CN105591803A - Resource processing method and equipment - Google Patents
Resource processing method and equipment Download PDFInfo
- Publication number
- CN105591803A CN105591803A CN201510523727.2A CN201510523727A CN105591803A CN 105591803 A CN105591803 A CN 105591803A CN 201510523727 A CN201510523727 A CN 201510523727A CN 105591803 A CN105591803 A CN 105591803A
- Authority
- CN
- China
- Prior art keywords
- resource
- node
- resource node
- layout
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003672 processing method Methods 0.000 title abstract 3
- 238000012545 processing Methods 0.000 claims abstract description 14
- 238000012544 monitoring process Methods 0.000 claims abstract description 6
- 238000000034 method Methods 0.000 claims description 23
- 230000002159 abnormal effect Effects 0.000 claims description 12
- 239000000284 extract Substances 0.000 claims description 7
- 239000003607 modifier Substances 0.000 claims description 4
- 238000000605 extraction Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract 1
- 230000000875 corresponding effect Effects 0.000 description 31
- 238000007726 management method Methods 0.000 description 14
- 238000005516 engineering process Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000002688 persistence Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0896—Bandwidth or capacity management, i.e. automatically increasing or decreasing capacities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/50—Network service management, e.g. ensuring proper service fulfilment according to agreements
- H04L41/5041—Network service management, e.g. ensuring proper service fulfilment according to agreements characterised by the time relationship between creation and deployment of a service
- H04L41/5051—Service on demand, e.g. definition and deployment of services in real time
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- User Interface Of Digital Computer (AREA)
Abstract
The invention discloses a resource processing method and resource processing equipment. The resource processing method comprises the steps of: extracting resources corresponding to a resource demonstration message when receiving the resource demonstration message; determining a plurality of resource nodes contained in the resources, and links among the plurality of resource nodes; carrying out hierarchical display of the resource nodes in the resources according to a topological hierarchy based on resource icons corresponding to the plurality of determined resource nodes and the links; and achieving centralized and unified monitoring and management of the resources, and demonstrating and displaying topological relations among the resources through a graphic typology, thereby increasing management, operation and maintenance efficiency of the resources.
Description
Technical field
The embodiment of the present application relates to communication technical field, particularly a kind of method for processing resource and equipment.
Background technology
In recent years, cloud computing technology development is very fast, its Self-Service as required, network insertion widely,The complexity features such as elastic telescopic, resource pool, mensurable, many tenants are management and the O&M of cloud resourceBring huge challenge. The resource of cloud management platform management and the service providing are very many, comprise cloud masterMachine, cloud hard disk, cloud fire wall, cloud load balancing, cloud network, cloud router, cloud storage etc. SoHow many resources and service are planned and to join according to the topological layout that need to carry out easily resource of businessPut, how the automation of fast and flexible dispose, how shirtsleeve operation management, open-and-shut prison howControl, these all become management and O&M personnel's a difficult problem.
Existing scheme is to be multiple modules by cloud resource according to category division, and each module is with original listForm be independently in charge of a class cloud resource, but there is following shortcoming in prior art scheme: resource managementDisperse independent: cloud resource is dispersed in multiple module pages, carries out configuration, deployment and the management of cloud resourceNeed to enter multiple pages and operate, cannot centralized and unified management. Can not embody intuitively cloud moneyTopological relation between source. Cannot carry out overall resource topology layout planning. Once resource configures completeJust need to issue deployment, cannot repeatedly configure. The deployment of resource can only be to configure one by one one by one to dispose,Cannot be centralized and unified dispose.
Summary of the invention
The present invention proposes a kind of method for processing resource, state resource and comprise multiple resource nodes, described resourceNode is to having resource map mark and topological level, and the resource icon that different resource node is corresponding is different,Resource node between different topology level is by link connection, and the method comprises:
In the time receiving resource displaying message, extract described resource and show resource corresponding to message;
Determine multiple resource nodes that described resource comprises, and chain between described multiple resource nodeRoad;
Resource map corresponding to multiple resource nodes based on determining is marked with and described link comes in described resourceEach resource node carry out layering demonstration according to topological level.
The invention allows for a kind of resource processing arrangements, described resource comprises multiple resource nodes, described inResource node is to having resource map mark and topological level, respectively phase not of resource icon corresponding to different resource nodeWith, the resource node between different topology level is by link connection, and this equipment comprises:
Extraction module, in the time receiving resource displaying message, extracts described resource and shows message correspondenceResource;
Determination module, for multiple resource nodes of determining that described resource comprises, and described multiple moneyLink between source node;
Display module, is marked with and described link for resource map corresponding to multiple resource nodes based on determiningEach resource node in described resource is carried out to layering demonstration according to topological level.
Compared with prior art, the method for processing resource that the present invention proposes, realization is centralized and unified to resourceMonitoring and management, and reveal the topological relation between each resource by graphical topological display body; EnergyEnough carry out overall topological layout planning, and can carry out repeatedly layout configuration, a key automation is concentratedUnified plan, has improved the management of resource and the efficiency of O&M.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of a kind of method for processing resource of embodiment of the present invention proposition;
Fig. 2 is the schematic flow sheet of the method for a kind of deploy resources of embodiment of the present invention proposition;
Fig. 3 is the schematic flow sheet of the method for a kind of showing resource of embodiment of the present invention proposition;
Fig. 4 is the structural representation that a kind of resource of embodiment of the present invention proposition is shown;
Fig. 5 is the structural representation of a kind of resource processing arrangements of embodiment of the present invention proposition.
Detailed description of the invention
As background technology, for defect of the prior art, the present invention proposes a kind of method for processing resource,Be applied to needing resource to carry out in the virtual data center of centralized and unified management, for example, can be applied in netIn network asset management device, various resources (comprising cloud resource) are processed as required, whereinSpecifically can process interface by resource resource is processed, in resource processing interface, be provided with manyThe individual resource icon corresponding to each resource node, can need to carry out arbitrarily resource icon based on businessDrag, and carry out connection resource node by line, thereby form topology; Resource representative in the present inventionFor the disposal ability of business, can be cloud resource, wherein, resource comprises multiple resource nodes, resourceNode is to having resource map mark and topological level (being specially the level in topological relation), different resource nodeCorresponding resource icon is different, and the resource node between different topology level passes through link connection, asShown in Fig. 1, the method comprises:
Step 101, show when message when receiving resource, extract resource and show resource corresponding to message.
Concrete, because the resource of having disposed is stored in database, therefore can from database, extractWith resource show message for resource.
Step 102, determine multiple resource nodes that resource comprises, and chain between multiple resource nodeRoad.
Concrete, because resource node and link are the basic elements in topology, the cloud resource in topology justBe the set of resource node and link, load in topological resource process on backstage, finally can be by from databaseIn the set that is converted to resource node and link of the various cloud resources that read push to front page layout and show,Each resource node, to there being different resource icons, therefore (is opened up by link between each resource nodeWhile showing, represent with line) represent the topological relation between resource node, and according to topological relationIn different topological levels, can be different logical levels by resource division, with common network nodeFor root node, the cloud resource of the superiors connects common network node, and lower floor's resource connects upper strata resource, withThis top-down tree structure layout is shown cloud resource and the topological relation in cloud management platform, for this reasonCan adopt layering to load the mode of resource, determine successively first, second, third and fourth, five layer resource,And according to the data acquisition system of the pass series structure resource node (Node) between resource and link (Link),After data acquisition system construction complete, follow-up data acquisition system is pushed to foreground together with refreshing topological instruction, frontPlatform is received after load instructions, upgrades resource node and the link of buffer memory in the page; And draw topology, adoptFollowing step determines, concrete comprises the following steps:
Step 1, judge that whether current N layer does not reach maximum layer, if reached maximum layer, carries outStep 5, if do not reached, performs step 2;
Step 2, judge whether N layer exists resource node, continue execution step 3 if exist, if notExist N=N+1 is set, and return to step 1;
Step 3, all resource node of traversal N layer, judge whether resource node exists topological coordinate,If exist perform step 4, use if do not exist topological layout's algorithm for resource node generates topological coordinateAnd persistence;
Step 4, resource node and link are added in buffer memory, N=N+1 is set, and returns to step 1;
After the link of having determined between multiple resource nodes and multiple resource node, can forbidShow, also perform step 103.
Step 103, resource map corresponding to multiple resource nodes based on determining are marked with and link comes in resourceEach resource node carry out layering demonstration according to topological level.
Concrete, can draw as the tree topology in Fig. 2 according to resource node and link.
And resource node and link information are added after buffer memory, according to the resource node adding and linkInformation updating buffer memory in the resource node of original deployable state and the information of link; After upgradingResource node determine upgrade after the corresponding resource icon of resource node; Resource joint based on after upgradingThe corresponding resource map of point be marked with and buffer memory in the information of link after upgrading draw topology and show user.
(to be also resource node in abovementioned steps based on the resource of deployable state owing to drawing topologyState), therefore first from database, extract, then the deploy resources based on extracting is upgraded in buffer memoryDeploy resources (can not upgrade init state and the resource of configuration status), and finally based on after upgradingBuffer memory in the resource of deployable state draw topology and show user.
In addition, before step 101, also comprise resource is carried out to deployment process, as shown in Figure 3,Its step is as follows:
Step 301, in the time receiving user's layout resource map target and move corresponding layout message, based onLayout message judges that whether the topological relation of layout generation is correct.
Concrete, for the resource node to each stage identifies, can be to the resource of different phaseNode carries out the mark of different conditions, in the time that resource icon is carried out to layout, and the resource that resource icon is correspondingNode is now in init state; In order to distinguish, resource map that can be corresponding to this resource nodeMark shows, specifically resource icon can be appeared dimmed, and can certainly be shown as other mode,As long as the effect that can show is different from other states, the while also makes the user can very clear and definite knowingThe state of current concrete resource node.
User can carry out layout to resource icon at the page on foreground, for example, change resource map target position,Topological relations between change resource icon and resource icon etc., it is in fact between resource nodeTopological relation is modified, and corresponding to user's layout, backstage can receive layout message, and this layout disappearsIn breath, can carry resource icon is carried out to the resource map target information after layout, for example resource icon and resourceTopological relation between icon, can also comprise positional information, for example, can be abscissa and ordinateMode shows, can also put as initial point using certain, and resource icon is to distance and the angle of this initial pointResource icon is identified; Whether the topological relation in the layout message that then judgement receives is correct;
If judged result is no, also determine that topological relation is incorrect, generates information and shows useFamily, information is used for pointing out topological relation incorrect, and indicating user re-starts layout; And ifBe that judged result is yes, perform step 302.
Step 302, if the determination result is YES, the resource node that cache resources icon is corresponding and topological relationIn link information, and point out user to carry out parameter configuration to resource node.
When definite topological relation is correct, by resource node corresponding resource icon and topological relationLink information carries out buffer memory, due to topological relation and layout correct, in the case, also need to moneySource node carries out parameter configuration, therefore points out user to carry out parameter configuration to resource node, and when receivingAfter user configured parameter, the state that receives the resource node after configuration parameter becomes from init stateConfiguration status, and when resource node is during in configuration status, can be with the configuration status presetMode is carried out the resource icon that display is corresponding, for example, represent with translucent vivid icon.
In the case, also need configuration parameter to carry out the whether correctly judgement of configuration, if judgement configurationParameter is incorrect, generates information and shows user, and information is used for pointing out configuration parameter incorrect,And indicating user re-starts parameter configuration; Wherein this prompting reconfigures parameter, aforesaid volume againRow topology, and prompting in step 302 resource node is carried out to parameter configuration specifically can be by promptingThe mode of frame shows user, so that understanding and carry out accordingly at prompting frame, subsequent user operates,Wherein prompting frame can be checked the information of resource and carry out business operation, can enter resource based on prompting frameLine pipe reason; For example, in the time receiving left mouse button and click the signal that resource node produces, trigger foreground backwardPlatform sends and upgrades resource information instruction, and backstage sends to foreground after inquiring this resource node latest data,Resource prompting frame is ejected on foreground, and fills prompting frame by up-to-date resource information, and wherein, one is optionalIn prompting frame, content can comprise: the link of resource information, correlated resources, business operation button, specifically inAppearance can arrange according to the service needed of various resources, and for this reason, prompting frame can comprise three parts: markTopic hurdle (being marked with and title composition by resource map), resource information hurdle (inclusion information label and corresponding informationValue), business operation button bar (for placing business operation button, for example, start, close, destruction etc.);And if judge that configuration parameter is correct, perform step 303.
If it is correct that step 303 judgement receives configuration parameter, based on the resource node that carries out parameter configurationUpgrade resource node and link information in buffer memory.
Step 304, in the time receiving deployment order, dispose the resource node and the link that have upgraded in buffer memoryInformation, and be deployable state by completing the resource node of deployment and the status modifier of link.
Wherein, concrete in the time receiving deployment order, dispose the resource node that upgraded in buffer memory andLink information, specifically comprises:
In the time receiving deployment order, resource node and the link information of the configuration status based in buffer memoryGenerate and dispose snapshot; Based on disposing resource node and the link information of snapshot to the configuration status in buffer memoryCorresponding resource is carried out the asynchronous deployment of multithreading.
Corresponding to the resource node of deployable state, can show in vivid resource map target modeShow, in addition, for abovementioned steps, the resource that has completed layout and configuration (comprises resource node and chainRoad), be kept in buffer memory, do not dispose and issue, and while only receiving deployment order, just will delayThe resource node and the corresponding resource of link information that in depositing, have completed renewal are all disposed and are issued, andConcrete deployment is to carry out the asynchronous deployment of multithreading, for example as shown in Figure 4, can be first based on layout andThe resource node having configured and link information generate disposes snapshot, follow-uply enters based on this deployment snapshotRow is disposed, and in disposing, user can also carry out other operation in topology, for exampleCarry out the topological relation of layout resource node, or resource node carried out to parameter configuration, and delete orThe newly-increased resource node of person etc. In addition, in the time disposing, deployment daily record can also be set, to alignCarry out record in the daily record of disposing, and real-time update resource deployment state and result, realize disposingThe real-time monitoring of resource.
In addition, about the renewal of concrete buffer memory, also comprise:
In the time receiving user's layout resource icon layout message corresponding to target location, disappear based on layoutThe information of the resource node that in breath, in the information updating buffer memory of target location, resource icon is corresponding, and work as resourceThe state of the resource node that icon is corresponding is during for deployable state, by resource node corresponding resource iconInformation is persisted in database;
In the time receiving default amendment and trigger message, prompting user is to the resource joint beyond deployable statePoint is modified, and wherein the amendment of resource node is comprised resource node is carried out to parameter configuration, deletes moneySource node and the topological link being connected with resource node, and based on amendment result buffer memory is upgraded.
Resource in topology is carried out repeatedly layout and parameter configuration, and resources all in topology (comprise moneySource node and link) be all kept in buffer memory, but resource in buffer memory is session session rank, andResource in buffer memory is divided into not deployable state (being also init state, configuration status) and has disposed shapeState, for the resource of deployable state, can be persisted in database, and not deployable state in buffer memoryResource can after session loses efficacy, destroy, therefore ought revise the not resource of deployable state, only meeting
And because the resource node of deployable state also likely moves undesiredly, therefore need it to carry outMonitoring, concrete, monitor the running status of the resource node of deployable state;
If resource node is in normal operating condition, come with the display mode of the normal operating condition presetShow resource node;
If resource node is in abnormal running state, with the demonstration side of the abnormal running state presetFormula shows resource node; Wherein, the display mode of default normal operating condition is with default improperThe display mode difference of running status.
Concrete, for the resource node of normal operating condition, can be with vivid resource map in topologyMark shows, and for the resource node of abnormal running state, in topology, can use rednessThe resource icon of flicker shows, and concrete, the running status of resource node can load and open up at needsFlutter, receive preset signals, and upgrade when active push, receive and wherein load topological sumPreset signals (signal for example producing for clicking the corresponding resource icon of resource node) belongs to initiativelyUpdate mode, also can initiatively send renewal instruction, the resource node after the follow-up renewal that receives feedbackRunning status, upgrade, active push is to occur when the running status of device discovery resourceWhen variation, the running status of the resource node in resource being upgraded, is that equipment carries out automatically.
For the present invention is further detailed, the invention also discloses a kind of resource processing arrangements,Resource comprises multiple resource nodes, and described resource node is to having resource map mark and topological level, and difference providesThe resource icon that source node is corresponding is different, and the resource node between different topology level connects by linkConnect, this equipment comprises, as shown in Figure 5, this equipment comprises:
Extraction module 501, in the time receiving resource displaying message, extracts described resource and shows message pairThe resource of answering;
Determination module 502, for multiple resource nodes of determining that described resource comprises, and described multipleLink between resource node;
Display module 503, is marked with and described chain for resource map corresponding to multiple resource nodes based on determiningRoad is carried out layering demonstration to the each resource node in described resource according to topological level.
Concrete, this equipment also comprises:
Judge module, for moving corresponding layout and disappear when receiving described in user's layout resource map targetWhen breath, judge that based on described layout message whether the topological relation of layout generation is correct;
Cache module, for when judged result is when being, resource node corresponding to resource icon described in buffer memoryAnd link information in described topological relation, and point out user to carry out parameter configuration to described resource node;
More new module, for receiving configuration parameter when correct when judgement, based on carrying out parameter configurationResource node upgrades resource node and the link information in buffer memory;
Deployment module, in the time receiving deployment order, dispose the resource node that upgraded in buffer memory withAnd link information, and be deployable state by completing the resource node of deployment and the status modifier of link.
Also comprise: reminding module, in the time judging that topological relation is incorrect, generates information and showGive user, described information is used for pointing out topological relation incorrect, and indicating user re-starts volumeRow;
When the configuration parameter that receives when judgement is incorrect, generates information and show user, described in carryShow that information is for pointing out configuration parameter incorrect, and indicating user re-starts parameter configuration.
Described more new module 503 also for:
In the time of the layout message corresponding to target location of resource icon described in receiving user's layout, based on instituteState the letter of the resource node that described in the information updating buffer memory of target location in layout message, resource icon is correspondingBreath, and when the state of resource node corresponding to described resource icon is during for deployable state, by described resourceThe information of the resource node that icon is corresponding is persisted in database;
In the time receiving default amendment and trigger message, prompting user is to the resource joint beyond deployable statePoint is modified, and wherein the amendment of resource node is comprised resource node is carried out to parameter configuration, deletes moneySource node and the topological link being connected with resource node, and based on amendment result buffer memory is upgraded.
Wherein, deployment module, specifically for:
In the time receiving deployment order, resource node and the link of the configuration status based in described buffer memoryInformation generation is disposed snapshot;
Resource node based on described deployment snapshot to the configuration status in buffer memory and link information institute are correspondingResource carry out the asynchronous deployment of multithreading.
Also comprise: monitoring module, for monitoring the running status of the resource node of deployable state;
If described resource node is in normal operating condition, with the demonstration side of the normal operating condition presetFormula shows described resource node;
If described resource node is in abnormal running state, aobvious with the abnormal running state presetThe mode of showing shows described resource node; Wherein, the display mode of default normal operating condition is with defaultThe display mode difference of abnormal running state.
Compared with prior art, the method for processing resource that the present invention proposes, realization is centralized and unified to resourceMonitoring and management, and reveal the topological relation between each resource by graphical topological display body; EnergyEnough carry out overall topological layout planning, and can carry out repeatedly layout configuration, a key automation is concentratedUnified plan, has improved the management of resource and the efficiency of O&M.
Through the above description of the embodiments, those skilled in the art can be well understood to this ShenPlease realize by hardware, the mode that also can add necessary general hardware platform by software realizes.Based on such understanding, the application's technical scheme can embody with the form of software product, and this is softPart product can be stored in a non-volatile memory medium, and (can be CD-ROM, USB flash disk, moves hardDish etc.) in, comprise that some instructions are in order to make a computer equipment (can be personal computer, takeBusiness device, or the network equipment etc.) each implements the method described in scene to carry out the application.
It will be appreciated by those skilled in the art that accompanying drawing is a schematic diagram of preferably implementing scene, in accompanying drawingModule or flow process might not be implement the application necessary.
It will be appreciated by those skilled in the art that the module in the device of implementing in scene can be according to implementing sceneDescription is distributed in to be implemented in the device of scene, also can carry out respective change and be positioned at and be different from this enforcementIn one or more devices of scene. The module of above-mentioned enforcement scene can be merged into a module, also canFurther to split into multiple submodules.
Above-mentioned the application's sequence number, just to describing, does not represent the quality of implementing scene.
Disclosed is above only the application's several concrete enforcement scene, and still, the application is not limited toThis, the changes that any person skilled in the art can think of all should fall into the application's protection domain.
Claims (10)
1. a method for processing resource, is characterized in that, described resource comprises multiple resource nodes, instituteState resource node to having resource map mark and topological level, resource icon corresponding to different resource node is not respectivelyIdentical, the resource node between different topology level is by link connection, and the method comprises:
In the time receiving resource displaying message, extract described resource and show resource corresponding to message;
Determine multiple resource nodes that described resource comprises, and chain between described multiple resource nodeRoad;
Resource map corresponding to multiple resource nodes based on determining is marked with and described link comes in described resourceEach resource node carry out layering demonstration according to topological level.
2. the method for claim 1, is characterized in that, also comprises:
In the time that resource map target described in receiving user's layout is moved corresponding layout message, based on describedLayout message judges that whether the topological relation of layout generation is correct;
If the determination result is YES the resource node that, described in buffer memory, resource icon is corresponding and described topological relationIn link information, and point out user to carry out parameter configuration to described resource node;
If it is correct that judgement receives configuration parameter, the resource node based on carrying out parameter configuration upgrades buffer memoryIn resource node and link information;
In the time receiving deployment order, dispose the resource node and the link information that in buffer memory, have upgraded, andBe deployable state by completing the resource node of deployment and the status modifier of link.
3. method as claimed in claim 2, is characterized in that, also comprises:
If judge, topological relation is incorrect, generates information and shows user, and described information is used forPrompting topological relation is incorrect, and indicating user re-starts layout;
If the configuration parameter that judgement receives is incorrect, generates information and show user, described promptingInformation is used for pointing out configuration parameter incorrect, and indicating user re-starts parameter configuration.
4. method as claimed in claim 2, is characterized in that, also comprises:
In the time of the layout message corresponding to target location of resource icon described in receiving user's layout, based on instituteState the letter of the resource node that described in the information updating buffer memory of target location in layout message, resource icon is correspondingBreath, and when the state of resource node corresponding to described resource icon is during for deployable state, by described resourceThe information of the resource node that icon is corresponding is persisted in database;
In the time receiving default amendment and trigger message, prompting user is to the resource joint beyond deployable statePoint is modified, and wherein the amendment of resource node is comprised resource node is carried out to parameter configuration, deletes moneySource node and the topological link being connected with resource node, and based on amendment result buffer memory is upgraded.
5. method as claimed in claim 2, is characterized in that, described in the time receiving deployment order,Dispose the resource node and the link information that in buffer memory, have upgraded, specifically comprise:
In the time receiving deployment order, resource node and the link of the configuration status based in described buffer memoryInformation generation is disposed snapshot;
Resource node based on described deployment snapshot to the configuration status in buffer memory and link information institute are correspondingResource carry out the asynchronous deployment of multithreading.
6. method as claimed in claim 2, is characterized in that, also comprises:
Monitor the running status of the resource node of deployable state;
If described resource node is in normal operating condition, with the demonstration side of the normal operating condition presetFormula shows described resource node;
If described resource node is in abnormal running state, aobvious with the abnormal running state presetThe mode of showing shows described resource node; Wherein, the display mode of default normal operating condition is with defaultThe display mode difference of abnormal running state.
7. a resource processing arrangements, is characterized in that, described resource comprises multiple resource nodes, instituteState resource node to having resource map mark and topological level, resource icon corresponding to different resource node is not respectivelyIdentical, the resource node between different topology level is by link connection, and this equipment comprises:
Extraction module, in the time receiving resource displaying message, extracts described resource and shows message correspondenceResource;
Determination module, for multiple resource nodes of determining that described resource comprises, and described multiple moneyLink between source node;
Display module, is marked with and described link for resource map corresponding to multiple resource nodes based on determiningEach resource node in described resource is carried out to layering demonstration according to topological level.
8. equipment as claimed in claim 7, is characterized in that, also comprises
Judge module, for moving corresponding layout and disappear when receiving described in user's layout resource map targetWhen breath, judge that based on described layout message whether the topological relation of layout generation is correct;
Cache module, for when judging that topological relation that layout produces is when correct, resource icon described in buffer memoryLink information in corresponding resource node and described topological relation, and point out user to save described resourcePoint carries out parameter configuration;
More new module, for receiving configuration parameter when correct when judgement, based on carrying out parameter configurationResource node upgrades resource node and the link information in buffer memory;
Deployment module, in the time receiving deployment order, dispose the resource node that upgraded in buffer memory withAnd link information, and be deployable state by completing the resource node of deployment and the status modifier of link.
9. equipment as claimed in claim 8, is characterized in that, also comprises:
Reminding module, in the time judging that topological relation is incorrect, generates information and shows user,Described information is used for pointing out topological relation incorrect, and indicating user re-starts layout;
And when judging that the configuration parameter receiving is incorrect, generate information and show user, described inInformation is used for pointing out configuration parameter incorrect, and indicating user re-starts parameter configuration.
10. equipment as claimed in claim 8, is characterized in that, also comprises:
Monitoring module, for monitoring the running status of the resource node of deployable state;
If described resource node is in normal operating condition, with the demonstration side of the normal operating condition presetFormula shows described resource node;
If described resource node is in abnormal running state, aobvious with the abnormal running state presetThe mode of showing shows described resource node; Wherein, the display mode of default normal operating condition is with defaultThe display mode difference of abnormal running state.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510523727.2A CN105591803A (en) | 2015-08-24 | 2015-08-24 | Resource processing method and equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510523727.2A CN105591803A (en) | 2015-08-24 | 2015-08-24 | Resource processing method and equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105591803A true CN105591803A (en) | 2016-05-18 |
Family
ID=55931062
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510523727.2A Pending CN105591803A (en) | 2015-08-24 | 2015-08-24 | Resource processing method and equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105591803A (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107295074A (en) * | 2017-06-13 | 2017-10-24 | 郑州云海信息技术有限公司 | It is a kind of to realize the method and apparatus that cloud resource is shown |
| CN107426335A (en) * | 2017-08-15 | 2017-12-01 | 成都千牛信息技术有限公司 | A kind of system and application method for automatically generating cloud environment configuration file |
| CN108881374A (en) * | 2018-04-28 | 2018-11-23 | 安徽四创电子股份有限公司 | The design method that a kind of cloud computing resources framework front end is shown |
| CN109039786A (en) * | 2018-09-28 | 2018-12-18 | 山东中创软件商用中间件股份有限公司 | A kind of topology drawing generating method, device, equipment and readable storage medium storing program for executing |
| CN111221560A (en) * | 2019-11-14 | 2020-06-02 | 北京神州绿盟信息安全科技股份有限公司 | Resource management method and device and electronic equipment |
| CN111917578A (en) * | 2020-07-29 | 2020-11-10 | 山东英信计算机技术有限公司 | Multi-node network topology management method, device, electronic device and storage medium |
| CN112083849A (en) * | 2020-09-24 | 2020-12-15 | 深圳市艾酷通信软件有限公司 | Information display method, device, equipment and medium |
| CN112367367A (en) * | 2020-10-27 | 2021-02-12 | 西安万像电子科技有限公司 | Image management method, device and system |
| CN112817683A (en) * | 2021-03-02 | 2021-05-18 | 深圳市东微智能科技股份有限公司 | Control method, control device and medium for topological structure configuration interface |
| CN112905268A (en) * | 2019-12-03 | 2021-06-04 | 上海宝信软件股份有限公司 | Dynamic construction method and system for micro-service distributed calling topology in cloud environment |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101083684A (en) * | 2007-07-24 | 2007-12-05 | 华为技术有限公司 | Communication apparatus batch configuration managerial approach and apparatus |
| CN103118127A (en) * | 2013-02-22 | 2013-05-22 | 浪潮电子信息产业股份有限公司 | Method for positioning topology view of virtual resource rapidly based on color and state identification |
| US20140320500A1 (en) * | 2013-04-30 | 2014-10-30 | Splunk Inc. | Proactive monitoring tree with state distribution ring |
| CN104243193A (en) * | 2013-06-18 | 2014-12-24 | 阿里巴巴集团控股有限公司 | Network topology dynamic allocation and display method and device |
| CN104361098A (en) * | 2014-11-21 | 2015-02-18 | 浪潮(北京)电子信息产业有限公司 | Method applied to customization of nodes in topological graph of cloud system |
-
2015
- 2015-08-24 CN CN201510523727.2A patent/CN105591803A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101083684A (en) * | 2007-07-24 | 2007-12-05 | 华为技术有限公司 | Communication apparatus batch configuration managerial approach and apparatus |
| CN103118127A (en) * | 2013-02-22 | 2013-05-22 | 浪潮电子信息产业股份有限公司 | Method for positioning topology view of virtual resource rapidly based on color and state identification |
| US20140320500A1 (en) * | 2013-04-30 | 2014-10-30 | Splunk Inc. | Proactive monitoring tree with state distribution ring |
| CN104243193A (en) * | 2013-06-18 | 2014-12-24 | 阿里巴巴集团控股有限公司 | Network topology dynamic allocation and display method and device |
| CN104361098A (en) * | 2014-11-21 | 2015-02-18 | 浪潮(北京)电子信息产业有限公司 | Method applied to customization of nodes in topological graph of cloud system |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107295074A (en) * | 2017-06-13 | 2017-10-24 | 郑州云海信息技术有限公司 | It is a kind of to realize the method and apparatus that cloud resource is shown |
| CN107426335A (en) * | 2017-08-15 | 2017-12-01 | 成都千牛信息技术有限公司 | A kind of system and application method for automatically generating cloud environment configuration file |
| CN107426335B (en) * | 2017-08-15 | 2020-08-28 | 成都千牛信息技术有限公司 | System capable of automatically generating cloud environment configuration file and use method |
| CN108881374A (en) * | 2018-04-28 | 2018-11-23 | 安徽四创电子股份有限公司 | The design method that a kind of cloud computing resources framework front end is shown |
| CN108881374B (en) * | 2018-04-28 | 2021-07-27 | 安徽四创电子股份有限公司 | Design method for front-end display of cloud computing resource architecture |
| CN109039786A (en) * | 2018-09-28 | 2018-12-18 | 山东中创软件商用中间件股份有限公司 | A kind of topology drawing generating method, device, equipment and readable storage medium storing program for executing |
| CN111221560A (en) * | 2019-11-14 | 2020-06-02 | 北京神州绿盟信息安全科技股份有限公司 | Resource management method and device and electronic equipment |
| CN111221560B (en) * | 2019-11-14 | 2023-10-03 | 绿盟科技集团股份有限公司 | Resource management method and device and electronic equipment |
| CN112905268A (en) * | 2019-12-03 | 2021-06-04 | 上海宝信软件股份有限公司 | Dynamic construction method and system for micro-service distributed calling topology in cloud environment |
| CN111917578A (en) * | 2020-07-29 | 2020-11-10 | 山东英信计算机技术有限公司 | Multi-node network topology management method, device, electronic device and storage medium |
| CN112083849B (en) * | 2020-09-24 | 2022-10-21 | 深圳市艾酷通信软件有限公司 | Information display method, device, equipment and medium |
| CN112083849A (en) * | 2020-09-24 | 2020-12-15 | 深圳市艾酷通信软件有限公司 | Information display method, device, equipment and medium |
| CN112367367A (en) * | 2020-10-27 | 2021-02-12 | 西安万像电子科技有限公司 | Image management method, device and system |
| CN112367367B (en) * | 2020-10-27 | 2024-06-07 | 西安万像电子科技有限公司 | Image management method, device and system |
| CN112817683A (en) * | 2021-03-02 | 2021-05-18 | 深圳市东微智能科技股份有限公司 | Control method, control device and medium for topological structure configuration interface |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105591803A (en) | Resource processing method and equipment | |
| CN110166285B (en) | A method of building a network security experimental platform based on Docker | |
| CN104243193A (en) | Network topology dynamic allocation and display method and device | |
| CN106156186A (en) | A kind of data model managing device, server and data processing method | |
| US20210149645A1 (en) | System, method, and apparatus for data-centric networked application development services | |
| CN103646104A (en) | Hard real-time fault diagnosis method and system | |
| CN113836754A (en) | Multi-agent simulation modeling oriented simulation method, device, equipment and medium | |
| CN113449444B (en) | Simulation method, computer device and storage medium for domain engineering | |
| CN106330575A (en) | Safety service platform and safety service deployment method | |
| CN103186376B (en) | A kind of method, apparatus and equipment for being used to establish or update software development environment | |
| CN110750254A (en) | Flowchart editor implementation method based on Angular | |
| CN103618762A (en) | System and method for enterprise service bus state pretreatment based on AOP | |
| CN103036855A (en) | Achievement device and method of authority management | |
| CN103914385B (en) | Test detailed rules and regulations Visual Dynamic construction method towards safety critical system concurrent testing | |
| CN109598427A (en) | Management method, device and the electronic equipment of robot | |
| Roy Chowdhury et al. | Complementary assistance mechanisms for end user mashup composition | |
| CN103440309A (en) | Automatic resource and environment model combination modeling semantic recognition and recommendation method | |
| CN103226501A (en) | Logic backup method and logic backup system for database | |
| CN106843899A (en) | A kind of web development methods and device based on Node.js platforms | |
| CN117973829A (en) | Business process management system and method based on blockchain | |
| Ellul et al. | Towards national connected digital twins-a geospatial perspective | |
| US10439897B1 (en) | Method and apparatus for enabling customized control to applications and users using smart tags | |
| CN112449354A (en) | Base station type replacement method, equipment and SDR network management system | |
| US20230111537A1 (en) | Auto-detection and resolution of similar network misconfiguration | |
| CN102868746B (en) | Method for realizing mobile informationization |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 310052 Binjiang District Changhe Road, Zhejiang, China, No. 466, No. Applicant after: Xinhua three Technology Co., Ltd. Address before: 310052 Binjiang District Changhe Road, Zhejiang, China, No. 466, No. Applicant before: Huasan Communication Technology Co., Ltd. |
|
| CB02 | Change of applicant information | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160518 |
|
| RJ01 | Rejection of invention patent application after publication |