CN105814761A - 变电站自动化系统的测试 - Google Patents
变电站自动化系统的测试 Download PDFInfo
- Publication number
- CN105814761A CN105814761A CN201480052747.XA CN201480052747A CN105814761A CN 105814761 A CN105814761 A CN 105814761A CN 201480052747 A CN201480052747 A CN 201480052747A CN 105814761 A CN105814761 A CN 105814761A
- Authority
- CN
- China
- Prior art keywords
- test
- ied
- input
- output
- lns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/133—Arrangements for measuring electric power or power factor by using digital technique
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/02—Details
- H02H3/04—Details with warning or supervision in addition to disconnection, e.g. for indicating that protective apparatus has functioned
- H02H3/044—Checking correct functioning of protective arrangements, e.g. by simulating a fault
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (4)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP13186507.3 | 2013-09-27 | ||
| EP20130186507 EP2854337A1 (en) | 2013-09-27 | 2013-09-27 | Testing of a substation automation system |
| PCT/EP2014/070592 WO2015044329A2 (en) | 2013-09-27 | 2014-09-26 | Testing of a substation automation system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105814761A true CN105814761A (zh) | 2016-07-27 |
| CN105814761B CN105814761B (zh) | 2018-10-16 |
Family
ID=49274468
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201480052747.XA Active CN105814761B (zh) | 2013-09-27 | 2014-09-26 | 变电站自动化系统的测试 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US10012681B2 (zh) |
| EP (2) | EP2854337A1 (zh) |
| CN (1) | CN105814761B (zh) |
| WO (1) | WO2015044329A2 (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120855667A (zh) * | 2025-07-22 | 2025-10-28 | 东莞市输变电工程建设有限责任公司 | 一种变电站自动化测试方法及系统 |
Families Citing this family (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104734364B (zh) * | 2015-04-15 | 2017-03-01 | 国家电网公司 | 智能变电站继电保护装置sv、goose输入测试的方法及系统 |
| CN105207851A (zh) * | 2015-09-30 | 2015-12-30 | 小米科技有限责任公司 | 故障的检测方法、装置、系统、终端及智能设备 |
| ES2914249T3 (es) * | 2017-02-23 | 2022-06-08 | Schneider Electric Ind Sas | Réplica de tensión de subestación basada en la tensión digital |
| CN107122532A (zh) * | 2017-04-14 | 2017-09-01 | 国网电力科学研究院武汉南瑞有限责任公司 | 配送式变电站合智一体设备的仿真方法和系统 |
| CN108551401B (zh) * | 2018-04-09 | 2021-01-05 | 贵州电网有限责任公司 | 智能变电站虚实诊断系统虚实回路关联映射及诊断方法 |
| CN108873735B (zh) * | 2018-06-29 | 2021-11-19 | 许继集团有限公司 | 一种配电主站系统组件仿真测试装置及方法 |
| US10782328B2 (en) | 2018-09-07 | 2020-09-22 | Schweitzer Engineering Laboratories, Inc. | Configuration of testing modes in substation devices |
| US11128116B2 (en) | 2018-10-08 | 2021-09-21 | Schweitzer Engineering Laboratories, Inc. | Electric power system protection device with active and testing configurations |
| CN111505416B (zh) * | 2020-04-26 | 2023-02-28 | 伟宸科技(武汉)有限公司 | 一种变电站综合自动化测试系统 |
| CN112737878B (zh) * | 2020-12-25 | 2022-06-17 | 国网四川省电力公司电力科学研究院 | 一种站控层交换机测试系统及其性能测试方法 |
| US11550285B1 (en) | 2021-06-30 | 2023-01-10 | Schweitzer Engineering Laboratories, Inc. | Systems and methods for enabling a maintenance mode of protection devices in digital secondary systems |
| CN114137930B (zh) * | 2021-10-18 | 2023-12-19 | 国网浙江省电力有限公司温州供电公司 | 一种用于区域稳控系统的测试系统及方法 |
| CN114095492B (zh) * | 2021-11-16 | 2024-12-03 | 许昌许继软件技术有限公司 | 一种电力系统主子站数据传输方法、系统及电子设备 |
| US11831529B2 (en) | 2022-02-04 | 2023-11-28 | Schweitzer Engineering Laboratories, Inc. | Redundant generic object oriented substation event (GOOSE) messages |
| US12506360B2 (en) | 2022-02-04 | 2025-12-23 | Schweitzer Engineering Laboratories, Inc. | Redundant generic object oriented substation event (GOOSE) messages with live and test power system data |
| CN115955422B (zh) * | 2022-12-16 | 2024-05-24 | 南方电网科学研究院有限责任公司 | 一种智能变电站网络性能自动测试方法 |
| CN117908518B (zh) * | 2024-01-19 | 2025-06-24 | 国网江苏省电力有限公司镇江供电分公司 | 一种基于变电站scd模型文件的一键顺控自动校核方法 |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009135512A1 (de) * | 2008-05-05 | 2009-11-12 | Siemens Aktiengesellschaft | Überprüfung einer kommunikationsverbindung zwischen feldgeräten |
| CN102685036A (zh) * | 2011-03-07 | 2012-09-19 | Abb技术有限公司 | Iec 61850变电站网关 |
| CN103324693A (zh) * | 2013-06-05 | 2013-09-25 | 国电南瑞科技股份有限公司 | 基于iec61850协议和xml数据库的建模方法 |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6795789B2 (en) * | 2001-05-21 | 2004-09-21 | Omnicron Electronics Corp. Usa | System for testing of intelligent electronic devices with digital communications |
| DE602006004846D1 (de) * | 2006-04-24 | 2009-03-05 | Abb Research Ltd | Test auf Systemebene für Automatisierungsysteme einer Unterstation |
| CN101836122B (zh) | 2007-10-25 | 2014-12-24 | Abb研究有限公司 | 操作变电站自动化系统 |
| EP2362577A1 (en) | 2010-02-23 | 2011-08-31 | ABB Technology AG | Analysing communication configuration in a process control system |
-
2013
- 2013-09-27 EP EP20130186507 patent/EP2854337A1/en not_active Withdrawn
-
2014
- 2014-09-26 WO PCT/EP2014/070592 patent/WO2015044329A2/en not_active Ceased
- 2014-09-26 EP EP14777067.1A patent/EP3050259B1/en active Active
- 2014-09-26 CN CN201480052747.XA patent/CN105814761B/zh active Active
-
2016
- 2016-03-25 US US15/081,333 patent/US10012681B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009135512A1 (de) * | 2008-05-05 | 2009-11-12 | Siemens Aktiengesellschaft | Überprüfung einer kommunikationsverbindung zwischen feldgeräten |
| CN102685036A (zh) * | 2011-03-07 | 2012-09-19 | Abb技术有限公司 | Iec 61850变电站网关 |
| CN103324693A (zh) * | 2013-06-05 | 2013-09-25 | 国电南瑞科技股份有限公司 | 基于iec61850协议和xml数据库的建模方法 |
Non-Patent Citations (2)
| Title |
|---|
| 笃峻等: "基于IEC61850标准的变电站防误闭锁系统的实现", 《电力系统保护与控制》 * |
| 韩法玲等: "基于IEC61850标准的IED建模分析", 《电力系统保护与控制》 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120855667A (zh) * | 2025-07-22 | 2025-10-28 | 东莞市输变电工程建设有限责任公司 | 一种变电站自动化测试方法及系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105814761B (zh) | 2018-10-16 |
| US10012681B2 (en) | 2018-07-03 |
| EP3050259B1 (en) | 2020-02-19 |
| WO2015044329A3 (en) | 2015-09-17 |
| US20160209450A1 (en) | 2016-07-21 |
| EP2854337A1 (en) | 2015-04-01 |
| EP3050259A2 (en) | 2016-08-03 |
| WO2015044329A2 (en) | 2015-04-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105814761B (zh) | 变电站自动化系统的测试 | |
| US9484738B2 (en) | Operating a substation automation system | |
| CN102299560B (zh) | 实现变电站自动化负载转移功能 | |
| CA2816486C (en) | Method of monitoring operation of an electric power system and monitoring system | |
| EP2480941B1 (en) | Reliability calculation for substation automation systems | |
| CN101931231B (zh) | 间隔间变电站自动化应用 | |
| CN104040447B (zh) | 分析过程控制或者分站自动化系统中的数据通信 | |
| WO2007122196A1 (en) | Intelligent electronic device configuration inspection | |
| WO2007122194A1 (en) | Intelligent electronic device configuration verification | |
| EP2540036B1 (en) | Analysing communication configuration in a iec 61850 process control system | |
| Sidhu et al. | IED modelling for IEC61850 based substation automation system performance simulation | |
| Daboul et al. | Testing protection relays based on IEC 61850 in substation automation systems | |
| EP4254704B1 (en) | Method of monitoring operation of an electric power system and monitoring system | |
| Amjadi et al. | IEC61850 GOOSE performance in real time and challenges faced by power utilities | |
| Pereira et al. | Strategies and techniques applied to IEC 61850 based DSAS architectures | |
| Adhikary et al. | Implementation aspects of substation automation systems based on IEC 61850 | |
| Gholizadeh | Iec 61850 standard and its capabilities in protection systems | |
| US12537388B2 (en) | Method for controlling an energy network, agent device, network control arrangement and system | |
| Klaes | On the identification and analysis of ICT-induced stability risks in cyber-physical energy systems | |
| Ali et al. | Ethernet enabled fast and reliable monitoring, protection and control of electric power substation | |
| Dolezilek | Case study examples of interoperable ethernet communications within distribution, transmission, and wide-area control systems | |
| Dolezilek | IEC 61850 GOOSE and IEEE C37. 118 Synchrophasors used for wide-area monitoring and control, SPS, RAS, and load and generation management | |
| Dolezilek | Case study of mission-critical smart grid remedial action schemes via ethernet |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20180516 Address after: Baden, Switzerland Applicant after: ABB Switzerland Co.,Ltd. Address before: Zurich Applicant before: ABB TECHNOLOGY Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20210623 Address after: Baden, Switzerland Patentee after: ABB grid Switzerland AG Address before: Baden, Switzerland Patentee before: ABB Switzerland Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: Swiss Baden Patentee after: Hitachi energy Switzerland AG Address before: Swiss Baden Patentee before: ABB grid Switzerland AG |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20231229 Address after: Zurich, SUI Patentee after: Hitachi Energy Co.,Ltd. Address before: Swiss Baden Patentee before: Hitachi energy Switzerland AG |