CN105040829A - 一种预制混凝土主次梁连接结构及其施工方法 - Google Patents
一种预制混凝土主次梁连接结构及其施工方法 Download PDFInfo
- Publication number
- CN105040829A CN105040829A CN201510359892.9A CN201510359892A CN105040829A CN 105040829 A CN105040829 A CN 105040829A CN 201510359892 A CN201510359892 A CN 201510359892A CN 105040829 A CN105040829 A CN 105040829A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- main beam
- secondary beam
- precast main
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 239000004567 concrete Substances 0.000 title abstract description 6
- 238000009415 formwork Methods 0.000 claims abstract description 7
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 210000003205 muscle Anatomy 0.000 claims description 20
- 239000011178 precast concrete Substances 0.000 claims description 17
- 238000004873 anchoring Methods 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000010008 shearing Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 239000000463 material Substances 0.000 abstract description 3
- 238000010030 laminating Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 239000008280 blood Substances 0.000 description 1
- 210000004369 blood Anatomy 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本发明公开了一种预制混凝土主次梁连接结构及其施工方法,包括预制主梁和预制次梁,预制主梁上设置后浇段,且预制主梁的主梁底部受力钢筋在后浇段贯通连续,预制主梁的后浇段内预留主梁箍筋,预制次梁伸入预制主梁的后浇段内,预制次梁的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁上,预制主梁上部的叠合层内铺设通长受力钢筋,通长受力钢筋穿过预制次梁上部,支模浇筑形成后浇段。与现有技术相比,本发明的有益效果是:通过改进预制主梁和预制次梁的连接方式,方便预制构件的吊装及连接,使预制主梁和预制次梁连接性能达到等同于现浇结构的效果,节点连接牢靠,无需水平套筒灌浆连接,节省材料,降低造价,施工简单快捷。
Description
技术领域
本发明属于土木工程领域,涉及一种预制混凝土主次梁连接结构及其施工方法。
背景技术
预制装配整体式框架结构的关键是如何将在工厂制作的预制构件现场吊装后有效地连接形成一个整体结构体系。连接节点区域构件的安装难易程度与混凝土浇筑质量会直接影响工程的施工进度与质量。因此,在保证结构安全的前提下,寻求尽可能简便的预制装配整体式框架节点连接方法,是目前工程界亟需解决的问题。
预制混凝土主次梁连接可采用灌浆套筒水平连接受力钢筋等连接方式。但采用上述连接方式,造价高,施工麻烦。
发明内容
本发明需要解决的上述问题是针对上述现有技术中采用灌浆套筒水平连接受力钢筋等连接方式,造价高,施工麻烦的不足,而提供一种降低造价,施工简单快捷的预制混凝土主次梁连接结构及其施工方法。
为解决上述技术问题,本发明采用的技术方案是:
一种预制混凝土主次梁连接结构,包括预制主梁和预制次梁,预制主梁上搭接预制次梁处设置后浇段,且预制主梁的主梁底部受力钢筋在后浇段贯通连续,预制主梁的后浇段内预留主梁箍筋,预制次梁伸入预制主梁的后浇段内,预制次梁的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁上,且锚固长度大于等于12d,预制主梁及预制次梁上部的叠合层内铺设通长受力钢筋,通长受力钢筋穿过预制次梁上部,需要绑扎的钢筋进行绑扎处理,支模浇筑形成后浇段。
预制次梁伸入预制主梁的后浇段内的长度大于等于10mm。
预制主梁的一侧或两侧分别搭接预制次梁,两预制次梁的次梁底部纵筋采用高度上下错开锚固的方式分别与预制主梁锚固。
预制主梁、预制次梁端部分别设置抗剪凹槽。
后浇段的两端分别伸出主梁腰筋,增设等直径的附加腰筋分别与两根主梁腰筋焊接连接。
预制混凝土主次梁连接结构的施工方法,包括以下步骤:
(1)、制造预制主梁和预制次梁,预制主梁上搭接预制次梁处设置后浇段,且预制主梁的主梁底部受力钢筋在后浇段贯通连续,预制主梁的后浇段内预留主梁箍筋;
(2)、吊装预制主梁和预制次梁,将预制次梁伸入预制主梁的后浇段内,预制次梁的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁上,且锚固长度大于等于12d;
(3)、预制主梁及预制次梁上部的叠合层内铺设通长受力钢筋,通长受力钢筋穿过预制次梁上部;
(4)、支模板,在预制主梁的侧边、预制次梁的侧边及预制主梁的底部设置模板;
(5)、对需要绑扎的钢筋进行绑扎处理;
(6)、浇筑后浇段;使预制主梁和预制次梁形成整体。
与现有技术相比,本发明的有益效果是:通过改进预制主梁和预制次梁的连接方式,方便预制构件的吊装及连接,使预制主梁和预制次梁连接性能达到等同于现浇结构的效果,节点连接牢靠,无需水平套筒灌浆连接,节省材料,降低造价,施工简单快捷。
附图说明
图1是本发明的预制混凝土主次梁连接结构的俯视图;
图2是预制混凝土主次梁连接结构的A-A剖视图;
图3是预制混凝土主次梁连接结构的B-B剖视图。
其中,1、预制主梁,2、预制次梁,3、后浇段,4、叠合层,5、主梁箍筋,6、通长受力钢筋,7、抗剪凹槽,8、主梁腰筋,9、附加腰筋。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示,一种预制混凝土主次梁连接结构,包括预制主梁1和预制次梁2,预制主梁1上搭接预制次梁2处设置后浇段3,且预制主梁1的主梁底部受力钢筋在后浇段3贯通连续,预制主梁1的后浇段3内预留主梁箍筋5,预制次梁2伸入预制主梁1的后浇段3内,预制次梁2的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁1上,且锚固长度大于等于12d,预制主梁1及预制次梁2上部的叠合层4内铺设通长受力钢筋6,通长受力钢筋6穿过预制次梁2上部,需要绑扎的钢筋进行绑扎处理,支模浇筑形成后浇段3。
预制次梁2伸入预制主梁1的后浇段3内的长度大于等于10mm。
预制主梁1的一侧或两侧分别搭接预制次梁2,两预制次梁2的次梁底部纵筋采用高度上下错开锚固的方式分别与预制主梁1锚固。
预制主梁1、预制次梁2端部分别设置抗剪凹槽7。
后浇段3的两端分别伸出主梁腰筋8,增设等直径的附加腰筋9分别与两根主梁腰筋8焊接连接。
预制混凝土主次梁连接结构的施工方法,包括以下步骤:
(1)、制造预制主梁1和预制次梁2,预制主梁1上搭接预制次梁2处设置后浇段3,且预制主梁1的主梁底部受力钢筋在后浇段3贯通连续,预制主梁1的后浇段3内预留主梁箍筋5;
(2)、吊装预制主梁1和预制次梁2,将预制次梁2伸入预制主梁1的后浇段3内,预制次梁2的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁1上,且锚固长度大于等于12d;
(3)、预制主梁1及预制次梁2上部的叠合层4内铺设通长受力钢筋6,通长受力钢筋6穿过预制次梁2上部;
(4)、支模板,在预制主梁1的侧边、预制次梁2的侧边及预制主梁1的底部设置模板;
(5)、对需要绑扎的钢筋进行绑扎处理;
(6)、浇筑后浇段3,使预制主梁1和预制次梁2形成整体。
与现有技术相比,本发明的有益效果是:通过改进预制主梁和预制次梁的连接方式,方便预制构件的吊装及连接,使预制主梁和预制次梁连接性能达到等同于现浇结构的效果,节点连接牢靠,无需水平套筒灌浆连接,节省材料,降低造价,施工简单快捷。
以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述的设备和结构应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案作出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。
Claims (6)
1.一种预制混凝土主次梁连接结构,包括预制主梁和预制次梁,其特征在于:预制主梁上搭接预制次梁处设置后浇段,且预制主梁的主梁底部受力钢筋在后浇段贯通连续,预制主梁的后浇段内预留主梁箍筋,预制次梁伸入预制主梁的后浇段内,预制次梁的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁上,且锚固长度大于等于12d,预制主梁及预制次梁上部的叠合层内铺设通长受力钢筋,通长受力钢筋穿过预制次梁上部,需要绑扎的钢筋进行绑扎处理,支模浇筑形成后浇段。
2.根据权利要求1所述的预制混凝土主次梁连接结构,其特征在于:预制次梁伸入预制主梁的后浇段内的长度大于等于10mm。
3.根据权利要求1所述的预制混凝土主次梁连接结构,其特征在于:预制主梁的一侧或两侧分别搭接预制次梁,两预制次梁的次梁底部纵筋采用高度上下错开锚固的方式分别与预制主梁锚固。
4.根据权利要求1所述的预制混凝土主次梁连接结构,其特征在于:预制主梁、预制次梁端部分别设置抗剪凹槽。
5.根据权利要求1所述的预制混凝土主次梁连接结构,其特征在于:后浇段的两端分别伸出主梁腰筋,增设等直径的附加腰筋分别与两根主梁腰筋焊接连接。
6.根据权利要求1所述的预制混凝土主次梁连接结构的施工方法,其特征在于:包括以下步骤:
(1)、制造预制主梁和预制次梁,预制主梁上搭接预制次梁处设置后浇段,且预制主梁的主梁底部受力钢筋在后浇段贯通连续,预制主梁的后浇段内预留主梁箍筋;
(2)、吊装预制主梁和预制次梁,将预制次梁伸入预制主梁的后浇段内,预制次梁的次梁底部纵筋直接锚固或通过附加钢筋锚固于预制主梁上,且锚固长度大于等于12d;
(3)、预制主梁及预制次梁上部的叠合层内铺设通长受力钢筋,通长受力钢筋穿过预制次梁上部;
(4)、支模板,在预制主梁的侧边、预制次梁的侧边及预制主梁的底部设置模板;
(5)、对需要绑扎的钢筋进行绑扎处理;
(6)、浇筑后浇段;使预制主梁和预制次梁形成整体。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510359892.9A CN105040829B (zh) | 2015-06-26 | 2015-06-26 | 一种预制混凝土主次梁连接结构及其施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510359892.9A CN105040829B (zh) | 2015-06-26 | 2015-06-26 | 一种预制混凝土主次梁连接结构及其施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105040829A true CN105040829A (zh) | 2015-11-11 |
| CN105040829B CN105040829B (zh) | 2017-11-03 |
Family
ID=54447771
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510359892.9A Active CN105040829B (zh) | 2015-06-26 | 2015-06-26 | 一种预制混凝土主次梁连接结构及其施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105040829B (zh) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105297892A (zh) * | 2015-12-02 | 2016-02-03 | 上海欧本钢结构有限公司 | 一种设有张拉钢筋的混凝土梁交叉连接结构及其施工方法 |
| CN105297893A (zh) * | 2015-12-02 | 2016-02-03 | 上海欧本钢结构有限公司 | 榫卯式混凝土叠合梁交叉连接结构及其施工方法 |
| CN105926820A (zh) * | 2016-05-03 | 2016-09-07 | 台州远信建设工程有限公司 | 一种预制梁钢承板电阻网片组合楼面的施工工法 |
| CN109098279A (zh) * | 2018-09-28 | 2018-12-28 | 福州大学 | 装配式预制主梁与次梁的连接构造及施工方法 |
| CN109680807A (zh) * | 2019-01-25 | 2019-04-26 | 华汇工程设计集团股份有限公司 | 先张法预制叠合梁钢绞线在梁柱节点的锚固结构及方法 |
| CN110130487A (zh) * | 2019-05-24 | 2019-08-16 | 广东中建新型建筑构件有限公司 | 一种预制主次梁连接节点及连接方法 |
| CN110331817A (zh) * | 2019-07-11 | 2019-10-15 | 江西建工第二建筑有限责任公司 | 一种装配式组合梁次梁构造 |
| CN110439180A (zh) * | 2019-08-20 | 2019-11-12 | 长沙远大住宅工业安徽有限公司 | 一种交叉梁及施工方法 |
| CN110512730A (zh) * | 2019-08-07 | 2019-11-29 | 泰州职业技术学院 | 一种装配式混凝土主次梁连接结构 |
| CN110725399A (zh) * | 2019-10-15 | 2020-01-24 | 广州瀚阳工程咨询有限公司 | 一种装配式建筑纵横梁连接节点的实施方法 |
| CN111005446A (zh) * | 2019-12-23 | 2020-04-14 | 三一筑工科技有限公司 | 预制柱节点连接结构及施工方法 |
| CN112411746A (zh) * | 2020-11-27 | 2021-02-26 | 湖南建工五建建筑工业化有限公司 | 一种主次梁十字搭接连接结构及其连接方法 |
| CN114541576A (zh) * | 2022-02-16 | 2022-05-27 | 浙江大学建筑设计研究院有限公司 | 装配式钢筋混凝土主梁与次梁的连接结构及施工方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000073448A (ja) * | 1998-08-28 | 2000-03-07 | Dai Nippon Construction | プレキャストコンクリート梁と柱の接合方法および接合構造 |
| CN2637592Y (zh) * | 2003-09-04 | 2004-09-01 | 张英保 | 建筑外墙墙板与现浇混凝土楼板的连接结构 |
| CN101660327A (zh) * | 2008-08-29 | 2010-03-03 | 万科企业股份有限公司 | 预制混凝土次梁与主梁的连接结构、施工方法及建筑 |
| CN102587554A (zh) * | 2012-02-29 | 2012-07-18 | 黑龙江宇辉新型建筑材料有限公司 | 跨度内应用钢筋180°弯锚连接的混凝土叠合板及连接方法 |
| CN102677784A (zh) * | 2012-05-21 | 2012-09-19 | 天津大学 | 一种预制混凝土管柱钢筋混凝土梁节点结构及其施工方法 |
| CN204098221U (zh) * | 2014-07-28 | 2015-01-14 | 南京长江都市建筑设计股份有限公司 | 一种包含t型抗剪钢板的预制主次梁连接节点 |
| CN204728484U (zh) * | 2015-06-26 | 2015-10-28 | 南京长江都市建筑设计股份有限公司 | 一种预制混凝土主次梁连接结构 |
-
2015
- 2015-06-26 CN CN201510359892.9A patent/CN105040829B/zh active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000073448A (ja) * | 1998-08-28 | 2000-03-07 | Dai Nippon Construction | プレキャストコンクリート梁と柱の接合方法および接合構造 |
| CN2637592Y (zh) * | 2003-09-04 | 2004-09-01 | 张英保 | 建筑外墙墙板与现浇混凝土楼板的连接结构 |
| CN101660327A (zh) * | 2008-08-29 | 2010-03-03 | 万科企业股份有限公司 | 预制混凝土次梁与主梁的连接结构、施工方法及建筑 |
| CN102587554A (zh) * | 2012-02-29 | 2012-07-18 | 黑龙江宇辉新型建筑材料有限公司 | 跨度内应用钢筋180°弯锚连接的混凝土叠合板及连接方法 |
| CN102677784A (zh) * | 2012-05-21 | 2012-09-19 | 天津大学 | 一种预制混凝土管柱钢筋混凝土梁节点结构及其施工方法 |
| CN204098221U (zh) * | 2014-07-28 | 2015-01-14 | 南京长江都市建筑设计股份有限公司 | 一种包含t型抗剪钢板的预制主次梁连接节点 |
| CN204728484U (zh) * | 2015-06-26 | 2015-10-28 | 南京长江都市建筑设计股份有限公司 | 一种预制混凝土主次梁连接结构 |
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105297893A (zh) * | 2015-12-02 | 2016-02-03 | 上海欧本钢结构有限公司 | 榫卯式混凝土叠合梁交叉连接结构及其施工方法 |
| CN105297892B (zh) * | 2015-12-02 | 2017-09-19 | 上海欧本钢结构有限公司 | 一种设有张拉钢筋的混凝土梁交叉连接结构的施工方法 |
| CN105297892A (zh) * | 2015-12-02 | 2016-02-03 | 上海欧本钢结构有限公司 | 一种设有张拉钢筋的混凝土梁交叉连接结构及其施工方法 |
| CN105926820A (zh) * | 2016-05-03 | 2016-09-07 | 台州远信建设工程有限公司 | 一种预制梁钢承板电阻网片组合楼面的施工工法 |
| CN109098279A (zh) * | 2018-09-28 | 2018-12-28 | 福州大学 | 装配式预制主梁与次梁的连接构造及施工方法 |
| CN109680807A (zh) * | 2019-01-25 | 2019-04-26 | 华汇工程设计集团股份有限公司 | 先张法预制叠合梁钢绞线在梁柱节点的锚固结构及方法 |
| CN110130487A (zh) * | 2019-05-24 | 2019-08-16 | 广东中建新型建筑构件有限公司 | 一种预制主次梁连接节点及连接方法 |
| CN110130487B (zh) * | 2019-05-24 | 2024-01-16 | 广东中建新型建筑构件有限公司 | 一种预制主次梁连接节点及连接方法 |
| CN110331817A (zh) * | 2019-07-11 | 2019-10-15 | 江西建工第二建筑有限责任公司 | 一种装配式组合梁次梁构造 |
| CN110512730B (zh) * | 2019-08-07 | 2022-08-12 | 泰州职业技术学院 | 一种装配式混凝土主次梁连接结构 |
| CN110512730A (zh) * | 2019-08-07 | 2019-11-29 | 泰州职业技术学院 | 一种装配式混凝土主次梁连接结构 |
| CN110439180A (zh) * | 2019-08-20 | 2019-11-12 | 长沙远大住宅工业安徽有限公司 | 一种交叉梁及施工方法 |
| CN110725399A (zh) * | 2019-10-15 | 2020-01-24 | 广州瀚阳工程咨询有限公司 | 一种装配式建筑纵横梁连接节点的实施方法 |
| CN111005446A (zh) * | 2019-12-23 | 2020-04-14 | 三一筑工科技有限公司 | 预制柱节点连接结构及施工方法 |
| CN112411746A (zh) * | 2020-11-27 | 2021-02-26 | 湖南建工五建建筑工业化有限公司 | 一种主次梁十字搭接连接结构及其连接方法 |
| CN114541576A (zh) * | 2022-02-16 | 2022-05-27 | 浙江大学建筑设计研究院有限公司 | 装配式钢筋混凝土主梁与次梁的连接结构及施工方法 |
| CN114541576B (zh) * | 2022-02-16 | 2024-07-02 | 浙江大学建筑设计研究院有限公司 | 装配式钢筋混凝土主梁与次梁的连接结构及施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105040829B (zh) | 2017-11-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105040829A (zh) | 一种预制混凝土主次梁连接结构及其施工方法 | |
| CN106401036B (zh) | 一种装配式钢框架预制混凝土楼板结构 | |
| CN205024907U (zh) | 预应力空心楼板与翼缘不等宽工字钢梁的连接构造 | |
| CN103669598A (zh) | 一种多层混凝土框架结构顶部的加层钢框架柱脚节点及其施工方法 | |
| CN105839846A (zh) | 预制装配式钢筋混凝土叠合梁 | |
| CN105421632B (zh) | 捷约楼盖系统及其施工方法 | |
| CN103046645B (zh) | 一种大跨度预制整浇结构及施工方法 | |
| CN206859479U (zh) | 一种钢筋桁架叠合楼板 | |
| CN107130715A (zh) | 一种后浇齿槽连接装配式楼屋盖的施工方法 | |
| CN106759434B (zh) | 一种井字形预制混凝土塔柱基础及其施工方法 | |
| CN111364681B (zh) | 一种端部柱梁节点预应力筋交错张拉锚固构造及施工方法 | |
| CN103741881A (zh) | 装配式框架柱及施工方法 | |
| CN107130716A (zh) | 后浇齿槽连接装配式楼屋盖 | |
| CN103122691A (zh) | 塔吊标准节支承高空支模钢平台结构及施工方法 | |
| CN110241915A (zh) | 一种装配式混凝土梁柱l型筋整体连接节点及使用方法 | |
| CN104110097B (zh) | 一种端部增强型钢骨混凝土叠合梁 | |
| CN104453013A (zh) | 预制墙体构件以及装配式钢筋混凝土剪力墙 | |
| KR101673287B1 (ko) | 보수, 보강 또는 리모델링시에 보의 단부에 작용하는 부모멘트에 대한 단면 내력을 증가시키는 방법 | |
| CN103790176A (zh) | 一种预埋短肢柱结构及其施工方法 | |
| CN103758347B (zh) | 大跨度钢筋混凝土梁板结构后浇带支撑托换施工方法 | |
| CN203939144U (zh) | 用于连接建筑结构中剪力墙与混凝土楼板的装置 | |
| CN206769150U (zh) | 后浇齿槽连接装配式楼屋盖 | |
| CN105752864A (zh) | 塔式起重机附着节点及其施工方法 | |
| CN104153467A (zh) | 一种连接建筑结构中剪力墙与混凝土楼板的装置及其设置方法 | |
| CN206053079U (zh) | 一种装配式梁板集成组合楼盖 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |