CN1055044C - Continuous Feeding Coating Technology for Small Diameter Pipe Mortar Lining - Google Patents
Continuous Feeding Coating Technology for Small Diameter Pipe Mortar Lining Download PDFInfo
- Publication number
- CN1055044C CN1055044C CN96106258A CN96106258A CN1055044C CN 1055044 C CN1055044 C CN 1055044C CN 96106258 A CN96106258 A CN 96106258A CN 96106258 A CN96106258 A CN 96106258A CN 1055044 C CN1055044 C CN 1055044C
- Authority
- CN
- China
- Prior art keywords
- pipe
- mortar
- lining
- feeding
- small
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004570 mortar (masonry) Substances 0.000 title claims abstract description 37
- 238000000576 coating method Methods 0.000 title abstract description 8
- 239000011248 coating agent Substances 0.000 title abstract description 7
- 238000005516 engineering process Methods 0.000 title description 2
- 238000000034 method Methods 0.000 claims abstract description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 241000283690 Bos taurus Species 0.000 claims 1
- 238000004140 cleaning Methods 0.000 claims 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 claims 1
- 238000012856 packing Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 6
- 238000004062 sedimentation Methods 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000007765 extrusion coating Methods 0.000 description 1
- 238000005488 sandblasting Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
Landscapes
- Revetment (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
Description
本发明涉及管道内壁衬里工艺,属于φ114毫米以下小口径管砂浆的衬里工艺。The invention relates to a pipeline inner wall lining process, which belongs to the lining process of mortar for small-diameter pipes below φ114 mm.
目前油田使用的管线一般在10年左右要修复,否则管线穿孔、漏油,甚至报废,更换新管线费用昂贵。虽然管线修复砂浆衬里施工技术有离心沉淀法、喷涂法和风动背压挤涂法等,可离心沉淀法只适合于长20米以内的中径管厂内衬里,对地下旧管线无法衬里或修复;离心喷涂法只适合于φ273毫米以上中、大口径管焊接就位后现场衬里,因喷涂器无法送入小口径管内,不能对小口径管线衬里或修复;风动背压挤涂法只能针对φ114毫米以上中口径管现场砂浆衬里施工,由于小口径管线断面直径小,背压不足无法实现小口径管砂浆衬里施工。At present, the pipelines used in oil fields generally need to be repaired in about 10 years. Otherwise, the pipelines will be perforated, leak oil, or even be scrapped, and the replacement of new pipelines will be expensive. Although pipeline repair mortar lining construction techniques include centrifugal sedimentation method, spraying method, and pneumatic back pressure extrusion coating method, the centrifugal sedimentation method is only suitable for the inner lining of medium-diameter pipes with a length of less than 20 meters, and cannot be used for lining old underground pipelines. Repair; the centrifugal spraying method is only suitable for the on-site lining after the medium and large diameter pipes above φ273mm are welded in place, because the sprayer cannot be sent into the small diameter pipe, it cannot be used for lining or repairing the small diameter pipeline; the pneumatic back pressure extrusion method is only It can be used for on-site mortar lining construction of medium-diameter pipes above φ114 mm. Due to the small diameter of the small-diameter pipeline section and insufficient back pressure, the mortar lining construction of small-diameter pipes cannot be realized.
本发明的目的在于克服上述现有技术的不足而提供一种适合φ114毫米以下小口径管砂浆衬里施工的小口径管砂浆衬里连续喂料涂敷工艺。The purpose of the present invention is to overcome above-mentioned deficiencies in the prior art and provide a kind of small-diameter pipe mortar lining continuous feeding coating process suitable for the construction of small-diameter pipe mortar lining below φ114 mm.
本发明的目的可通过以下技术方案来达到:将管内壁清垢、清水、除锈后管一端口固定“牛角形”喂料斗,间隔连接若干个喂料球的绳前端穿过管,砂浆装入喂料斗,绳向前移动,喂料球把砂浆带入管内预涂敷在管内壁上,然后借助喂料球和喂料斗间产生的真空把砂浆吸入管内通过喂料球涂敷在管内壁上,绳末端固定的定心涂抹器随绳进入管内将涂敷在管内壁上的砂浆层涂匀、压实。The purpose of the present invention can be achieved through the following technical proposals: clean the inner wall of the pipe, clean water, and fix the "horn-shaped" feeding hopper at one end of the pipe after derusting, and the front end of the rope connecting several feeding balls at intervals passes through the pipe, and the mortar is installed Into the feeding hopper, the rope moves forward, the feeding ball brings the mortar into the pipe to pre-coat on the inner wall of the pipe, and then the mortar is sucked into the pipe by the vacuum generated between the feeding ball and the feeding hopper and coated on the inner wall of the pipe through the feeding ball On the top, the centering applicator fixed at the end of the rope enters the pipe with the rope to spread and compact the mortar layer coated on the inner wall of the pipe.
本发明与现有技术相比具有如下优点:由于本发明采用喂料斗加入砂浆,通过直径不同的喂料球把砂浆涂敷在管内壁上,对较长管线可开有喂料口连续加入砂浆,解决小口径管砂浆衬里连续涂敷技术。Compared with the prior art, the present invention has the following advantages: since the present invention uses a feeding hopper to add mortar, the mortar is coated on the inner wall of the pipe through feeding balls with different diameters, and a feeding port can be opened for longer pipelines to continuously add mortar , to solve the small-diameter pipe mortar lining continuous coating technology.
图1是本实用新型结构示图。Fig. 1 is a structural diagram of the utility model.
下面结合附图将对本发明作进一步说明:The present invention will be further described below in conjunction with accompanying drawing:
由图1示,要修复的管线2应使用高压水射流将管2内壁污垢清洗干净,用风送PIG把管内壁污水清净后,进行喷砂除锈,在管2一端口连接固定“牛角形”喂料斗5,牵引绳1前端预先穿过管2,绳1端与拖拉装置相连,绳1后部(管2外部分)每隔一定距离固定一个喂料球3,球3是中心有供绳1穿过固定球3的孔,最后固定定心涂抹器6,将搅拌均匀的砂浆或胶泥灌入喂料斗5内,当拖拉装置牵引绳1向前移动,喂料球3随绳1把砂浆带入管2内,同时喂料球3与喂料斗5之间产生真空,把陆续灌入喂料斗5内的砂浆吸入管2内,再由下一个喂料球3把砂浆带入管2内,喂料球3继续向前运动,把砂浆吸入管2内的同时,便把砂浆预涂敷在管2内壁上,经过若干个喂料球3多次抹涂,最后由定心涂抹器将预涂衬的砂浆层涂匀,再压实,形成厚度均匀的符合设计的砂浆衬里层。为了减小牵引力p,尽量少用喂料球3(喂料球3间隔大一些),若待衬管道很长时,可在管2上开若干个喂料口7,待完成前一段管2喂料涂敷后由喂料口7继续加入砂浆进行下一段管2的喂料涂敷,以保持喂料涂敷连续,保持管内壁的砂浆层连续。As shown in Figure 1, the pipeline 2 to be repaired should use high-pressure water jets to clean the dirt on the inner wall of the pipe 2, use the air to send PIG to clean the sewage on the inner wall of the pipe, and then carry out sandblasting and derusting, and connect and fix the "ox horn" at the end of the pipe 2. "Feeding hopper 5, the front end of the traction rope 1 passes through the pipe 2 in advance, and the end of the rope 1 is connected with the pulling device. The rope 1 passes through the hole of the fixed ball 3, and finally the centering applicator 6 is fixed, and the evenly stirred mortar or cement is poured into the feeding hopper 5, and when the pulling device pulls the rope 1 to move forward, the feeding ball 3 is held together with the rope 1 The mortar is brought into the pipe 2, and at the same time, a vacuum is generated between the feeding ball 3 and the feeding hopper 5, and the mortar poured into the feeding hopper 5 is sucked into the pipe 2, and then the next feeding ball 3 brings the mortar into the pipe 2 Inside, the feeding ball 3 continues to move forward. When the mortar is sucked into the pipe 2, the mortar is pre-coated on the inner wall of the pipe 2. After passing through several feeding balls 3 for multiple times, the centering applicator finally Spread the pre-coated mortar layer evenly, and then compact it to form a designed mortar lining layer with uniform thickness. In order to reduce the traction force p, use the feeding balls 3 as little as possible (the distance between the feeding balls 3 is larger). If the pipeline to be lined is very long, several feeding ports 7 can be opened on the pipe 2. After the feeding coating, continue to add mortar from the feeding port 7 to carry out the feeding coating of the next section of pipe 2, so as to keep the feeding coating continuous and the mortar layer on the inner wall of the pipe continuous.
喂料球3直径=管2内径-2倍的待衬里的厚度Feeding ball 3 diameter = pipe 2 inner diameter - 2 times the thickness to be lined
喂料多少取于管2规格(直径、长),衬里厚度、其关系是:How much to feed depends on the pipe 2 specification (diameter, length), lining thickness, and its relationship is:
V=(D-2&1-&2)*π*&2*100V=(D-2& 1 -& 2 )*π*& 2 *100
&1-管壁厚度& 1 - pipe wall thickness
&2-衬里厚度& 2 - lining thickness
D-管道公称直径100-长100米D- pipe nominal diameter 100- length 100 meters
对于新敷设的小口径管线,同样可采用此工艺方法。For newly laid small-diameter pipelines, this process method can also be used.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN96106258A CN1055044C (en) | 1996-05-14 | 1996-05-14 | Continuous Feeding Coating Technology for Small Diameter Pipe Mortar Lining |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN96106258A CN1055044C (en) | 1996-05-14 | 1996-05-14 | Continuous Feeding Coating Technology for Small Diameter Pipe Mortar Lining |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1147451A CN1147451A (en) | 1997-04-16 |
| CN1055044C true CN1055044C (en) | 2000-08-02 |
Family
ID=5119040
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN96106258A Expired - Fee Related CN1055044C (en) | 1996-05-14 | 1996-05-14 | Continuous Feeding Coating Technology for Small Diameter Pipe Mortar Lining |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1055044C (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2293365A (en) * | 1941-03-03 | 1942-08-18 | Tate Pipe Linings Inc | Method and apparatus for lining pipe |
| GB2113571A (en) * | 1982-01-21 | 1983-08-10 | Mercol Descaling Co Ltd | Lining of pipes |
-
1996
- 1996-05-14 CN CN96106258A patent/CN1055044C/en not_active Expired - Fee Related
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2293365A (en) * | 1941-03-03 | 1942-08-18 | Tate Pipe Linings Inc | Method and apparatus for lining pipe |
| GB2113571A (en) * | 1982-01-21 | 1983-08-10 | Mercol Descaling Co Ltd | Lining of pipes |
Also Published As
| Publication number | Publication date |
|---|---|
| CN1147451A (en) | 1997-04-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101359448B1 (en) | Entire repairing method for pipe lines with non-excavation | |
| CN101518773B (en) | Method and device for clearing rust-dirt and performing anticorrosion coating on metal pipelines | |
| JP4532661B2 (en) | Rehabilitation of drainage main pipe | |
| CN104806843A (en) | Steel cylinder mesh suspended mortar spray compound lining and pressure pipe non-excavation repair method | |
| CN1055044C (en) | Continuous Feeding Coating Technology for Small Diameter Pipe Mortar Lining | |
| CN104421569A (en) | Pipeline overturn lining repair method | |
| CN117067064B (en) | Rust removing device and rust removing method for slender pipeline | |
| KR101463577B1 (en) | Method for Rehabilitating Superannuated Pipes | |
| CN115816870B (en) | A CIPP hose, a dispensing tool, and a manufacturing process | |
| JP3426499B2 (en) | Lining method of existing pipeline | |
| JP4203556B2 (en) | In-line lining method | |
| CN222067953U (en) | Pipeline structure suitable for CIPP ultraviolet light curing full lining repairing method | |
| JP3160354B2 (en) | Pipe line repair method by suction lining | |
| CN2182320Y (en) | Hose turnover apparatus for pipe lining use | |
| CN218992716U (en) | Ductile cast iron pipe fitting for connecting Prestressed Concrete Cylinder (PCCP) | |
| CN222132351U (en) | Spraying repair equipment for drainage inspection well | |
| JPS60115737A (en) | Renewal of embedded tap water pipe | |
| CN216422967U (en) | A concrete interlocking block steam curing equipment | |
| CN222067948U (en) | A pipeline repair structure | |
| JPS5850779B2 (en) | Pipe inner lining method | |
| CN2463662Y (en) | Anti-corrosive steel pipeline lined plastic pipe | |
| KR200286186Y1 (en) | Bowels iron for water and sewage pipe rebirth lining | |
| JPH09141152A (en) | Pipe-inside coating apparatus | |
| JPH05228437A (en) | Pipe line repair method using suction lining | |
| CN1247119A (en) | In-line sand blasting technology for derusting pipeline |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C06 | Publication | ||
| PB01 | Publication | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |