[go: up one dir, main page]

CN105855810A - Shaft sleeve with excellent lubrication property - Google Patents

Shaft sleeve with excellent lubrication property Download PDF

Info

Publication number
CN105855810A
CN105855810A CN201610432695.XA CN201610432695A CN105855810A CN 105855810 A CN105855810 A CN 105855810A CN 201610432695 A CN201610432695 A CN 201610432695A CN 105855810 A CN105855810 A CN 105855810A
Authority
CN
China
Prior art keywords
incubated
axle sleeve
welding
temperature
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610432695.XA
Other languages
Chinese (zh)
Other versions
CN105855810B (en
Inventor
余锦芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XUEMEI REFRIGERATION EQUIPMENT CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610432695.XA priority Critical patent/CN105855810B/en
Publication of CN105855810A publication Critical patent/CN105855810A/en
Application granted granted Critical
Publication of CN105855810B publication Critical patent/CN105855810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/02Parts of sliding-contact bearings
    • F16C33/04Brasses; Bushes; Linings
    • F16C33/06Sliding surface mainly made of metal
    • F16C33/10Construction relative to lubrication
    • F16C33/1025Construction relative to lubrication with liquid, e.g. oil, as lubricant
    • F16C33/106Details of distribution or circulation inside the bearings, e.g. details of the bearing surfaces to affect flow or pressure of the liquid
    • F16C33/1065Grooves on a bearing surface for distributing or collecting the liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • B23P15/003Making specific metal objects by operations not covered by a single other subclass or a group in this subclass bearings
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • C21D6/04Hardening by cooling below 0 degrees Celsius
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/40Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for rings; for bearing races
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C1/00Making non-ferrous alloys
    • C22C1/02Making non-ferrous alloys by melting
    • C22C1/03Making non-ferrous alloys by melting using master alloys
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C1/00Making non-ferrous alloys
    • C22C1/06Making non-ferrous alloys with the use of special agents for refining or deoxidising
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C19/00Alloys based on nickel or cobalt
    • C22C19/03Alloys based on nickel or cobalt based on nickel
    • C22C19/05Alloys based on nickel or cobalt based on nickel with chromium
    • C22C19/058Alloys based on nickel or cobalt based on nickel with chromium without Mo and W
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C9/00Alloys based on copper
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/08Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of copper or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C8/00Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C8/06Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using gases
    • C23C8/28Solid state diffusion of only non-metal elements into metallic material surfaces; Chemical surface treatment of metallic material by reaction of the surface with a reactive gas, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using gases more than one element being applied in one step
    • C23C8/30Carbo-nitriding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/02Parts of sliding-contact bearings
    • F16C33/04Brasses; Bushes; Linings
    • F16C33/06Sliding surface mainly made of metal
    • F16C33/12Structural composition; Use of special materials or surface treatments, e.g. for rust-proofing
    • F16C33/121Use of special materials
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/02Parts of sliding-contact bearings
    • F16C33/04Brasses; Bushes; Linings
    • F16C33/06Sliding surface mainly made of metal
    • F16C33/12Structural composition; Use of special materials or surface treatments, e.g. for rust-proofing
    • F16C33/122Multilayer structures of sleeves, washers or liners
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C33/00Parts of bearings; Special methods for making bearings or parts thereof
    • F16C33/02Parts of sliding-contact bearings
    • F16C33/04Brasses; Bushes; Linings
    • F16C33/06Sliding surface mainly made of metal
    • F16C33/14Special methods of manufacture; Running-in
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2204/00Metallic materials; Alloys
    • F16C2204/10Alloys based on copper
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2220/00Shaping
    • F16C2220/02Shaping by casting
    • F16C2220/06Shaping by casting in situ casting or moulding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2220/00Shaping
    • F16C2220/24Shaping by built-up welding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2223/00Surface treatments; Hardening; Coating
    • F16C2223/10Hardening, e.g. carburizing, carbo-nitriding
    • F16C2223/16Hardening, e.g. carburizing, carbo-nitriding with carbo-nitriding
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16CSHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
    • F16C2223/00Surface treatments; Hardening; Coating
    • F16C2223/30Coating surfaces

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • General Engineering & Computer Science (AREA)
  • Thermal Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Solid-Phase Diffusion Into Metallic Material Surfaces (AREA)
  • Heat Treatment Of Articles (AREA)
  • Vehicle Body Suspensions (AREA)

Abstract

The invention discloses a shaft sleeve with excellent lubrication property. The shaft sleeve is of a cylindrical shape; a transverse oil tank is formed in the inner surface of a shaft sleeve cylinder; the shaft sleeve comprises a copper alloy shaft sleeve body; the surface of an oil tank body is coated with an aluminum oxide coating; the inner surface of the shaft sleeve cylinder beyond the surface of an oil removal tank has a nickel alloy build-up welding layer; the inner surface of the shaft sleeve cylinder has an aluminum alloy build-up welding layer. The surface of the shaft sleeve oil tank body is coated with the coating to improve the corrosion resistance of the tank body; a copper-based alloy material of the invention fully meets the strength requirements of the shaft sleeve body material.

Description

The axle sleeve that a kind of lubricity is good
Technical field
The present invention relates to the axle sleeve that a kind of lubricity is good, belongs to technical field of bearings.
Background technology
In parts at the volley, rotating shaft is installed in axis hole, because long-term use can cause between rotating shaft and axis hole Abrasion, is generally arranged on axle sleeve countershaft in rotating shaft and shields, but rotating shaft and axle sleeve during supporting the use also Constantly rubbing, at present, using the mode of oil addition between axle sleeve and rotating shaft to ensure to fill therebetween The lubrication divided, extends rotating shaft and the service life of axle sleeve.Therefore, the fatigue strength of axle sleeve, wearability, intensity, hardness has the highest Requirement, the bearing capacity of current sleeve lining is the highest, reduces the service life of axle sleeve;And processing technique is complicated, processing Efficiency is the lowest.The deficiencies in the prior art cause axle sleeve in use, still have in-convenience in use, or self-lubrication function is not The problem such as perfect, if safeguarding not prompt enough, then can cause axle and axle sleeve heavy wear, the problem even scrapped.
Summary of the invention
The axle sleeve that a kind of lubricity is good: cylindrically, axle sleeve cylinder inner surface offers horizontal oil groove, axle to described axle sleeve Set includes that copper alloy shaft sleeve main body, oil groove cell body surface-coated have aluminum oxide coating layer, in the axle sleeve cylinder beyond degreasing tank surface Surface has nickel alloy overlay cladding, and axle sleeve cylinder inner surface has aluminium alloy overlay cladding,
Copper alloy chemical composition be (percentage by weight): Cr:14.5: Si 3.5, Ni:2.5, Mn:0.85, Mo: 0.65, Nb:0.55, Ti:0.25, W:0.085, Al: 0.035, Zr:0.035, Ca 0.015, Ta: 0.015, surplus is Cu and inevitable impurity;
Manufacture described axle sleeve to comprise the following steps: according to above-mentioned copper alloy chemical composition dispensing, first fine copper is joined smelting furnace In, Control for Kiln Temperature at 1180 DEG C, until fine copper melt after, copper melt temperature be raised to 1200 DEG C add chromium-copper intermediate alloys, after by stove Temperature rise to 1220 DEG C adds copper silicon intermediate alloy;After furnace temperature be increased to 1240 DEG C add nickel-copper intermediate alloys;After by furnace temperature Being increased to 1260 DEG C and add other alloying elements, rear furnace temperature is increased to 1280 DEG C, adds refine cleanser, and refine cleanser adds Amount is the 0.9% of furnace charge amount, stirs 50 minutes, stands 100 minutes, treat that slag separates with molten metal, skim, adds coverture afterwards, The total addition of coverture is the 0.6% of furnace charge amount, again skims after standing 40 minutes, and the most countershaft set is poured into a mould;Cast temperature Degree is 1200 DEG C;The axle sleeve blank obtained carries out heat treatment: first carry out being heated to 750 DEG C by axle sleeve blank, and heat up speed Rate 50 DEG C/h, is incubated 2 hours, carries out Quenching Treatment afterwards, and hardening media is water, is heated to from room temperature by axle sleeve after quenching 550 DEG C, heating rate 75 DEG C/h, be incubated 3 hours, after be cooled to 300 DEG C, rate of temperature fall 50 DEG C/h, be incubated 3 hours, After be again cooled to 200 DEG C, rate of temperature fall 50 DEG C/h, be incubated 9 hours, rear air cooling to room temperature, described refine cleanser bag Include: aluminum chloride 70%, calcium fluoride 10%, prodan 10%, silica 1 0%;Described coverture includes: potassium chloride 30%, Borax 20%, sodium fluoride 20%, calcium chloride 20%, sodium chloride 10%;
Workpiece cylinder inner surface and outer surface are carried out carbo-nitriding heat treatment, oozes by force process: temperature 750-760 DEG C scope, carbon Gesture and nitrogen gesture take level Four step, carbon potential 1.2-1.4%, nitrogen gesture 0.4-0.6%, are incubated 3h, and then reduction carbon potential is to 1.0-1.1%, Raise nitrogen gesture to 0.7-0.9%, be incubated 3h, then reduce carbon potential to 0.7-0.9%, raise nitrogen gesture to 1.0-1.1%, be incubated 4h, finally Reduce carbon potential and to 1.2-1.6%, be incubated 4h to 0.4-0.5%, rising nitrogen gesture;It is diffused after oozing by force, diffusion process: control furnace temperature Degree be down to 730 DEG C, be incubated 3h, be cooled to 700 DEG C, be incubated 4h, diffusion process carbon-potential control between 0.9-1.0%, nitrogen potential control Between 1.1-1.2%;Air cooling is to room temperature;
After carbo-nitriding, workpiece is warming up to 650 DEG C, heating rate 100 DEG C/h, it is incubated 3 hours, water hardening afterwards, then Secondary heating base substrate is incubated 5 hours at 400 DEG C, and air cooling of coming out of the stove is to room temperature;Base substrate puts into subzero treatment 8 minutes in liquid nitrogen, at sky Gas goes back up to room temperature;
Workpiece cylinder outer surface is carried out built-up welding, and bead-welding technology is: 210 DEG C of preheatings, and during built-up welding, electric current is 55A, and voltage is 12V, Built-up welding speed is 13mm/s, and argon flow amount is 13L/min, and overlay cladding thickness is 2.5mm;, built-up welding complete after Slow cooling;Built-up welding Layer material is: Zn 10.5%, Ti 6.5%, Ca 1.5%, W 0.75%, Mn 0.55%, Cr 0.35%, Mg 0.055%, and surplus is Al;
Oil groove coats: at oil groove cell body surface-coated aluminum oxide coating layer, coating layer thickness 0.3mm,
Cylinder inner surface beyond workpiece degreasing tank cell body surface is carried out built-up welding, and bead-welding technology is: 180 DEG C of preheatings, during built-up welding, Electric current is 67A, and voltage is 12V, and built-up welding speed is 9mm/s, and argon flow amount is 9L/min, and overlay cladding thickness is 3mm;, heap is soldered Slow cooling after one-tenth;Weld overlay materials is: Cr 10.5%, Ti 8.5%, Si 5.5%, Zn 2.5%, Ca 0.75%, Cu 0.045%, Zn 0.025%, surplus is Ni;
Finished heat treatment: workpiece heat to 500 DEG C is incubated 3 hours, then it is cooled to 300 DEG C of insulations 4 hours, obtain final axle Set.
Oil groove cell body cross section becomes semicircle or rectangle.
The carbo-nitriding carrying out workpiece cylinder inner surface and outer surface also includes cylinder inner surface oil groove cell body surface.
Foregoing invention content having the beneficial effects that relative to prior art: 1) by shaft sleeve oil groove cell body surface is carried out Applying coating improves cell body decay resistance;2) copper-based alloy material of the present invention fully meet axle sleeve material of main part intensity want Ask;3) countershaft set carries out multistage gradient carbo-nitriding heat treatment and improves hardness and the intensity fatigue behaviour of axle sleeve, it is to avoid occur splitting Stricture of vagina;4) making axle sleeve reach higher wearability and fatigue performance by inside surfacing process, corresponding fatigue behaviour is also It is improved;5) by sleeve outer surface being carried out built-up welding, the anticorrosion, high temperature resistant of material is improved.6) axle sleeve carries out subzero treatment Improve its impact resistance and fatigue behaviour.
Accompanying drawing explanation
Fig. 1 is axle sleeve front view;
Fig. 2 is axle sleeve top view.
Detailed description of the invention
In order to the technical characteristic of the present invention, purpose and effect are more clearly understood from, now describe the present invention's in detail Detailed description of the invention.
The axle sleeve that lubricity is good as shown in Figure 1-2, cylindrically, axle sleeve cylinder inner surface offers horizontal oil groove to axle sleeve (1), oil groove offering oilhole (2), oil groove cell body surface-coated has aluminum oxide coating layer (not shown), beyond degreasing tank surface Axle sleeve cylinder inner surface has nickel alloy overlay cladding (3), and axle sleeve cylinder inner surface has aluminium alloy overlay cladding (4).
Embodiment 1
The axle sleeve that a kind of lubricity is good: cylindrically, axle sleeve cylinder inner surface offers horizontal oil groove, axle sleeve bag to described axle sleeve Including copper alloy shaft sleeve main body, oil groove cell body surface-coated has aluminum oxide coating layer, the axle sleeve cylinder inner surface beyond degreasing tank surface Having nickel alloy overlay cladding, axle sleeve cylinder inner surface has aluminium alloy overlay cladding,
Copper alloy chemical composition be (percentage by weight): Cr:14.5: Si 3.5, Ni:2.5, Mn:0.85, Mo: 0.65, Nb:0.55, Ti:0.25, W:0.085, Al: 0.035, Zr:0.035, Ca 0.015, Ta: 0.015, surplus is Cu and inevitable impurity;
Manufacture described axle sleeve to comprise the following steps: according to above-mentioned copper alloy chemical composition dispensing, first fine copper is joined smelting furnace In, Control for Kiln Temperature at 1180 DEG C, until fine copper melt after, copper melt temperature be raised to 1200 DEG C add chromium-copper intermediate alloys, after by stove Temperature rise to 1220 DEG C adds copper silicon intermediate alloy;After furnace temperature be increased to 1240 DEG C add nickel-copper intermediate alloys;After by furnace temperature Being increased to 1260 DEG C and add other alloying elements, rear furnace temperature is increased to 1280 DEG C, adds refine cleanser, and refine cleanser adds Amount is the 0.9% of furnace charge amount, stirs 50 minutes, stands 100 minutes, treat that slag separates with molten metal, skim, adds coverture afterwards, The total addition of coverture is the 0.6% of furnace charge amount, again skims after standing 40 minutes, and the most countershaft set is poured into a mould;Cast temperature Degree is 1200 DEG C;The axle sleeve blank obtained carries out heat treatment: first carry out being heated to 750 DEG C by axle sleeve blank, and heat up speed Rate 50 DEG C/h, is incubated 2 hours, carries out Quenching Treatment afterwards, and hardening media is water, is heated to from room temperature by axle sleeve after quenching 550 DEG C, heating rate 75 DEG C/h, be incubated 3 hours, after be cooled to 300 DEG C, rate of temperature fall 50 DEG C/h, be incubated 3 hours, After be again cooled to 200 DEG C, rate of temperature fall 50 DEG C/h, be incubated 9 hours, rear air cooling to room temperature, described refine cleanser bag Include: aluminum chloride 70%, calcium fluoride 10%, prodan 10%, silica 1 0%;Described coverture includes: potassium chloride 30%, Borax 20%, sodium fluoride 20%, calcium chloride 20%, sodium chloride 10%;
Workpiece cylinder inner surface and outer surface are carried out carbo-nitriding heat treatment, oozes by force process: temperature 750-760 DEG C scope, carbon Gesture and nitrogen gesture take level Four step, carbon potential 1.2-1.4%, nitrogen gesture 0.4-0.6%, are incubated 3h, and then reduction carbon potential is to 1.0-1.1%, Raise nitrogen gesture to 0.7-0.9%, be incubated 3h, then reduce carbon potential to 0.7-0.9%, raise nitrogen gesture to 1.0-1.1%, be incubated 4h, finally Reduce carbon potential and to 1.2-1.6%, be incubated 4h to 0.4-0.5%, rising nitrogen gesture;It is diffused after oozing by force, diffusion process: control furnace temperature Degree be down to 730 DEG C, be incubated 3h, be cooled to 700 DEG C, be incubated 4h, diffusion process carbon-potential control between 0.9-1.0%, nitrogen potential control Between 1.1-1.2%;Air cooling is to room temperature;
After carbo-nitriding, workpiece is warming up to 650 DEG C, heating rate 100 DEG C/h, it is incubated 3 hours, water hardening afterwards, then Secondary heating base substrate is incubated 5 hours at 400 DEG C, and air cooling of coming out of the stove is to room temperature;Base substrate puts into subzero treatment 8 minutes in liquid nitrogen, at sky Gas goes back up to room temperature;
Workpiece cylinder outer surface is carried out built-up welding, and bead-welding technology is: 210 DEG C of preheatings, and during built-up welding, electric current is 55A, and voltage is 12V, Built-up welding speed is 13mm/s, and argon flow amount is 13L/min, and overlay cladding thickness is 2.5mm;, built-up welding complete after Slow cooling;Built-up welding Layer material is: Zn 10.5%, Ti 6.5%, Ca 1.5%, W 0.75%, Mn 0.55%, Cr 0.35%, Mg 0.055%, and surplus is Al;
Oil groove coats: at oil groove cell body surface-coated aluminum oxide coating layer, coating layer thickness 0.3mm,
Cylinder inner surface beyond workpiece degreasing tank cell body surface is carried out built-up welding, and bead-welding technology is: 180 DEG C of preheatings, during built-up welding, Electric current is 67A, and voltage is 12V, and built-up welding speed is 9mm/s, and argon flow amount is 9L/min, and overlay cladding thickness is 3mm;, heap is soldered Slow cooling after one-tenth;Weld overlay materials is: Cr 10.5%, Ti 8.5%, Si 5.5%, Zn 2.5%, Ca 0.75%, Cu 0.045%, Zn 0.025%, surplus is Ni;
Finished heat treatment: workpiece heat to 500 DEG C is incubated 3 hours, then it is cooled to 300 DEG C of insulations 4 hours, obtain final axle Set.

Claims (1)

1. the axle sleeve that a lubricity is good: cylindrically, axle sleeve cylinder inner surface offers horizontal oil groove, axle sleeve to described axle sleeve Including copper alloy shaft sleeve main body, oil groove cell body surface-coated has aluminum oxide coating layer, table in the axle sleeve cylinder beyond degreasing tank surface Mask has nickel alloy overlay cladding, axle sleeve cylinder inner surface to have aluminium alloy overlay cladding,
Copper alloy chemical composition be (percentage by weight): Cr:14.5: Si 3.5, Ni:2.5, Mn:0.85, Mo: 0.65, Nb:0.55, Ti:0.25, W:0.085, Al: 0.035, Zr:0.035, Ca 0.015, Ta: 0.015, surplus is Cu and inevitable impurity;
Manufacture described axle sleeve to comprise the following steps: according to above-mentioned copper alloy chemical composition dispensing, first fine copper is joined smelting furnace In, Control for Kiln Temperature at 1180 DEG C, until fine copper melt after, copper melt temperature be raised to 1200 DEG C add chromium-copper intermediate alloys, after by stove Temperature rise to 1220 DEG C adds copper silicon intermediate alloy;After furnace temperature be increased to 1240 DEG C add nickel-copper intermediate alloys;After by furnace temperature Being increased to 1260 DEG C and add other alloying elements, rear furnace temperature is increased to 1280 DEG C, adds refine cleanser, and refine cleanser adds Amount is the 0.9% of furnace charge amount, stirs 50 minutes, stands 100 minutes, treat that slag separates with molten metal, skim, adds coverture afterwards, The total addition of coverture is the 0.6% of furnace charge amount, again skims after standing 40 minutes, and the most countershaft set is poured into a mould;Cast temperature Degree is 1200 DEG C;The axle sleeve blank obtained carries out heat treatment: first carry out being heated to 750 DEG C by axle sleeve blank, and heat up speed Rate 50 DEG C/h, is incubated 2 hours, carries out Quenching Treatment afterwards, and hardening media is water, is heated to from room temperature by axle sleeve after quenching 550 DEG C, heating rate 75 DEG C/h, be incubated 3 hours, after be cooled to 300 DEG C, rate of temperature fall 50 DEG C/h, be incubated 3 hours, After be again cooled to 200 DEG C, rate of temperature fall 50 DEG C/h, be incubated 9 hours, rear air cooling to room temperature, described refine cleanser bag Include: aluminum chloride 70%, calcium fluoride 10%, prodan 10%, silica 1 0%;Described coverture includes: potassium chloride 30%, Borax 20%, sodium fluoride 20%, calcium chloride 20%, sodium chloride 10%;
Workpiece cylinder inner surface and outer surface are carried out carbo-nitriding heat treatment, oozes by force process: temperature 750-760 DEG C scope, carbon Gesture and nitrogen gesture take level Four step, carbon potential 1.2-1.4%, nitrogen gesture 0.4-0.6%, are incubated 3h, and then reduction carbon potential is to 1.0-1.1%, Raise nitrogen gesture to 0.7-0.9%, be incubated 3h, then reduce carbon potential to 0.7-0.9%, raise nitrogen gesture to 1.0-1.1%, be incubated 4h, finally Reduce carbon potential and to 1.2-1.6%, be incubated 4h to 0.4-0.5%, rising nitrogen gesture;It is diffused after oozing by force, diffusion process: control furnace temperature Degree be down to 730 DEG C, be incubated 3h, be cooled to 700 DEG C, be incubated 4h, diffusion process carbon-potential control between about 0.9-1.0%, nitrogen gesture control System is between about 1.1-1.2%;Air cooling is to room temperature;
After carbo-nitriding, workpiece is warming up to 650 DEG C, heating rate 100 DEG C/h, it is incubated 3 hours, water hardening afterwards, then Secondary heating base substrate is incubated 5 hours at 400 DEG C, and air cooling of coming out of the stove is to room temperature;Base substrate puts into subzero treatment 8 minutes in liquid nitrogen, at sky Gas goes back up to room temperature;
Workpiece cylinder outer surface is carried out built-up welding, and bead-welding technology is: 210 DEG C of preheatings, and during built-up welding, electric current is 55A, and voltage is 12V, Built-up welding speed is 13mm/s, and argon flow amount is 13L/min, and overlay cladding thickness is 2.5mm;, built-up welding complete after Slow cooling;Built-up welding Layer material is: Zn 10.5%, Ti 6.5%, Ca 1.5%, W 0.75%, Mn 0.55%, Cr 0.35%, Mg 0.055%, and surplus is Al;
Oil groove coats: at oil groove cell body surface-coated aluminum oxide coating layer, coating layer thickness 0.3mm,
Cylinder inner surface beyond workpiece degreasing tank cell body surface is carried out built-up welding, and bead-welding technology is: 180 DEG C of preheatings, during built-up welding, Electric current is 67A, and voltage is 12V, and built-up welding speed is 9mm/s, and argon flow amount is 9L/min, and overlay cladding thickness is 3mm;, heap is soldered Slow cooling after one-tenth;Weld overlay materials is: Cr 10.5%, Ti 8.5%, Si 5.5%, Zn 2.5%, Ca 0.75%, Cu 0.045%, Zn 0.025%, surplus is Ni;
Finished heat treatment: workpiece heat to 500 DEG C is incubated 3 hours, then it is cooled to 300 DEG C of insulations 4 hours, obtain final axle Set.
CN201610432695.XA 2015-06-02 2015-06-02 A kind of good axle sleeve of lubricity Active CN105855810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610432695.XA CN105855810B (en) 2015-06-02 2015-06-02 A kind of good axle sleeve of lubricity

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510294971.6A CN104862521B (en) 2015-06-02 2015-06-02 A shaft sleeve with good lubricity
CN201610432695.XA CN105855810B (en) 2015-06-02 2015-06-02 A kind of good axle sleeve of lubricity

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510294971.6A Division CN104862521B (en) 2015-06-02 2015-06-02 A shaft sleeve with good lubricity

Publications (2)

Publication Number Publication Date
CN105855810A true CN105855810A (en) 2016-08-17
CN105855810B CN105855810B (en) 2017-11-07

Family

ID=53908684

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610434852.0A Active CN106090014B (en) 2015-06-02 2015-06-02 A kind of good axle sleeve of lubricity for bearing
CN201510294971.6A Expired - Fee Related CN104862521B (en) 2015-06-02 2015-06-02 A shaft sleeve with good lubricity
CN201610432695.XA Active CN105855810B (en) 2015-06-02 2015-06-02 A kind of good axle sleeve of lubricity

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201610434852.0A Active CN106090014B (en) 2015-06-02 2015-06-02 A kind of good axle sleeve of lubricity for bearing
CN201510294971.6A Expired - Fee Related CN104862521B (en) 2015-06-02 2015-06-02 A shaft sleeve with good lubricity

Country Status (1)

Country Link
CN (3) CN106090014B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106970020A (en) * 2017-03-10 2017-07-21 北京科技大学 HTHP liquid-solid medium erosion-corrosion experiment and in-situ electrochemical test device
CN109277784A (en) * 2018-11-02 2019-01-29 泉州市金典机械发展有限公司 A kind of preparation process of bucket spindle set

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107243587B (en) * 2017-06-10 2019-04-26 南京采青五金制品有限公司 a punch
CN107675066A (en) * 2017-08-24 2018-02-09 南通冠达粉末冶金有限公司 A kind of automobile bearing
CN115772612B (en) * 2022-11-17 2024-03-12 安徽鑫科铜业有限公司 Vertical smelting casting covering agent, preparation method thereof and application thereof in brass production

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02285024A (en) * 1989-04-05 1990-11-22 Skf Gmbh Manufacturing roller bearing member from solid-hardened roller bearing steel
US5365664A (en) * 1993-06-22 1994-11-22 Federal-Mogul Corporation Method of making aluminum alloy bearing
CN1249005A (en) * 1997-12-26 2000-03-29 日本精工株式会社 Continuous annealing furnace, rolling bearing, annealing method, and method of manufacturing inner and outer races of deeply groove ball bearing
CN102433513A (en) * 2011-11-29 2012-05-02 杨学焦 Preparation and heat treatment method of a low-alloy heat-resistant high-strength steel component
CN103173690A (en) * 2013-04-16 2013-06-26 牛加伟 Wear-resistant bearing steel and heat treatment method thereof
CN104093518A (en) * 2011-12-20 2014-10-08 Skf公司 Method, ring & bearing
CN104451805A (en) * 2014-11-05 2015-03-25 芜湖金龙模具锻造有限责任公司 Anti-wear treatment method for sliding bearing bush

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09287661A (en) * 1996-04-19 1997-11-04 Unisia Jecs Corp Piston for internal combustion engine
JP3731600B2 (en) * 2003-09-19 2006-01-05 住友金属工業株式会社 Copper alloy and manufacturing method thereof
WO2009016706A1 (en) * 2007-07-27 2009-02-05 Materials Solution Inc. Copper alloy material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02285024A (en) * 1989-04-05 1990-11-22 Skf Gmbh Manufacturing roller bearing member from solid-hardened roller bearing steel
US5365664A (en) * 1993-06-22 1994-11-22 Federal-Mogul Corporation Method of making aluminum alloy bearing
CN1249005A (en) * 1997-12-26 2000-03-29 日本精工株式会社 Continuous annealing furnace, rolling bearing, annealing method, and method of manufacturing inner and outer races of deeply groove ball bearing
CN102433513A (en) * 2011-11-29 2012-05-02 杨学焦 Preparation and heat treatment method of a low-alloy heat-resistant high-strength steel component
CN104093518A (en) * 2011-12-20 2014-10-08 Skf公司 Method, ring & bearing
CN103173690A (en) * 2013-04-16 2013-06-26 牛加伟 Wear-resistant bearing steel and heat treatment method thereof
CN104451805A (en) * 2014-11-05 2015-03-25 芜湖金龙模具锻造有限责任公司 Anti-wear treatment method for sliding bearing bush

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106970020A (en) * 2017-03-10 2017-07-21 北京科技大学 HTHP liquid-solid medium erosion-corrosion experiment and in-situ electrochemical test device
CN109277784A (en) * 2018-11-02 2019-01-29 泉州市金典机械发展有限公司 A kind of preparation process of bucket spindle set
CN109277784B (en) * 2018-11-02 2020-12-08 泉州市金典机械发展有限公司 Preparation process of bucket shaft sleeve

Also Published As

Publication number Publication date
CN105855810B (en) 2017-11-07
CN104862521A (en) 2015-08-26
CN106090014B (en) 2018-06-26
CN104862521B (en) 2016-11-16
CN106090014A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN105838917B (en) A kind of high-wearing feature generator axle sleeve
CN106244846A (en) A kind of ball bearing
CN105855810B (en) A kind of good axle sleeve of lubricity
CN102851597B (en) Anti-abrasion sink roller shaft sleeve and manufacturing method thereof
CN105127205B (en) Large-scale bushing roll for producing strip and preparation method thereof
CN101152692A (en) Technique for processing tin bronze valve body and tube union
CN114535933B (en) A method for manufacturing a high-stress self-tightening force copper-steel composite wear-resistant bushing
CN104775065A (en) High strength and toughness wear-resistant ductile iron rocking arm and production method thereof
CN1846887A (en) A high-speed steel composite roll and its manufacturing method
CN107100936B (en) A kind of motor bearing and its manufacturing method
CN107034411B (en) A kind of abrasion-resistant roller and preparation method thereof
CN101417380A (en) Manufacture method of composite roller for rolling narrow strip
CN112877564B (en) Copper-steel solid-liquid composite bimetallic material for hot extrusion die and preparation method thereof
CN104294268A (en) Preparation method of wear-resistant guide roller
CN104863967B (en) A petroleum machinery bearing
CN101596583B (en) Compound centrifugal manufacturing method for axial sleeve of bushing
CN103422007B (en) Preparation method of high temperature resistant and abrasion resistant alloy steel containing aluminum-boron-chromium
CN105112790A (en) High-strength wear-resistant spheroidal-graphit cast steel and preparation method thereof
CN104911414B (en) A kind of aluminum alloy materials and preparation method for car light heat dissipation base
CN1067443C (en) Multi-element w-alloy cast iron roll collar and its making technology
CN105624565A (en) Chrome-plating-free cold roll and producing method thereof
CN101736191A (en) Insert material for heat-resisting ductile iron stamping die
CN105401065B (en) Production process of high-strength alloyed gray iron hydraulic valve body part
CN112848552B (en) Copper-steel solid-liquid composite bimetallic material for ocean engineering and preparation method thereof
CN1239753C (en) Nickel base alloy composite conductor roll and manufacturing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xia Tian

Inventor after: Hu Ping

Inventor after: Wang Yonghua

Inventor after: Sun Zhiping

Inventor after: Li Jian

Inventor after: Fang Yiwen

Inventor after: Ma Yongsheng

Inventor before: Yu Jinfang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170825

Address after: Hailing Phoenix Road 225300 Jiangsu city of Taizhou province 2-102

Applicant after: Jiangsu Xuemei Refrigeration Equipment Co., Ltd.

Address before: No. 88, Phoenix lane, Qingcheng Avenue, Wuyang District, Henan, Nanyang

Applicant before: Yu Jinfang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant