CN104929603B - Infinite stage sectional fracturing method for casing - Google Patents

Infinite stage sectional fracturing method for casing Download PDF

Info

Publication number
CN104929603B
CN104929603B CN201510307413.9A CN201510307413A CN104929603B CN 104929603 B CN104929603 B CN 104929603B CN 201510307413 A CN201510307413 A CN 201510307413A CN 104929603 B CN104929603 B CN 104929603B
Authority
CN
China
Prior art keywords
setting
piston
sliding sleeve
sleeve pipe
central tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510307413.9A
Other languages
Chinese (zh)
Other versions
CN104929603A (en
Inventor
丁柯宇
程智远
徐玉龙
李梅
何志勇
张永忠
刘志斌
姚卫东
孙鑫
杨永青
郭鸣
王瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201510307413.9A priority Critical patent/CN104929603B/en
Publication of CN104929603A publication Critical patent/CN104929603A/en
Application granted granted Critical
Publication of CN104929603B publication Critical patent/CN104929603B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a casing infinite stage sectional fracturing method, which comprises the following steps: 1) setting a casing and cementing a tubular column; 2) a service tool is put to the bottom of the artificial well; 3) lifting the continuous oil pipe, and positioning the bottommost layer infinite sliding sleeve by using a mechanical coupling positioner; 4) setting the repeatable setting and unsealing tool in the bottommost infinite sliding sleeve and between the upper through hole and the lower through hole; 5) fracturing; after the repeatable setting and unsealing tool is completely set, annular pressure is applied to push the piston to move downwards and clamp the piston on the locking ring, the infinite sliding sleeve is opened, and sand fracturing is performed; 6) after fracturing is completed, lifting the coiled tubing, and unsealing the repeatable setting and unsealing tool; 7) sequentially positioning the infinite sliding sleeves 2 upwards by using the method in the step 3); 8) and repeating the steps 4) to 7) until the fracturing of the whole well section is completed. The method can greatly shorten the construction period, improve the fracturing efficiency and reduce the construction cost.

Description

Sleeve pipe infinite stages staged fracturing method
Technical field
The present invention relates to oil-drilling field, more particularly to a kind of sleeve pipe infinite stages staged fracturing method.
Background technology
Increasing with domestic horizontal well development, staged fracturing of horizontal well technology has been increasingly becoming horizontal well development mistake Major technique in journey, is in general divided into barefoot completion and cased hole completion.What cased-hole applications were more at present is motionless pipe Post hydrajetting techniques, water-jet bridging plug packing sleeve pipe fracturing technique and coiled tubing band underseal abrasive perforating staged fracturing skill Art.Fixed tubular column hydrajetting techniques connect hydraulic sand blasting instrument by oil pipe and enter well, open sliding sleeves at different levels by pitching and realize Multistage pressure break.The main pressure break of sleeve pipe is generally used, oil pipe fluid infusion mode is constructed.Because oil jacket annular clearance is smaller, construction pressure Power is high, it is impossible to meet massive hydraulic fracture needs.Meanwhile, using pitching unfolding mode by casing size and ball and the differential limit of ball seat System, the pressure break number of plies is limited.Water-jet bridging plug packing sleeve pipe fracturing technique insulates fractured interval by setting bridging plug first, then Pitching opens hydrajet tool and completes many cluster perforating jobs.This technique uses casing fracturing, can not only realize larger rule The pressing crack construction of mould, can also carry out multiple perforation, but once enter to carry out one layer of pressing crack construction down, it is necessary to repeatedly rise Lower bridging plug and replacing hydrajet tool, long construction period.After pressure break terminates, in addition it is also necessary under enter to bore plug instrument bore mill bridging plug, apply Work complex process.After coiled tubing band underseal abrasive perforating staged fracturing technology is positioned using mechanical collar locator, lead to Cross hydrajet tool and penetrate out sleeve pipe, annular space carries out huge discharge sand fracturing.Due to needing to carry out multiple perforation, to spray tip Wearability and anti-backwash nocuity can require higher., it is necessary to replace perforating fluid after perforation terminates, the activity duration is added.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides a kind of sleeve pipe infinite stages staged fracturing method and solves prior art The pressure break number of plies is limited, long construction period, and the defect high to equipment requirement greatly shortens construction period, improves pressure break efficiency and drop Low construction cost.
Therefore, technical scheme is as follows:
A kind of sleeve pipe infinite stages staged fracturing method, comprises the following steps:
1) setting of casing well cementation tubing string;Described sleeve pipe well cementation tubing string include from shaft bottom to well head set float shoe, float collar and The spaced more piece sleeve pipe of horizontal segment and multiple infinite stages sliding sleeves, near well head at be provided that sleeve pipe and its always from water Flat section extends to well head;Two short sleeves are further respectively had between the single infinite stages sliding sleeve and sleeve pipe;
2) service aid is to artificial bottom of a well under;The service aid is is connected to coiled tubing lower end, from top to bottom successively The jointing of connection, give up, centralizer, hydrajet tool, reverse circulation valve, repeat setting unsealing tool, mechanical box cupling Locator and seeker;
3) coiled tubing is above carried to position bottom infinite stages sliding sleeve;The mechanical collar locator is by connecting Load fluctuation can be produced when connecing at the casing coupling of short sleeve, determines whether the service aid is in the bottom by load fluctuation The position of infinite stages sliding sleeve;
4) to repeat setting unsealing tool setting in the bottom infinite stages sliding sleeve by described, and between upper and lower logical Between hole;The infinite stages sliding sleeve includes top connection, central tube, piston, lock ring, outer barrel, adapter sleeve and lower contact, the center Pipe upper end is caught in top connection, and both longitudinal correspondence positions are equipped with sandblasting hole;The outer barrel upper end passes through screw thread and top connection Connection, lower end is connected by adapter sleeve with lower contact;Withstand central tube in the lower contact top;The outer barrel and the company of top connection Socket part position card has lock ring, and lock ring is held out against by outer barrel;The outer surface of piston is provided with pawl, can be stuck on the lock ring, prevents from living Retreated after plug is descending;The cavity volume for accommodating piston is formed between the central tube and top connection and outer barrel;The piston is by cutting Nail, which is fixed between central tube and top connection, closes sandblasting hole, and the length of piston is less than the cavity volume bottom to the sandblasting hole The length of lower edge;The piston does not leave space when fixing with being in contact at the top of the cavity volume, the central tube pair The position in the space is answered to be provided with upper through hole;The central tube is provided with lower through-hole on the downside of the cavity volume;
5) pressure break;After the repeatable setting unsealing tool is completely setting, annular space is suppressed, and pressure is acted on by upper through hole The upper surface of piston, lower through-hole will not act on the lower end of piston due to the packing for repeating setting unsealing tool, pressure Face, the pressure difference of the piston upper and lower end face cuts shear pin, and descent of piston is simultaneously stuck on lock ring, in the top connection and central tube Sandblasting hole connection so that establish with stratum link up passage;Sand fracturing;
6) treat after the completion of pressure break, above carry the coiled tubing, unseal the repeatable setting unsealing tool;
7) utilize step 3) method, infinite stages sliding sleeve is positioned upwards successively;
8) repeat step 4)~7), until full well section pressure break is completed.
The structure for repeating setting unsealing tool is shown in patent CN204024574U disclosures, is mainly used for beating Open infinite stages sliding sleeve and insulate non-fractured interval.Its structure is to include:Central tube and the spacer ring being sequentially arranged on central tube, Packing element, centrum, slips, slip spider, centralizer seat, slip ring sheath, slip ring and sliding block, be provided with central tube bottom nipple and Lower contact, central tube threaded upper ends connect a upper instrument, and the spacer ring, packing element and centrum are enclosed within central tube, and centrum is in The step formed on heart pipe is spacing;The slip spider, centralizer seat, slip ring sliding sleeve and lower contact are sequentially connected and led to by screw thread Cross sliding block to be connected on central tube, the track by being easy to sliding block to slide up and down is formed on central tube, at the center of the slideway end Position limiting structure is formed with pipe;Multiple slips central tube be circumferentially mounted on slip spider and by be arranged on slip spider and The first spring between slips is fixed;Multiple wiper blocks are circumferentially disposed on centralizer seat, the upper and lower ends of wiper block Spacing by slip spider lower end and baffle ring respectively, wiper block is fixed by its second spring between centralizer seat;The slip ring It is arranged in slip ring sheath and fixed by centralizer seat, the sliding block is arranged on slip ring;The nipple is located in lower contact, And be threadedly coupled with central tube lower end, it can be relatively moved between nipple and lower contact.
First step is provided with the top of the lower contact, center bottom of the tube is provided with second matched with the first step Rank, first step holds out against second step.
If some infinite stages sliding sleeve can not be opened normally, i.e., described top connection can not be connected with the sandblasting hole on central tube When, service aid is above carried to the sleeve pipe for the infinite stages sliding sleeve upper end that can not normally open, by repeatable setting unsealing tool Setting in sleeve pipe, avoiding, casing coupling is carried out to sleeve pipe plus sand blasting is penetrated, and sleeve pipe is penetrated out into rear annular space carries out sand fracturing;Complete Afterwards, a upper infinite stages sliding sleeve is repositioned, step 5 is carried out)~8).
Compared with prior art, the present invention has the following effects that:
1st, casing cementing pressing crack construction conventional at present needs to carry out perforation to sleeve pipe, requires higher to perforating apparatus, often The fracturing process occurred in the situation that pressure break is not opened after perforation, the present invention need not carry out perforation construction, by the way that packer is sat Envelope can link up stratum progress pressure break with suppressing opening sliding sleeve from annular space in sliding sleeve.
2nd, the present invention is using a kind of repeatable fracturing packer for setting, unsealing.Packing element setting force is low, using coiled tubing Packing element can be set by pushing, and meet higher operation pressure.Packing element anti-fatigue performance is strong, can repeatedly be set, unsealed by switching tracks.
3rd, the pressing crack construction of different layers position is realized by opening sliding sleeve, the layer transition time is short, opens efficiency high.Pressure break knot Operating tool string acts ground in Shu Hou, well, it is ensured that the full-bore in well.
4th, when sliding sleeve is not opened, abrasive perforating is carried out using hydrajet tool, it is ensured that each layer can smoothly enter Row pressing crack construction.
In summary, the present invention by it is repeatable set, deblocking packer opens well cementation sliding sleeve and carries out pressing crack construction step by step Method, can as needed under enter sliding sleeve, due to not limiting the series of pressure break, larger pressure break scale needs can be met, contract In the short pressing crack construction cycle, production cost is reduced, there is positive effect for improving oil gas field recovery ratio.
Brief description of the drawings
Fig. 1 is casing cementing tubular column structure schematic diagram;
Fig. 2 is structure chart when infinite stages sliding sleeve is closed;
Fig. 3 is structure chart when infinite stages sliding sleeve is opened;
Fig. 4 is that service aid opens infinite stages sliding sleeve schematic diagram.
Embodiment
The technical scheme of invention is described in detail below in conjunction with the drawings and specific embodiments.
Infinite stages sliding sleeve 2 includes top connection 201, central tube 202, piston 209, lock ring 210, outer barrel 203, adapter sleeve 206 With lower contact 205, the upper end of central tube 202 is caught in top connection 201, and both longitudinal correspondence positions are equipped with sandblasting hole 213; The upper end of outer barrel 203 is connected by screw thread with top connection 201, and lower end is connected by adapter sleeve 206 with lower contact 205;It is described Withstand central tube 202 in the top of lower contact 205;The outer barrel 203 and the connecting portion card of top connection 201 have lock ring 210;The work 209 outer surfaces are filled in provided with pawl, can be stuck on the lock ring 210, are retreated after preventing piston 209 descending;The central tube 202 with The cavity volume 212 for accommodating piston 209 is formed between top connection 201 and outer barrel 203;The piston 209 is fixed on by shear pin 211 Between central tube 202 and top connection 201, sandblasting hole 213 is closed, and the length of piston 209 is less than the bottom of cavity volume 212 to institute State the length of the lower edge of sandblasting hole 213;Space, the correspondence of central tube 202 space are left in top when the piston 209 is fixed Position be provided with upper through hole 207;The central tube 202 is provided with lower through-hole 208 in the downside of cavity volume 212.The lower contact 205 Top is provided with first step, and the bottom of central tube 202 is provided with the second step that matches with the first step, and first step is by the Two steps are held out against.
Tubing string cement the well including the float shoe 4 set from shaft bottom to well head, float collar 3 and in the spaced more piece sleeve pipe of horizontal segment 1 and multiple infinite stages sliding sleeves 2, near well head at be provided that sleeve pipe 1 and it extends to well head from horizontal segment always;The list Two short sleeves 12 are further respectively had between individual infinite stages sliding sleeve 2 and sleeve pipe 1.
Service aid is is connected to the lower end of coiled tubing 5, the jointing 6 being sequentially connected from top to bottom, 7, righting of giving up Device 8, hydrajet tool 9, reverse circulation valve 10, repeatable setting unsealing tool 11, mechanical collar locator 13 and seeker 15.
The structure for repeating setting unsealing tool is shown in patent CN204024574U disclosures, is mainly used for opening nothing Limit level sliding sleeve and insulate non-fractured interval.Its structure is to include:Central tube and the spacer ring being sequentially arranged on central tube, glue Cylinder, centrum, slips, slip spider, centralizer seat, slip ring sheath, slip ring and sliding block, nipple is provided with central tube bottom with Joint, central tube threaded upper ends connect a upper instrument, and the spacer ring, packing element and centrum are enclosed within central tube, and centrum is by center The step formed on pipe is spacing;The slip spider, centralizer seat, slip ring sliding sleeve and lower contact are sequentially connected and passed through by screw thread Sliding block is connected on central tube, and the track by being easy to sliding block to slide up and down is formed on central tube, in the central tube of the slideway end On be formed with position limiting structure;Multiple slips are circumferentially mounted on slip spider and by being arranged on slip spider and card in central tube The first spring between watt is fixed;Multiple wiper blocks are circumferentially disposed on centralizer seat, the upper and lower ends point of wiper block Not spacing by slip spider lower end and baffle ring, wiper block is fixed by its second spring between centralizer seat;The slip ring is set Put in slip ring sheath and fixed by centralizer seat, the sliding block is arranged on slip ring;The nipple is located in lower contact, and It is threadedly coupled, can be relatively moved between nipple and lower contact with central tube lower end.
A kind of sleeve pipe infinite stages staged fracturing method, comprises the following steps:
1) setting of casing well cementation tubing string;
2) service aid is to artificial bottom of a well under;Depth of setting can be checked by preset positioning short sleeve in well;
3) coiled tubing 5 is above carried to position bottom infinite stages sliding sleeve 2;The mechanical collar locator 13 is passed through Load fluctuation can be produced when crossing at the casing coupling 14 of connection short sleeve 12, whether the service aid is determined by load fluctuation In the position of bottom infinite stages sliding sleeve 2;
4) to repeat setting unsealing tool 11 setting in the bottom infinite stages sliding sleeve 2 by described, and between upper 207th, between lower through-hole 208;
5) pressure break;After the repeatable setting unsealing tool 11 is completely setting, annular space is suppressed, and pressure passes through upper through hole 207 The upper surface of piston 209 is acted on, then promotes piston 209 descending and is stuck on lock ring 210, the top connection 201 and center Sandblasting hole 213 on pipe 202 is connected, so as to establish the passage linked up with stratum;Sand fracturing;
6) treat after the completion of pressure break, above carry the coiled tubing 5, unseal the repeatable setting unsealing tool 11;
7) utilize step 3) method, infinite stages sliding sleeve 2 is positioned upwards successively;
8) repeat step 4)~7), until full well section pressure break is completed.
If some infinite stages sliding sleeve 2 can not be opened normally, i.e., the sandblasting hole in described top connection 201 and central tube 202 213 when can not connect, and service aid above be carried to the sleeve pipe 1 for the upper end of infinite stages sliding sleeve 2 that can not normally open, will be repeatable Setting unsealing tool 11 is setting, and in sleeve pipe 1, avoiding, casing coupling 14 is carried out to sleeve pipe 1 plus sand blasting is penetrated, and sleeve pipe 1 is penetrated out into rear ring Sky carries out sand fracturing;After the completion of, a upper infinite stages sliding sleeve is repositioned, step 5 is carried out)~8).
When there is sand plug or sand is buried, it can use and just wash and two kinds of well-flushing modes of backwash.When just washing, liquid is from continuous oil It is pumped into and is flowed out through hydrajet tool nozzle in pipe, is discharged after being cleaned to sleeve pipe sand setting from sleeve gate.Due to reacting cycle Ball sealer closure in valve top connection, liquid can not be discharged through the backwash hole on reverse circulation valve outer barrel.During backwash, liquid is from sleeve pipe It is pumped into, enters coiled tubing by the backwash hole on reverse circulation valve.Because the ball sealer in reverse circulation valve top connection does not rise now Effect, liquid can be discharged from this after entering coiled tubing from coiled tubing.
The sleeve pipe infinite stages staged fracturing method of the present invention is to will be equipped with mechanical collar locator and repeatable setting deblocking The fracturing string of instrument is by the way that in coiled tubing G.I.H sleeve pipe, infinite stages sliding sleeve is opened using the positioning of mechanical collar locator Pressing crack construction is carried out, pressure break well section is insulated using repeatable setting unsealing tool.Due to not limiting the series of pressure break, Ke Yiman The larger pressure break scale of foot needs, and shortens the pressing crack construction cycle, reduces production cost, has for improving oil gas field recovery ratio Positive effect.

Claims (3)

1. a kind of sleeve pipe infinite stages staged fracturing method, it is characterised in that comprise the following steps:
1) setting of casing well cementation tubing string;Described sleeve pipe well cementation tubing string include from shaft bottom to well head set float shoe (4), float collar (3) and In the spaced more piece sleeve pipe (1) of horizontal segment and multiple infinite stages sliding sleeves (2), near well head at be provided that sleeve pipe (1) And it extends to well head from horizontal segment always;Further respectively had between the single infinite stages sliding sleeve (2) and sleeve pipe (1) two short Sleeve pipe (12);
2) service aid is to artificial bottom of a well under;The service aid connects successively from top to bottom to be connected to coiled tubing (5) lower end The jointing (6) that connects, give up (7), centralizer (8), hydrajet tool (9), reverse circulation valve (10), repeat setting deblocking Instrument (11), mechanical collar locator (13) and seeker (15);
3) coiled tubing (5) is above carried to position bottom infinite stages sliding sleeve (2);The mechanical collar locator (13) Through connection short sleeve (12) casing coupling (14) place when can produce load fluctuation, the service aid is determined by load fluctuation Whether the position of bottom infinite stages sliding sleeve (2) is in;
4) it is the repeatable setting unsealing tool (11) is setting in the bottom infinite stages sliding sleeve (2), and between upper and lower Between through hole (207,208);The infinite stages sliding sleeve (2) includes top connection (201), central tube (202), piston (209), lock ring (210), outer barrel (203), adapter sleeve (206) and lower contact (205), central tube (202) upper end are caught in top connection (201), And both longitudinal correspondence positions are equipped with sandblasting hole (213);Outer barrel (203) upper end is connected by screw thread and top connection (201) Connect, lower end is connected by adapter sleeve (206) with lower contact (205);Withstand central tube (202) in lower contact (205) top;Institute Stating outer barrel (203) and the connecting portion card of top connection (201) has lock ring (210);Piston (209) outer surface is provided with pawl, It can be stuck on the lock ring (210), be retreated after preventing piston (209) descending;The central tube (202) and top connection (201) and The cavity volume (212) for accommodating piston (209) is formed between outer barrel (203);The piston (209) is fixed on by shear pin (211) Between central tube (202) and top connection (201), the sandblasting hole (213) is closed, and the length of piston (209) is less than described hold Length of chamber (212) bottom to the sandblasting hole (213) lower edge;Space is left at top when the piston (209) is fixed, it is described in The position in heart pipe (202) the correspondence space is provided with upper through hole (207);The central tube (202) is on the downside of the cavity volume (212) Provided with lower through-hole (208);
5) pressure break;After the repeatable setting unsealing tool (11) is completely setting, annular space is suppressed, and pressure passes through upper through hole (207) The upper surface of piston (209) is acted on, then promotes piston (209) descending and is stuck on lock ring (210), the top connection (201) connected with the sandblasting hole (213) on central tube (202), so as to establish the passage linked up with stratum;Sand fracturing;
6) treat after the completion of pressure break, above carry the coiled tubing (5), unseal the repeatable setting unsealing tool (11);
7) utilize step 3) method, infinite stages sliding sleeve (2) is positioned upwards successively;
8) repeat step 4)~7), until full well section pressure break is completed.
2. sleeve pipe infinite stages staged fracturing method as claimed in claim 1, it is characterised in that:Set at the top of the lower contact (205) There is first step, central tube (202) bottom is provided with the second step matched with the first step, and first step is by second Rank holds out against.
3. sleeve pipe infinite stages staged fracturing method as claimed in claim 1, it is characterised in that:If some infinite stages sliding sleeve (2) nothing When method is normally opened, i.e., when described top connection (201) can not connect with the sandblasting hole (213) on central tube (202), work will be serviced Carried on tool to the sleeve pipe (1) of infinite stages sliding sleeve (2) upper end that can not normally open, by repeatable setting unsealing tool (11) seat It is encapsulated in sleeve pipe (1), avoids casing coupling (14) and sleeve pipe (1) is carried out to add sand blasting to penetrate, sleeve pipe (1) is penetrated out into rear annular space is added Sand pressure break;After the completion of, a upper infinite stages sliding sleeve is repositioned, step 5 is carried out)~8).
CN201510307413.9A 2015-06-05 2015-06-05 Infinite stage sectional fracturing method for casing Active CN104929603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510307413.9A CN104929603B (en) 2015-06-05 2015-06-05 Infinite stage sectional fracturing method for casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510307413.9A CN104929603B (en) 2015-06-05 2015-06-05 Infinite stage sectional fracturing method for casing

Publications (2)

Publication Number Publication Date
CN104929603A CN104929603A (en) 2015-09-23
CN104929603B true CN104929603B (en) 2017-07-11

Family

ID=54116996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510307413.9A Active CN104929603B (en) 2015-06-05 2015-06-05 Infinite stage sectional fracturing method for casing

Country Status (1)

Country Link
CN (1) CN104929603B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639968A (en) * 2015-10-30 2017-05-10 中石化石油工程技术服务有限公司 Multi-cluster infinite-order well cementation segmentation fracturing string and fracturing method
CN106640014A (en) * 2015-10-30 2017-05-10 中石化石油工程技术服务有限公司 Counting type infinite class multi cluster full path sectional fracturing slip sleeve
CN105952418B (en) 2016-06-29 2019-02-15 西南石油大学 An intelligent on-off valve for reservoir reconstruction, production monitoring and control and its construction method
CN108571306B (en) * 2017-03-09 2020-06-26 中国石油化工股份有限公司 Sliding sleeve, fracturing tool and fracturing method
CN109707358B (en) * 2017-10-25 2023-09-05 中海石油(中国)有限公司上海分公司 Fracturing string and fracturing method thereof
CN107701147B (en) * 2017-10-26 2023-11-10 中国石油大学(北京) An annular pressure downhole control valve
CN108868732B (en) * 2018-07-26 2020-11-06 东北石油大学 Coiled tubing stratified fracturing system tool and its stratified fracturing method
CN110748336B (en) * 2019-08-06 2024-01-23 中国石油天然气集团有限公司 Magnetic signal control electromagnetic force driving mechanical positioner and method
CN111472738A (en) * 2020-03-12 2020-07-31 中国石油天然气股份有限公司 Switchable well cementation sliding sleeve water control fracturing method for horizontal well
CN114075961B (en) * 2020-08-19 2024-08-27 中国石油天然气股份有限公司 Fracturing tool, fracturing process string and horizontal well fracturing construction method
CN114427420B (en) * 2020-09-25 2024-03-22 中国石油化工股份有限公司 Stage fracturing sliding sleeve of unlimited full-drift-diameter oil-gas well
CN114482958B (en) * 2020-10-26 2024-06-18 中国石油化工股份有限公司 Casing well cementation full-drift diameter infinite stage fracturing completion device and fracturing completion method thereof
CN112780227B (en) * 2021-02-20 2023-06-23 中海油能源发展股份有限公司 Infinite-level well cementation sliding sleeve capable of preventing cement from being solidified and assembling and operating method thereof
CN113266329B (en) * 2021-06-11 2023-04-07 中煤科工集团西安研究院有限公司 Intelligent infinite-grade segmental hydraulic fracturing system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924905U (en) * 2010-12-23 2011-08-10 中国石油集团渤海钻探工程有限公司 Differential pressure open sliding sleeve for horizontal well fracturing
CN202788753U (en) * 2012-09-18 2013-03-13 中国石油集团渤海钻探工程有限公司 Differential-pressure sliding sleeve for staged fracturing of sidetrack horizontal wells
CN204002746U (en) * 2014-08-23 2014-12-10 中国石油集团渤海钻探工程有限公司 Coiled tubing infinite stages fracturing sliding bush

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8127847B2 (en) * 2007-12-03 2012-03-06 Baker Hughes Incorporated Multi-position valves for fracturing and sand control and associated completion methods
US9562409B2 (en) * 2010-08-10 2017-02-07 Baker Hughes Incorporated Downhole fracture system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924905U (en) * 2010-12-23 2011-08-10 中国石油集团渤海钻探工程有限公司 Differential pressure open sliding sleeve for horizontal well fracturing
CN202788753U (en) * 2012-09-18 2013-03-13 中国石油集团渤海钻探工程有限公司 Differential-pressure sliding sleeve for staged fracturing of sidetrack horizontal wells
CN204002746U (en) * 2014-08-23 2014-12-10 中国石油集团渤海钻探工程有限公司 Coiled tubing infinite stages fracturing sliding bush

Also Published As

Publication number Publication date
CN104929603A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN104929603B (en) Infinite stage sectional fracturing method for casing
CN204060661U (en) A kind of coiled tubing multistage fracturing tool tubing string
CN108166965B (en) Sand blasting perforation, fracturing and packing integrated device
CN105507865B (en) The method of refracturing for oil gas water well
CN104563998A (en) Multistage fracturing tool pipe column of continuous oil pipe and construction method
CN105178947A (en) An integrated method for finding and plugging water in horizontal wells
CN111271036B (en) Liquid nitrogen fracturing process
CN108625830B (en) Ball throwing type layering sand prevention process pipe column and method thereof
CN110454129A (en) Gas well separate-layer fracturing and water control integrated process pipe column
CN105840166A (en) Horizontal well fracturing gas testing and well completion technology adopting completely dissoluble bridge plug
CN105888639A (en) Feeding-controlling full-bore sliding sleeve sectional fracturing tube column
CN111425148B (en) Casing pipe column applying toe end sliding sleeve to full-diameter sliding sleeve and application method thereof
CN101864922A (en) Compression type dual-sealing open hole packer
CN204113261U (en) A layered fracturing string
CN108301785A (en) A sand control completion pipe string and method
CN111058817B (en) Multi-section perforation fracturing horizontal well shaft integrity recovery method
CN104100249B (en) Casing slide for unlimited number of fracturing
CN206668234U (en) A kind of ball-throwing type selective sand control process pipe string
CN106593387B (en) Method for realizing staged multi-cluster fracturing of horizontal well
CN108240205B (en) Downhole casing double-stage cone expansion device and its operating method
CN202500541U (en) Gas well vertical well multi-stage layered fracturing process string
CN105134131A (en) A cementing casing or tubing sliding sleeve with unlimited segments and clusters
CN111485849B (en) Casing hydraulic packer
CN201778771U (en) Integrated string for hydrojet layered fracturing without moving string
CN2856407Y (en) Horizontal well perforation and fracturing combined string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ding Keyu

Inventor after: Yang Yongqing

Inventor after: Guo Ming

Inventor after: Wang Yao

Inventor after: Cheng Zhiyuan

Inventor after: Xu Yulong

Inventor after: Li Mei

Inventor after: He Zhiyong

Inventor after: Zhang Yongzhong

Inventor after: Liu Zhibin

Inventor after: Yao Weidong

Inventor after: Sun Xin

Inventor before: Ding Keyu

Inventor before: Yang Yongqing

Inventor before: Guo Ming

Inventor before: Wang Yao

Inventor before: Cheng Zhiyuan

Inventor before: Xu Yulong

Inventor before: Li Mei

Inventor before: He Zhiyong

Inventor before: Zhang Yongzhong

Inventor before: Liu Zhibin

Inventor before: Yao Weidong

Inventor before: Sun Xin

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210824

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Development Zone Huanghai Road 106, Bohai Drilling Engineering Co., Ltd. science and Technology Development Office

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right