CN105956108B - A kind of automatic processing method and system of high load - Google Patents
A kind of automatic processing method and system of high load Download PDFInfo
- Publication number
- CN105956108B CN105956108B CN201610290314.9A CN201610290314A CN105956108B CN 105956108 B CN105956108 B CN 105956108B CN 201610290314 A CN201610290314 A CN 201610290314A CN 105956108 B CN105956108 B CN 105956108B
- Authority
- CN
- China
- Prior art keywords
- treatment progress
- value
- current
- processes
- default
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3051—Monitoring arrangements for monitoring the configuration of the computing system or of the computing system component, e.g. monitoring the presence of processing resources, peripherals, I/O links, software programs
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
- G06F16/217—Database tuning
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Computing Systems (AREA)
- Quality & Reliability (AREA)
- General Factory Administration (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
The present invention relates to a kind of automatic processing method of high load and systems.Wherein method includes: step S1, obtains current traffic;Step S2, judges whether current traffic belongs to default shoulder load range and otherwise execute S3 if so, process terminates;Current process quantity is compared step S3 with default treatment progress quantity determined threshold or default treatment progress quantity ceiling value, adjusts the current process quantity for the first time according to comparison result;Number of processes adjusted for the first time is compared with default treatment progress quantity determined threshold or default treatment progress quantity ceiling value, adjusts current process quantity according to second of comparison result by step S4.The present invention can carry out Full-automatic monitoring to high-load system, and monitoring threshold value can be adjusted flexibly, easy to operate, and response rapidly, saves human cost.
Description
Technical field
The present invention relates to the automatic processing methods and system of data processing field more particularly to a kind of high load.
Background technique
The case where load surge can be encountered often due to transaction processing system, causes business processing duration to increase when surge
Add, number of services to be processed increases substantially, and will cause database while needing to increase process and handle as early as possible, and increase process
System pressure increases, unfavorable to database stable operation, therefore needs to reduce process in the case that daily load is not heavy, reduces
Database load.
Currently in minicomputer background processing system, when processing severe relies on the business of database, since data are usually pressed
Data value section divides the mode of table to store, and leads to that treatment progress quantity cannot be reduced when portfolio is small, in portfolio
Business process quantity can not be increased automatically when big.
In the prior art, common solution is: 1, monitoring system and be in processing underload or high-load condition;2,
Modification configuration decreases or increases number of processes, or adjustment start command parameter;3, reboot process program;4, continue to monitor.
Common solution is very high to monitoring personnel requirement, and staff needs by being familiar with system for a long time simultaneously
Solve the meaning of parameters, it is necessary to be familiar with system performance and order, while need monitoring system state always, if portfolio is prominent
Become, needs to modify parameter repeatedly.The mode of this full-time manual monitoring and operation, heavy workload, personnel's pressure is big, manpower at
This height is easy to appear erroneous judgement, fails to judge and situations such as maloperation.Issue handling duration is influenced by personnel's situation, can not be rung immediately
It should and handle, the basic quality for the treatment of people is required high.
Summary of the invention
The technical problem to be solved by the present invention is in view of the deficiencies of the prior art, provide a kind of automatically processing for high load
Method and system.
The technical scheme to solve the above technical problems is that a kind of automatic processing method of high load, including such as
Lower step:
Step S1 obtains current traffic;
Step S2, judges whether current traffic belongs to default shoulder load range and otherwise hold if so, process terminates
Row S3;
Step S3, by current process quantity and default treatment progress quantity determined threshold or default treatment progress quantity ceiling value
It is compared, the current process quantity is adjusted according to comparison result for the first time;
Step S4, will first time number of processes adjusted and default treatment progress quantity determined threshold or default treatment progress
Quantity ceiling value compares, and adjusts current process quantity according to second of comparison result.
The beneficial effects of the present invention are: the present invention can to high-load system carry out Full-automatic monitoring, can be realized it is complete from
Dynamic monitoring and operation, current process quantity is matched with database load, guarantees the stable operation of database, easy to operate,
In time, response rapidly, saves human cost for processing.
Based on the above technical solution, the present invention can also be improved as follows.
Further, in step S2, presetting portfolio underload ident value in shoulder load range is a, and portfolio height is negative
Lotus ident value is b, judges whether current traffic belongs to the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, executes S3.
Beneficial effect using above-mentioned further scheme is: by by current traffic and default shoulder load range ratio
It is right, judge whether to need to be adjusted number of processes, to realize the effect of automatic monitoring current traffic.
Further, the specific implementation of step S3 are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if
Current process quantity≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced one
A step value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if
Current process quantity >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased by one
A step value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number
Amount determined threshold or the default treatment progress quantity ceiling value are compared, and can satisfy business demand in number of processes
Under the premise of, to system without operation, it ensure that the operational efficiency of system.
Further, the specific implementation of step S4 are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity ceiling value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number
Amount determined threshold or the default treatment progress quantity ceiling value are compared, can be in the premise of number of processes deviation limiting value
Under, number of processes is automatically adjusted, guarantees the normal operation of database.
Further, it is logical in step S3 reducing a step value or increase a step value current process quantity
Cross the realization of adjustment process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value
Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Beneficial effect using above-mentioned further scheme is: carrying out the adjustment of relevant parameter, by configuration file convenient for behaviour
Make personnel's learning and mastering, parameter adjustment has the flexibility and accuracy of height.
The another technical solution that the present invention solves above-mentioned technical problem is as follows: a kind of automated processing system of high load,
Module, portfolio judgment module, the first number of processes adjustment module and the second number of processes, which are obtained, including portfolio adjusts module;
The portfolio obtains module, for obtaining current traffic;
The portfolio judgment module, for judging whether current traffic belongs to default shoulder load range, if so,
Process terminates, and otherwise triggers the first number of processes adjustment module;
First number of processes adjusts module, for by current process quantity and default treatment progress quantity determined threshold or
Default treatment progress quantity ceiling value is compared, and adjusts the current process quantity for the first time according to comparison result;
Second number of processes adjusts module, and being used for will first time number of processes adjusted and default treatment progress number
It measures determined threshold or default treatment progress quantity ceiling value compares, adjust current process quantity according to second of comparison result.
The beneficial effects of the present invention are: the present invention can to high-load system carry out Full-automatic monitoring, can be realized it is complete from
Dynamic monitoring and operation, current process quantity is matched with database load, guarantees the stable operation of database, easy to operate,
In time, response rapidly, saves human cost for processing.
Based on the above technical solution, the present invention can also be improved as follows.
Further, presetting portfolio underload ident value in shoulder load range is a, and portfolio high load capacity ident value is
B, the portfolio judgment module judge whether current traffic belongs to the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, the first number of processes adjustment module is triggered.
Beneficial effect using above-mentioned further scheme is: by by current traffic and default shoulder load range ratio
It is right, judge whether to need to be adjusted number of processes, to realize the effect of automatic monitoring current traffic.
Further, the specific implementation of the first number of processes adjustment module are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if
Current process quantity≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced one
A step value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if
Current process quantity >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased by one
A step value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number
Amount determined threshold or the default treatment progress quantity ceiling value are compared, and can satisfy business demand in number of processes
Under the premise of, to system without operation, it ensure that the operational efficiency of system.
Further, the specific implementation of the second number of processes adjustment module are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity ceiling value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number
Amount determined threshold or the default treatment progress quantity ceiling value are compared, can be in the premise of number of processes deviation limiting value
Under, number of processes is automatically adjusted, guarantees the normal operation of database.
Further, the current process quantity is reduced a step value or increasing by the first number of processes adjustment module
Adding a step value is realized by adjusting process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value
Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Beneficial effect using above-mentioned further scheme is: carrying out the adjustment of relevant parameter, by configuration file convenient for behaviour
Make personnel's learning and mastering, parameter adjustment has the flexibility and accuracy of height.
Detailed description of the invention
Fig. 1 is a kind of automatic processing method flow chart of high load of the present invention;
Fig. 2 is a kind of automated processing system structure chart of high load of the present invention.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the invention.
Fig. 1 is a kind of automatic processing method flow chart of high load of the present invention;
As shown in Figure 1, a kind of automatic processing method of high load, includes the following steps:
Step S1 obtains current traffic;
Step S2, judges whether current traffic belongs to default shoulder load range and otherwise hold if so, process terminates
Row S3;
In a specific embodiment of the present invention, presetting portfolio underload ident value in shoulder load range is a, portfolio
High load capacity ident value is b, judges whether current traffic belongs to the specific implementation of default shoulder load range are as follows: if a < is current
Portfolio < b, then process terminates;If current traffic≤a or current traffic >=b, executes S3.
Step S3, by current process quantity and default treatment progress quantity determined threshold or default treatment progress quantity ceiling value
It is compared, the current process quantity is adjusted according to comparison result for the first time;
In a specific embodiment of the present invention, the specific implementation of step S3 are as follows: according to the value range of current traffic, divide
It is adjusted for two kinds of situations: if current traffic≤a, by current process quantity and the default treatment progress quantity determined threshold
It is compared, if current process quantity≤default treatment progress quantity determined threshold, process terminates, otherwise by current process
Quantity reduces a step value;If current traffic >=b, by current process quantity and the default treatment progress quantity ceiling value
It is compared, if current process quantity >=default treatment progress quantity ceiling value, process terminates, otherwise by current process
Quantity increases a step value.
In a specific embodiment of the present invention, the current process quantity is reduced into a step value or increases a stepping
Value is realized by adjusting process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value
Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Step S4, will first time number of processes adjusted and default treatment progress quantity determined threshold or default treatment progress
Quantity ceiling value compares, and adjusts current process quantity according to second of comparison result.
In a specific embodiment of the present invention, the specific implementation of step S4 are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity ceiling value.
Fig. 2 is a kind of automated processing system structure chart of high load of the present invention.
As shown in Fig. 2, a kind of automated processing system of high load, including portfolio obtain module, portfolio judgment module,
First number of processes adjusts module and the second number of processes adjusts module;
The portfolio obtains module, for obtaining current traffic;
The portfolio judgment module, for judging whether current traffic belongs to default shoulder load range, if so,
Process terminates, and otherwise triggers the first number of processes adjustment module;
In a specific embodiment of the present invention, presetting portfolio underload ident value in shoulder load range is a, portfolio
High load capacity ident value is b, and the portfolio judgment module judges whether current traffic belongs to the tool of default shoulder load range
Body is realized are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, the first number of processes adjustment module is triggered.
First number of processes adjusts module, for by current process quantity and default treatment progress quantity determined threshold or
Default treatment progress quantity ceiling value is compared, and adjusts the current process quantity for the first time according to comparison result;
In a specific embodiment of the present invention, the specific implementation of the first number of processes adjustment module are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if
Current process quantity≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced one
A step value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if
Current process quantity >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased by one
A step value.
In a specific embodiment of the present invention, the first number of processes adjustment module reduces the current process quantity
One step value of one step value or increase is realized by adjusting process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value
Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Second number of processes adjusts module, and being used for will first time number of processes adjusted and default treatment progress number
It measures determined threshold or default treatment progress quantity ceiling value compares, adjust current process quantity according to second of comparison result.
In a specific embodiment of the present invention, the specific implementation of the second number of processes adjustment module are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process
Quantity is adjusted to the default treatment progress quantity ceiling value.
In the description of this specification, reference term " embodiment one ", " embodiment two ", " example ", " specific example " or
The description of " some examples " etc. means that specific method, device or feature described in conjunction with this embodiment or example are contained in this hair
In at least one bright embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to
Identical embodiment or example.Moreover, specific features, method, apparatus or the feature of description can be in any one or more realities
Applying can be combined in any suitable manner in example or example.In addition, without conflicting with each other, those skilled in the art can incite somebody to action
The feature of different embodiments or examples and different embodiments or examples described in this specification is combined.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of automatic processing method of high load, which comprises the steps of:
Step S1 obtains current traffic;
Step S2, judges whether current traffic belongs to default shoulder load range and otherwise execute S3 if so, process terminates;
Step S3 carries out current process quantity and default treatment progress quantity determined threshold or default treatment progress quantity ceiling value
It compares, the current process quantity is adjusted according to comparison result for the first time;
Step S4, will first time number of processes adjusted and default treatment progress quantity determined threshold or default treatment progress quantity
Ceiling value compares, and adjusts current process quantity according to second of comparison result;
The specific implementation of step S4 are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process quantity
It is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process quantity
It is adjusted to the default treatment progress quantity ceiling value.
2. a kind of automatic processing method of high load according to claim 1, which is characterized in that in step S2, preset in
Between in load range portfolio underload ident value be a, portfolio high load capacity ident value is b, judges whether current traffic belongs to
In the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, executes S3.
3. a kind of automatic processing method of high load according to claim 2, which is characterized in that the specific implementation of step S3
Are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if currently
Number of processes≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced a step
Into value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if currently
Number of processes >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased a step
Into value.
4. a kind of automatic processing method of high load according to claim 3, which is characterized in that work as by described in step S3
Preceding number of processes, which reduces a step value or increases a step value, to be realized by adjusting process configuration file;
The configuration file includes the pass of process running environment, inspection interface, step value, number of processes and high underload ident value
System, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
5. a kind of automated processing system of high load, which is characterized in that including portfolio obtain module, portfolio judgment module,
First number of processes adjusts module and the second number of processes adjusts module;
The portfolio obtains module, for obtaining current traffic;
The portfolio judgment module, for judging whether current traffic belongs to default shoulder load range, if so, process
Terminate, otherwise triggers the first number of processes adjustment module;
First number of processes adjusts module, is used for current process quantity and default treatment progress quantity determined threshold or presets
Treatment progress quantity ceiling value is compared, and adjusts the current process quantity for the first time according to comparison result;
Second number of processes adjusts module, and being used for will first time number of processes adjusted and default treatment progress quantity bottom
Limit value or default treatment progress quantity ceiling value compare, and adjust current process quantity according to second of comparison result;
The specific implementation of the second number of processes adjustment module are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process quantity
It is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process quantity
It is adjusted to the default treatment progress quantity ceiling value.
6. a kind of automated processing system of high load according to claim 5, which is characterized in that default shoulder load range
Middle portfolio underload ident value is a, and portfolio high load capacity ident value is b, and the portfolio judgment module judges current business
Whether amount belongs to the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, the first number of processes adjustment module is triggered.
7. a kind of automated processing system of high load according to claim 6, which is characterized in that first number of processes
Adjust the specific implementation of module are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if currently
Number of processes≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced a step
Into value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if currently
Number of processes >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased a step
Into value.
8. a kind of automated processing system of high load according to claim 7, which is characterized in that first number of processes
It is to configure text by adjusting process that the current process quantity is reduced a step value or increase a step value by adjustment module
What part was realized;
The configuration file includes the pass of process running environment, inspection interface, step value, number of processes and high underload ident value
System, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610290314.9A CN105956108B (en) | 2016-05-04 | 2016-05-04 | A kind of automatic processing method and system of high load |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610290314.9A CN105956108B (en) | 2016-05-04 | 2016-05-04 | A kind of automatic processing method and system of high load |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105956108A CN105956108A (en) | 2016-09-21 |
CN105956108B true CN105956108B (en) | 2019-07-26 |
Family
ID=56913774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610290314.9A Active CN105956108B (en) | 2016-05-04 | 2016-05-04 | A kind of automatic processing method and system of high load |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105956108B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111179080B (en) * | 2019-12-23 | 2023-10-27 | 中国建设银行股份有限公司 | Order processing method and order processing device |
CN113722073A (en) * | 2021-09-15 | 2021-11-30 | 中国银行股份有限公司 | Transaction matching processing method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103188730A (en) * | 2011-12-31 | 2013-07-03 | 中国移动通信集团山东有限公司 | System resource load regulating system and method and device and equipment regulating server |
CN103488728A (en) * | 2013-09-17 | 2014-01-01 | 北京思特奇信息技术股份有限公司 | Method and device for dynamic scaling adjustment of number of processes in business system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8849749B2 (en) * | 2010-05-14 | 2014-09-30 | Oracle International Corporation | Load balancing in parallel database systems using multi-reordering |
-
2016
- 2016-05-04 CN CN201610290314.9A patent/CN105956108B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103188730A (en) * | 2011-12-31 | 2013-07-03 | 中国移动通信集团山东有限公司 | System resource load regulating system and method and device and equipment regulating server |
CN103488728A (en) * | 2013-09-17 | 2014-01-01 | 北京思特奇信息技术股份有限公司 | Method and device for dynamic scaling adjustment of number of processes in business system |
Also Published As
Publication number | Publication date |
---|---|
CN105956108A (en) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103617098B (en) | Intelligent backup method and intelligent backup system based on data variation | |
CN103955491B (en) | Method for synchronizing timing data increment | |
CN101287073B (en) | Adaptive Acquisition Method of Stable Brightness Image in Machine Vision System in Variable Lighting Environment | |
EP3324304A1 (en) | Data processing method, device and system | |
DE102015102689B4 (en) | Controlling processor edge slew rates based on battery charge level | |
CN102195813A (en) | Method and device for intelligently creating operation and maintenance worksheet | |
CN107878366A (en) | A kind of method and device for being used to control new energy vehicle controller working condition | |
CN105956108B (en) | A kind of automatic processing method and system of high load | |
CN108288272A (en) | Yarn recognition methods and device | |
CN105389214A (en) | Monitoring method and system | |
CN106293402B (en) | Application control method and its device | |
CN116633002B (en) | UV variable frequency power supply parallel operation control system based on artificial intelligence | |
CN114553599B (en) | Garden monitoring system and method based on edge calculation | |
CN106835200B (en) | Aluminum electrolysis cell region control system | |
CN105426169A (en) | Method for automatically adjusting network card identification sequence in Windows system | |
CN102056201A (en) | Method and device for processing abnormal condition in service process | |
CN105224703B (en) | Electrical equipment management method and system | |
CN109542874A (en) | Deriving method, guiding device, server, terminal and readable storage medium storing program for executing | |
CN105871633A (en) | Application control method, device and system | |
CN107036684B (en) | A kind of flowmeter fault detection method and device | |
CN102881619A (en) | Yield monitoring system and monitoring method thereof | |
CN117423444A (en) | Medical equipment management system based on Internet of things | |
CN109871403A (en) | Industrial big data analysis method based on industry supply chain | |
CN210431453U (en) | Telephone debugging system and equipment | |
CN112426155A (en) | On-site work optimization method and system based on employee work emotion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |