[go: up one dir, main page]

CN104819375A - Novel production line sectional material - Google Patents

Novel production line sectional material Download PDF

Info

Publication number
CN104819375A
CN104819375A CN201510237151.3A CN201510237151A CN104819375A CN 104819375 A CN104819375 A CN 104819375A CN 201510237151 A CN201510237151 A CN 201510237151A CN 104819375 A CN104819375 A CN 104819375A
Authority
CN
China
Prior art keywords
lateral side
stiffening rib
rectangle
section bar
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510237151.3A
Other languages
Chinese (zh)
Inventor
冯俊龙
李青
李业勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yin Yida Aluminum Co Ltd
Original Assignee
Jiangsu Yin Yida Aluminum Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yin Yida Aluminum Co Ltd filed Critical Jiangsu Yin Yida Aluminum Co Ltd
Priority to CN201510237151.3A priority Critical patent/CN104819375A/en
Publication of CN104819375A publication Critical patent/CN104819375A/en
Pending legal-status Critical Current

Links

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

The invention discloses a novel production line sectional material. The novel production line sectional material comprises a main body which has a rectangular cross-section structure. the rectangle comprises a first lateral side, a second lateral side, a third lateral side and a fourth lateral side which are adjacent in sequence; two first reinforcing ribs are arranged between the second lateral side and the fourth lateral side; the two first reinforcing ribs are parallel with each other, and the first reinforcing rib and the first lateral side are parallel with each other; the two first reinforcing rib separates the inner part of the rectangle into three cavities; the first lateral side, the second lateral side, the third lateral side and the fourth lateral side are provided with multiple mounting slots used for installation of a conveyor belt. Through the way mentioned above, the novel production line sectional material is simple in structure, not easy to deform, higher in bearing capacity of unit area, low in material cost, light in weight, good in economic benefit and good in use effect.

Description

A kind of Novel hydroelectric line section bar
Technical field
The present invention relates to section bar field, particularly relate to a kind of Novel hydroelectric line section bar.
Background technique
The internal structure of existing production line section bar, there is lateral cross section structure as shown in Figure 1 more, namely the stiffening rib of its inside is criss-crossing reinforcing ribs 1, the interior separation of section bar is four cavitys 2 by criss-crossing reinforcing ribs 1, because these section bars are all by extruded, in extruded process, criss-crossing reinforcing ribs 1 easily deforms.
Summary of the invention
The technical problem that the present invention mainly solves be to provide a kind of structure simply, bearing capacity that is not yielding, per unit volume is higher, the cost of material is low, lightweight, good in economic efficiency, using effect is good Novel hydroelectric line section bar.
For solving the problems of the technologies described above, the invention provides a kind of Novel hydroelectric line section bar, comprise: body, described body is provided with the cross section structure of rectangle, described rectangle comprises first side adjacent successively, second side, 3rd side and four side, two first stiffening ribs are provided with between described second side and four side, described two first stiffening ribs are parallel to each other, and described first stiffening rib and described first side are parallel to each other, the interior separation of rectangle is three cavitys by two described first stiffening ribs, described first side, second side, 3rd side and four side are all provided with multiple installation notch for installing conveyor belt.
In a preferred embodiment of the present invention, described installation notch is provided with circular arc cutaway, and one end of described first stiffening rib is fixedly connected on the installation notch of second side, and the other end is fixedly connected on the installation notch of four side.
In a preferred embodiment of the present invention, described rectangle is also provided with multiple second stiffening rib, described second stiffening rib is fixedly connected between the first stiffening rib and described installation notch.
In a preferred embodiment of the present invention, described rectangle is also provided with multiple 3rd stiffening rib, described 3rd stiffening rib is fixedly connected between adjacent two described installation notches.
In a preferred embodiment of the present invention, described second stiffening rib and the 3rd stiffening rib are all provided with a square hole.
The invention has the beneficial effects as follows: Novel hydroelectric line section bar structure of the present invention simply, bearing capacity that is not yielding, per unit volume is higher, the cost of material is low, lightweight, good in economic efficiency, using effect is good.
Accompanying drawing explanation
In order to be illustrated more clearly in the technological scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of existing production line section bar in background technique;
Fig. 2 is the structural representation of Novel hydroelectric line section bar one of the present invention preferred embodiment.
Embodiment
Be clearly and completely described to the technological scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Refer to Fig. 2, the embodiment of the present invention comprises:
A kind of Novel hydroelectric line section bar, comprise: body, described body is provided with the cross section structure of rectangle, described rectangle comprises first side 11 adjacent successively, second side 12, 3rd side 13 and four side 14, two first stiffening ribs 2 are provided with between described second side 12 and four side 14, described two first stiffening ribs 2 are parallel to each other, and described first stiffening rib 21 is parallel to each other with described first side 11, the interior separation of rectangle is three cavitys 31 by two described first stiffening ribs 21, described first side 11, second side 12, 3rd side 13 and four side 14 are all provided with multiple installation notch 15 for installing conveyor belt.
Described installation notch 15 is provided with circular arc cutaway, and one end of described first stiffening rib 21 is fixedly connected on the installation notch 15 of second side 12, and the other end is fixedly connected on the installation notch 15 of four side 14.
Described rectangle is also provided with multiple second stiffening rib 22, described second stiffening rib 22 is fixedly connected between the first stiffening rib 21 and described installation notch 15.
Described rectangle is also provided with multiple 3rd stiffening rib 23, described 3rd stiffening rib 23 is fixedly connected between adjacent two described installation notches 15.
Described second stiffening rib 22 and the 3rd stiffening rib 23 are all provided with a square hole 24.
As shown in Figure 2, first side 11 and the 3rd side 13 are all provided with two installation notches 15, second side 12 and four side 14 are all provided with four installation notches 15, rectangle is separated into three adjacent cavitys 31 by two first stiffening ribs 21, simultaneously, four the second stiffening ribs 22 and four the 3rd stiffening ribs 23 are provided with in this rectangle, first stiffening rib 22 is parallel to each other, and be parallel to each other with first side 11, change stiffening rib in prior art and intersect the structure of (criss-crossing reinforcing ribs), make section bar in the process of extruding production, not easily deform.And not only structure is simple for this structure of the first stiffening rib 21 be parallel to each other, the materials'use cost that under the same terms of equality strength, equal bearing capacity, equal volume, the production line section bar weight in the present embodiment is lighter, reduce section bar, improves productivity effect.
Be different from prior art, Novel hydroelectric line section bar structure of the present invention simply, bearing capacity that is not yielding, per unit volume is higher, the cost of material is low, lightweight, good in economic efficiency, using effect is good.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.

Claims (5)

1. a Novel hydroelectric line section bar, it is characterized in that, comprise: body, described body is provided with the cross section structure of rectangle, described rectangle comprises first side adjacent successively, second side, 3rd side and four side, two first stiffening ribs are provided with between described second side and four side, described two first stiffening ribs are parallel to each other, and described first stiffening rib and described first side are parallel to each other, the interior separation of rectangle is three cavitys by two described first stiffening ribs, described first side, second side, 3rd side and four side are all provided with multiple installation notch for installing conveyor belt.
2. Novel hydroelectric line section bar according to claim 1, it is characterized in that, described installation notch is provided with circular arc cutaway, and one end of described first stiffening rib is fixedly connected on the installation notch of second side, and the other end is fixedly connected on the installation notch of four side.
3. Novel hydroelectric line section bar according to claim 1, is characterized in that, described rectangle is also provided with multiple second stiffening rib, and described second stiffening rib is fixedly connected between the first stiffening rib and described installation notch.
4. Novel hydroelectric line section bar according to claim 3, is characterized in that, described rectangle is also provided with multiple 3rd stiffening rib, and described 3rd stiffening rib is fixedly connected between adjacent two described installation notches.
5. Novel hydroelectric line section bar according to claim 4, is characterized in that, described second stiffening rib and the 3rd stiffening rib are all provided with a square hole.
CN201510237151.3A 2015-05-12 2015-05-12 Novel production line sectional material Pending CN104819375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510237151.3A CN104819375A (en) 2015-05-12 2015-05-12 Novel production line sectional material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510237151.3A CN104819375A (en) 2015-05-12 2015-05-12 Novel production line sectional material

Publications (1)

Publication Number Publication Date
CN104819375A true CN104819375A (en) 2015-08-05

Family

ID=53729769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510237151.3A Pending CN104819375A (en) 2015-05-12 2015-05-12 Novel production line sectional material

Country Status (1)

Country Link
CN (1) CN104819375A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107314229A (en) * 2016-11-25 2017-11-03 成都福誉科技有限公司 A kind of gusseted device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030219307A1 (en) * 2000-12-12 2003-11-27 Fms Forder-Und Montage-Systeme Schmalzhofer Gmbh Connector for profiles
CN2679468Y (en) * 2004-02-13 2005-02-16 李春海 Industrial aluminum profile
CN102884358A (en) * 2010-04-23 2013-01-16 普帝龙集成房屋技术(重庆)有限公司 Quick connection structure system
KR20140070320A (en) * 2012-11-30 2014-06-10 윤영웅 Aluminium profile having a integrated coupler
CN104165265A (en) * 2014-07-04 2014-11-26 苏州琼派瑞特电子科技有限公司 Cross rod
CN204729907U (en) * 2015-05-12 2015-10-28 江苏银奕达铝业有限公司 A kind of Novel hydroelectric line section bar

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030219307A1 (en) * 2000-12-12 2003-11-27 Fms Forder-Und Montage-Systeme Schmalzhofer Gmbh Connector for profiles
CN2679468Y (en) * 2004-02-13 2005-02-16 李春海 Industrial aluminum profile
CN102884358A (en) * 2010-04-23 2013-01-16 普帝龙集成房屋技术(重庆)有限公司 Quick connection structure system
KR20140070320A (en) * 2012-11-30 2014-06-10 윤영웅 Aluminium profile having a integrated coupler
CN104165265A (en) * 2014-07-04 2014-11-26 苏州琼派瑞特电子科技有限公司 Cross rod
CN204729907U (en) * 2015-05-12 2015-10-28 江苏银奕达铝业有限公司 A kind of Novel hydroelectric line section bar

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
MM728662412: "80160工业铝型材", 《百度文库>专业资料>工程科技>材料科学HTTP://WENKU.BAIDU.COM/VIEW/54F8A9F8524DE518964B7D38》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107314229A (en) * 2016-11-25 2017-11-03 成都福誉科技有限公司 A kind of gusseted device

Similar Documents

Publication Publication Date Title
EP2772370A3 (en) Pneumatic tire
US20150082955A1 (en) Method for cascading and molding LED filament support based on support flitch
CN204729907U (en) A kind of Novel hydroelectric line section bar
CN104819375A (en) Novel production line sectional material
US20120196080A1 (en) Stiffened structure integrating an opening
CN105015712A (en) Thin Kenter shackle
CN105545914A (en) Semi-closed screw
WO2010127799A8 (en) Structure for the production of armatures for beams and assembly method of said structure
CN203770525U (en) Novel demountable mounting belt
CN205972647U (en) Conveyer belt
WO2013060900A3 (en) Self-mounting dismounting pallet structure
WO2015038860A3 (en) High surface area fiber and method of construction thereof
CN105179423A (en) U-shaped bolt
CN204185019U (en) Integral type winding roll
CN202946599U (en) Compound plate spring
CN110617397A (en) Steel structure
CN204380836U (en) A kind of easy-to-dismount hurley log washer
CN216835055U (en) Multifunctional lifting basket
CN202926937U (en) Compound plate spring
CN204545125U (en) A kind of boats and ships pipe fitting bend pipe mould
CN103291838B (en) Tower shelf type oil pumping machine Special belt
CN211550861U (en) Split liquid separator liquid-separating head
RU141927U1 (en) COMPONENT SUPPORT OF THE ELECTRIC TRANSMISSION LINE
CN105197298A (en) ARC product blanking groove
CN204640449U (en) The wear-resisting tightening cover of mud bar extrusion die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150805