CN105803150B
CN105803150B CN201610171547.7A CN201610171547A CN105803150B CN 105803150 B CN105803150 B CN 105803150B CN 201610171547 A CN201610171547 A CN 201610171547A CN 105803150 B CN105803150 B CN 105803150B
Authority
CN
China
Prior art keywords
molten steel
controlled
argon
slab
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610171547.7A
Other languages
Chinese (zh)
Other versions
CN105803150A (en
Inventor
陈天明
李红光
郭华
李扬洲
陈亮
郭奠荣
杨文中
李志强
冯远超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Original Assignee
Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd filed Critical Pangang Group Panzhihua Iron and Steel Research Institute Co Ltd
Priority to CN201610171547.7A priority Critical patent/CN105803150B/en
Publication of CN105803150A publication Critical patent/CN105803150A/en
Application granted granted Critical
Publication of CN105803150B publication Critical patent/CN105803150B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal
    • B22D11/114Treating the molten metal by using agitating or vibrating means
    • B22D11/115Treating the molten metal by using agitating or vibrating means by using magnetic fields
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/22Controlling or regulating processes or operations for cooling cast stock or mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/22Controlling or regulating processes or operations for cooling cast stock or mould
    • B22D11/225Controlling or regulating processes or operations for cooling cast stock or mould for secondary cooling
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0006Adding metallic additives
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0056Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00 using cored wires
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/072Treatment with gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/10Handling in a vacuum

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Continuous Casting (AREA)

Abstract

本发明公开的是冶金领域的一种生产断面尺寸为φ280mm的铬钼系列圆管钢铸坯的内部质量控制方法。该方法包括转炉冶炼、LF炉精炼钢水、RH精炼以及连铸钢水等步骤,首先,在钢水冶炼阶段按照合理的参数控制,提高了钢水的纯净度,并通过对钢液进行微钛处理,改善了其高温塑性,降低了钢种裂纹敏感性,随后在钢水浇注的过程中,采用结晶器电磁搅拌与凝固末端电磁搅拌相结合的方式,使得钢液成分和温度均匀化,坯壳均匀生长,铸坯凝固组织得到有效改善,疏松评级提高、等轴晶区域面积扩大、圆坯中心区域致密性得到有效提高,铸坯裂纹缺陷得到有效控制,表面无清理率得到提高改善,轧材质量控制良好且稳定。The invention discloses an internal quality control method for producing chrome-molybdenum series round tubular steel billets with a section size of φ280mm in the field of metallurgy. The method includes steps such as converter smelting, LF furnace refining molten steel, RH refining, and continuous casting molten steel. treatment, which improves its high-temperature plasticity and reduces the crack sensitivity of steel grades. Then, in the process of pouring molten steel, the combination of electromagnetic stirring in the mold and electromagnetic stirring at the end of solidification is used to homogenize the composition and temperature of the molten steel, and the billet shell Uniform growth, the solidification structure of the slab is effectively improved, the porosity rating is improved, the area of the equiaxed grain area is enlarged, the compactness of the central area of the round slab is effectively improved, the crack defects of the slab are effectively controlled, the surface non-cleaning rate is improved, and the rolled product The quality control is good and stable.

Description

φ280mm的铬钼系列圆管坯铸坯质量控制方法The quality control method of chrome-molybdenum series round tube billets with a diameter of φ280mm

技术领域technical field

本发明涉及钢铁冶金领域,尤其涉及一种生产尺度断面为φ280mm的铬钼系列圆管坯铸坯质量控制方法。The invention relates to the field of iron and steel metallurgy, in particular to a method for controlling the quality of chrome-molybdenum series round tube blanks with a production scale section of φ280mm.

背景技术Background technique

铬钼系列管坯钢主要用于生产油气开采、运输使用的油井管用钢,在使用时在使用应力和硫化氢气体的共同作用下,往往会在受力远低于其本身屈服强度时突然发生脆断(称为硫化氢应力腐蚀),往往造成生泄露等问题,对生产及环保造成不利影响。随着社会经济的发展,油气运输效率要求更高、开采难度增大等发展趋势不断对铸坯质量提出更加苛刻的要求。尤其如铸坯中心疏松、中心偏析等缺陷,对铸坯轧制穿管加工及成品质量产生不利影响。Chromium-molybdenum series tube billet steel is mainly used in the production of oil well pipe steel for oil and gas exploitation and transportation. Under the joint action of stress and hydrogen sulfide gas during use, it often occurs suddenly when the force is much lower than its own yield strength. Brittle fracture (called hydrogen sulfide stress corrosion) often causes problems such as production leakage, which has an adverse effect on production and environmental protection. With the development of society and economy, the development trends such as higher requirements for oil and gas transportation efficiency and increased mining difficulty continue to put forward more stringent requirements for the quality of billets. In particular, defects such as slab center looseness and center segregation have adverse effects on the casting slab rolling process and the quality of finished products.

连铸坯中心偏析及疏松的产生,主要是由于连铸生产过程中铸坯凝固传热方向性强,导致柱状晶过于发达,而钢液凝固过程溶质元素在固液相间的再分配导致铸坯后凝固部位溶质合金元素浓度相对偏高;再者,柱状晶的发达导致铸坯中心凝固过程形核结晶不均匀,组织致密性下降,凝固结束后钢液凝固收缩形成疏松缺陷。所形成的中心偏析、中心疏松在后续加热轧制工艺过程中不能全部有效消除,影响产品质量。对于铬钼系列管坯钢来说,成分本身决定了了铸坯柱状晶更为发达,中心疏松趋势更大,中心偏析倾向增加。再者,由于铸坯断面相对较大且为圆坯,其比表面积更小铸坯传热效率更低,铸坯内部质量的控制更加困难。The central segregation and porosity of the continuous casting slab are mainly due to the strong directionality of solidification and heat transfer of the slab during the continuous casting production process, resulting in over-developed columnar crystals, and the redistribution of solute elements between the solid and liquid phases during the solidification of molten steel leads to The concentration of solute alloying elements in the post-solidification part of the slab is relatively high; moreover, the development of columnar crystals leads to uneven nucleation and crystallization during the solidification process in the center of the slab, and a decrease in the compactness of the structure. After solidification, the molten steel solidifies and shrinks to form loose defects. The formed center segregation and center porosity cannot be effectively eliminated in the subsequent heating and rolling process, which affects product quality. For the chrome-molybdenum series tube billet steel, the composition itself determines that the columnar crystals of the cast slab are more developed, the center is more loose, and the center segregation tends to increase. Furthermore, since the slab has a relatively large section and is a round slab, its specific surface area is smaller and the heat transfer efficiency of the slab is lower, making it more difficult to control the internal quality of the slab.

发明内容Contents of the invention

为克服现有较大断面尺寸的铬钼系列圆管钢铸坯内部质量普遍较低、易出现裂纹等不足,本发明所要解决的技术问题是:提供一种针对断面尺寸为φ280mm的铬钼系列圆管钢铸坯的增强其内部质量的控制方法。In order to overcome the shortcomings of the existing chrome-molybdenum series round tubular steel billets with relatively large cross-sectional sizes, which are generally low in internal quality and prone to cracks, the technical problem to be solved by the present invention is to provide a chrome-molybdenum series with a cross-sectional size of φ280mm A control method for enhancing the internal quality of round tubular steel slabs.

本发明解决其技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve its technical problems is:

φ280mm的铬钼系列圆管坯铸坯质量控制方法,其特征在于,包括以下步骤:The method for controlling the quality of the chrome-molybdenum series round tube billets of φ280mm is characterized in that it comprises the following steps:

Ⅰ、转炉冶炼:转炉终点碳按照质量百分比0.05%~0.15%进行控制,终点温度≥1670℃控制,小平台按每吨钢1.4~2.0m的喂入量喂加铝线,进行脱氧处理,小平台目标成分按质量百分比:[C]0.20%~0.35%、[Si]0.16%~0.30%、[Mn]1.00%~1.40%、[P]≤0.013%控制,脱氧合金化结束后进行至少3min的软吹氩处理;Ⅰ. Converter smelting: The carbon at the end point of the converter is controlled according to the mass percentage of 0.05%~0.15%, the end point temperature is controlled at ≥1670°C, and the small platform is fed with aluminum wire at a feed rate of 1.4~2.0m per ton of steel for deoxidation treatment. The target composition of the platform is controlled by mass percentage: [C]0.20%~0.35%, [Si]0.16%~0.30%, [Mn]1.00%~1.40%, [P]≤0.013%, at least 3min after deoxidation alloying soft argon blowing treatment;

Ⅱ、LF炉精炼钢水:将步骤Ⅰ中得到的钢水进行LF炉精炼,精炼全程吹氩搅拌,精炼末期加入钛合金料,加入量按钢液重量的0.018%~0.038%进行配加,之后进行200~500m的喂入量喂加硅钙线进行钙处理,其中中包第一炉次按上限喂加,精炼结束后继续吹氩搅拌至少5min,出站温度按1560~1620℃控制;Ⅱ. Refining molten steel in LF furnace: Refining the molten steel obtained in step Ⅰ in LF furnace, blowing argon and stirring throughout the refining process, adding titanium alloy material at the end of refining, and adding the amount according to 0.018% to 0.038% of the weight of molten steel. Afterwards, 200-500m of feeding amount is fed to silicon-calcium line for calcium treatment, and the first batch of tundish is fed according to the upper limit. After refining, continue to blow argon and stir for at least 5 minutes, and the exit temperature is controlled at 1560-1620°C;

Ⅲ、RH精炼:将步骤Ⅱ中得到的钢水进行RH精炼,RH精炼要求氩气流量按1150~1450NL/min控制,真空度<3mbar,处理时间≥10min,RH出站Alt质量百分比按照0.030%~0.055%控制,真空处理结束后继续吹氩至少5min,出站温度按1550~1580℃控制;Ⅲ. RH refining: RH refining is carried out on the molten steel obtained in step Ⅱ. RH refining requires that the argon flow rate is controlled at 1150-1450NL/min, the vacuum degree is less than 3mbar, the processing time is ≥10min, and the mass percentage of RH outbound Alt is 0.030%~ 0.055% control, continue to blow argon for at least 5 minutes after the vacuum treatment, and control the exit temperature at 1550-1580°C;

Ⅳ、连铸钢水:连铸环节采用结晶器电磁搅拌与凝固末端电磁搅拌相结合的方式,其中,结晶器电磁搅拌的参数为:搅拌电流200~350A,2~4Hz;凝固末端电磁搅拌参数为:搅拌电流100~150A,频率4.0~7.0Hz。Ⅳ. Continuous casting of molten steel: The continuous casting process adopts the method of combining electromagnetic stirring of the mold and electromagnetic stirring at the end of solidification. Among them, the parameters of electromagnetic stirring of the mold are: stirring current 200-350A, 2-4Hz; parameters of electromagnetic stirring at the end of solidification For: stirring current 100-150A, frequency 4.0-7.0Hz.

进一步的是,步骤Ⅰ、Ⅱ和Ⅲ中冶炼过程采用中强度吹氩搅拌,以钢液表面不出现大翻沸腾为准;冶炼结束后采用软吹氩搅拌,使钢水有微弱搅动即可。Further, in the smelting process of steps I, II and III, medium-intensity argon blowing and agitation are used, subject to no large boiling on the surface of the molten steel; soft argon blowing and agitation is used after smelting to make the molten steel slightly agitated.

进一步的是,在步骤Ⅳ中进行钢液浇注的时候还需要控制以下参数:过热度控制在25~38℃,拉速控制在0.60~1.20m/min,结晶器冷却控制在2400~2500L/min,二冷比水量控制在0.21~0.33/kgFurthermore, the following parameters need to be controlled during pouring of molten steel in step IV: the degree of superheat is controlled at 25-38°C, the casting speed is controlled at 0.60-1.20m/min, and the cooling of the crystallizer is controlled at 2400-2500L/min , The specific water volume of the secondary cooling is controlled at 0.21-0.33/kg steel .

本发明的有益效果是:首先在钢水冶炼阶段按照合理的参数控制,提高了钢水的纯净度,并且通过对钢液进行微钛处理,改善了其高温塑性,降低了钢种裂纹敏感性,在钢水浇注的过程中,采用结晶器电磁搅拌与凝固末端电磁搅拌相结合的方式,使得钢液成分和温度均匀化,坯壳均匀生长,铸坯凝固组织得到有效改善,疏松评级提高、等轴晶区域面积扩大、圆坯中心区域致密性得到有效提高,铸坯裂纹缺陷得到有效控制,表面无清理率得到提高改善,轧材质量控制良好且稳定。The beneficial effects of the present invention are as follows: firstly, the purity of molten steel is improved according to reasonable parameter control in the molten steel smelting stage, and by micro-titanium treatment of molten steel, its high-temperature plasticity is improved, and the crack sensitivity of steel grades is reduced. In the process of molten steel pouring, the combination of mold electromagnetic stirring and solidification end electromagnetic stirring is adopted, so that the composition and temperature of molten steel are homogenized, the slab shell grows uniformly, the solidification structure of the slab is effectively improved, the porosity rating is improved, and the equiaxed grain The area area is expanded, the compactness of the central area of the round billet is effectively improved, the crack defects of the cast billet are effectively controlled, the surface no-cleaning rate is improved, and the quality control of the rolled product is good and stable.

具体实施方式Detailed ways

以下通过具体实施方式对本发明作进一步描述,但不应理解为是本发明的限定。本领域普通技术人员根据上述方案,还可以做出各种形式的修改、替换、变更。凡是基于上述技术思想所作的修改、替换和变更都属于本发明的范围。The present invention will be further described below through specific embodiments, but it should not be construed as a limitation of the present invention. Those skilled in the art may also make various modifications, replacements, and changes based on the above solutions. All modifications, replacements and changes made based on the above-mentioned technical ideas belong to the scope of the present invention.

φ280mm的铬钼系列圆管坯铸坯质量控制方法,其特征在于,包括以下步骤:The method for controlling the quality of the chrome-molybdenum series round tube billets of φ280mm is characterized in that it comprises the following steps:

Ⅰ、转炉冶炼:转炉终点碳按照质量百分比0.05%~0.15%进行控制,终点温度≥1670℃控制,小平台按每吨钢1.4~2.0m的喂入量喂加铝线,进行脱氧处理,小平台目标成分按质量百分比:[C]0.20%~0.35%、[Si]0.16%~0.30%、[Mn]1.00%~1.40%、[P]≤0.013%控制,脱氧合金化结束后进行至少3min的软吹氩处理;Ⅰ. Converter smelting: The carbon at the end point of the converter is controlled according to the mass percentage of 0.05%~0.15%, the end point temperature is controlled at ≥1670°C, and the small platform is fed with aluminum wire at a feed rate of 1.4~2.0m per ton of steel for deoxidation treatment. Platform target composition is controlled by mass percentage: [C]0.20%~0.35%, [Si]0.16%~0.30%, [Mn]1.00%~1.40%, [P]≤0.013%, at least 3min after deoxidation alloying soft argon blowing treatment;

Ⅱ、LF炉精炼钢水:将步骤Ⅰ中得到的钢水进行LF炉精炼,精炼全程吹氩搅拌,精炼末期加入钛合金料,加入量按钢液重量的0.018%~0.038%进行配加,之后进行200~500m的喂入量喂加硅钙线进行钙处理,其中中包第一炉次按上限喂加,精炼结束后继续吹氩搅拌至少5min,出站温度按1560~1620℃控制;Ⅱ. Refining molten steel in LF furnace: Refining the molten steel obtained in step Ⅰ in LF furnace, blowing argon and stirring throughout the refining process, adding titanium alloy material at the end of refining, and adding the amount according to 0.018% to 0.038% of the weight of molten steel. Afterwards, 200-500m of feeding amount is fed to silicon-calcium line for calcium treatment, and the first batch of tundish is fed according to the upper limit. After refining, continue to blow argon and stir for at least 5 minutes, and the exit temperature is controlled at 1560-1620°C;

Ⅲ、RH精炼:将步骤Ⅱ中得到的钢水进行RH精炼,RH精炼要求氩气流量按1150~1450NL/min控制,真空度<3mbar,处理时间≥10min,RH出站Alt按照质量百分比0.030%~0.055%控制,真空处理结束后继续吹氩至少5min,出站温度按1550~1580℃控制;Ⅲ. RH refining: carry out RH refining on the molten steel obtained in step Ⅱ. RH refining requires that the argon flow rate is controlled at 1150-1450NL/min, the vacuum degree is less than 3mbar, and the processing time is ≥10min. 0.055% control, continue to blow argon for at least 5 minutes after the vacuum treatment, and control the exit temperature at 1550-1580°C;

Ⅳ、连铸钢水:连铸环节采用结晶器电磁搅拌与凝固末端电磁搅拌相结合的方式,其中,结晶器电磁搅拌的参数为:搅拌电流200~350A,2~4Hz;凝固末端电磁搅拌参数为:搅拌电流100~150A,频率4.0~7.0Hz。Ⅳ. Continuous casting of molten steel: The continuous casting process adopts the method of combining electromagnetic stirring of the mold and electromagnetic stirring at the end of solidification. Among them, the parameters of electromagnetic stirring of the mold are: stirring current 200-350A, 2-4Hz; parameters of electromagnetic stirring at the end of solidification For: stirring current 100-150A, frequency 4.0-7.0Hz.

步骤Ⅰ、Ⅱ和Ⅲ主要是对钢水的冶炼进行控制,保证钢水在浇注前具有稳定的特性、均匀的成分以及适当的浇注温度。其中,转炉冶炼过程主要是进行脱氧处理,并加入和控制一些合金元素,以保证钢水的内部质量,提高其稳定性,LF炉精炼是为了使钢水充分反应,并去除多余的杂质,提高钢水的纯净度,并且使钢液的成分更加稳定均匀。Steps I, II and III are mainly to control the smelting of molten steel to ensure that the molten steel has stable characteristics, uniform composition and proper pouring temperature before pouring. Among them, the converter smelting process is mainly to carry out deoxidation treatment, and add and control some alloy elements to ensure the internal quality of molten steel and improve its stability. Purity, and make the composition of molten steel more stable and uniform.

本发明的关键在于步骤Ⅳ中连铸钢水阶段,通常情况下,连铸工艺过程中铸坯凝固组织从铸坯表面向中心依次呈现激冷层细晶区、柱状晶区、中心等轴晶区的结晶器组织区域。为改善铸坯质量,提高铸坯内部质量,目前冶金行业一般采用的是电磁搅拌技术和凝固末端压下技术,两种技术所达到的效果都不够理想。本发明的改进之处在于,采用的是结晶器电磁搅拌与凝固末端电磁搅拌相结合的方式。该技术的作用机理是:结晶器电磁搅拌通过磁场产生电磁力矩,改变结晶器内部钢液流场、温度场分布情况,促进结晶器内钢液成分、温度均匀化,减弱凝固传热的方向性,促进坯壳均匀生长;进一步地,凝固末端电磁搅拌通过强制驱动糊状区钢液的流动,对柱状晶组织冲刷熔断,提高等轴晶形核率,抑制柱状晶生长,使等轴晶区扩大,提高了铸坯内部质量。The key of the present invention lies in the stage of continuous casting of molten steel in step IV. Usually, in the continuous casting process, the solidification structure of the cast slab presents the fine-grained zone of the chilling layer, the columnar crystal zone, and the central equiaxed grain successively from the surface of the cast slab to the center. area of the crystallizer tissue. In order to improve the quality of the slab and improve the internal quality of the slab, the current metallurgical industry generally adopts the electromagnetic stirring technology and the solidification end pressing technology, and the effects achieved by the two technologies are not ideal. The improvement of the present invention lies in the combination of electromagnetic stirring of the crystallizer and electromagnetic stirring at the end of solidification. The working mechanism of this technology is: the electromagnetic stirring of the mold generates electromagnetic torque through the magnetic field, changes the flow field and temperature field distribution of the molten steel inside the mold, promotes the uniformity of the composition and temperature of the molten steel in the mold, and weakens the directionality of solidification heat transfer , to promote the uniform growth of the billet shell; furthermore, the electromagnetic stirring at the end of solidification drives the flow of molten steel in the mushy region by force, scours and fuses the columnar grain structure, improves the nucleation rate of equiaxed crystals, inhibits the growth of columnar crystals, and expands the equiaxed crystal region , Improve the internal quality of the slab.

在转炉冶炼、LF炉精炼和RH真空处理过程中均采用吹氩进行搅拌,在冶炼过程中一般采用中强度吹氩搅拌,以钢液表面不出现大翻沸腾为准;冶炼结束后采用软吹氩搅拌,使钢水有微弱搅动即可。吹氩搅拌主要是为了使钢水能够充分反应,使钢水中的成分混合均匀,便于后续在钢水浇注过程中能够形成稳定的凝固组织。During the process of converter smelting, LF furnace refining and RH vacuum treatment, argon blowing is used for stirring. In the process of smelting, argon blowing with medium intensity is generally used for stirring, as long as there is no large boiling on the surface of molten steel; Stir with argon to slightly stir the molten steel. The main purpose of argon blowing and stirring is to make the molten steel fully react, to mix the components in the molten steel evenly, and to facilitate the subsequent formation of a stable solidification structure during the molten steel pouring process.

进一步地,在进行连铸钢水阶段时,如果凝固末端电磁搅拌强度控制不好,容易造成枝晶尖端冲刷严重,导致低熔点强流动性的低溶质浓度钢液呈环形聚集,形成白亮带,因此需要对其搅拌强度进行精确控制,此外为了保证最后的成材质量,还需在进行钢液浇注时控制以下参数:过热度控制在25~38℃,拉速控制在0.60~1.20m/min,结晶器冷却控制在2400~2500L/min,二冷比水量控制在0.21~0.33/kg。合理的过热度、拉速匹配控制及二冷强度制定是对铸坯凝固传热控制的关键,即铸坯中心质量控制的关键。Furthermore, in the stage of continuous casting molten steel, if the electromagnetic stirring intensity at the solidification end is not well controlled, it is easy to cause severe erosion of the dendrite tip, resulting in ring-shaped aggregation of low-melting-point and high-fluidity low-solute-concentration molten steel, forming a bright white band. Therefore, it is necessary to precisely control the stirring intensity. In addition, in order to ensure the quality of the final product, the following parameters need to be controlled during molten steel pouring: the degree of superheat is controlled at 25-38°C, and the casting speed is controlled at 0.60-1.20m/min. The crystallizer cooling is controlled at 2400-2500L/min, and the specific water volume of the secondary cooling is controlled at 0.21-0.33/kg steel . Reasonable superheating, casting speed matching control and secondary cooling strength formulation are the key to the control of heat transfer during solidification of the slab, that is, the key to the quality control of the slab center.

实施例一:Embodiment one:

某炼钢厂采用120t转炉冶炼→LF炉精炼→RH精炼→六机六流铸机φ280mm断面连铸生产30CrMo系列圆管坯。转炉吹炼结束时,终点碳为0.10%进行控制,终点温度控制在1675℃;小平台按1.7m/t钢喂入铝线进行脱氧;小平台出站成分质量百分比控制为:[C]0.28%、[Si]0.21%、[Mn]1.25%、[P]0.011%;脱氧合金化后进行软吹氩搅拌,搅拌时间3.5min,搅拌未出现钢液裸露。A steelmaking plant adopts 120t converter smelting → LF furnace refining → RH refining → six-machine six-strand casting machine φ280mm section continuous casting to produce 30CrMo series round tube blanks. At the end of converter blowing, the end point carbon is controlled at 0.10%, and the end point temperature is controlled at 1675°C; the small platform is fed with 1.7m/t steel into the aluminum wire for deoxidation; the mass percentage of the outbound composition of the small platform is controlled as: [C]0.28 %, [Si] 0.21%, [Mn] 1.25%, [P] 0.011%; after deoxidation and alloying, carry out soft blowing argon stirring, stirring time 3.5min, stirring does not appear bare molten steel.

钢水到达LF精炼炉处,进行吹氩钢液微微波动,未出现大翻现象,精炼结束后,按钢液重量的0.026%配加Ti;配加完毕后喂加400m硅钙线进行钙处理,喂线后进行了7.5min的软吹搅拌,LF出站温度为1585℃。When the molten steel arrives at the LF refining furnace, the molten steel fluctuates slightly after argon blowing, and there is no major turning phenomenon. After refining, Ti is added at 0.026% of the weight of the molten steel; 7.5 minutes of soft blowing and stirring were carried out after the line feeding, and the temperature at the exit of LF was 1585°C.

钢水到站后,RH精炼吹氩氩气流量为1300NL/min控制,真空度<3mbar的处理时间10min,RH出站Alt为0.045%,真空处理结束后吹氩≥6.5min,出站温度控制在1550℃。After the molten steel arrives at the station, the RH refining argon blowing argon flow rate is controlled at 1300NL/min, the processing time is 10 minutes when the vacuum degree is less than 3mbar, the RH outbound Alt is 0.045%, after the vacuum treatment is completed, the argon blowing is ≥ 6.5min, and the outbound temperature is controlled at 1550°C.

RH精炼处理结束后调运至六机六流铸机φ280mm断面进行钢液浇铸,与本发明要求相关的关键技术参数实际控制为:结晶器电磁搅拌:搅拌电流200A,搅拌频率3.0Hz;凝固末端电磁搅拌:搅拌电流105A,搅拌频率7.0Hz;钢液实际连铸过程过热度控制在25~32℃;拉速为1.0m/min;结晶器冷却控制在2500L/min;二冷比水量控制在0.33/kg钢。After the RH refining process is completed, it is transferred to a six-machine six-strand casting machine with a φ280mm section for molten steel casting. The actual control of the key technical parameters related to the requirements of the present invention is: electromagnetic stirring of the crystallizer: stirring current 200A, stirring frequency 3.0Hz; solidification end electromagnetic Stirring: Stirring current 105A, stirring frequency 7.0Hz; the actual continuous casting process of molten steel is controlled at 25-32°C; casting speed is 1.0m/min; crystallizer cooling is controlled at 2500L/min; secondary cooling specific water volume is controlled at 0.33 /kg steel.

上述技术发明稳定运用后,铸坯质量得到良好控制,铸坯低倍检测结果为:铸坯疏松度0.5~1.0级,疏松区域直径比例40.2%;铸坯表面无裂纹等缺陷,铸坯表面综合无清理率达到99.2%。铸坯金属原位分析致密度检测,中心区域为0.82,铸坯等轴晶区长度比例50.1%~54.2%;铸坯钻样偏析检测结果为0.96~1.03。After the stable application of the above technical inventions, the quality of the slab has been well controlled. The low-magnification detection results of the slab are: the porosity of the slab is 0.5 to 1.0, and the diameter ratio of the loose area is 40.2%. There are no defects such as cracks on the surface of the slab, and the surface of the slab is comprehensive. The no-cleanup rate reaches 99.2%. The in-situ analysis and density test of the slab metal shows that the central area is 0.82, and the length ratio of the equiaxed crystal region of the slab is 50.1% to 54.2%; the segregation test result of the slab drill sample is 0.96 to 1.03.

实施例二:Embodiment two:

某炼钢厂采用120t转炉冶炼→LF炉精炼→RH精炼→六机六流铸机φ280mm断面连铸生产35CrMo系列圆管坯。转炉吹炼结束时,终点碳为0.05%进行控制,终点温度控制在1680℃;小平台按2.0m/t喂入铝线进行脱氧;小平台出站成分控制为:[C]0.30%、[Si]0.18%、[Mn]1.30%、[P]0.012%;脱氧合金化后进行软吹氩搅拌,搅拌时间4.0min,搅拌未出现钢液裸露。A steelmaking plant adopts 120t converter smelting → LF furnace refining → RH refining → six-machine six-strand casting machine φ280mm section continuous casting to produce 35CrMo series round tube blanks. At the end of converter blowing, the end point carbon is controlled at 0.05%, and the end point temperature is controlled at 1680°C; the small platform is fed with 2.0m/t steel into the aluminum wire for deoxidation; the outbound composition of the small platform is controlled as: [C]0.30%, [Si] 0.18%, [Mn] 1.30%, [P] 0.012%; after deoxidation and alloying, soft argon blowing and stirring were carried out, the stirring time was 4.0min, and the molten steel did not appear exposed during stirring.

钢水到达LF精炼炉处,进行吹氩钢液微微波动,未出现大翻现象,精炼结束后,按钢液重量的0.035%配加Ti;配加完毕后喂加500m硅钙线进行钙处理,喂线后进行了7.5min的软吹搅拌,LF出站温度为1600℃。When the molten steel reaches the LF refining furnace, the molten steel fluctuates slightly after argon blowing, and there is no big turning phenomenon. After refining, Ti is added at 0.035% of the weight of the molten steel; 7.5 minutes of soft blowing and stirring were carried out after the wire feeding, and the temperature of LF exiting the station was 1600°C.

钢水到站后,RH精炼吹氩氩气流量为1400NL/min控制,真空度<3mbar的处理时间12min,RH出站Alt为0.050%,真空处理结束后吹氩7.5min,出站温度控制在1570℃。After the molten steel arrives at the station, the RH refining argon blowing argon flow rate is controlled at 1400NL/min, the processing time is 12 minutes when the vacuum degree is less than 3mbar, the Alt of the RH outbound station is 0.050%, and the argon is blown for 7.5min after the vacuum treatment is completed, and the outbound temperature is controlled at 1570 ℃.

LF精炼处理结束后调运至六机六流铸机φ280mm断面进行钢液浇铸,与本发明要求相关的关键技术参数实际控制为:结晶器电磁搅拌:搅拌电流260A,搅拌频率4.0Hz;凝固末端电磁搅拌:搅拌电流110A,搅拌频率6.5Hz;钢液实际连铸过程过热度控制在31~38℃;拉速为0.7m/min;结晶器冷却控制在2400L/min;二冷比水量控制在0.21/kgAfter the LF refining process is completed, it is transferred to a six-machine six-strand casting machine with a φ280mm section for molten steel casting. The actual control of the key technical parameters related to the requirements of the present invention is: electromagnetic stirring of the crystallizer: stirring current 260A, stirring frequency 4.0Hz; solidification end electromagnetic Stirring: Stirring current 110A, stirring frequency 6.5Hz; the actual continuous casting process of molten steel is controlled at 31-38°C; casting speed is 0.7m/min; crystallizer cooling is controlled at 2400L/min; /kg steel .

上述技术发明稳定运用后,铸坯质量得到良好控制,铸坯低倍检测结果为:铸坯疏松度0.5~1.0级,疏松区域直径比例41.1%;铸坯表面无裂纹等缺陷,铸坯表面综合无清理率达到97.8%。铸坯金属原位分析致密度检测,中心区域为0.83,铸坯等轴晶区长度比例50.3%~52.2%;铸坯钻样偏析检测结果为0.95~1.04。After the stable application of the above technical inventions, the quality of the slab has been well controlled. The low-magnification detection results of the slab are: the porosity of the slab is 0.5 to 1.0, and the diameter ratio of the loose area is 41.1%; the surface of the slab has no defects such as cracks, and the surface of the slab is comprehensive The no-cleanup rate reached 97.8%. The in-situ analysis and density test of the billet metal shows that the central area is 0.83, and the length ratio of the equiaxed grain region of the billet is 50.3% to 52.2%; the segregation test result of the billet drill sample is 0.95 to 1.04.

Claims (3)

1. the chrome molybdenum series circular pipe blank slab quality control method of φ 280mm, which is characterized in that comprise the following steps:
Ith, converter smelting:Converter terminal carbon is controlled according to mass percent 0.05% ~ 0.15%, outlet temperature >=1670 DEG C control System, chain-wales are fed by the feed quantity of 1.4 ~ 2.0m of steel per ton plus aluminum steel, carry out deoxidation treatment, and chain-wales target component presses quality hundred Divide ratio:[C] 0.20% ~ 0.35%, [Si] 0.16% ~ 0.30%, [Mn] 1.00% ~ 1.40%, [P]≤0.013% control, deoxygenated alloy The soft blow argon processing of at least 3min is carried out after change;
IIth, LF stoves refined molten steel:The molten steel obtained in step I is subjected to LF stove refinings, whole Argon stirring is refined, refines latter stage Add in titanium alloy material, addition by molten steel weight 0.018% ~ 0.038% carry out with addition of, afterwards carry out 200 ~ 500m feed quantity It feeds and silicon-calcium wire is added to carry out Calcium treatment, add wherein the first heat of middle bag is fed by the upper limit, continue Argon stirring after refining at least 5min, out-station temperature is by 1560 ~ 1620 DEG C of controls;
IIIth, RH is refined:The molten steel obtained in step II is subjected to RH refinings, RH refinings require argon flow amount by 1150 ~ 1450NL/ Min is controlled, vacuum degree < 3mbar, and processing time >=10min, the outbound Alt of RH are controlled according to mass percent 0.030% ~ 0.055% System continues Argon at least 5min after application of vacuum, out-station temperature is by 1550 ~ 1580 DEG C of controls;
IVth, continuous casting steel:Continuous casting link using M-EMS in a manner that solidification end electromagnetic agitation is combined, In, the parameter of M-EMS is:200 ~ 350A of stir current, 2 ~ 4Hz of frequency;Solidification end stirring parameter is: 100 ~ 150A of stir current, 4.0 ~ 7.0Hz of frequency.
2. the chrome molybdenum series circular pipe blank slab quality control method of φ 280mm as described in claim 1, it is characterized in that:Step Ith, intensity Argon stirs during smelting process uses in II and III, is subject to molten steel surface and does not occur turning over boiling greatly;After smelting It is stirred using soft blow argon, molten steel is made to have faint agitation.
3. the chrome molybdenum series circular pipe blank slab quality control method of φ 280mm as described in claim 1, it is characterized in that:In step It carries out also needing to control following parameter when molten steel cast in rapid III:The degree of superheat is controlled at 25 ~ 38 DEG C, and casting speed control is 0.60 ~ 1.20m/min, crystallizer cooling control are controlled in 2400 ~ 2500L/min, Water Rate for Secondary Cooling Water in 0.21 ~ 0.33/kg.
CN201610171547.7A 2016-03-23 2016-03-23 The chrome molybdenum series circular pipe blank slab quality control method of φ 280mm Active CN105803150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610171547.7A CN105803150B (en) 2016-03-23 2016-03-23 The chrome molybdenum series circular pipe blank slab quality control method of φ 280mm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610171547.7A CN105803150B (en) 2016-03-23 2016-03-23 The chrome molybdenum series circular pipe blank slab quality control method of φ 280mm

Publications (2)

Publication Number Publication Date
CN105803150A CN105803150A (en) 2016-07-27
CN105803150B true CN105803150B (en) 2018-06-05

Family

ID=56454304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610171547.7A Active CN105803150B (en) 2016-03-23 2016-03-23 The chrome molybdenum series circular pipe blank slab quality control method of φ 280mm

Country Status (1)

Country Link
CN (1) CN105803150B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106513617B (en) * 2016-12-30 2019-02-12 中国重型机械研究院股份公司 A kind of device and method improving continuous casting slab quality
CN108705050A (en) * 2018-06-29 2018-10-26 攀钢集团攀枝花钢铁研究院有限公司 The method that bloom continuous casting produces 34CrMo4 oxygen cylinder steel
CN108687317B (en) * 2018-06-29 2020-02-04 攀钢集团攀枝花钢铁研究院有限公司 Method for producing 42CrMoH steel by bloom continuous casting
CN108705055A (en) * 2018-06-29 2018-10-26 攀钢集团攀枝花钢铁研究院有限公司 M+F-EMS control method in bloom continuous casting
CN114150107A (en) * 2021-11-26 2022-03-08 南京钢铁股份有限公司 Smelting method of spring steel for ultrahigh-strength engineering machinery

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184304A (en) * 2013-04-19 2013-07-03 江苏沙钢集团淮钢特钢股份有限公司 Technology for producing 38CrMoAl steel by converter-LF (low frequency)-RH (rockwell hardness)-continuous casting
CN104120352A (en) * 2014-07-30 2014-10-29 攀钢集团西昌钢钒有限公司 34CrMo4 gas cylinder steel and production method thereof
CN105177427A (en) * 2015-10-21 2015-12-23 攀钢集团西昌钢钒有限公司 Steel for 30CrMo gas cylinders and production method thereof
CN105215310A (en) * 2015-11-17 2016-01-06 攀钢集团攀枝花钢铁研究院有限公司 A kind of method that big cross section Properties of Heavy Rail Steel strand center porosity controls

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184304A (en) * 2013-04-19 2013-07-03 江苏沙钢集团淮钢特钢股份有限公司 Technology for producing 38CrMoAl steel by converter-LF (low frequency)-RH (rockwell hardness)-continuous casting
CN104120352A (en) * 2014-07-30 2014-10-29 攀钢集团西昌钢钒有限公司 34CrMo4 gas cylinder steel and production method thereof
CN105177427A (en) * 2015-10-21 2015-12-23 攀钢集团西昌钢钒有限公司 Steel for 30CrMo gas cylinders and production method thereof
CN105215310A (en) * 2015-11-17 2016-01-06 攀钢集团攀枝花钢铁研究院有限公司 A kind of method that big cross section Properties of Heavy Rail Steel strand center porosity controls

Also Published As

Publication number Publication date
CN105803150A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105568122B (en) φ 280mm 30CrMo circular pipe blank center segregation control methods
CN105803150B (en) The chrome molybdenum series circular pipe blank slab quality control method of φ 280mm
CN104259415B (en) A kind of continuous cast method of continuous cast round billets
CN104946972B (en) Steel disc strip for diode lead and production technology of steel disc strip
CN105537549B (en) The production method of 100 DEG C of low temperature seamless steel pipe steel continuous cast round billets
CN105803152B (en) The center porosity control method of 30CrMo circular pipe blank steel strands
CN110042238A (en) The production method of high-quality FeV50 alloy
CN105772666B (en) The center segregation control method of 30CrMo circular pipe blank steel strands
CN105695659B (en) The 37Mn circular pipe blank slab quality control method of φ 280mm
CN105803149B (en) The 35CrMo circular pipe blank equiaxial crystal ratio control methods of φ 280mm
CN105586531B (en) A kind of production method that can effectively control 37Mn circular pipe blank steel slab qualities
CN114959414B (en) Large forging for pressure container and smelting method thereof
CN105779869B (en) The method of 30Mn circular pipe blank steel Inner Quality of Billet control
CN115156495B (en) Control method for corner cracks of medium-carbon high-silicon steel continuous casting square billet
CN105624540A (en) Control method of equiaxial crystal ratio of 30CrMo round pipe billet and steel casting blank
CN108705050A (en) The method that bloom continuous casting produces 34CrMo4 oxygen cylinder steel
CN105603301A (en) 30CrMo circular tube billet steel casting blank internal quality control method
CN105695657B (en) The 30Mn circular pipe blank slab quality control methods of φ 280mm
CN105772665B (en) The 34CrMo pipes steel billet and its method for refining of 350 ㎜ diameters
CN105568166B (en) The 34CrMo pipes steel billet and its casting method of 350 ㎜ diameters
CN105603300A (en) Center segregation control method of phi280mm 35CrMo circular tube blank
CN102517476B (en) High strength aluminum alloy capable of reducing porosity and dispersed shrinkage and preparation method thereof
CN105695658B (en) The 30CrMo circular pipe blank equiaxial crystal ratio control methods of φ 280mm
CN105803151B (en) The 35CrMo circular pipe blank center porosity control methods of φ 280mm
CN105603302A (en) Phi350mm 34CrMo circular tube steel blank and smelting method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant