CN105570866A - 一种供热用燃气锅炉负荷参数的调节方法及系统 - Google Patents
一种供热用燃气锅炉负荷参数的调节方法及系统 Download PDFInfo
- Publication number
- CN105570866A CN105570866A CN201511018885.9A CN201511018885A CN105570866A CN 105570866 A CN105570866 A CN 105570866A CN 201511018885 A CN201511018885 A CN 201511018885A CN 105570866 A CN105570866 A CN 105570866A
- Authority
- CN
- China
- Prior art keywords
- heat
- heat supply
- total amount
- actual
- supply total
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B35/00—Control systems for steam boilers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1003—Arrangement or mounting of control or safety devices for steam heating systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2200/00—Heat sources or energy sources
- F24D2200/04—Gas or oil fired boiler
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201511018885.9A CN105570866A (zh) | 2015-12-29 | 2015-12-29 | 一种供热用燃气锅炉负荷参数的调节方法及系统 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201511018885.9A CN105570866A (zh) | 2015-12-29 | 2015-12-29 | 一种供热用燃气锅炉负荷参数的调节方法及系统 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105570866A true CN105570866A (zh) | 2016-05-11 |
Family
ID=55881300
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201511018885.9A Pending CN105570866A (zh) | 2015-12-29 | 2015-12-29 | 一种供热用燃气锅炉负荷参数的调节方法及系统 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105570866A (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107842908A (zh) * | 2017-09-26 | 2018-03-27 | 国网浙江省电力公司杭州供电公司 | 一种基于环境参数补偿的实时供热负荷控制方法 |
| CN111027885A (zh) * | 2019-12-24 | 2020-04-17 | 北京华远意通热力科技股份有限公司 | 一种供热系统效能分析管理系统 |
| CN111486428A (zh) * | 2020-04-17 | 2020-08-04 | 杭州航民热电有限公司 | 一种锅炉负荷控制方法、系统以及存储介质 |
| CN113685971A (zh) * | 2021-08-02 | 2021-11-23 | 吉林建筑大学 | 恒温供热自控循环动态平衡控制系统、方法、数据处理终端 |
| CN113850478A (zh) * | 2021-08-30 | 2021-12-28 | 华能国际电力股份有限公司大连电厂 | 一种城市供热智能分户管理系统 |
| CN117073059A (zh) * | 2023-08-28 | 2023-11-17 | 呼伦贝尔安泰热电有限责任公司海拉尔热电厂 | 区域供热方法、装置、存储介质和电子设备 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101021914A (zh) * | 2006-03-22 | 2007-08-22 | 侯春海 | 暖通空调负荷预测方法和系统 |
| CN103017253A (zh) * | 2012-12-06 | 2013-04-03 | 鞍山市海汇自动化有限公司 | 一种集中供热全网热平衡控制方法 |
| CN103150610A (zh) * | 2013-02-28 | 2013-06-12 | 哈尔滨工业大学 | 基于模糊信息粒化与支持向量机的供热负荷预报方法 |
| CN104791903A (zh) * | 2015-04-30 | 2015-07-22 | 北京上庄燃气热电有限公司 | 一种热网智能调度系统 |
| JP2015218995A (ja) * | 2014-05-21 | 2015-12-07 | アズビル株式会社 | 省エネルギー効果算出方法および装置 |
-
2015
- 2015-12-29 CN CN201511018885.9A patent/CN105570866A/zh active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101021914A (zh) * | 2006-03-22 | 2007-08-22 | 侯春海 | 暖通空调负荷预测方法和系统 |
| CN103017253A (zh) * | 2012-12-06 | 2013-04-03 | 鞍山市海汇自动化有限公司 | 一种集中供热全网热平衡控制方法 |
| CN103150610A (zh) * | 2013-02-28 | 2013-06-12 | 哈尔滨工业大学 | 基于模糊信息粒化与支持向量机的供热负荷预报方法 |
| JP2015218995A (ja) * | 2014-05-21 | 2015-12-07 | アズビル株式会社 | 省エネルギー効果算出方法および装置 |
| CN104791903A (zh) * | 2015-04-30 | 2015-07-22 | 北京上庄燃气热电有限公司 | 一种热网智能调度系统 |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107842908A (zh) * | 2017-09-26 | 2018-03-27 | 国网浙江省电力公司杭州供电公司 | 一种基于环境参数补偿的实时供热负荷控制方法 |
| CN107842908B (zh) * | 2017-09-26 | 2020-01-03 | 国网浙江省电力公司杭州供电公司 | 一种基于环境参数补偿的实时供热负荷控制方法 |
| CN111027885A (zh) * | 2019-12-24 | 2020-04-17 | 北京华远意通热力科技股份有限公司 | 一种供热系统效能分析管理系统 |
| CN111486428A (zh) * | 2020-04-17 | 2020-08-04 | 杭州航民热电有限公司 | 一种锅炉负荷控制方法、系统以及存储介质 |
| CN113685971A (zh) * | 2021-08-02 | 2021-11-23 | 吉林建筑大学 | 恒温供热自控循环动态平衡控制系统、方法、数据处理终端 |
| CN113850478A (zh) * | 2021-08-30 | 2021-12-28 | 华能国际电力股份有限公司大连电厂 | 一种城市供热智能分户管理系统 |
| CN117073059A (zh) * | 2023-08-28 | 2023-11-17 | 呼伦贝尔安泰热电有限责任公司海拉尔热电厂 | 区域供热方法、装置、存储介质和电子设备 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Henning et al. | A comprehensive model for the German electricity and heat sector in a future energy system with a dominant contribution from renewable energy technologies—Part I: Methodology | |
| CN105570866A (zh) | 一种供热用燃气锅炉负荷参数的调节方法及系统 | |
| CN110094802B (zh) | 一种热泵与蓄热式电锅炉联合供暖负荷分配方法及装置 | |
| CN112128841A (zh) | 一种基于负荷预测和室温反馈修正的全网平衡调节方法 | |
| CN112165122B (zh) | 一种综合能源系统的运行方法及系统 | |
| Rysanek et al. | A decoupled whole-building simulation engine for rapid exhaustive search of low-carbon and low-energy building refurbishment options | |
| CN110794775B (zh) | 多台锅炉负荷智能控制系统和方法 | |
| CN107860057B (zh) | 一种热电联产供暖系统热负荷经济优化调度方法 | |
| Rogers et al. | The 20% house–An integrated assessment of options for reducing net carbon emissions from existing UK houses | |
| Wang et al. | Day-ahead schedule optimization of household appliances for demand flexibility: Case study on PV/T powered buildings | |
| CN115289518B (zh) | 供热系统热力和水力平衡控制方法及系统 | |
| Wang et al. | Improving wind power integration by a novel short-term dispatch model based on free heat storage and exhaust heat recycling | |
| US11262713B2 (en) | Method for calculating control parameters of heating supply power of heating network | |
| He et al. | Towards to the development of virtual testbed for net zero energy communities | |
| CN105570867A (zh) | 直接供热燃气锅炉负荷参数的调节方法及系统 | |
| Tapia-Ahumada et al. | A methodology for understanding the impacts of large-scale penetration of micro-combined heat and power | |
| CN112862181B (zh) | 基于区块链的采暖机组节能运行控制系统及方法 | |
| CN103471178B (zh) | 供热节能控制系统以及节能控制方法 | |
| Qi et al. | Artificial intelligence control system of heat recovery in thermal power plant | |
| Libralato et al. | Development of an energy digital twin from a hotel supervision system using building energy modelling | |
| CN118208758B (zh) | 预制集成式换热机组的控制方法、控制器及存储介质 | |
| CN109167396A (zh) | 一种基于建筑热惯性的抽汽式热电联产机组调频能力挖掘方法 | |
| CN119128326A (zh) | 一种抽凝机组协同热网调峰方法及系统 | |
| CN113531647A (zh) | 天然气锅炉分布式供热系统调控方法及系统 | |
| CN115289520A (zh) | 基于室内温度分离技术的换热站控制方法及系统 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information |
Inventor after: Liu Jiangtao Inventor after: Wang Jianguo Inventor after: Wang Zheng Inventor after: Guo Xu Inventor after: Lu Chao Inventor after: Song Fengze Inventor after: Wang Yue Inventor after: Shi Jinfeng Inventor after: Wang Li Inventor before: Wang Jianguo Inventor before: Wang Zheng Inventor before: Guo Xu Inventor before: Song Fengze Inventor before: Wang Yue Inventor before: Shi Jinfeng Inventor before: Wang Li |
|
| CB03 | Change of inventor or designer information | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20170328 Address after: 100035 Xicheng District, North Xizhimen, South Street, No. 22, No. Applicant after: Beijing Gas Group Co., Ltd. Applicant after: BEIJING BEIRAN HEAT SUPPLY CO., LTD. Applicant after: Beijing Gas and Heating Engineering Design Institute Co., Ltd. Applicant after: Beijing Far East Instrument Co., Ltd. Address before: 100035 Xicheng District, North Xizhimen, South Street, No. 22, No. Applicant before: Beijing Gas Group Co., Ltd. Applicant before: BEIJING BEIRAN HEAT SUPPLY CO., LTD. Applicant before: Beijing Far East Instrument Co., Ltd. |
|
| TA01 | Transfer of patent application right | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160511 |
|
| RJ01 | Rejection of invention patent application after publication |