[go: up one dir, main page]

CN105956108B - A kind of automatic processing method and system of high load - Google Patents

A kind of automatic processing method and system of high load Download PDF

Info

Publication number
CN105956108B
CN105956108B CN201610290314.9A CN201610290314A CN105956108B CN 105956108 B CN105956108 B CN 105956108B CN 201610290314 A CN201610290314 A CN 201610290314A CN 105956108 B CN105956108 B CN 105956108B
Authority
CN
China
Prior art keywords
treatment progress
value
current
processes
default
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610290314.9A
Other languages
Chinese (zh)
Other versions
CN105956108A (en
Inventor
徐文宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Si Tech Information Technology Co Ltd
Original Assignee
Beijing Si Tech Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Si Tech Information Technology Co Ltd filed Critical Beijing Si Tech Information Technology Co Ltd
Priority to CN201610290314.9A priority Critical patent/CN105956108B/en
Publication of CN105956108A publication Critical patent/CN105956108A/en
Application granted granted Critical
Publication of CN105956108B publication Critical patent/CN105956108B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3051Monitoring arrangements for monitoring the configuration of the computing system or of the computing system component, e.g. monitoring the presence of processing resources, peripherals, I/O links, software programs
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/217Database tuning

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Computing Systems (AREA)
  • Quality & Reliability (AREA)
  • General Factory Administration (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The present invention relates to a kind of automatic processing method of high load and systems.Wherein method includes: step S1, obtains current traffic;Step S2, judges whether current traffic belongs to default shoulder load range and otherwise execute S3 if so, process terminates;Current process quantity is compared step S3 with default treatment progress quantity determined threshold or default treatment progress quantity ceiling value, adjusts the current process quantity for the first time according to comparison result;Number of processes adjusted for the first time is compared with default treatment progress quantity determined threshold or default treatment progress quantity ceiling value, adjusts current process quantity according to second of comparison result by step S4.The present invention can carry out Full-automatic monitoring to high-load system, and monitoring threshold value can be adjusted flexibly, easy to operate, and response rapidly, saves human cost.

Description

A kind of automatic processing method and system of high load
Technical field
The present invention relates to the automatic processing methods and system of data processing field more particularly to a kind of high load.
Background technique
The case where load surge can be encountered often due to transaction processing system, causes business processing duration to increase when surge Add, number of services to be processed increases substantially, and will cause database while needing to increase process and handle as early as possible, and increase process System pressure increases, unfavorable to database stable operation, therefore needs to reduce process in the case that daily load is not heavy, reduces Database load.
Currently in minicomputer background processing system, when processing severe relies on the business of database, since data are usually pressed Data value section divides the mode of table to store, and leads to that treatment progress quantity cannot be reduced when portfolio is small, in portfolio Business process quantity can not be increased automatically when big.
In the prior art, common solution is: 1, monitoring system and be in processing underload or high-load condition;2, Modification configuration decreases or increases number of processes, or adjustment start command parameter;3, reboot process program;4, continue to monitor.
Common solution is very high to monitoring personnel requirement, and staff needs by being familiar with system for a long time simultaneously Solve the meaning of parameters, it is necessary to be familiar with system performance and order, while need monitoring system state always, if portfolio is prominent Become, needs to modify parameter repeatedly.The mode of this full-time manual monitoring and operation, heavy workload, personnel's pressure is big, manpower at This height is easy to appear erroneous judgement, fails to judge and situations such as maloperation.Issue handling duration is influenced by personnel's situation, can not be rung immediately It should and handle, the basic quality for the treatment of people is required high.
Summary of the invention
The technical problem to be solved by the present invention is in view of the deficiencies of the prior art, provide a kind of automatically processing for high load Method and system.
The technical scheme to solve the above technical problems is that a kind of automatic processing method of high load, including such as Lower step:
Step S1 obtains current traffic;
Step S2, judges whether current traffic belongs to default shoulder load range and otherwise hold if so, process terminates Row S3;
Step S3, by current process quantity and default treatment progress quantity determined threshold or default treatment progress quantity ceiling value It is compared, the current process quantity is adjusted according to comparison result for the first time;
Step S4, will first time number of processes adjusted and default treatment progress quantity determined threshold or default treatment progress Quantity ceiling value compares, and adjusts current process quantity according to second of comparison result.
The beneficial effects of the present invention are: the present invention can to high-load system carry out Full-automatic monitoring, can be realized it is complete from Dynamic monitoring and operation, current process quantity is matched with database load, guarantees the stable operation of database, easy to operate, In time, response rapidly, saves human cost for processing.
Based on the above technical solution, the present invention can also be improved as follows.
Further, in step S2, presetting portfolio underload ident value in shoulder load range is a, and portfolio height is negative Lotus ident value is b, judges whether current traffic belongs to the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, executes S3.
Beneficial effect using above-mentioned further scheme is: by by current traffic and default shoulder load range ratio It is right, judge whether to need to be adjusted number of processes, to realize the effect of automatic monitoring current traffic.
Further, the specific implementation of step S3 are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if Current process quantity≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced one A step value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if Current process quantity >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased by one A step value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number Amount determined threshold or the default treatment progress quantity ceiling value are compared, and can satisfy business demand in number of processes Under the premise of, to system without operation, it ensure that the operational efficiency of system.
Further, the specific implementation of step S4 are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity ceiling value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number Amount determined threshold or the default treatment progress quantity ceiling value are compared, can be in the premise of number of processes deviation limiting value Under, number of processes is automatically adjusted, guarantees the normal operation of database.
Further, it is logical in step S3 reducing a step value or increase a step value current process quantity Cross the realization of adjustment process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Beneficial effect using above-mentioned further scheme is: carrying out the adjustment of relevant parameter, by configuration file convenient for behaviour Make personnel's learning and mastering, parameter adjustment has the flexibility and accuracy of height.
The another technical solution that the present invention solves above-mentioned technical problem is as follows: a kind of automated processing system of high load, Module, portfolio judgment module, the first number of processes adjustment module and the second number of processes, which are obtained, including portfolio adjusts module;
The portfolio obtains module, for obtaining current traffic;
The portfolio judgment module, for judging whether current traffic belongs to default shoulder load range, if so, Process terminates, and otherwise triggers the first number of processes adjustment module;
First number of processes adjusts module, for by current process quantity and default treatment progress quantity determined threshold or Default treatment progress quantity ceiling value is compared, and adjusts the current process quantity for the first time according to comparison result;
Second number of processes adjusts module, and being used for will first time number of processes adjusted and default treatment progress number It measures determined threshold or default treatment progress quantity ceiling value compares, adjust current process quantity according to second of comparison result.
The beneficial effects of the present invention are: the present invention can to high-load system carry out Full-automatic monitoring, can be realized it is complete from Dynamic monitoring and operation, current process quantity is matched with database load, guarantees the stable operation of database, easy to operate, In time, response rapidly, saves human cost for processing.
Based on the above technical solution, the present invention can also be improved as follows.
Further, presetting portfolio underload ident value in shoulder load range is a, and portfolio high load capacity ident value is B, the portfolio judgment module judge whether current traffic belongs to the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, the first number of processes adjustment module is triggered.
Beneficial effect using above-mentioned further scheme is: by by current traffic and default shoulder load range ratio It is right, judge whether to need to be adjusted number of processes, to realize the effect of automatic monitoring current traffic.
Further, the specific implementation of the first number of processes adjustment module are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if Current process quantity≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced one A step value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if Current process quantity >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased by one A step value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number Amount determined threshold or the default treatment progress quantity ceiling value are compared, and can satisfy business demand in number of processes Under the premise of, to system without operation, it ensure that the operational efficiency of system.
Further, the specific implementation of the second number of processes adjustment module are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity ceiling value.
Beneficial effect using above-mentioned further scheme is: by by current process quantity and the default treatment progress number Amount determined threshold or the default treatment progress quantity ceiling value are compared, can be in the premise of number of processes deviation limiting value Under, number of processes is automatically adjusted, guarantees the normal operation of database.
Further, the current process quantity is reduced a step value or increasing by the first number of processes adjustment module Adding a step value is realized by adjusting process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Beneficial effect using above-mentioned further scheme is: carrying out the adjustment of relevant parameter, by configuration file convenient for behaviour Make personnel's learning and mastering, parameter adjustment has the flexibility and accuracy of height.
Detailed description of the invention
Fig. 1 is a kind of automatic processing method flow chart of high load of the present invention;
Fig. 2 is a kind of automated processing system structure chart of high load of the present invention.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
Fig. 1 is a kind of automatic processing method flow chart of high load of the present invention;
As shown in Figure 1, a kind of automatic processing method of high load, includes the following steps:
Step S1 obtains current traffic;
Step S2, judges whether current traffic belongs to default shoulder load range and otherwise hold if so, process terminates Row S3;
In a specific embodiment of the present invention, presetting portfolio underload ident value in shoulder load range is a, portfolio High load capacity ident value is b, judges whether current traffic belongs to the specific implementation of default shoulder load range are as follows: if a < is current Portfolio < b, then process terminates;If current traffic≤a or current traffic >=b, executes S3.
Step S3, by current process quantity and default treatment progress quantity determined threshold or default treatment progress quantity ceiling value It is compared, the current process quantity is adjusted according to comparison result for the first time;
In a specific embodiment of the present invention, the specific implementation of step S3 are as follows: according to the value range of current traffic, divide It is adjusted for two kinds of situations: if current traffic≤a, by current process quantity and the default treatment progress quantity determined threshold It is compared, if current process quantity≤default treatment progress quantity determined threshold, process terminates, otherwise by current process Quantity reduces a step value;If current traffic >=b, by current process quantity and the default treatment progress quantity ceiling value It is compared, if current process quantity >=default treatment progress quantity ceiling value, process terminates, otherwise by current process Quantity increases a step value.
In a specific embodiment of the present invention, the current process quantity is reduced into a step value or increases a stepping Value is realized by adjusting process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Step S4, will first time number of processes adjusted and default treatment progress quantity determined threshold or default treatment progress Quantity ceiling value compares, and adjusts current process quantity according to second of comparison result.
In a specific embodiment of the present invention, the specific implementation of step S4 are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity ceiling value.
Fig. 2 is a kind of automated processing system structure chart of high load of the present invention.
As shown in Fig. 2, a kind of automated processing system of high load, including portfolio obtain module, portfolio judgment module, First number of processes adjusts module and the second number of processes adjusts module;
The portfolio obtains module, for obtaining current traffic;
The portfolio judgment module, for judging whether current traffic belongs to default shoulder load range, if so, Process terminates, and otherwise triggers the first number of processes adjustment module;
In a specific embodiment of the present invention, presetting portfolio underload ident value in shoulder load range is a, portfolio High load capacity ident value is b, and the portfolio judgment module judges whether current traffic belongs to the tool of default shoulder load range Body is realized are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, the first number of processes adjustment module is triggered.
First number of processes adjusts module, for by current process quantity and default treatment progress quantity determined threshold or Default treatment progress quantity ceiling value is compared, and adjusts the current process quantity for the first time according to comparison result;
In a specific embodiment of the present invention, the specific implementation of the first number of processes adjustment module are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if Current process quantity≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced one A step value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if Current process quantity >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased by one A step value.
In a specific embodiment of the present invention, the first number of processes adjustment module reduces the current process quantity One step value of one step value or increase is realized by adjusting process configuration file;
The configuration file includes process running environment, checks interface, step value, number of processes and high underload ident value Relationship, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
Second number of processes adjusts module, and being used for will first time number of processes adjusted and default treatment progress number It measures determined threshold or default treatment progress quantity ceiling value compares, adjust current process quantity according to second of comparison result.
In a specific embodiment of the present invention, the specific implementation of the second number of processes adjustment module are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process Quantity is adjusted to the default treatment progress quantity ceiling value.
In the description of this specification, reference term " embodiment one ", " embodiment two ", " example ", " specific example " or The description of " some examples " etc. means that specific method, device or feature described in conjunction with this embodiment or example are contained in this hair In at least one bright embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to Identical embodiment or example.Moreover, specific features, method, apparatus or the feature of description can be in any one or more realities Applying can be combined in any suitable manner in example or example.In addition, without conflicting with each other, those skilled in the art can incite somebody to action The feature of different embodiments or examples and different embodiments or examples described in this specification is combined.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of automatic processing method of high load, which comprises the steps of:
Step S1 obtains current traffic;
Step S2, judges whether current traffic belongs to default shoulder load range and otherwise execute S3 if so, process terminates;
Step S3 carries out current process quantity and default treatment progress quantity determined threshold or default treatment progress quantity ceiling value It compares, the current process quantity is adjusted according to comparison result for the first time;
Step S4, will first time number of processes adjusted and default treatment progress quantity determined threshold or default treatment progress quantity Ceiling value compares, and adjusts current process quantity according to second of comparison result;
The specific implementation of step S4 are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process quantity It is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process quantity It is adjusted to the default treatment progress quantity ceiling value.
2. a kind of automatic processing method of high load according to claim 1, which is characterized in that in step S2, preset in Between in load range portfolio underload ident value be a, portfolio high load capacity ident value is b, judges whether current traffic belongs to In the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, executes S3.
3. a kind of automatic processing method of high load according to claim 2, which is characterized in that the specific implementation of step S3 Are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if currently Number of processes≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced a step Into value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if currently Number of processes >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased a step Into value.
4. a kind of automatic processing method of high load according to claim 3, which is characterized in that work as by described in step S3 Preceding number of processes, which reduces a step value or increases a step value, to be realized by adjusting process configuration file;
The configuration file includes the pass of process running environment, inspection interface, step value, number of processes and high underload ident value System, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
5. a kind of automated processing system of high load, which is characterized in that including portfolio obtain module, portfolio judgment module, First number of processes adjusts module and the second number of processes adjusts module;
The portfolio obtains module, for obtaining current traffic;
The portfolio judgment module, for judging whether current traffic belongs to default shoulder load range, if so, process Terminate, otherwise triggers the first number of processes adjustment module;
First number of processes adjusts module, is used for current process quantity and default treatment progress quantity determined threshold or presets Treatment progress quantity ceiling value is compared, and adjusts the current process quantity for the first time according to comparison result;
Second number of processes adjusts module, and being used for will first time number of processes adjusted and default treatment progress quantity bottom Limit value or default treatment progress quantity ceiling value compare, and adjust current process quantity according to second of comparison result;
The specific implementation of the second number of processes adjustment module are as follows:
If treatment progress quantity determined threshold is preset described in current process quantity < adjusted for the first time, by current process quantity It is adjusted to the default treatment progress quantity determined threshold;
If treatment progress quantity ceiling value is preset described in current process quantity > adjusted for the first time, by current process quantity It is adjusted to the default treatment progress quantity ceiling value.
6. a kind of automated processing system of high load according to claim 5, which is characterized in that default shoulder load range Middle portfolio underload ident value is a, and portfolio high load capacity ident value is b, and the portfolio judgment module judges current business Whether amount belongs to the specific implementation of default shoulder load range are as follows:
If a < current traffic < b, process terminate;
If current traffic≤a or current traffic >=b, the first number of processes adjustment module is triggered.
7. a kind of automated processing system of high load according to claim 6, which is characterized in that first number of processes Adjust the specific implementation of module are as follows:
If current traffic≤a, current process quantity is compared with the default treatment progress quantity determined threshold, if currently Number of processes≤default treatment progress quantity the determined threshold, then process terminates, and current process quantity is otherwise reduced a step Into value;
If current traffic >=b, current process quantity is compared with the default treatment progress quantity ceiling value, if currently Number of processes >=default treatment progress quantity the ceiling value, then process terminates, and current process quantity is otherwise increased a step Into value.
8. a kind of automated processing system of high load according to claim 7, which is characterized in that first number of processes It is to configure text by adjusting process that the current process quantity is reduced a step value or increase a step value by adjustment module What part was realized;
The configuration file includes the pass of process running environment, inspection interface, step value, number of processes and high underload ident value System, order configuration, filename, path, the inspection intervals for restarting mode and real time detecting process.
CN201610290314.9A 2016-05-04 2016-05-04 A kind of automatic processing method and system of high load Active CN105956108B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610290314.9A CN105956108B (en) 2016-05-04 2016-05-04 A kind of automatic processing method and system of high load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610290314.9A CN105956108B (en) 2016-05-04 2016-05-04 A kind of automatic processing method and system of high load

Publications (2)

Publication Number Publication Date
CN105956108A CN105956108A (en) 2016-09-21
CN105956108B true CN105956108B (en) 2019-07-26

Family

ID=56913774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610290314.9A Active CN105956108B (en) 2016-05-04 2016-05-04 A kind of automatic processing method and system of high load

Country Status (1)

Country Link
CN (1) CN105956108B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111179080B (en) * 2019-12-23 2023-10-27 中国建设银行股份有限公司 Order processing method and order processing device
CN113722073A (en) * 2021-09-15 2021-11-30 中国银行股份有限公司 Transaction matching processing method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103188730A (en) * 2011-12-31 2013-07-03 中国移动通信集团山东有限公司 System resource load regulating system and method and device and equipment regulating server
CN103488728A (en) * 2013-09-17 2014-01-01 北京思特奇信息技术股份有限公司 Method and device for dynamic scaling adjustment of number of processes in business system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8849749B2 (en) * 2010-05-14 2014-09-30 Oracle International Corporation Load balancing in parallel database systems using multi-reordering

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103188730A (en) * 2011-12-31 2013-07-03 中国移动通信集团山东有限公司 System resource load regulating system and method and device and equipment regulating server
CN103488728A (en) * 2013-09-17 2014-01-01 北京思特奇信息技术股份有限公司 Method and device for dynamic scaling adjustment of number of processes in business system

Also Published As

Publication number Publication date
CN105956108A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN103617098B (en) Intelligent backup method and intelligent backup system based on data variation
CN103955491B (en) Method for synchronizing timing data increment
CN101287073B (en) Adaptive Acquisition Method of Stable Brightness Image in Machine Vision System in Variable Lighting Environment
EP3324304A1 (en) Data processing method, device and system
DE102015102689B4 (en) Controlling processor edge slew rates based on battery charge level
CN102195813A (en) Method and device for intelligently creating operation and maintenance worksheet
CN107878366A (en) A kind of method and device for being used to control new energy vehicle controller working condition
CN105956108B (en) A kind of automatic processing method and system of high load
CN108288272A (en) Yarn recognition methods and device
CN105389214A (en) Monitoring method and system
CN106293402B (en) Application control method and its device
CN116633002B (en) UV variable frequency power supply parallel operation control system based on artificial intelligence
CN114553599B (en) Garden monitoring system and method based on edge calculation
CN106835200B (en) Aluminum electrolysis cell region control system
CN105426169A (en) Method for automatically adjusting network card identification sequence in Windows system
CN102056201A (en) Method and device for processing abnormal condition in service process
CN105224703B (en) Electrical equipment management method and system
CN109542874A (en) Deriving method, guiding device, server, terminal and readable storage medium storing program for executing
CN105871633A (en) Application control method, device and system
CN107036684B (en) A kind of flowmeter fault detection method and device
CN102881619A (en) Yield monitoring system and monitoring method thereof
CN117423444A (en) Medical equipment management system based on Internet of things
CN109871403A (en) Industrial big data analysis method based on industry supply chain
CN210431453U (en) Telephone debugging system and equipment
CN112426155A (en) On-site work optimization method and system based on employee work emotion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant