CN105868903A - System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof - Google Patents

System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof Download PDF

Info

Publication number
CN105868903A
CN105868903A CN201610182712.9A CN201610182712A CN105868903A CN 105868903 A CN105868903 A CN 105868903A CN 201610182712 A CN201610182712 A CN 201610182712A CN 105868903 A CN105868903 A CN 105868903A
Authority
CN
China
Prior art keywords
equipment
data
management information
acceptance
production management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610182712.9A
Other languages
Chinese (zh)
Inventor
陈晓红
李开灿
孔维娜
芮昱
张煊
方晋东
袁冰
赵锐
山东海
孔平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610182712.9A priority Critical patent/CN105868903A/en
Publication of CN105868903A publication Critical patent/CN105868903A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system for managing acceptance and transferring to fixed asset of a newly commissioned transformation device and a working method thereof. The system includes a scanning device which scans electronic materials of the newly commissioned electronic device to be accepted and converts the scanned electronic materials into pictures and stores the pictures to an electronic material storing platform. The electronic material storing platform stores the data and transmits the data to a production management information system through network transmission. The production management information system receives data which are obtained by online monitoring by primary equipment within a substation, and transmits the data to a cloud server. According to the invention, the system is based on a PMS2.0 system which is the production management information system, establishes an informatization platform, saves manpower and material resources, realizes processing analysis and sharing of electronic data, and increases acceptance efficiency of the newly commissioned transformation device.

Description

一种新投变电设备验收及转资管理系统及其工作方法A new investment and transformation equipment acceptance and capital transfer management system and its working method

技术领域technical field

本发明涉及一种设备管理系统,具体涉及一种新投变电设备验收及转资管理系统及其工作方法。The invention relates to an equipment management system, in particular to a new investment and transformation equipment acceptance and capital transfer management system and its working method.

背景技术Background technique

随着智能电网建设的迅猛发展及企业三集五大体系建设的全面推进,电网每年新投运、改造变电站数量也呈现出不断增长的趋势。目前新投变电设备验收及转资管理水平距离电网精益化管理要求仍有较大差距,设备验收及转资管理水平亟需提高。With the rapid development of smart grid construction and the comprehensive promotion of the construction of three sets of five major systems in enterprises, the number of newly put into operation and renovated substations of the power grid every year also shows a growing trend. At present, there is still a big gap between the acceptance and capital transfer management level of new investment and transformation equipment and the lean management requirements of the power grid, and the equipment acceptance and capital transfer management level needs to be improved urgently.

现有的新投变电设备在验收及转资时存在的不足是:The shortcomings of the existing new investment and transformation equipment in the acceptance and transfer of capital are:

(1)现场纸质验收资料方式无法满足系统流程需要(1) The on-site paper acceptance data method cannot meet the needs of the system process

传统设备验收资料为基建部将纸质设备技术资料装箱交接给运检部,由运检部再分发给检修单位和运行单位,纸质资料不仅无法有效实现资料共享,而且不便于查阅。The traditional equipment acceptance data is that the Ministry of Infrastructure packs paper equipment technical data and hands them over to the Transportation Inspection Department, which then distributes them to maintenance units and operating units. Paper documents not only cannot effectively achieve data sharing, but are also inconvenient to consult.

(2)无法把控新投变电站在线监测装置接入(2) It is impossible to control the access of the online monitoring device of Xintou substation

根据国网公司PMS2.0实用化评价体系和国网(运检/3)299-2014《国家电网公司电网设备状态监测系统管理规定》的要求:变电站投运前,站内一次设备在线监测装置数据必须稳定接入PMS2.0在线监测模块,新投监测装置接入率应为100%。在此背景下,将在线监测装置接入PMS2.0系统变电设备维护流程迫在眉睫。According to the PMS2.0 practical evaluation system of the State Grid Corporation and the requirements of the State Grid Corporation of China (Operation Inspection/3) 299-2014 "State Grid Corporation of Power Grid Equipment Status Monitoring System Management Regulations": before the substation is put into operation, the data of the primary equipment online monitoring device in the substation The PMS2.0 online monitoring module must be connected stably, and the access rate of newly invested monitoring devices should be 100%. In this context, it is imminent to connect the online monitoring device to the PMS2.0 system substation equipment maintenance process.

(3)无法有效把控设备转资条件(3) Unable to effectively control the conditions for capital transfer of equipment

目前变电设备转资通过PMS系统与ERP系统集成,只要PMS系统中数据维护后即可转资,与现场实际情况没有直接关系,存在管理漏洞。设备是否具有转资条件需要在系统中严格体现。At present, the capital transfer of substation equipment is integrated with the ERP system through the PMS system. As long as the data in the PMS system is maintained, the capital can be transferred. It has no direct relationship with the actual situation on site, and there are management loopholes. Whether the equipment has the conditions for capital transfer needs to be strictly reflected in the system.

发明内容Contents of the invention

为解决现有技术存在的不足,本发明公开了一种新投变电设备验收及转资管理系统及其工作方法,该方法搭建共享式电子资料存储平台将待验收的电子资料进行存储,将站内一次设备在线监测装置的数据接入PMS2.0系统,在PMS2.0系统中添加设备运行状态发布节点,用于对设备状态进行发布。In order to solve the deficiencies in the existing technology, the present invention discloses a new investment and transformation equipment acceptance and capital transfer management system and its working method. The method builds a shared electronic data storage platform to store the electronic data to be checked and accepted. The data of the primary equipment online monitoring device in the station is connected to the PMS2.0 system, and the equipment operation status publishing node is added to the PMS2.0 system to publish the equipment status.

为实现上述目的,本发明的具体方案如下:To achieve the above object, the specific scheme of the present invention is as follows:

一种新投变电设备验收及转资管理系统,包括扫描设备,所述扫描设备将待验收新投变电设备的电子资料进行扫描并转化为图片存储至电子资料存储平台,电子资料存储平台对数据进行存储并通过网络传输至生产管理信息系统,生产管理信息系统接收站内一次设备在线监测装置监测的数据,生产管理信息系统还将数传送至云服务器;A new investment and transformation equipment acceptance and capital transfer management system, including a scanning device, the scanning device scans the electronic data of the new investment and transformation equipment to be accepted and converts them into pictures and stores them on the electronic data storage platform, the electronic data storage platform The data is stored and transmitted to the production management information system through the network. The production management information system receives the data monitored by the primary equipment online monitoring device in the station, and the production management information system also transmits the data to the cloud server;

所述电子资料存储平台包括应用服务器及数据库服务器,所述数据库服务器用于对扫描设备扫描得到的图片进行存储,所述应用服务器与数据库服务器通信,所述应用服务器还与客户端相连,所述应用服务器调用存储在数据库服务器的数据并传输至生产管理信息系统,生产管理信息系统包括电力服务器及移动终端,所述电力服务器分别与站内一次设备在线监测装置、云服务器及移动终端通信。通过移动终端可方便查询变电设备的验收及转资流程,简洁方便。The electronic data storage platform includes an application server and a database server, the database server is used to store the pictures scanned by the scanning device, the application server communicates with the database server, the application server is also connected to the client, and the The application server invokes the data stored in the database server and transmits it to the production management information system. The production management information system includes a power server and a mobile terminal, and the power server communicates with the primary equipment online monitoring device in the station, the cloud server and the mobile terminal respectively. Through the mobile terminal, it is convenient to inquire about the inspection and acceptance of the substation equipment and the capital transfer process, which is simple and convenient.

进一步的,所述扫描设备为滚筒式扫描仪和平面扫描仪。Further, the scanning device is a drum scanner and a flat scanner.

进一步的,所述站内一次设备在线监测装置包括电压检测电路及电流检测电路,电压检测电路及电流检测电路分别用于检测站内一次设备运行时的电压及电流,并将检测的电压及电流数据传输至DSP控制器,DSP控制器将接收的数据进行处理后传输至电力服务器。Further, the on-line monitoring device for the primary equipment in the station includes a voltage detection circuit and a current detection circuit, the voltage detection circuit and the current detection circuit are respectively used to detect the voltage and current of the primary equipment in the station during operation, and transmit the detected voltage and current data To the DSP controller, the DSP controller processes the received data and transmits it to the power server.

进一步的,所述电压检测电路包括电阻分压网络电路及减法运算电路,电阻分压网络电路包括第一电阻及与第一电阻相连的第二电阻,第二电阻与电容相并联,电阻分压网络电路用于等比例的衰减被测电压信号。Further, the voltage detection circuit includes a resistor divider network circuit and a subtraction circuit, the resistor divider network circuit includes a first resistor and a second resistor connected to the first resistor, the second resistor is connected in parallel with the capacitor, and the resistor divider The network circuit is used to attenuate the measured voltage signal proportionally.

进一步的,减法运算电路包括运算放大器,运算放大器正极端与地之间连接有磁珠,算放大器负极端分两路,一路与可调电阻相连,另一路与相并联的电阻及电容电路相连,相并联的电阻及电容电路与运算放大器输出端相连。Further, the subtraction operation circuit includes an operational amplifier, and a magnetic bead is connected between the positive terminal of the operational amplifier and the ground. The negative terminal of the operational amplifier is divided into two circuits, one of which is connected to an adjustable resistor, and the other is connected to a parallel resistor and capacitor circuit. The resistor and capacitor circuits connected in parallel are connected to the output terminal of the operational amplifier.

进一步的,所述电流检测电路包括依次连接的精密测流电阻、窗口比较器电路及减法运算电路,所述精密测流电阻串联在被测回路中,将被测电流等比例的转换为电压信号;窗口比较器用于提取精密测流电阻的电压差信号,减法运算电路用于将电压差信号等比例的衰减。Further, the current detection circuit includes a precision current-measuring resistor, a window comparator circuit, and a subtraction circuit connected in sequence, and the precision current-measuring resistor is connected in series in the measured circuit to convert the measured current into a voltage signal proportionally ; The window comparator is used to extract the voltage difference signal of the precision current measuring resistor, and the subtraction operation circuit is used to attenuate the voltage difference signal in proportion.

进一步的,所述电子资料存储平台还包括第一校验模块,第一校验模块根据数据库服务器中存储的待验收新投变电设备的电子资料电压等级数据进行判断,如果待验收新投变电设备为110kv及以下的设备则将该站内一次设备在线监测装置的数据发送至生产管理信息系统,当待验收新投变电设备为220kv及以上的设备则发送至第一验收申请审批模块,第一验收申请审批模块对接收的数据再次进行确认后将该站内一次设备在线监测装置的数据发送至生产管理信息系统。Further, the electronic data storage platform also includes a first verification module. The first verification module judges according to the electronic data voltage level data of the new power conversion equipment to be checked and accepted stored in the database server. If the electrical equipment is 110kv and below, the data of the primary equipment online monitoring device in the station will be sent to the production management information system. When the new power transformation equipment to be accepted is 220kv and above, it will be sent to the first acceptance application approval module. The first acceptance application approval module reconfirms the received data and sends the data of the primary equipment online monitoring device in the station to the production management information system.

进一步的,所述生产管理信息系统还包括第二校验模块,第二校验模块根据在线监测模块接收的一次设备在线监测装置监测的数据进行判断,当待验收新投变电设备为110kv及以下的设备时,直接对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布,当待验收新投变电设备为220kv及以上的设备时,第二校验模块将该信息发送至第二验收申请审批模块,第二验收申请审批模块对接收的数据再次进行确认后,对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布。Further, the production management information system also includes a second verification module. The second verification module judges according to the data monitored by the online monitoring device of the primary equipment received by the online monitoring module. For the following equipment, directly transmit power to the primary equipment in the station, and publish the operating status of the equipment through the mobile terminal. When the new power transformation equipment to be checked and accepted is 220kv and above equipment, the second verification module will send the information Go to the second acceptance application approval module. After confirming the received data again, the second acceptance application approval module transmits power to the primary equipment in the station, and publishes the operating status of the equipment through the mobile terminal.

进一步的,在设备运行状态的发布该设备才具备转资条件。Furthermore, the equipment is eligible for capital transfer only after the equipment’s operating status is released.

一种新投变电设备验收及转资管理系统的工作方法,包括以下步骤:A working method for the acceptance and capital transfer management system of new investment and transformation equipment, comprising the following steps:

扫描设备将待验收新投变电设备的电子资料进行扫描并转化为图片存储至电子资料存储平台,The scanning equipment scans the electronic data of the new power transformation equipment to be accepted and converts them into pictures and stores them on the electronic data storage platform.

电子资料存储平台中第一校验模块根据数据库服务器中存储的待验收新投变电设备的电子资料电压等级数据进行判断,如果待验收新投变电设备为110kv及以下的设备则将该站内一次设备在线监测装置的数据发送至生产管理信息系统,当待验收新投变电设备为220kv及以上的设备则发送至第一验收申请审批模块,第一验收申请审批模块对接收的数据再次进行确认后将该站内一次设备在线监测装置的数据发送至生产管理信息系统;The first verification module in the electronic data storage platform judges according to the voltage level data of the electronic data of the new power transformation equipment to be checked and accepted stored in the database server. If the new power transformation equipment to be checked and accepted is 110kv and below The data of the primary equipment on-line monitoring device is sent to the production management information system. When the new power transformation equipment to be checked and accepted is 220kv and above, it is sent to the first acceptance application approval module, and the first acceptance application approval module performs the received data again After confirmation, send the data of the primary equipment online monitoring device in the station to the production management information system;

生产管理信息系统中第二校验模块根据在线监测模块接收的一次设备在线监测装置监测的数据进行判断,当待验收新投变电设备为110kv及以下的设备时,直接对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布,当待验收新投变电设备为220kv及以上的设备时,第二校验模块将该信息发送至第二验收申请审批模块,第二验收申请审批模块对接收的数据再次进行确认后,对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布;The second verification module in the production management information system judges according to the data monitored by the online monitoring device of the primary equipment received by the online monitoring module. power, and publish the operating status of the equipment through the mobile terminal. When the new power transformation equipment to be accepted is 220kv and above equipment, the second verification module sends the information to the second acceptance application approval module, and the second acceptance application After the approval module confirms the received data again, it sends power to the primary equipment in the station, and releases the equipment running status through the mobile terminal;

生产管理信息系统还将数传送至云服务器,实现数据的共享。The production management information system also transmits the data to the cloud server to realize data sharing.

本发明的有益效果:Beneficial effects of the present invention:

本发明基于PMS2.0系统即生产管理信息系统,以该系统的管理要求为工作纲领,全面推进业务规范和管理细化工作,将变电设备验收资料在系统体现,以系统流转规范变电设备验收流程,增加在线监测装置接入审核及设备运行状态发布节点,明确各节点及环节的职责分工,以系统技术手段进行严格把控设备验收及转资条件,真正实现依托信息化开展生产管理工作,促进各专业管理精益化水平的不断提高。The present invention is based on the PMS2.0 system, that is, the production management information system, takes the management requirements of the system as the work program, comprehensively promotes the work of business specification and management refinement, embodies the acceptance data of power transformation equipment in the system, and regulates power transformation equipment through system circulation In the acceptance process, add online monitoring device access review and equipment operation status release nodes, clarify the division of responsibilities of each node and link, strictly control equipment acceptance and capital transfer conditions with systematic technical means, and truly realize production management relying on information technology , to promote the continuous improvement of the lean level of professional management.

本发明基于PMS2.0系统即生产管理信息系统,搭建了信息化平台,节省的人力物力,实现电子数据的处理分析及共享,提高了新投变电设备的验收的效率。The invention is based on the PMS2.0 system, that is, the production management information system, builds an information platform, saves manpower and material resources, realizes the processing, analysis and sharing of electronic data, and improves the efficiency of acceptance of new power transformation equipment.

附图说明Description of drawings

图1本发明的整体结构框图;The overall structural block diagram of Fig. 1 the present invention;

图2本发明的电压检测电路图;Fig. 2 voltage detection circuit diagram of the present invention;

图3本发明的电流检测电路图;Fig. 3 current detection circuit diagram of the present invention;

图4本发明的整体流程示意图;Fig. 4 is a schematic diagram of the overall process of the present invention;

图5本发明的具体实施流程示意图;Fig. 5 is a schematic flow chart of the specific implementation of the present invention;

图中,1、扫描设备,2、电子资料存储平台,3、生产管理信息系统,4、云服务器,5、站内一次设备在线监测装置。In the figure, 1. Scanning equipment, 2. Electronic data storage platform, 3. Production management information system, 4. Cloud server, 5. Online monitoring device for primary equipment in the station.

具体实施方式:detailed description:

下面结合附图对本发明进行详细说明:The present invention is described in detail below in conjunction with accompanying drawing:

PMS2.0系统是指普遍应用于电力企业的生产管理信息系统,目前为国网统一推广上线的设备(资产)运维精益管理系统。The PMS2.0 system refers to the production management information system commonly used in electric power enterprises. It is currently an equipment (asset) operation and maintenance lean management system that is promoted and launched by the State Grid.

如图1所示,一种新投变电设备验收及转资管理系统,包括扫描设备1,所述扫描设备1将待验收新投变电设备的电子资料进行扫描并转化为图片存储至电子资料存储平台2,电子资料存储平台2对数据进行存储并通过网络传输至生产管理信息系统3,生产管理信息系统3接收站内一次设备在线监测装置5监测的数据,生产管理信息系统3还将数传送至云服务器4;As shown in Figure 1, a new investment and transformation equipment acceptance and capital transfer management system includes a scanning device 1. The scanning device 1 scans the electronic data of the new investment and transformation equipment to be accepted and converts them into pictures and stores them on the computer. The data storage platform 2 and the electronic data storage platform 2 store the data and transmit them to the production management information system 3 through the network. The production management information system 3 receives the data monitored by the primary equipment online monitoring device 5 in the station, and the production management information system 3 returns the data Send to cloud server 4;

电子资料存储平台2包括应用服务器及数据库服务器,所述数据库服务器用于对扫描设备1扫描得到的图片进行存储,所述应用服务器与数据库服务器通信,所述应用服务器还与客户端相连,所述应用服务器调用存储在数据库服务器的数据并传输至生产管理信息系统3,生产管理信息系统3包括电力服务器及移动终端,所述电力服务器分别与站内一次设备在线监测装置5、云服务器4及移动终端通信。The electronic data storage platform 2 includes an application server and a database server, the database server is used to store the pictures scanned by the scanning device 1, the application server communicates with the database server, and the application server is also connected to the client. The application server invokes the data stored in the database server and transmits it to the production management information system 3. The production management information system 3 includes a power server and a mobile terminal. communication.

本申请还公开了一种电压检测电路:如图2所示,电压检测电路在本系统中,承担着检测直流母线电压、检测蓄电池电压的作用。The present application also discloses a voltage detection circuit: as shown in FIG. 2 , the voltage detection circuit is responsible for detecting DC bus voltage and battery voltage in this system.

电压检测电路由电阻分压网络、减法运算电路构成。The voltage detection circuit is composed of a resistor divider network and a subtraction circuit.

电阻分压网络的作用是等比例的衰减被测电压信号,使之满足DSP采样端口的需要。The role of the resistor divider network is to attenuate the measured voltage signal proportionally to meet the needs of the DSP sampling port.

减法运算电路的作用是提取电阻分压网络的差值信号,并将该差值进一步等比例的衰减为低幅值信号,并输送给DSP的采样端口。在减法运算电路中增加了磁珠,用于消耗系统内的高频干扰成分,提高测量精度。The function of the subtraction operation circuit is to extract the difference signal of the resistor divider network, and further attenuate the difference into a low-amplitude signal proportionally, and send it to the sampling port of the DSP. Magnetic beads are added in the subtraction circuit to consume high-frequency interference components in the system and improve measurement accuracy.

本申请还公开了一种电流检测电路:如图3所示,电流检测电路在本系统中,承担着检测蓄电池充放电电流、光伏板电流的作用。The present application also discloses a current detection circuit: as shown in FIG. 3 , the current detection circuit in this system is responsible for detecting the charging and discharging current of the storage battery and the current of the photovoltaic panel.

电流检测电路主要有精密测流电阻、窗口比较器、减法运算电路构成。The current detection circuit is mainly composed of a precision current measurement resistor, a window comparator, and a subtraction circuit.

精密测流电阻串联在被测回路中,将被测电流等比例的转换为电压信号。The precision current-measuring resistor is connected in series in the measured circuit, and converts the measured current into a voltage signal in equal proportions.

窗口比较器的作用精确的提取测流电阻的电压差信号。The function of the window comparator is to accurately extract the voltage difference signal of the current measuring resistor.

减法运算电路的作用是将电压差信号等比例的衰减,以满足DSP模拟采样端口的要求。The function of the subtraction circuit is to attenuate the voltage difference signal in proportion to meet the requirements of the DSP analog sampling port.

如图4所示,在实际操作时,具体的流程如下:PMS2.0系统变电设备验收及转资新流程:As shown in Figure 4, in actual operation, the specific process is as follows: PMS2.0 system substation equipment acceptance and capital transfer new process:

(1)设备验收前,验收电子资料在系统中统一挂接。因此,搭建共享式电子资料存储平台。(1) Before equipment acceptance, the acceptance electronic data shall be unified in the system. Therefore, build a shared electronic data storage platform.

(2)添加在线监测装置接入审核节点,确保新投监测装置接入率。(2) Add an online monitoring device access audit node to ensure the access rate of newly invested monitoring devices.

(3)在设备验收及调度送电审核通过后,添加设备运行状态发布节点,待设备状态发布后,方可具备转资条件。(3) After the equipment acceptance and dispatching and power transmission review are passed, add the equipment operation status release node, and the capital transfer conditions will not be met until the equipment status is released.

更为详细的流程如图5所示,通过扫描设备实现对待验收资料的提报,进行判断,如果是110kv及以下的则将在线监测模块接入审核,如果是220kv及以上,则验收申请审批,然后将在线监测模块接入审核,之后进入现场校验,字啊现场校验时,再次进行判断,如果是110kv及以下的则进入送电审批环节,如果是220kv及以上的则市公司提报验收报告,然后验收申请审批,审批后在进行送电审批,送电审批完成后,将设备的运行状态发布,设备的运行状态发布则该设备具有转资条件。The more detailed process is shown in Figure 5. The scanning equipment is used to report and judge the materials to be accepted. If it is 110kv and below, the online monitoring module will be connected for review. If it is 220kv and above, the acceptance application will be approved. , and then connect the online monitoring module to the review, and then enter the on-site verification. During the on-site verification, judge again. If it is 110kv and below, it will enter the power transmission approval link. If it is 220kv and above, the city company will provide Submit the acceptance report, and then apply for approval. After the approval, the power transmission approval will be carried out. After the power transmission approval is completed, the operating status of the equipment will be released. If the operating status of the equipment is released, the equipment has the conditions for capital transfer.

上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。Although the specific implementation of the present invention has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the present invention. Those skilled in the art should understand that on the basis of the technical solution of the present invention, those skilled in the art do not need to pay creative work Various modifications or variations that can be made are still within the protection scope of the present invention.

Claims (10)

1.一种新投变电设备验收及转资管理系统,其特征是,包括扫描设备,所述扫描设备将待验收新投变电设备的电子资料进行扫描并转化为图片存储至电子资料存储平台,电子资料存储平台对数据进行存储并通过网络传输至生产管理信息系统,生产管理信息系统接收站内一次设备在线监测装置监测的数据,生产管理信息系统还将数传送至云服务器;1. A management system for acceptance and capital transfer of new investment and transformation equipment, which is characterized in that it includes a scanning device that scans the electronic data of the new investment and transformation equipment to be accepted and converts them into pictures and stores them in the electronic data storage Platform, the electronic data storage platform stores the data and transmits it to the production management information system through the network. The production management information system receives the data monitored by the primary equipment online monitoring device in the station, and the production management information system also transmits the data to the cloud server; 所述电子资料存储平台包括应用服务器及数据库服务器,所述数据库服务器用于对扫描设备扫描得到的图片进行存储,所述应用服务器与数据库服务器通信,所述应用服务器还与客户端相连,所述应用服务器调用存储在数据库服务器的数据并传输至生产管理信息系统,生产管理信息系统包括电力服务器及移动终端,所述电力服务器分别与站内一次设备在线监测装置、云服务器及移动终端通信。The electronic data storage platform includes an application server and a database server, the database server is used to store the pictures scanned by the scanning device, the application server communicates with the database server, the application server is also connected to the client, and the The application server invokes the data stored in the database server and transmits it to the production management information system. The production management information system includes a power server and a mobile terminal, and the power server communicates with the primary equipment online monitoring device in the station, the cloud server and the mobile terminal respectively. 2.如权利要求1所述的一种新投变电设备验收及转资管理系统,其特征是,所述扫描设备为滚筒式扫描仪和平面扫描仪。2. A new investment and transformation equipment inspection and capital transfer management system according to claim 1, wherein the scanning equipment is a drum scanner and a plane scanner. 3.如权利要求1所述的一种新投变电设备验收及转资管理系统,其特征是,所述站内一次设备在线监测装置包括电压检测电路及电流检测电路,电压检测电路及电流检测电路分别用于检测站内一次设备运行时的电压及电流,并将检测的电压及电流数据传输至DSP控制器,DSP控制器将接收的数据进行处理后传输至电力服务器。3. A new investment and transformation equipment acceptance and capital transfer management system as claimed in claim 1, wherein the on-line monitoring device for primary equipment in the station includes a voltage detection circuit and a current detection circuit, a voltage detection circuit and a current detection circuit The circuits are respectively used to detect the voltage and current of the primary equipment in the station during operation, and transmit the detected voltage and current data to the DSP controller, and the DSP controller processes the received data and transmits it to the power server. 4.如权利要求3所述的一种新投变电设备验收及转资管理系统,其特征是,所述电压检测电路包括电阻分压网络电路及减法运算电路,电阻分压网络电路包括第一电阻及与第一电阻相连的第二电阻,第二电阻与电容相并联,电阻分压网络电路用于等比例的衰减被测电压信号。4. A new investment and transformation equipment inspection and capital transfer management system as claimed in claim 3, wherein the voltage detection circuit includes a resistor voltage divider network circuit and a subtraction circuit, and the resistor voltage divider network circuit includes a first A resistor and a second resistor connected to the first resistor, the second resistor and the capacitor are connected in parallel, and the resistor divider network circuit is used to attenuate the measured voltage signal in equal proportion. 5.如权利要求4所述的一种新投变电设备验收及转资管理系统,其特征是,减法运算电路包括运算放大器,运算放大器正极端与地之间连接有磁珠,算放大器负极端分两路,一路与可调电阻相连,另一路与相并联的电阻及电容电路相连,相并联的电阻及电容电路与运算放大器输出端相连。5. A kind of management system for checking and accepting new investment and transforming equipment and capital transfer as claimed in claim 4, wherein the subtraction operation circuit includes an operational amplifier, a magnetic bead is connected between the positive terminal of the operational amplifier and the ground, and the negative terminal of the operational amplifier is connected to the ground. The poles are divided into two circuits, one of which is connected with the adjustable resistor, and the other is connected with the parallel resistance and capacitance circuit, and the parallel connection of the resistance and capacitance circuit is connected with the output terminal of the operational amplifier. 6.如权利要求3所述的一种新投变电设备验收及转资管理系统,其特征是,所述电流检测电路包括依次连接的精密测流电阻、窗口比较器电路及减法运算电路,所述精密测流电阻串联在被测回路中,将被测电流等比例的转换为电压信号;窗口比较器用于提取精密测流电阻的电压差信号,减法运算电路用于将电压差信号等比例的衰减。6. A new investment and transformation equipment inspection and capital transfer management system as claimed in claim 3, wherein the current detection circuit includes a precision current measuring resistor, a window comparator circuit and a subtraction operation circuit connected in sequence, The precision current-measuring resistor is connected in series in the measured circuit, and the measured current is converted into a voltage signal proportionally; the window comparator is used to extract the voltage difference signal of the precision current-measuring resistor, and the subtraction circuit is used to convert the voltage difference signal into a proportional attenuation. 7.如权利要求1所述的一种新投变电设备验收及转资管理系统,其特征是,所述电子资料存储平台还包括第一校验模块,第一校验模块根据数据库服务器中存储的待验收新投变电设备的电子资料电压等级数据进行判断,如果待验收新投变电设备为110kv及以下的设备则将该站内一次设备在线监测装置的数据发送至生产管理信息系统,当待验收新投变电设备为220kv及以上的设备则发送至第一验收申请审批模块,第一验收申请审批模块对接收的数据再次进行确认后将该站内一次设备在线监测装置的数据发送至生产管理信息系统。7. A new investment and transformation equipment inspection and capital transfer management system as claimed in claim 1, wherein the electronic data storage platform also includes a first verification module, and the first verification module is based on the data in the database server. The stored electronic data voltage level data of the new power transformation equipment to be accepted is judged. If the new power transformation equipment to be accepted is 110kv and below, the data of the primary equipment online monitoring device in the station is sent to the production management information system. When the new power substation equipment to be accepted is 220kv and above, it will be sent to the first acceptance application approval module, and the first acceptance application approval module will reconfirm the received data and send the data of the primary equipment online monitoring device in the station to Production management information system. 8.如权利要求7所述的一种新投变电设备验收及转资管理系统,其特征是,所述生产管理信息系统还包括第二校验模块,第二校验模块根据在线监测模块接收的一次设备在线监测装置监测的数据进行判断,当待验收新投变电设备为110kv及以下的设备时,直接对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布,当待验收新投变电设备为220kv及以上的设备时,第二校验模块将该信息发送至第二验收申请审批模块,第二验收申请审批模块对接收的数据再次进行确认后,对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布。8. A new investment and transformation equipment inspection and capital transfer management system as claimed in claim 7, wherein the production management information system also includes a second verification module, and the second verification module is based on the online monitoring module The data received by the online monitoring device of the primary equipment is judged. When the new power transformation equipment to be checked and accepted is 110kv or below, it will directly transmit power to the primary equipment in the station, and release the operating status of the equipment through the mobile terminal. When the new power substation equipment to be accepted is 220kv and above, the second verification module sends the information to the second acceptance application approval module, and the second acceptance application approval module confirms the received data again, The equipment transmits power, and releases the operating status of the equipment through the mobile terminal. 9.如权利要求8所述的一种新投变电设备验收及转资管理系统,其特征是,在设备运行状态的发布该设备才具备转资条件。9. A new investment and transformation equipment acceptance and capital transfer management system as claimed in claim 8, characterized in that the equipment is eligible for capital transfer only when the equipment is in operation status. 10.基于上述权利要求1-9任一所述的新投变电设备验收及转资管理系统的工作方法,其特征是,包括以下步骤:10. Based on the working method of the new investment and transformation equipment acceptance and capital transfer management system described in any one of claims 1-9, it is characterized in that it includes the following steps: 扫描设备将待验收新投变电设备的电子资料进行扫描并转化为图片存储至电子资料存储平台,The scanning equipment scans the electronic data of the new power transformation equipment to be accepted and converts them into pictures and stores them on the electronic data storage platform. 电子资料存储平台中第一校验模块根据数据库服务器中存储的待验收新投变电设备的电子资料电压等级数据进行判断,如果待验收新投变电设备为110kv及以下的设备则将该站内一次设备在线监测装置的数据发送至生产管理信息系统,当待验收新投变电设备为220kv及以上的设备则发送至第一验收申请审批模块,第一验收申请审批模块对接收的数据再次进行确认后将该站内一次设备在线监测装置的数据发送至生产管理信息系统;The first verification module in the electronic data storage platform judges according to the voltage level data of the electronic data of the new power transformation equipment to be checked and accepted stored in the database server. If the new power transformation equipment to be checked and accepted is 110kv and below The data of the primary equipment on-line monitoring device is sent to the production management information system. When the new power transformation equipment to be checked and accepted is 220kv and above, it is sent to the first acceptance application approval module, and the first acceptance application approval module performs the received data again After confirmation, send the data of the primary equipment online monitoring device in the station to the production management information system; 生产管理信息系统中第二校验模块根据在线监测模块接收的一次设备在线监测装置监测的数据进行判断,当待验收新投变电设备为110kv及以下的设备时,直接对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布,当待验收新投变电设备为220kv及以上的设备时,第二校验模块将该信息发送至第二验收申请审批模块,第二验收申请审批模块对接收的数据再次进行确认后,对站内一次设备进行送电,并通过移动终端进行设备运行状态的发布;The second verification module in the production management information system judges according to the data monitored by the online monitoring device of the primary equipment received by the online monitoring module. power, and publish the operating status of the equipment through the mobile terminal. When the new power transformation equipment to be accepted is 220kv and above equipment, the second verification module sends the information to the second acceptance application approval module, and the second acceptance application After the approval module confirms the received data again, it sends power to the primary equipment in the station, and releases the equipment running status through the mobile terminal; 生产管理信息系统还将数传送至云服务器,实现数据的共享。The production management information system also transmits the data to the cloud server to realize data sharing.
CN201610182712.9A 2016-03-25 2016-03-25 System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof Pending CN105868903A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610182712.9A CN105868903A (en) 2016-03-25 2016-03-25 System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610182712.9A CN105868903A (en) 2016-03-25 2016-03-25 System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof

Publications (1)

Publication Number Publication Date
CN105868903A true CN105868903A (en) 2016-08-17

Family

ID=56624967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610182712.9A Pending CN105868903A (en) 2016-03-25 2016-03-25 System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof

Country Status (1)

Country Link
CN (1) CN105868903A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520399A (en) * 2018-04-03 2018-09-11 国网上海市电力公司 Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1078462A (en) * 1996-09-03 1998-03-24 Yokogawa Instr Kk Insulation resistance measuring apparatus
US6601040B1 (en) * 1998-07-20 2003-07-29 Usa Technologies, Inc. Electronic commerce terminal for wirelessly communicating to a plurality of communication devices
CN202120308U (en) * 2011-04-28 2012-01-18 中国石油化工股份有限公司胜利油田分公司临盘采油厂 Substation operation data management system
CN103984774A (en) * 2014-06-06 2014-08-13 国家电网公司 Method and system for viewing drawings of substation
CN205427929U (en) * 2016-03-25 2016-08-03 国网山东省电力公司济宁供电公司 A management system for acceptance and capital transfer of new investment and transformation equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1078462A (en) * 1996-09-03 1998-03-24 Yokogawa Instr Kk Insulation resistance measuring apparatus
US6601040B1 (en) * 1998-07-20 2003-07-29 Usa Technologies, Inc. Electronic commerce terminal for wirelessly communicating to a plurality of communication devices
CN202120308U (en) * 2011-04-28 2012-01-18 中国石油化工股份有限公司胜利油田分公司临盘采油厂 Substation operation data management system
CN103984774A (en) * 2014-06-06 2014-08-13 国家电网公司 Method and system for viewing drawings of substation
CN205427929U (en) * 2016-03-25 2016-08-03 国网山东省电力公司济宁供电公司 A management system for acceptance and capital transfer of new investment and transformation equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘妍妍,周文良主编: "《电子电路设计与实践》", 31 July 2015 *
咸庆信编著: "《变频器电路维修与故障实例分析 第2版》", 31 July 2013 *
葛维春等: "一、二次设备状态监测信息融合及在PMS建设中的应用", 《电力系统保护与控制》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108520399A (en) * 2018-04-03 2018-09-11 国网上海市电力公司 Line project onsite acceptance system and method based on cloud storage PMS2.0 platforms

Similar Documents

Publication Publication Date Title
CN103576025B (en) A kind of detection test system for energy storage power station grid connection
CN104376081A (en) Data application processing system, handhold terminal and on-site checking data processing system
CN103413250A (en) Cross-system EMS status estimation method based on CIM/E interaction
CN103995932A (en) A Unified Modeling Method Using Generalized Measurement Horizontal Correlation
CN110027437A (en) Electric automobile charging pile on-line calibration system
CN103543326A (en) System of measuring generating power of photovoltaic modules
CN103543355B (en) A kind of system measuring solar energy power generating efficiency
CN105203887A (en) Prewarning method, device and system for overload of transformer
CN211124131U (en) Power distribution station topology and asset management system
CN106097586A (en) The vehicle-mounted charging accounting device of electric automobile based on the Internet
CN112215482B (en) A household variable relationship identification method and device
CN107656234A (en) A kind of phase three-wire three high-voltage electric-energy meter online test method and device
CN104007410A (en) Digital electric energy meter verifying device
Zhang et al. Research on online monitoring platform of charging pile based on big data soft computing
CN205427929U (en) A management system for acceptance and capital transfer of new investment and transformation equipment
CN104978631A (en) Electric energy metering and management system for large-scale enterprise
CN105868903A (en) System for managing acceptance and transferring to fixed asset of newly commissioned transformation device and working method thereof
CN105427123A (en) An electricity bill calculation system and method based on multiple settlement entities
CN205427916U (en) A system for improving data maintenance of substation equipment
CN105844731B (en) Patrol task distribution apparatus
CN104880646A (en) Cable fault detector
CN105471572B (en) A kind of time synchronized measurement method based on GOOSE message
CN219574355U (en) A new online monitoring device for electric energy metering error
CN106646326A (en) Intelligent monitoring method for electric energy metering device
CN105823998A (en) Energy efficiency monitoring terminal automatic performance detection system and method and correlated monitoring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817

RJ01 Rejection of invention patent application after publication