[go: up one dir, main page]

CN105003286A - Protective cover for tunnel arch bar planting and wall protection construction - Google Patents

Protective cover for tunnel arch bar planting and wall protection construction Download PDF

Info

Publication number
CN105003286A
CN105003286A CN201510474159.1A CN201510474159A CN105003286A CN 105003286 A CN105003286 A CN 105003286A CN 201510474159 A CN201510474159 A CN 201510474159A CN 105003286 A CN105003286 A CN 105003286A
Authority
CN
China
Prior art keywords
protective cover
bar planting
tunnel
tunnel arch
arch bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510474159.1A
Other languages
Chinese (zh)
Inventor
黄成友
韩玉庆
代权
张鉴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN201510474159.1A priority Critical patent/CN105003286A/en
Publication of CN105003286A publication Critical patent/CN105003286A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a protective cover for tunnel arc arch bar planting and wall protection construction, relates to the technical field of tunnel construction, and provides a protective cover for tunnel arc arch bar planting and wall protection construction, which can prevent stone slag and slurry from falling in the bar planting drilling process. The protective cover for tunnel arch bar planting and wall protection construction comprises a protective cover bottom plate and a plurality of protective cover vertical plates connected with the protective cover bottom plate; each protective cover vertical plate is arranged at intervals, and a dirt groove is formed between every two adjacent protective cover vertical plates; the protective cover bottom plate is provided with a cross-shaped notch and a fixing hole, and the edge of the protective cover bottom plate is provided with a connecting hole. The invention is fixed on the tunnel arch, covers the tunnel arch, and the stone slag and the slurry fall into the dirt groove and are discharged along the dirt groove, so the invention can avoid the stone slag and the slurry from falling, thereby not only improving the construction efficiency, but also ensuring the safety of constructors.

Description

For the protective cover of tunnel arch bar planting and panelling construction
Technical field
The present invention relates to technical field of tunnel construction, particularly relate to a kind of protective cover for tunnel arch bar planting and panelling construction.
Background technology
For the bar planting construction before tunnel arch retaining wall, first will hole to bar planting hole, what generally adopt is water drilling.Execute in drill-through journey, necessarily have rock ballast and come off from arch wall, also have mud simultaneously and overflow from boring.Rock ballast and mud both can affect constructor's operation, the safety of entail dangers to constructor again, but current not good mode solves this problem.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of protective cover for tunnel arch bar planting and panelling construction that rock ballast and mud in bar planting boring procedure can be avoided to drop.
In order to solve the problem, the technical scheme adopted is: some protective cover risers that the protective cover for tunnel arch bar planting and panelling construction comprises protective cover base plate and is connected with protective cover base plate; Each protective cover riser interval is arranged, and is dirt groove between adjacent protective cover riser; Protective cover base plate is provided with cross type cut and fixing hole, protective cover bottom edge is provided with connecting hole.
Further: protective cover base plate and protective cover riser are made by rubber and the two makes one.
The invention has the beneficial effects as follows: the present invention is fixed in tunnel arch, the present invention covers tunnel arch, rock ballast and mud are fallen into dirt groove and are discharged along dirt groove, and the present invention can avoid rock ballast and mud to drop, and has both improved the safety that efficiency of construction in turn ensure that constructor.
Accompanying drawing explanation
Fig. 1 is the front view of the protective cover for tunnel arch bar planting and panelling construction;
Fig. 2 is the lateral view of the protective cover for tunnel arch bar planting and panelling construction;
Be labeled as in figure: connecting hole 1, protective cover riser 2, cross type cut 3, fixing hole 4, protective cover base plate 5, dirt groove 6.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
As depicted in figs. 1 and 2, for some protective cover risers 2 that the protective cover of tunnel arch bar planting and panelling construction comprises protective cover base plate 5 and is connected with protective cover base plate 5; Each protective cover riser 2 interval is arranged, and is dirt groove 6 between adjacent protective cover riser 2; Protective cover base plate 5 is provided with cross type cut 3 and fixing hole 4, protective cover base plate 5 edge is provided with connecting hole 1.
Utilize the present invention to carry out tunnel arch bar planting and panelling construction process as follows: A, in tunnel arch, beat hole for the expansion bolt, expansion bolt is passed fixing hole 4 and inserts hole for the expansion bolt, this protective cover is fixed in tunnel arch by expansion bolt, when fixing this protective cover, pressure should be avoided to collapse protective cover riser 2; B, repetition step A, fixing multiple protective cover is until protective cover covers tunnel arch completely, and adjacent protective cover is connected by connecting hole 1; Reinforcing shored by C, seal closure; D, use short drill pipe rig, adopt water drilling through cross type cut 3 and bore bar planting hole in tunnel arch; E, bar planting is installed and is in the milk in brill bar planting hole; F, dismounting protective cover; G, extension steel fabric sheet; H, sprayed mortar retaining wall.
Bore in the process of bar planting hole, the present invention covers tunnel arch, and rock ballast and mud are fallen into dirt groove 6 and discharged along dirt groove 6, and therefore the present invention can avoid rock ballast and mud to drop, and has both improved the safety that efficiency of construction in turn ensure that constructor.
Bore in the process of bar planting hole, protective cover will be fitted with tunnel arch, and therefore protective cover should be flexible, and the present invention recommends protective cover base plate 5 and protective cover riser 2 to make by rubber and the two makes one.
The effect of cross type cut 3 facilitates drill bit to pass protective cover; And when drill bit is through protective cover, the protective cover base plate 5 near cross type cut 3 is fitted with drill bit, makes substantially to seal between protective cover base plate 5 and drill bit, rock ballast and mud can be avoided to drop out between drill bit and protective cover base plate 5.

Claims (2)

1., for the protective cover of tunnel arch bar planting and panelling construction, it is characterized in that: the some protective cover risers (2) comprising protective cover base plate (5) and be connected with protective cover base plate (5); Each protective cover riser (2) interval is arranged, and is dirt groove (6) between adjacent protective cover riser (2); Protective cover base plate (5) is provided with cross type cut (3) and fixing hole (4), protective cover base plate (5) edge is provided with connecting hole (1).
2. the protective cover for tunnel arch bar planting and panelling construction according to claim 1, is characterized in that: protective cover base plate (5) and protective cover riser (2) are made by rubber and the two makes one.
CN201510474159.1A 2015-08-05 2015-08-05 Protective cover for tunnel arch bar planting and wall protection construction Pending CN105003286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510474159.1A CN105003286A (en) 2015-08-05 2015-08-05 Protective cover for tunnel arch bar planting and wall protection construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510474159.1A CN105003286A (en) 2015-08-05 2015-08-05 Protective cover for tunnel arch bar planting and wall protection construction

Publications (1)

Publication Number Publication Date
CN105003286A true CN105003286A (en) 2015-10-28

Family

ID=54376117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510474159.1A Pending CN105003286A (en) 2015-08-05 2015-08-05 Protective cover for tunnel arch bar planting and wall protection construction

Country Status (1)

Country Link
CN (1) CN105003286A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677822A (en) * 2017-02-14 2017-05-17 贵州大学 Anti-collapse device for stone drift blasting

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5295764A (en) * 1991-08-14 1994-03-22 Wci Steel, Inc. Tunnel liner
JPH0868300A (en) * 1994-08-31 1996-03-12 Ohbayashi Corp Protection structure of tunnel interior wall surface
CN103321657A (en) * 2013-06-25 2013-09-25 黄河勘测规划设计有限公司 Reinforced concrete tunnel reinforcement method
CN203321537U (en) * 2013-06-20 2013-12-04 中铁三局集团有限公司 Self-chinching lining template for tunnel
CN203783600U (en) * 2013-09-30 2014-08-20 招商局重庆交通科院设计院有限公司 Bonding steel reinforcement device for highway tunnel lining surface

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5295764A (en) * 1991-08-14 1994-03-22 Wci Steel, Inc. Tunnel liner
JPH0868300A (en) * 1994-08-31 1996-03-12 Ohbayashi Corp Protection structure of tunnel interior wall surface
CN203321537U (en) * 2013-06-20 2013-12-04 中铁三局集团有限公司 Self-chinching lining template for tunnel
CN103321657A (en) * 2013-06-25 2013-09-25 黄河勘测规划设计有限公司 Reinforced concrete tunnel reinforcement method
CN203783600U (en) * 2013-09-30 2014-08-20 招商局重庆交通科院设计院有限公司 Bonding steel reinforcement device for highway tunnel lining surface

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677822A (en) * 2017-02-14 2017-05-17 贵州大学 Anti-collapse device for stone drift blasting
CN106677822B (en) * 2017-02-14 2019-02-26 贵州大学 An anti-collapse device for rock roadway blasting

Similar Documents

Publication Publication Date Title
CN104863629B (en) A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring
CN102661167B (en) Protected seam bottom plate upward comb-shaped drilled hole gas extraction method
CN105240046B (en) Drill hole layout method for gas extraction during primary mining and stoping of large mining height fully-mechanized face
CN102943690A (en) Method for preventing and treating separation layer water of top plate of coal face
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
WO2016112771A1 (en) Complete non-coal-pillar continuous depressurized mining method for short-distance coal seam group
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN104763466B (en) Method for detecting active diffusion radius of covered rock separation grouting filling slurry
CN103277114A (en) Non-sprayed-concrete anchor net supporting method of underground construction broken surrounding rocks
CN104500078A (en) Method for optimizing roadway area stress field in construction outside roadway
CN102383830A (en) Comprehensive outburst prevention method for outburst coal seam region
WO2016107434A1 (en) Regional stress field optimization method for main haulageway
CN103161492A (en) Gas extraction well location method based on overlying rock fracture shell
UA123770C2 (en) Anti-collapse structure beside roadway based on 110 construction method for breaking roof
CN104453944A (en) Coal-pillar-impacting-preventing roadway protecting method
CN109322621B (en) Broken layer pipe fixing and grouting method
CN105909284A (en) Sloughing prevention and control method for large mining height coal wall
CN102155249A (en) Method for supporting tunnel roof below mined-out area
CN204492661U (en) A kind of anti-blocking drill bit that is little, long service life that weares and teares
CN105003286A (en) Protective cover for tunnel arch bar planting and wall protection construction
CN105317382B (en) The drill bit of construction drill bored concrete pile and the construction method using the drill bit
CN103195446A (en) Yielding buffer device for floor heave of soft rock roadway and method for constructing yielding buffer device
CN105019928A (en) Construction method for tunnel arch bar planting and wall protection
CN103362541B (en) Method for regionally increasing coal seam permeability in high gassy and low permeability coal seam
CN102852532A (en) Grouting method for preventing rib walk caving

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20180403

AD01 Patent right deemed abandoned