CN104878926A CN201510335359.9A CN201510335359A CN104878926A CN 104878926 A CN104878926 A CN 104878926A CN 201510335359 A CN201510335359 A CN 201510335359A CN 104878926 A CN104878926 A CN 104878926A
Authority
CN
China
Prior art keywords
flute
main
support
formwork
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510335359.9A
Other languages
Chinese (zh)
Other versions
CN104878926B (en
Inventor
张具林
梅江涛
全有维
沈兴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201510335359.9A priority Critical patent/CN104878926B/en
Publication of CN104878926A publication Critical patent/CN104878926A/en
Application granted granted Critical
Publication of CN104878926B publication Critical patent/CN104878926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a suspended template system construction method and turnover brackets. The suspended template system construction method comprises steps as follows: performing stress calculation, determining component models and layout, mounting and adjusting the turnover brackets, mounting main ridges and auxiliary ridges, laying templates on the auxiliary ridges, binding reinforcing steel bars to the templates, pouring concrete, dismounting the main ridges at intervals, sequentially dismounting the auxiliary ridges and the templates and the like. Each turnover bracket comprises a bracket body, a supporting rod, a fixing base, a locking bolt and other components. According to the suspended template system construction method and the turnover brackets, the on-site construction and mounting operation is convenient, the construction efficiency is high, welding and cutting operation is avoided, and turnover of the brackets can be completely realized for use.

Description

一种悬挂模板体系施工方法及可周转支托A construction method of a suspended formwork system and a turnable support

技术领域 technical field

本发明涉及一种模板施工方法及施工工具,尤其是一种用于悬挂模板体系的施工方法及支托。 The invention relates to a formwork construction method and a construction tool, in particular to a construction method and a support for a suspended formwork system.

背景技术 Background technique

目前,随着城市高层结构中H型钢梁+钢筋混凝土楼板的梁板设计出现,出现了一种新型的模架体系:型钢悬挂模板。型钢悬挂模板充分利用先安装的H型钢梁,在其上设置钢筋吊环,按照设计的间距安放型钢,在型钢上部敷设方木模板。其中作为型钢的受力构件钢筋吊环在每层楼板浇筑完成后,锚固部位已浇筑在混凝土内,其外留的均需要采用乙炔切割拆除。该项操作将造成一定量的人工和材料投入、而且是动火作业,吊环材料也不可周转。 At present, with the emergence of the beam-slab design of H-shaped steel beams and reinforced concrete floors in urban high-rise structures, a new type of formwork system has emerged: section steel suspension formwork. The shaped steel suspension formwork makes full use of the H-shaped steel beams installed first, sets the steel bar suspension rings on it, places the shaped steel according to the designed spacing, and lays the square wooden formwork on the upper part of the shaped steel. Among them, the steel bar suspension ring, which is the stressed component of the section steel, has been poured in the concrete after the pouring of each floor slab is completed, and the remaining parts need to be removed by cutting with acetylene. This operation will cause a certain amount of labor and material input, and it is a hot work, and the ring material cannot be turned over.

发明内容 Contents of the invention

发明目的:本发明的目的在于现有的悬挂模板体系施工方法需要安装不可拆卸的吊环,费时、费力且不可周转使用。 Purpose of the invention: The purpose of the present invention is that the existing construction method of the suspended formwork system needs to install non-detachable suspension rings, which is time-consuming, laborious and cannot be used repeatedly.

技术方案:本发明所述的悬挂模板体系施工方法,包括如下步骤: Technical solution: The construction method of the suspended formwork system according to the present invention includes the following steps:

步骤1,根据建筑结构本身的主钢梁间距、楼面钢筋混凝土自重以及施工荷载参数进行受力计算,确定模板厚度、可周转支托型号、主楞型号、次楞型号、主楞间距以及次楞间距; Step 1. According to the main steel girder spacing of the building structure itself, the self-weight of the reinforced concrete on the floor and the construction load parameters, the force calculation is performed to determine the thickness of the formwork, the model of the turnable support, the model of the main flute, the model of the secondary flute, the spacing of the main flute and the secondary flute. flute spacing;

步骤2,对主楞位置进行放线定位,将可周转支托的底座安装于各个定位处的主钢梁下翼板上; Step 2: Carry out setting-out positioning for the position of the main flute, and install the base of the turnable support on the lower flange of the main steel beam at each position;

步骤3,调节可周转支托的支撑高度,使可周转支托的托顶距主钢梁上翼缘板高度=模板厚度+次楞高度+主楞高度,且高度误差小于2mm; Step 3, adjust the support height of the turnable support, so that the height of the support top of the turnable support from the upper flange plate of the main steel beam = template thickness + secondary flute height + main flute height, and the height error is less than 2mm;

步骤4,在主楞上设置用于定位次楞的扣件,且位于同一主楞上的扣件的间距与次楞间距相同; Step 4, setting fasteners for positioning the secondary flute on the main flute, and the spacing of the fasteners on the same main flute is the same as the spacing of the secondary flute;

步骤5,利用缆绳从主楞两端进行吊装,使主楞两端分别放置于相邻两根主钢梁对应位置处的两个可周转支托的托顶上,并对各个主楞进行编号; Step 5: Use cables to hoist from both ends of the main flute, so that the two ends of the main flute are respectively placed on the tops of the two turnable supports at the corresponding positions of the two adjacent main steel beams, and each main flute is numbered ;

步骤6,将次楞垂直安装在主楞上,且次楞嵌于各个主楞相同位置处的扣件上; Step 6, vertically install the secondary flute on the main flute, and the secondary flute is embedded on the fasteners at the same position of each main flute;

步骤7,在次楞上铺设模板,且模板的安装方向与次楞相垂直,并相对固定模板和次楞; Step 7, laying the formwork on the secondary flute, and the installation direction of the formwork is perpendicular to the secondary flute, and relatively fixing the formwork and the secondary flute;

步骤8,在模板上方绑扎钢筋,并浇筑混凝土。 Step 8, binding steel bars above the formwork and pouring concrete.

采用安装可周转支托对各个主楞进行支撑,并根据需要调节主楞的高度,不仅避免使用不可拆卸的吊环,而且方便调节,施工精度高;采用在主楞上设置扣件能够方便定位次楞位置,有效提高了次楞施工的效率;采用对各个主楞进行编号能够方便其他相同施工结构的周转使用,进一步提高了整体施工效率;将模板和次楞相对固定,能够防止施工过程中模板翘起和移动。 The installation of revolvable supports is used to support each main flute, and the height of the main flute can be adjusted according to the needs, which not only avoids the use of non-detachable lifting rings, but also facilitates adjustment and high construction accuracy; the use of fasteners on the main flute can facilitate the positioning of the secondary The location of the flute effectively improves the efficiency of the construction of the secondary flute; the use of numbering each main flute can facilitate the turnover of other similar construction structures, and further improves the overall construction efficiency; relatively fixing the formwork and the secondary flute can prevent the formwork from being damaged during the construction process. Tilt and move.

作为本发明施工方法的进一步改进方案,还包括如下步骤: As a further improvement of the construction method of the present invention, it also includes the following steps:

步骤9,在达到拆模要求后,间隔拆除主楞; Step 9, after meeting the form removal requirements, remove the main flute at intervals;

步骤10,依次拆除次楞和模板,并分离模板和次楞,同时对模板和次楞进行编号。 Step 10, remove the secondary flute and formwork in sequence, separate the formwork and secondary flute, and number the formwork and secondary flute at the same time.

采用间隔拆除主楞能够有效防止次楞和模板大面积脱落,提高了模板拆除的安全性;采用对模板和次楞进行编号能够方便其他相同施工结构的周转使用,进一步提高了整体施工效率。 Removing the main flute at intervals can effectively prevent the secondary flute and formwork from falling off in a large area, improving the safety of formwork removal; adopting numbering of formwork and secondary flute can facilitate the turnover of other similar construction structures, and further improve the overall construction efficiency.

作为本发明的进一步限定方案,在步骤5中,可周转支托的托顶支撑点至少远离主楞相应端100mm。该设计要求能够有效防止主楞脱落,进一步提高了主楞施工的安全性。 As a further limiting solution of the present invention, in step 5, the support point of the revolvable support is at least 100 mm away from the corresponding end of the main flute. This design requirement can effectively prevent the main flute from falling off, further improving the safety of the main flute construction.

作为本发明施工方法的进一步限定方案,在步骤6中,将各列前后两根对接次楞的对接处互相错开,且对接处均位于主楞上方。该设计能够提高次楞施工安装的稳固性,防止在次楞对接处出现断裂。 As a further limiting scheme of the construction method of the present invention, in step 6, the butt joints of the two butt-joint secondary flutes in each column are staggered from each other, and the butt joints are all located above the main flute. This design can improve the stability of the corrugated construction and installation, and prevent breakage at the butt joints of the corrugated corrugated.

作为本发明施工方法的进一步限定方案,在步骤7中,将各模板对接处均设置于次楞上方,且对接处缝隙宽度小于3mm。该设计要求能够提高次楞施工安装的稳固性,防止在模板对接处出现断裂。 As a further limiting scheme of the construction method of the present invention, in step 7, the joints of each formwork are arranged above the second flute, and the gap width at the joints is less than 3mm. This design requirement can improve the stability of corrugated construction and installation, and prevent fractures at the formwork joints.

作为本发明施工方法的进一步限定方案,在各模板对接处粘贴胶带。采用胶带粘贴在模板对接处,能够防止从各模板对接缝隙处漏浆。 As a further limiting scheme of the construction method of the present invention, tapes are pasted at the joints of the templates. Adhesive adhesive tape is used to paste the joints of the templates to prevent slurry leakage from the joints of the templates.

本发明还提供了一种用于悬挂模板体系施工方法的可周转支托,包括支托、支撑杆、固定座以及锁紧螺栓;在支托底部设有垂直向下的上螺纹套管;在支撑杆的上下两端分别设有上螺纹和下螺纹;固定座为C形结构,并在固定座的上侧板上方设有下螺纹套管;锁紧螺栓旋合在固定座的下侧板上,并在锁紧螺栓的顶部设有压板;压板介于固定座的上侧板和下侧板之间;上螺纹和下螺纹分别与上螺纹套管和下螺纹套管相旋合。采用支托、支撑杆以及固定座构成一个可拆卸的托举结构,方便在悬挂模板施工后拆除周转使用,避免钢材料的浪费,同时也能够避免动火作业,提高了施工效率;采用锁紧螺栓能够在施工时对支托装置的位置相对固定,提高了本装置的施工安全性和稳定性。 The present invention also provides a turnable support used for the construction method of the suspended formwork system, including a support, a support rod, a fixing seat and a locking bolt; a vertically downward upper threaded sleeve is arranged at the bottom of the support; The upper and lower ends of the support rod are respectively provided with upper and lower threads; the fixed seat is a C-shaped structure, and a lower threaded sleeve is provided above the upper side plate of the fixed seat; the locking bolt is screwed on the lower side plate of the fixed seat and a pressure plate is arranged on the top of the locking bolt; the pressure plate is interposed between the upper side plate and the lower side plate of the fixing seat; the upper thread and the lower thread are screwed with the upper threaded sleeve and the lower threaded sleeve respectively. Support brackets, support rods and fixed seats are used to form a detachable lifting structure, which is convenient for dismantling and turnover after the construction of the hanging formwork, avoiding the waste of steel materials, and at the same time avoiding hot work and improving construction efficiency; using locking The bolts can relatively fix the position of the supporting device during construction, which improves the construction safety and stability of the device.

作为本发明可周转支托的进一步限定方案,还包括至少一个调节套筒,在调节套筒的上端设有内螺纹孔,下端设有外螺纹柱。采用调节套筒能够延长调节支撑杆的长度,从而使本装置具有更好的高度适应能力。 As a further limiting solution of the revolving support of the present invention, it also includes at least one adjusting sleeve, an internally threaded hole is provided at the upper end of the adjusting sleeve, and an externally threaded post is provided at the lower end. The adjustment sleeve can extend the length of the adjustment support rod, so that the device has better height adaptability.

作为本发明可周转支托的进一步限定方案,在支撑杆上设有与支撑杆相垂直的旋转把手。采用旋转把手能够方便人工手动快速旋转支撑杆,提高了施工效率。 As a further limiting solution of the revolving support of the present invention, a rotating handle perpendicular to the support rod is provided on the support rod. The use of the rotating handle can facilitate the rapid manual rotation of the support rod, which improves the construction efficiency.

作为本发明可周转支托的进一步限定方案,在固定座的下侧板上设有内螺纹套管,锁紧螺栓与内螺纹套管相旋合。采用内螺纹套管能够进一步提高锁紧螺栓的固定性能。 As a further limiting solution of the revolvable support of the present invention, an internally threaded sleeve is provided on the lower side plate of the fixing seat, and the locking bolt is screwed into the internally threaded sleeve. The use of the inner threaded sleeve can further improve the fixing performance of the locking bolt.

本发明与现有技术相比,其有益效果是:(1)采用安装可周转支托对各个主楞进行支撑,并根据需要调节主楞的高度,不仅避免使用不可拆卸的吊环,而且方便调节,施工精度高;(2)采用在主楞上设置扣件能够方便定位次楞位置,有效提高了次楞施工的效率;(3)采用对各个主楞进行编号能够方便其他相同施工结构的周转使用,进一步提高了整体施工效率;(4)将模板和次楞相对固定,能够防止施工过程中模板翘起和移动。 Compared with the prior art, the present invention has the beneficial effects as follows: (1) The installation of the revolvable support is used to support each main flute, and the height of the main flute can be adjusted according to the needs, which not only avoids the use of non-detachable lifting rings, but also facilitates adjustment , high construction accuracy; (2) Using fasteners on the main flute can easily locate the position of the secondary flute, effectively improving the efficiency of the construction of the secondary flute; (3) Using numbering for each main flute can facilitate the turnover of other identical construction structures (4) Relatively fixing the formwork and the second flute can prevent the formwork from lifting and moving during the construction process.

附图说明 Description of drawings

图1为本发明的施工方法流程示意图; Fig. 1 is the schematic flow sheet of construction method of the present invention;

图2为本发明的可周转支托结构示意图。 Fig. 2 is a schematic diagram of the structure of the revolvable support of the present invention.

图中,1、支托,2、支撑杆,3、调节套筒,4、固定座,5、上螺纹套管,6、上螺纹,7、下螺纹,8、旋转把手,9、外螺纹柱,10、下螺纹套管,11、内螺纹套管,12、锁紧螺栓,13、压板。 In the figure, 1. Support bracket, 2. Support rod, 3. Adjusting sleeve, 4. Fixing seat, 5. Upper threaded sleeve, 6. Upper thread, 7. Lower thread, 8. Rotary handle, 9. External thread Column, 10, lower threaded casing, 11, internally threaded casing, 12, locking bolt, 13, pressing plate.

具体实施方式 Detailed ways

下面结合附图对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。 The technical solutions of the present invention will be described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the embodiments.

实施例1: Example 1:

如图1所示,本发明的悬挂模板体系施工方法,包括如下步骤: As shown in Figure 1, the hanging formwork system construction method of the present invention comprises the following steps:

步骤1,根据建筑结构本身的主钢梁间距、楼面钢筋混凝土自重以及施工荷载参数进行受力计算,确定模板厚度、可周转支托型号、主楞型号、次楞型号、主楞间距以及次楞间距; Step 1. According to the main steel girder spacing of the building structure itself, the self-weight of the reinforced concrete on the floor and the construction load parameters, the force calculation is performed to determine the thickness of the formwork, the model of the turnable support, the model of the main flute, the model of the secondary flute, the spacing of the main flute and the secondary flute. flute spacing;

步骤2,对主楞位置进行放线定位,将可周转支托的底座安装于各个定位处的主钢梁下翼板上,可在隐蔽或被下道工序覆盖的定位处设置标识,设置的标识应清洁,不得污染其它部位; Step 2: Carry out setting-out positioning for the position of the main flute, install the base of the turnable support on the lower flange of the main steel beam at each position, and set signs at positions that are concealed or covered by the next process. The mark should be clean and not contaminate other parts;

步骤3,调节可周转支托的支撑高度,使可周转支托的托顶距主钢梁上翼缘板高度=模板厚度+次楞高度+主楞高度,且高度误差小于2mm,在可周转支托安装完成后应逐个检查验收,保证其已固定牢固,标高偏差也符合要求; Step 3: Adjust the supporting height of the turnable support so that the height of the support top of the turnable support from the upper flange plate of the main steel beam = template thickness + secondary flute height + main flute height, and the height error is less than 2mm. After the installation is completed, it should be checked and accepted one by one to ensure that it is fixed firmly and the elevation deviation meets the requirements;

步骤4,在主楞上设置用于定位次楞的扣件,且位于同一主楞上的扣件的间距与次楞间距相同,主楞可采用Q345B工字钢,加工长度=相应净跨-100mm,扣件为U形,直接焊接在主楞上; Step 4: Install fasteners on the main flute for positioning the secondary flute, and the spacing between the fasteners on the same main flute is the same as that of the secondary flute. The main flute can be made of Q345B I-beam, and the processing length = corresponding clear span - 100mm, the fastener is U-shaped, directly welded on the main flute;

步骤5,利用缆绳从主楞两端进行吊装,使主楞两端分别放置于相邻两根主钢梁对应位置处的两个可周转支托的托顶上,并对各个主楞进行编号,要求可周转支托的托顶支撑点至少远离主楞相应端100mm; Step 5: Use cables to hoist from both ends of the main flute, so that the two ends of the main flute are respectively placed on the tops of the two turnable supports at the corresponding positions of the two adjacent main steel beams, and each main flute is numbered , it is required that the top support point of the turnable support should be at least 100mm away from the corresponding end of the main corrugation;

步骤6,将次楞垂直安装在主楞上,且次楞嵌于各个主楞相同位置处的扣件上,次楞可采用方木,次楞悬挑长度不宜过长,否则应加密主楞,要求将各列前后两根对接次楞的对接处互相错开,且对接处均位于主楞上方; Step 6. Vertically install the secondary flute on the main flute, and the secondary flute is embedded on the fasteners at the same position of each main flute. The secondary flute can be made of square wood. The cantilever length of the secondary flute should not be too long, otherwise the main flute should be encrypted , it is required to stagger the butt joints of the two butt joints of the front and rear of each row, and the butt joints are all located above the main flute;

步骤7,在次楞上铺设模板,且模板的安装方向与次楞相垂直,并相对固定模板和次楞,模板可采用高分子塑料模板,模板与筒体之间的缝隙可采用泡沫胶填堵,要求将各模板对接处均设置于次楞上方,且对接处缝隙宽度小于3mm,在各模板对接处粘贴胶带; Step 7. Lay the formwork on the secondary flute, and the installation direction of the formwork is perpendicular to the secondary flute, and relatively fix the formwork and the secondary flute. The formwork can be made of polymer plastic formwork, and the gap between the formwork and the cylinder can be filled with foam glue Blocking, it is required to set the joints of each formwork above the secondary corrugated, and the gap width of the joints is less than 3mm, and stick tape on the joints of each formwork;

步骤8,在模板上方绑扎钢筋,并需要经过各方验收合格,再按照设计强度等级、楼板厚度浇筑混凝土,浇筑过程中,混凝土必须及时摊铺开来,振捣密实,严禁堆载过高,混凝土浇捣后,必须及时用刮尺,将多余浮浆层刮除,按测设的标高控制点,将混凝土表面刮拍平整,在混凝土初凝和终凝前,分别对表面进行抹压,并及时进行覆盖养护; Step 8: Bind the steel bars above the formwork and pass the acceptance of all parties, and then pour concrete according to the design strength level and floor thickness. During the pouring process, the concrete must be spread in time, vibrated and compacted, and it is strictly forbidden to pile up too high. After the concrete is poured and tamped, the excess laitance layer must be scraped off in time with a scraper, and the surface of the concrete should be scraped and leveled according to the elevation control point set. And timely cover maintenance;

步骤9,在楼板混凝土强度达到拆模强度规定并下达拆模令后,通过两个移动工作架上的施工人员间隔拆除主楞,要求同时降低同一主楞两端的两个可周转支托的高度,并将主楞两端放置于相邻两根主钢梁的下翼板上,再由上下各两名施工人员将主楞转运放置下来到楼面上; Step 9: After the concrete strength of the floor slab reaches the required formwork removal strength and a form removal order is issued, the construction workers on the two mobile working frames are required to remove the main flute at intervals, and it is required to reduce the height of the two turnable supports at both ends of the same main flute at the same time , and place the two ends of the main flute on the lower flanges of two adjacent main steel beams, and then two construction workers at the top and bottom will transfer and place the main flute down to the floor;

步骤10,依次拆除次楞和模板,当主楞拆除后,次楞和模板将靠自重脱离混凝土面,再分离模板和次楞,同时对模板和次楞进行编号。 Step 10, remove the secondary flute and formwork in sequence. When the main flute is removed, the secondary flute and formwork will separate from the concrete surface by their own weight, and then separate the formwork and secondary flute, and number the formwork and secondary flute at the same time.

实施例2: Example 2:

如图2所示,本发明的可周转支托包括:支托1、支撑杆2、固定座4以及锁紧螺栓12;在支托1底部设有垂直向下的上螺纹套管5;在支撑杆2的上下两端分别设有上螺纹6和下螺纹7;固定座4为C形结构,并在固定座4的上侧板上方设有下螺纹套管10;锁紧螺栓12旋合在固定座4的下侧板上,并在锁紧螺栓12的顶部设有压板13;压板13介于固定座4的上侧板和下侧板之间;上螺纹6和下螺纹7分别与上螺纹套管5和下螺纹套管10相旋合。 As shown in Figure 2, the revolvable support of the present invention includes: a support 1, a support rod 2, a fixing seat 4 and a locking bolt 12; a vertically downward upper threaded sleeve 5 is provided at the bottom of the support 1; The upper and lower ends of the support rod 2 are respectively provided with an upper thread 6 and a lower thread 7; the fixed seat 4 is a C-shaped structure, and a lower threaded sleeve 10 is provided above the upper side plate of the fixed seat 4; the locking bolt 12 is screwed together On the lower side plate of the fixed seat 4, and on the top of the locking bolt 12, a pressure plate 13 is provided; the pressure plate 13 is between the upper side plate and the lower side plate of the fixed seat 4; the upper thread 6 and the lower thread 7 are respectively connected with The upper threaded sleeve 5 and the lower threaded sleeve 10 are screwed together.

为了能够根据支撑高度的需要进行调节,本发明的支托装置还设计了至少一个调节套筒3,在调节套筒3的上端设有内螺纹孔,在其下端设有外螺纹柱9。在使用时可将上螺纹6与调节套筒3的内螺纹孔相旋合,将外螺纹柱9与下螺纹套管10相旋合,从而延长支撑杆2的高度。 In order to be able to adjust according to the needs of the supporting height, the supporting device of the present invention is also designed with at least one adjusting sleeve 3 , an internally threaded hole is arranged at the upper end of the adjusting sleeve 3 , and an externally threaded post 9 is provided at its lower end. When in use, the upper thread 6 can be screwed with the internal thread hole of the adjustment sleeve 3, and the external thread column 9 can be screwed with the lower threaded sleeve 10, thereby extending the height of the support rod 2.

为了能够方便人工手动快速旋转支撑杆2,本发明的可周转支托在支撑杆2上设有与支撑杆2相垂直的旋转把手8,优选地设置两个对称的旋转把手8。 In order to facilitate manual and quick rotation of the support rod 2 , the revolvable support of the present invention is provided with a rotation handle 8 perpendicular to the support rod 2 on the support rod 2 , preferably two symmetrical rotation handles 8 .

为了方便放置定位主楞,本发明的可周转支托在支托1的左右两侧均设有挡板,挡板与支托1共同构成U形结构。 In order to facilitate the placement and positioning of the main flute, the revolvable support of the present invention is provided with baffles on the left and right sides of the support 1, and the baffles and the support 1 together form a U-shaped structure.

为了进一步锁紧螺栓的固定性能,本发明的可周转支托在固定座4的下侧板上设有内螺纹套管11,锁紧螺栓12与内螺纹套管11相旋合。 In order to further tighten the fixing performance of the bolt, the revolvable support of the present invention is provided with an internally threaded bushing 11 on the lower side plate of the fixing seat 4 , and the locking bolt 12 is screwed with the internally threaded bushing 11 .

在具体制作时,各个部件的尺寸如下: In specific production, the dimensions of each component are as follows:

固定座4采用8mm 的Q235钢板制作,钢板制作成C型,C型的上侧板尺寸为100mm×100mm,下螺纹套管10焊接在上侧板上,且下螺纹套管10的外直径为46mm,内径为32mm,高度为40mm,内部设有内螺纹;C型的下侧板尺寸为100mm×60mm,上侧板和下侧板之间的距离为50mm。 The fixed seat 4 is made of 8mm Q235 steel plate, and the steel plate is made into a C shape. The size of the upper side plate of the C type is 100mm×100mm, and the lower threaded sleeve 10 is welded on the upper side plate, and the outer diameter of the lower threaded sleeve 10 is 46mm, inner diameter 32mm, height 40mm, with internal thread; the size of the lower side plate of C type is 100mm×60mm, and the distance between the upper side plate and the lower side plate is 50mm.

支撑杆2采用直径32mm的Q235钢杆,长度为150mm,上螺纹6和下螺纹7的长度均为40mm。 The supporting rod 2 adopts a Q235 steel rod with a diameter of 32mm, and the length is 150mm, and the lengths of the upper thread 6 and the lower thread 7 are both 40mm.

调节套筒3的上部长度为50mm(不含螺纹段),外径为46mm,内径为32mm,深度为40mm;下部螺纹柱9的长度为30mm,外径为32mm,支撑杆2根据实际钢梁设计情况增减调节套筒3。 The upper part of the adjustment sleeve 3 has a length of 50mm (not including the threaded section), an outer diameter of 46mm, an inner diameter of 32mm, and a depth of 40mm; the length of the lower threaded column 9 is 30mm, and the outer diameter is 32mm. Design situation increase and decrease adjustment sleeve 3.

支托1采用6mm的 Q235钢板制作,宽度为150mm,两边侧板高度为50mm,底部中心位置焊制外径为46mm,内径为32mm,高为40mm的上螺纹套管5,与支撑杆2进行连接。 The support 1 is made of 6mm Q235 steel plate, the width is 150mm, the height of the side plates on both sides is 50mm, and the upper threaded casing 5 with the outer diameter of 46mm, the inner diameter of 32mm and the height of 40mm is welded at the center of the bottom, and the supporting rod 2 is connected. connect.

旋转把手8的直径为5mm,长度为100mm。 The diameter of rotary handle 8 is 5mm, and length is 100mm.

锁紧螺栓12为直径M24螺栓,压板13的尺寸为60 mm×60 mm×8mm。 The locking bolt 12 is a diameter M24 bolt, and the size of the pressing plate 13 is 60 mm * 60 mm * 8mm.

本发明的可周转支托在施工时,首先在主钢梁上对主楞位置进行放线定位,接着在主楞位置的主钢梁下翼缘安装固定座4,安装时采用门式脚手架搭设移动工作架;再安装支撑杆2和上部的支托1,调节支撑杆2,使支托1的托顶标高位于设计位置,至此,可周转支托安装完成;在可周转支托安装完成后,依次安装悬挂主楞、次楞以及模板,施工后续钢筋混凝土的相关工序;在混凝土楼板强度满足拆除模板的要求时,可以拆除悬挂模板体系,拆除按照如下顺序进行:调节支撑杆2,降低支托1高度→间隔的拆除悬挂钢梁→顺序拆除木方、模板→拆除剩余钢梁→拆除固定座4。 During the construction of the revolvable support of the present invention, the main corrugated position is first set out and positioned on the main steel girder, and then the fixing seat 4 is installed on the lower flange of the main steel girder at the main corrugated position, and the portal scaffolding is used for erection during installation. Move the work frame; then install the support rod 2 and the upper support 1, adjust the support rod 2 so that the elevation of the support 1 is at the design position, so far, the installation of the revolvable support is completed; after the installation of the revolvable support , install and suspend the main flute, secondary flute and formwork in sequence, and construct the related procedures of subsequent reinforced concrete; when the strength of the concrete floor meets the requirements for dismantling the formwork, the suspended formwork system can be dismantled, and the dismantling is carried out in the following order: adjust the support rod 2, lower the support Support 1 height → remove the suspended steel beams at intervals → remove the wooden squares and formwork in sequence → remove the remaining steel beams → remove the fixing seat 4.

如上所述,尽管参照特定的优选实施例已经表示和表述了本发明,但其不得解释为对本发明自身的限制。在不脱离所附权利要求定义的本发明的精神和范围前提下,可对其在形式上和细节上作出各种变化。 As stated above, while the invention has been shown and described with reference to certain preferred embodiments, this should not be construed as limiting the invention itself. Various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (10)

1.一种悬挂模板体系施工方法,其特征在于:包括如下步骤: 1. a suspension formwork system construction method, is characterized in that: comprise the steps: 步骤1,根据建筑结构本身的主钢梁间距、楼面钢筋混凝土自重以及施工荷载参数进行受力计算,确定模板厚度、可周转支托型号、主楞型号、次楞型号、主楞间距以及次楞间距; Step 1. According to the main steel girder spacing of the building structure itself, the self-weight of the reinforced concrete on the floor and the construction load parameters, the force calculation is performed to determine the thickness of the formwork, the model of the turnable support, the model of the main flute, the model of the secondary flute, the spacing of the main flute and the secondary flute. flute spacing; 步骤2,对主楞位置进行放线定位,将可周转支托的底座安装于各个定位处的主钢梁下翼板上; Step 2: Carry out setting-out positioning for the position of the main flute, and install the base of the turnable support on the lower flange of the main steel beam at each position; 步骤3,调节可周转支托的支撑高度,使可周转支托的托顶距主钢梁上翼缘板高度=模板厚度+次楞高度+主楞高度,且高度误差小于2mm; Step 3, adjust the support height of the turnable support, so that the height of the support top of the turnable support from the upper flange plate of the main steel beam = template thickness + secondary flute height + main flute height, and the height error is less than 2mm; 步骤4,在主楞上设置用于定位次楞的扣件,且位于同一主楞上的扣件的间距与次楞间距相同; Step 4, setting fasteners for positioning the secondary flute on the main flute, and the spacing of the fasteners on the same main flute is the same as the spacing of the secondary flute; 步骤5,利用缆绳从主楞两端进行吊装,使主楞两端分别放置于相邻两根主钢梁对应位置处的两个可周转支托的托顶上,并对各个主楞进行编号; Step 5: Use cables to hoist from both ends of the main flute, so that the two ends of the main flute are respectively placed on the tops of the two turnable supports at the corresponding positions of the two adjacent main steel beams, and each main flute is numbered ; 步骤6,将次楞垂直安装在主楞上,且次楞嵌于各个主楞相同位置处的扣件上; Step 6, vertically install the secondary flute on the main flute, and the secondary flute is embedded on the fasteners at the same position of each main flute; 步骤7,在次楞上铺设模板,且模板的安装方向与次楞相垂直,并相对固定模板和次楞; Step 7, laying the formwork on the secondary flute, and the installation direction of the formwork is perpendicular to the secondary flute, and relatively fixing the formwork and the secondary flute; 步骤8,在模板上方绑扎钢筋,并浇筑混凝土。 Step 8, binding steel bars above the formwork and pouring concrete. 2.根据权利要求1所述的悬挂模板体系施工方法,其特征在于:还包括如下步骤: 2. The construction method of hanging formwork system according to claim 1, characterized in that: it also comprises the steps of: 步骤9,在达到拆模要求后,间隔拆除主楞; Step 9, after meeting the form removal requirements, remove the main flute at intervals; 步骤10,依次拆除次楞和模板,并分离模板和次楞,同时对模板和次楞进行编号。 Step 10, remove the secondary flute and formwork in sequence, separate the formwork and secondary flute, and number the formwork and secondary flute at the same time. 3.根据权利要求1或2所述的悬挂模板体系施工方法,其特征在于:在步骤5中,可周转支托的托顶支撑点至少远离主楞相应端100mm。 3. The construction method of the suspended formwork system according to claim 1 or 2, characterized in that: in step 5, the support point of the turnable support is at least 100 mm away from the corresponding end of the main flute. 4.根据权利要求1或2所述的悬挂模板体系施工方法,其特征在于:在步骤6中,将各列前后两根对接次楞的对接处互相错开,且对接处均位于主楞上方。 4. The construction method of the hanging formwork system according to claim 1 or 2, characterized in that: in step 6, the butt joints of the two butt-joint secondary flutes at the front and back of each column are staggered from each other, and the butt joints are all located above the main flute. 5.根据权利要求1或2所述的悬挂模板体系施工方法,其特征在于:在步骤7中,将各模板对接处均设置于次楞上方,且对接处缝隙宽度小于3mm。 5. The construction method of the suspended formwork system according to claim 1 or 2, characterized in that: in step 7, the butt joints of each formwork are arranged above the secondary corrugated, and the gap width at the joints is less than 3 mm. 6.根据权利要求5所述的悬挂模板体系施工方法,其特征在于:在各模板对接处粘贴胶带。 6. The construction method of the suspended formwork system according to claim 5, characterized in that adhesive tapes are pasted at the joints of each formwork. 7.一种用于权利要求1所述的悬挂模板体系施工方法的可周转支托,其特征在于:包括支托(1)、支撑杆(2)、固定座(4)以及锁紧螺栓(12);在支托(1)底部设有垂直向下的上螺纹套管(5);在支撑杆(2)的上下两端分别设有上螺纹(6)和下螺纹(7);固定座(4)为C形结构,并在固定座(4)的上侧板上方设有下螺纹套管(10);锁紧螺栓(12)旋合在固定座(4)的下侧板上,并在锁紧螺栓(12)的顶部设有压板(13);压板(13)介于固定座(4)的上侧板和下侧板之间;上螺纹(6)和下螺纹(7)分别与上螺纹套管(5)和下螺纹套管(10)相旋合。 7. A turnable support used for the construction method of the suspended formwork system according to claim 1, characterized in that it includes a support (1), a support rod (2), a fixing seat (4) and a locking bolt ( 12); at the bottom of the support (1) is provided with a vertically downward upper threaded sleeve (5); at the upper and lower ends of the support rod (2) are respectively provided with an upper thread (6) and a lower thread (7); fixed The seat (4) is a C-shaped structure, and a lower threaded sleeve (10) is provided above the upper side plate of the fixed seat (4); the locking bolt (12) is screwed on the lower side plate of the fixed seat (4) , and a pressure plate (13) is provided on the top of the locking bolt (12); the pressure plate (13) is between the upper side plate and the lower side plate of the fixing seat (4); the upper thread (6) and the lower thread (7 ) are screwed with the upper threaded sleeve (5) and the lower threaded sleeve (10) respectively. 8.根据权利要求7所述的可周转支托,其特征在于:还包括至少一个调节套筒(3),在调节套筒(3)的上端设有内螺纹孔,下端设有外螺纹柱(9)。 8. The revolvable support according to claim 7, characterized in that it further comprises at least one adjusting sleeve (3), an internally threaded hole is provided at the upper end of the adjusting sleeve (3), and an externally threaded post is provided at the lower end (9). 9.根据权利要求7所述的可周转支托,其特征在于:在支撑杆(2)上设有与支撑杆(2)相垂直的旋转把手(8)。 9. The revolvable support according to claim 7, characterized in that: a rotating handle (8) perpendicular to the support rod (2) is provided on the support rod (2). 10.根据权利要求7所述的可周转支托,其特征在于:在固定座(4)的下侧板上设有内螺纹套管(11),锁紧螺栓(12)与内螺纹套管(11)相旋合。 10. The revolvable support according to claim 7, characterized in that: an internally threaded bushing (11) is provided on the lower side plate of the fixing seat (4), and the locking bolt (12) and the internally threaded bushing (11) Phase rotation.
CN201510335359.9A 2015-06-16 2015-06-16 One kind hangs template system construction method and can have enough to meet the need rest Active CN104878926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510335359.9A CN104878926B (en) 2015-06-16 2015-06-16 One kind hangs template system construction method and can have enough to meet the need rest

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510335359.9A CN104878926B (en) 2015-06-16 2015-06-16 One kind hangs template system construction method and can have enough to meet the need rest

Publications (2)

Publication Number Publication Date
CN104878926A true CN104878926A (en) 2015-09-02
CN104878926B CN104878926B (en) 2017-10-10

Family

ID=53946583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510335359.9A Active CN104878926B (en) 2015-06-16 2015-06-16 One kind hangs template system construction method and can have enough to meet the need rest

Country Status (1)

Country Link
CN (1) CN104878926B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914268A (en) * 2019-04-23 2019-06-21 五冶集团上海有限公司 A kind of adjustable lowering device for precast beam installation
CN111502254A (en) * 2019-01-30 2020-08-07 河南天丰绿色装配集团有限公司 Hanging type formwork support-free frame for construction of beam system steel structure floor slab
CN114278341A (en) * 2022-02-16 2022-04-05 中铁一局集团有限公司 Two-lining template construction structure and method based on mine method tunnel special-shaped section
CN119434634A (en) * 2024-11-15 2025-02-14 中国建筑第八工程局有限公司 Turnover string-type post-casting strip side formwork quick-support and quick-dismantle formwork structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030167727A1 (en) * 2002-03-07 2003-09-11 Ta-Hsiung Peng Building construction method
CN101886468A (en) * 2010-03-29 2010-11-17 南京大地建设集团有限责任公司 Construction method of suspension type template support in high-position conjoined structure
CN103089004A (en) * 2013-01-31 2013-05-08 朱宏宇 Combination frame module, component frame module and tool set structure and installing and dismantling method thereof
CN103758348A (en) * 2014-02-20 2014-04-30 成军 Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN204001675U (en) * 2013-12-28 2014-12-10 温州市嘉丰建筑材料设备有限公司 Pulley-clip scaffold
CN104499715A (en) * 2014-12-08 2015-04-08 江苏中南建筑产业集团有限责任公司 Template overhanging construction method for floor system with composite structure by utilizing profiled steel beams

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030167727A1 (en) * 2002-03-07 2003-09-11 Ta-Hsiung Peng Building construction method
CN101886468A (en) * 2010-03-29 2010-11-17 南京大地建设集团有限责任公司 Construction method of suspension type template support in high-position conjoined structure
CN103089004A (en) * 2013-01-31 2013-05-08 朱宏宇 Combination frame module, component frame module and tool set structure and installing and dismantling method thereof
CN204001675U (en) * 2013-12-28 2014-12-10 温州市嘉丰建筑材料设备有限公司 Pulley-clip scaffold
CN103758348A (en) * 2014-02-20 2014-04-30 成军 Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN104499715A (en) * 2014-12-08 2015-04-08 江苏中南建筑产业集团有限责任公司 Template overhanging construction method for floor system with composite structure by utilizing profiled steel beams

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502254A (en) * 2019-01-30 2020-08-07 河南天丰绿色装配集团有限公司 Hanging type formwork support-free frame for construction of beam system steel structure floor slab
CN109914268A (en) * 2019-04-23 2019-06-21 五冶集团上海有限公司 A kind of adjustable lowering device for precast beam installation
CN109914268B (en) * 2019-04-23 2024-06-04 五冶集团上海有限公司 Adjustable unloading device for mounting precast beam plates
CN114278341A (en) * 2022-02-16 2022-04-05 中铁一局集团有限公司 Two-lining template construction structure and method based on mine method tunnel special-shaped section
CN114278341B (en) * 2022-02-16 2024-02-27 中铁一局集团有限公司 Two-lining template construction structure and method based on mine tunnel special-shaped section
CN119434634A (en) * 2024-11-15 2025-02-14 中国建筑第八工程局有限公司 Turnover string-type post-casting strip side formwork quick-support and quick-dismantle formwork structure and construction method thereof

Also Published As

Publication number Publication date
CN104878926B (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN106065681B (en) It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN102392536A (en) Construction method for long-span hanging vestibule type template support system
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN104878926B (en) One kind hangs template system construction method and can have enough to meet the need rest
CN110485742A (en) A kind of positioning device and construction method of the pre-buried pedestal anchor bolt in isolated footing
CN103590603A (en) Large-span multi-curvature thin shell reinforced concrete structure construction method
CN202090605U (en) Tool type floor evenness and floor slab negative reinforcement protecting layer control device
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN114770706B (en) A kind of light T-beam prefabricated equipment and prefabricated installation and construction method
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN203403670U (en) unsupported formwork system
CN111663770B (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN108678193B (en) Post-cast strip and construction method thereof
CN111535545B (en) Construction process of large-area concrete wear-resistant terrace
CN105952140B (en) Tool-type steel framework Wood-plastic formwork system and its construction technology for cast-in-place concrete
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN107401279A (en) Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method
CN109457960B (en) Adjustable universal mold for integrally assembling cast-in-situ stair steps
CN110258890A (en) A kind of broken line type exterior wall is connected the construction method of concrete structure with roofing
CN110593477A (en) A Construction Method of Cast-in-situ Reinforced Concrete Special-shaped Inclined Slab
CN210597794U (en) Connecting device of prefabricated plate
CN103397778A (en) Method for constructing high-rise commercial and residential building structure transfer floor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant