苏兴厦建筑安装有限公司 | 一种管桩纠偏复位的方法 |
| CN205000892U (zh) * | 2015-09-30 | 2016-01-27 | 广州市第二市政工程有限公司 | 具有测偏功能的自动冲孔桩机 |
Non-Patent Citations (2)
| Title |
|---|
| 吊打直桩锤笼的改进;袁孟全;《港工技术》;19931231(第2期);第1、3节 * |
| 钢管桩在地基加固工程中的研究与应用;廖从荣;《优秀硕士学位论文全文库》;20061231;第4.1节 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105951832A (zh) | 2016-09-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105951832B (zh) | 海上柴油锤偏位打桩纠偏施工工艺 | |
| CN104480865B (zh) | 一种大型钢沉井精确定位方法 | |
| CN206826891U (zh) | 一种基于甲板驳改造的海上风机单桩沉桩作业驳 | |
| US9976273B2 (en) | Foundation of an offshore structure | |
| KR20130124457A (ko) | 해저 정박 시스템 및 방법 | |
| CN104563119A (zh) | 旋转式水上打桩导架 | |
| CN103031844B (zh) | 用于将多个桩打入海床的方法和装置 | |
| CN102071647A (zh) | 一种拆装式钢栈桥安装方法 | |
| CN108316338B (zh) | 一种吸力贯入式弧形钢制锚 | |
| CN104727336A (zh) | 浅海风电场大型单管桩基础施工方法 | |
| CN104032765A (zh) | 一种浅海风电场嵌岩单桩基础施工方法 | |
| CN109853600A (zh) | 锁扣钢管桩与工字型板桩组合围堰结构及其施工方法 | |
| NO20092237L (no) | Understottelse for vindturbin eller lignende | |
| KR20220116472A (ko) | 부유 선박용 거동 보상 파일 가이드를 제어하기 위한 시스템 및 방법, 그리고 선박 | |
| CN108532626A (zh) | 一种带限位桩的吸力贯入式平板锚 | |
| CN213414164U (zh) | 一种船舶定位机构 | |
| CN202176267U (zh) | 一种新的吸力桩式海底钻井基盘 | |
| CN206365354U (zh) | 一种单根钢桩与单个水泥墩组装式网箱锚固基础 | |
| CN105401564A (zh) | 将潮流能发电装置固定于水底的施工方法和潮流发电装置 | |
| CN108528636A (zh) | 一种带圆弧固定板的吸力贯入式平板锚 | |
| CN102409680B (zh) | 滑道组合桩水下送桩工艺 | |
| CN102953709A (zh) | 一种新的吸力桩式海底钻井基盘 | |
| CN221276594U (zh) | 一种辅助海上沉桩施工用送桩器 | |
| CN106522224A (zh) | 一种深水区预应力混凝土u型板桩导架沉桩工艺 | |
| CN109736347A (zh) | 一种水下基槽挡泥墙的施工工艺 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |