CN105803920A - 一种浮桥定位用抱桩器 - Google Patents
一种浮桥定位用抱桩器 Download PDFInfo
- Publication number
- CN105803920A CN105803920A CN201610362575.7A CN201610362575A CN105803920A CN 105803920 A CN105803920 A CN 105803920A CN 201610362575 A CN201610362575 A CN 201610362575A CN 105803920 A CN105803920 A CN 105803920A
- Authority
- CN
- China
- Prior art keywords
- ring body
- pontoon bridge
- pile
- slide assemblies
- roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/14—Floating bridges, e.g. pontoon bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种浮桥定位用抱桩器,包括环体,在环体中部设置有孔,所述环体套装在桩柱上,并与浮桥连接,所述环体上设置有滑动组件,所述滑动组件在环体上的位置可调节,所述滑动组件包括固定板、滚轮,在所述固定板上设置有一对耳板,所述滚轮设置在一对耳板之间,在所述环体上设置有一对平行的长型螺栓孔,所述滑动组件通过螺栓固定在长型螺栓孔中;本发明环体上设置有长型螺栓孔,滑动组件在长型螺栓孔中方便根据需要调节滑动组件的位置,从而调节滚轮与桩柱之间的距离,避免桩柱直径偏大时抱桩器无法安装。
Description
技术领域
本发明涉及浮桥技术领域,尤其涉及一种将浮桥与桩柱定位的抱桩器。
背景技术
浮桥、水上码头是中国古代历史上应用浮力的伟大奇迹。浮桥构造并不复杂,架拆也方便,它曾经为军队、交通用途等方面起到相当重要的作用。如今,作为交通用途的浮桥已经不会再出现在我们的生活中了,现在的浮桥主要用于军队、港口和旅游景点中,作为一种临时性的交通工具或观赏体验性为主。
为了防止在风浪中浮桥、水上码头晃动或被倾覆,在现有技术中,安装浮桥、水上码头时,通常在浮桥或水上码头的两侧安装多根定位桩,将浮桥、水上码头与定位桩连接,防止其剧烈晃动。但是若将浮桥、水上码头与定位桩固定连接的话,在水位升高时,浮桥、水上码头即会淹没在水中。因此,需要采用抱桩器将浮桥、水上码头与定位桩连接,使浮桥、水上码头与定位桩在沿定位桩轴向可自由活动,方便浮桥、水上码头随水位升高或降低。目前的抱桩器上的滑动组件是焊接连接在抱桩器上的,滑动组件的位置不可调节,当桩柱的直径偏大时,导致抱桩器无法安装,给安装工作带来不便。
发明内容
本发明为了克服现有技术中的不足,提供了一种浮桥定位用抱桩器,本发明中抱桩器上的滑动组件位置可根据桩柱的直径进行调节,方便适用于不同直径的装置,便于安装。
本发明是通过以下技术方案实现:
一种浮桥定位用抱桩器,包括环体,在环体中部设置有孔,所述环体套装在桩柱上,并与浮桥连接,所述环体上设置有滑动组件,所述滑动组件在环体上的位置可调节,所述滑动组件包括固定板、滚轮,在所述固定板上设置有一对耳板,所述滚轮设置在一对耳板之间,在所述环体上设置有一对平行的长型螺栓孔,所述滑动组件通过螺栓固定在长型螺栓孔中。述长型螺栓孔的长度方向与环体上孔的直径方向平行。所述滚轮为树脂轮。所述环体上安装有四组滑动组件,所述四组滑动组件绕孔的中心在同一圆周上等间距分布。所述环体上设置有安装板,所述安装板上设置有安装孔。
作为本发明的优选技术方案,所述安装板为不锈钢板弯折成角钢,一侧连接环体。
作为本发明的优选技术方案,所述滚轮的直径为30~40mm。作为优选,所述滚轮的直径为35mm。
与现有的技术相比,本发明的有益效果是:本发明环体上设置有长型螺栓孔,滑动组件在长型螺栓孔中方便根据需要调节滑动组件的位置,从而调节滚轮与桩柱之间的距离,避免桩柱直径偏大时抱桩器无法安装。
附图说明
图1为本发明的整体结构示意图。
图中:1、固定板;2、长型螺栓孔;3、耳板;4、螺栓;5、环体;6、滚轮;7、孔;8、安装板;9、安装孔。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
如图1所示一种浮桥定位用抱桩器,包括环体5,在环体5中部设置有孔7,所述环体5套装在桩柱上,并与浮桥连接,所述环体5上设置有滑动组件,所述滑动组件在环体5上的位置可调节,所述滑动组件包括固定板1、滚轮6,在所述固定板1上设置有一对耳板3,所述滚轮6设置在一对耳板3之间,在所述环体5上设置有一对平行的长型螺栓孔2,所述滑动组件通过螺栓4固定在长型螺栓孔2中。
作为本发明的一个较佳实施例,所述长型螺栓孔2的长度方向与环体5上孔7的直径方向重合。
作为本发明的一个较佳实施例,所述滚轮6为树脂轮。
作为本发明的一个较佳实施例,所述环体5上安装有四组滑动组件,所述四组滑动组件绕孔7的中心在同一圆周上等间距分布。
作为本发明的一个较佳实施例,所述环体5上设置有安装板8,所述安装板8上设置有安装孔9。
由于浮桥长期浸泡在水中,抱桩器容易腐蚀,为此,所述安装板8为不锈钢板弯折成角钢,角钢一侧连接环体5。
所述滚轮6的直径为30~40mm。作为优选,所述滚轮6的直径为35mm。
本发明环体上设置有长型螺栓孔2,滑动组件在长型螺栓孔2中方便根据需要调节滑动组件的位置,从而调节滚轮6与桩柱之间的距离,避免桩柱直径偏大时抱桩器无法安装。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (4)
1.一种浮桥定位用抱桩器,包括环体(5),在环体(5)中部设置有孔(7),所述环体(5)套装在桩柱上,并与浮桥连接,所述环体(5)上设置有滑动组件,其特征在于:所述滑动组件包括固定板(1)、滚轮(6),在所述固定板(1)上设置有一对耳板(3),所述滚轮(6)设置在一对耳板(3)之间,在所述环体(5)上设置有一对平行的长型螺栓孔(2),所述滑动组件通过螺栓(4)固定在长型螺栓孔(2)中;所述长型螺栓孔(2)的长度方向与环体(5)上孔的直径方向平行;所述滚轮(6)为树脂轮;所述环体(5)上安装有四组滑动组件,所述四组滑动组件绕孔(7)的中心在同一圆周上等间距分布;所述环体(5)上设置有安装板(8),所述安装板(8)上设置有安装孔(9)。
2.根据权利要求1所述的一种浮桥定位用抱桩器,其特征在于:所述安装板(8)为不锈钢板弯折成角钢,一侧连接环体(5)。
3.根据权利要求1所述的一种浮桥定位用抱桩器,其特征在于:所述滚轮(6)的直径为30~40mm。
4.根据权利要求3所述的一种浮桥定位用抱桩器,其特征在于:所述滚轮(6)的直径为35mm。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610362575.7A CN105803920A (zh) | 2016-05-26 | 2016-05-26 | 一种浮桥定位用抱桩器 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610362575.7A CN105803920A (zh) | 2016-05-26 | 2016-05-26 | 一种浮桥定位用抱桩器 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105803920A true CN105803920A (zh) | 2016-07-27 |
Family
ID=56453144
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610362575.7A Pending CN105803920A (zh) | 2016-05-26 | 2016-05-26 | 一种浮桥定位用抱桩器 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105803920A (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104123A (zh) * | 2017-12-21 | 2018-06-01 | 太重(天津)重型装备科技开发有限公司 | 抱桩器的自动对中控制系统和控制方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03286008A (ja) * | 1990-04-02 | 1991-12-17 | Bridgestone Corp | 浮桟橋等の浮遊構造物の係留装置 |
| JPH04339095A (ja) * | 1991-05-15 | 1992-11-26 | Bridgestone Corp | 浮体構造物の係留装置 |
| JPH11256514A (ja) * | 1998-03-09 | 1999-09-21 | Sekisui Plastics Co Ltd | 浮体構造物の係留用支持具 |
| CN201037246Y (zh) * | 2006-08-29 | 2008-03-19 | 刘洪辉 | 浮动码头固定装置 |
| KR101311221B1 (ko) * | 2012-10-29 | 2013-09-27 | 주식회사 씨포트 | 콘크리트 부유체 고정구 및 콘크리트 부유체 |
| CN203864951U (zh) * | 2014-04-02 | 2014-10-08 | 南京工业大学 | 一种连续浮筒复合材料浮式结构体系 |
| CN204527545U (zh) * | 2014-12-03 | 2015-08-05 | 中国建筑第八工程局有限公司 | 悬浮平台 |
-
2016
- 2016-05-26 CN CN201610362575.7A patent/CN105803920A/zh active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03286008A (ja) * | 1990-04-02 | 1991-12-17 | Bridgestone Corp | 浮桟橋等の浮遊構造物の係留装置 |
| JPH04339095A (ja) * | 1991-05-15 | 1992-11-26 | Bridgestone Corp | 浮体構造物の係留装置 |
| JPH11256514A (ja) * | 1998-03-09 | 1999-09-21 | Sekisui Plastics Co Ltd | 浮体構造物の係留用支持具 |
| CN201037246Y (zh) * | 2006-08-29 | 2008-03-19 | 刘洪辉 | 浮动码头固定装置 |
| KR101311221B1 (ko) * | 2012-10-29 | 2013-09-27 | 주식회사 씨포트 | 콘크리트 부유체 고정구 및 콘크리트 부유체 |
| CN203864951U (zh) * | 2014-04-02 | 2014-10-08 | 南京工业大学 | 一种连续浮筒复合材料浮式结构体系 |
| CN204527545U (zh) * | 2014-12-03 | 2015-08-05 | 中国建筑第八工程局有限公司 | 悬浮平台 |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104123A (zh) * | 2017-12-21 | 2018-06-01 | 太重(天津)重型装备科技开发有限公司 | 抱桩器的自动对中控制系统和控制方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10267003B2 (en) | Pile guide | |
| KR101687590B1 (ko) | 태양광 모듈 설치용 해상 부력 구조물 | |
| CN110316321B (zh) | 自平衡式浮标装置 | |
| CN102926355A (zh) | 一种适应大水位变幅的独立式区域性防撞装置 | |
| CN104443319B (zh) | 姿态自适应水下高速拖曳水翼装置 | |
| CN105803920A (zh) | 一种浮桥定位用抱桩器 | |
| CN102745315A (zh) | 大型组块浮托安装横荡护舷装置 | |
| CN203782545U (zh) | 钢筋混凝土式桥墩 | |
| CN105987177A (zh) | 轴弹簧 | |
| CN107416143A (zh) | 一种漂浮式水面光伏系统 | |
| CN105040798A (zh) | 一种双层下水道井盖 | |
| CN105862567A (zh) | 一种抱桩器 | |
| US20190063398A1 (en) | Submersible plant comprising buoyant tether | |
| CN106049252A (zh) | 一种定位抱桩器 | |
| KR200486452Y1 (ko) | 차선 규제봉 | |
| KR20180062888A (ko) | 가스발생기와 메탈블레더를 이용한 비상용 메탈블레더 장치 | |
| CN212058879U (zh) | 一种基于浮力技术的海洋环境监测装置 | |
| CN105449618A (zh) | 一种海缆中心定位保护装置 | |
| CN206570677U (zh) | 一种适用于桥墩的防撞装置 | |
| CN105821803A (zh) | 一种码头抱桩装置 | |
| KR102567836B1 (ko) | 수력 발전 장치 및 그 고정구 | |
| JP2009299285A (ja) | 電気スクリーン | |
| KR101427613B1 (ko) | 선박의 방향타 플랩 자동제어장치 | |
| CN208221902U (zh) | 一种安全型天然气管道 | |
| CN104005376B (zh) | 快速拼装式桥墩防撞消能圈 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160727 |
|
| WD01 | Invention patent application deemed withdrawn after publication |