CN104819108A - Maintenance and construction device of outer wall of tower drum of wind driven generator - Google Patents
Maintenance and construction device of outer wall of tower drum of wind driven generator Download PDFInfo
- Publication number
- CN104819108A CN104819108A CN201510246059.3A CN201510246059A CN104819108A CN 104819108 A CN104819108 A CN 104819108A CN 201510246059 A CN201510246059 A CN 201510246059A CN 104819108 A CN104819108 A CN 104819108A
- Authority
- CN
- China
- Prior art keywords
- tower
- power supply
- electrically connected
- wall
- construction platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y02E10/722—
Landscapes
- Wind Motors (AREA)
Abstract
本发明公开了一种风力发电机塔筒外壁维护施工装置,包括运载工具、控制系统;所述运载工具上安装有用于清洗塔筒外壁的清洗系统;所述塔筒上安装有能沿所述塔筒上下移动的施工平台;所述控制系统控制所述施工平台的上下移动;所述运载工具的发动机与电力供应系统的输入端电连接;所述电力供应系统的输出端与所述施工平台上的耗电设施电连接。本发明具有准备时间短,作业效率高的优点,可以极大地改善施工环境。
The invention discloses a maintenance construction device for the outer wall of a wind power generator tower, which includes a vehicle and a control system; a cleaning system for cleaning the outer wall of the tower is installed on the vehicle; The construction platform on which the tower moves up and down; the control system controls the up and down movement of the construction platform; the engine of the vehicle is electrically connected to the input end of the power supply system; the output end of the power supply system is connected to the construction platform electrical connections to power-consuming facilities on the The invention has the advantages of short preparation time and high operation efficiency, and can greatly improve the construction environment.
Description
技术领域 technical field
本发明涉及一种风力发电机塔筒外壁维护施工装置,特别是一种用于风电塔筒外壁清洁、检修、涂装、更换零部件等维护及施工的装备总成。 The invention relates to a maintenance and construction device for the outer wall of a wind power generator tower, in particular to an equipment assembly used for maintenance and construction of the outer wall of a wind power tower such as cleaning, repair, painting, and replacement of parts.
背景技术 Background technique
风电是一种重要的可再生清洁能源,发展风电对减少传统石化能源的依赖、优化能源结构、实现社会可持续发展具有重要的意义,因此,大力发展风电成了很多国家近来在新能源开发领域的重要举措。我国在风力发电领域也取得了快速的发展,截止2014年末,我国风力发电装机总量接近1亿千瓦,装机数量超过10万台,将来也会维持较长一算时间的高速发展态势。 Wind power is an important renewable and clean energy. The development of wind power is of great significance to reduce the dependence on traditional petrochemical energy, optimize the energy structure, and realize the sustainable development of society. Therefore, vigorously developing wind power has become a new energy development field in many countries. important measures. my country has also achieved rapid development in the field of wind power generation. As of the end of 2014, the total installed capacity of wind power generation in my country was close to 100 million kilowatts, and the installed capacity exceeded 100,000 units. It will maintain a high-speed development trend for a long time in the future.
风力发电机都包含有一个固定在地面的基座上、用于支撑风轮、机舱及发电机组等部件的塔筒。为了获得更优质、更多的风力资源,塔筒往往需要达到数十米,甚至上百米高。 A wind turbine consists of a tower fixed on the ground to support components such as the wind rotor, the nacelle, and the generator set. In order to obtain better quality and more wind resources, towers often need to be tens of meters high, or even hundreds of meters high.
塔筒长期暴露在自然环境之中,受到风吹、日晒、雨淋,甚至盐雾、沙尘的侵袭,易导致钢铁塔筒外壁的涂装破坏、油漆脱落、锈蚀等;同时,塔筒分段连接部位的紧固件也有一定的使用时效,使用一定时间之后予以检修、更换;还有些风力发电机运行一段时间之后,润滑油脂从机舱漏洒在塔筒上,结合灰尘等杂物黏附在塔筒外壁,形成一层污垢,这样不仅会影响风机的美观,也会对风机的使用安全性造成影响。因此,需要定期对塔筒外壁进行除锈、补漆、涂装修复、更换零部件、清洁等维护保养措施,以改善风机的美观、延长塔筒使用寿命、保证风机运行安全。 The tower tube is exposed to the natural environment for a long time, and is subject to wind, sun, rain, and even salt spray and sand dust, which can easily lead to coating damage, paint peeling, and corrosion on the outer wall of the steel tower tube; at the same time, the tower tube The fasteners at the segmental connection parts also have a certain service life, and they are repaired and replaced after a certain period of use; after some wind turbines have been running for a period of time, lubricating grease leaks from the nacelle on the tower, combined with dust and other sundries. A layer of dirt is formed on the outer wall of the tower, which will not only affect the appearance of the fan, but also affect the safety of the fan. Therefore, it is necessary to regularly carry out maintenance measures such as rust removal, paint repair, painting repair, replacement of parts, and cleaning on the outer wall of the tower to improve the appearance of the fan, prolong the service life of the tower, and ensure the safe operation of the fan.
目前国内风电塔筒维护、保养比较普遍的做法是,施工人员先要爬上塔顶,再通过固定在机舱上的绳索将施工人员拴住,逐渐往下放,将施工人员悬吊在塔筒附近的空中进行施工;或者利用大型起重机提升吊笼,施工人员在吊笼内操作。风电塔筒的高度从几十米到超过百米,加之建设风机的地点风速较高,不仅对施工人员的身体素质、心理素质有极大的要求,而且劳动强度大、工作效率低下,并且,在起重机提升的吊笼内施工对作业场地、风速等外部环境要求严格、准备时间长、成本高昂。所以,风电塔筒的每次维护、保养都会消耗大量的人力、物力。 At present, the maintenance and maintenance of domestic wind power towers is relatively common. The construction personnel must first climb to the top of the tower, and then tie the construction personnel through the ropes fixed on the nacelle, and then gradually lower them, and hang the construction personnel near the tower. The construction is carried out in the air; or the cage is lifted by a large crane, and the construction personnel operate in the cage. The height of the wind power tower ranges from tens of meters to more than 100 meters. In addition, the wind speed at the location where the wind turbine is built is high, which not only has great requirements on the physical and psychological quality of the construction workers, but also has high labor intensity and low work efficiency. Moreover, The construction in the cage lifted by the crane has strict requirements on the external environment such as the work site and wind speed, long preparation time and high cost. Therefore, every maintenance and maintenance of the wind power tower will consume a lot of manpower and material resources.
随着我国风电装机数量的快速增加,且以前建设的风电机组逐渐进入维护保养期,风电塔筒的保养、清洁、检修、更换零件等维护领域有着越来越大的市场需求,而传统的维护作业方法逐渐难以满足快速增长的市场需求,因此,开发一种高施工效率、高安全性与可靠性、操作人员舒适性大大提高的风力发电机塔筒外壁维护系统对我国风电的发展具有重要的意义。 With the rapid increase in the number of installed wind power in my country, and the wind turbines built before are gradually entering the maintenance period, there is an increasing market demand for the maintenance, cleaning, overhaul, and replacement of parts of wind power towers, while traditional maintenance The operation method is gradually difficult to meet the rapidly growing market demand. Therefore, the development of a wind turbine tower outer wall maintenance system with high construction efficiency, high safety and reliability, and greatly improved operator comfort is of great importance to the development of wind power in my country. significance.
发明内容 Contents of the invention
本发明所要解决的技术问题是,针对现有技术不足,提供一种风力发电机塔筒外壁维护施工装置。 The technical problem to be solved by the present invention is to provide a maintenance construction device for the outer wall of a wind power generator tower in view of the deficiencies in the prior art.
为解决上述技术问题,本发明所采用的技术方案是:一种风力发电机塔筒外壁维护施工装置,包括运载工具、控制系统;所述运载工具上安装有用于清洗塔筒外壁的清洗系统;所述塔筒上环形包绕有能沿所述塔筒上下移动的施工平台;所述控制系统控制所述施工平台的上下移动;所述运载工具的发动机与电力供应系统的输入端电连接;所述电力供应系统的输出端与所述施工平台上的耗电设施电连接。 In order to solve the above-mentioned technical problems, the technical solution adopted in the present invention is: a maintenance construction device for the outer wall of the wind turbine tower, including a vehicle and a control system; the vehicle is equipped with a cleaning system for cleaning the outer wall of the tower; The tower is surrounded by a construction platform that can move up and down along the tower; the control system controls the up and down movement of the construction platform; the engine of the vehicle is electrically connected to the input end of the power supply system; The output end of the power supply system is electrically connected to the power consumption facilities on the construction platform.
所述清洗系统包括安装于所述运载工具上的水箱;所述水箱内安装有水泵;所述水泵通过水管与安装与所述施工平台上的喷枪连通。 The cleaning system includes a water tank installed on the vehicle; a water pump is installed in the water tank; the water pump communicates with the spray gun installed on the construction platform through a water pipe.
所述控制系统包括安装于运载工具上的地面控制部分和安装于施工平台上的空中控制部分;所述地面控制部分包括控制单元,所述控制单元与操作台、显示器电连接;所述控制单元与地面对讲机通信;所述空中控制部分包括至少一个摄像头、至少一个急停按钮、传感器、执行器、至少一个遥控器;所述摄像头、急停按钮、传感器、执行器、遥控器均与数据转发器电连接;所述数据转发器与空中对讲机通信;所述空中对讲机与所述地面对讲机通信;所述数据转发器与所述控制单元电连接。 The control system includes a ground control part installed on the vehicle and an air control part installed on the construction platform; the ground control part includes a control unit, and the control unit is electrically connected to the console and the display; the control unit Communicate with the ground walkie-talkie; the air control part includes at least one camera, at least one emergency stop button, sensor, actuator, and at least one remote controller; the camera, emergency stop button, sensor, actuator, and remote controller are all connected with data transmission The data transponder communicates with the intercom in the air; the intercom in the air communicates with the intercom on the ground; the transponder is electrically connected with the control unit.
所述电力供应系统包括设置在所述运载工具上的底盘发电机组、备用发电机组、塔筒电源、变电装置;所述底盘发电机组包括由所述运载工具发动机驱动的取力器、所述取力器、备用发电机组、塔筒电源均与选择开关连电接;所述选择开关与变电装置的变压器、AC/DC转换器电连接;所述AC/DC转换器与电瓶电连接。 The power supply system includes a chassis generator set, a backup generator set, a tower power supply, and a power conversion device arranged on the vehicle; the chassis generator set includes a power take-off driven by the engine of the vehicle, the The power take-off, the standby generator set, and the tower power supply are all electrically connected to the selector switch; the selector switch is electrically connected to the transformer and the AC/DC converter of the substation; the AC/DC converter is electrically connected to the storage battery.
上述结构的原理为:当某一风电塔筒需要进行外壁维护时,所述的运载工具携带分解状态的施工平台模块、电力供应系统、清洗系统、控制系统等设备及维护工具至塔筒附近,将施工平台的模块在塔筒下方进行拼装成完整的施工平台,启动电源供应系统,接通并调试好控制系统,维护人员搭乘施工平台对塔筒进行检修或者维护; The principle of the above structure is: when a certain wind power tower needs to be maintained on the outer wall, the vehicle carries the decomposed construction platform module, power supply system, cleaning system, control system and other equipment and maintenance tools to the vicinity of the tower, Assemble the modules of the construction platform under the tower tube into a complete construction platform, start the power supply system, connect and debug the control system, and the maintenance personnel take the construction platform to overhaul or maintain the tower tube;
正常情况下,施工平台上的维护人员可通过遥控器控制施工平台的上升、下降、悬停、调整水平度等动作;当遥控器失灵或者故障时,地面人员可通过处于地面的操作台控制施工平台的升降,以保证施工平台可控地沿塔筒回到地面。 Under normal circumstances, the maintenance personnel on the construction platform can use the remote control to control the construction platform’s rise, fall, hover, and level adjustment; when the remote control fails or malfunctions, the ground personnel can control the construction through the operation console on the ground Lifting of the platform to ensure that the construction platform returns to the ground along the tower tube in a controlled manner.
当风电塔筒需要进行外壁清洗作业时,施工人员开启水泵,将水箱中的水通过水管泵送至喷枪,并利用喷枪对塔筒外壁进行清洁作业。 When the outer wall of the wind power tower needs to be cleaned, the construction workers turn on the water pump, pump the water in the water tank to the spray gun through the water pipe, and use the spray gun to clean the outer wall of the tower.
当施工平台出现紧急情况时,除了施工平台本身的探测装置之外,作业人员可通过遥控器、急停按钮、设于地面控制台等措施启动施工平台的紧急保护装置,维护施工安全。 When an emergency occurs on the construction platform, in addition to the detection device of the construction platform itself, the operator can activate the emergency protection device of the construction platform through the remote control, emergency stop button, and the console installed on the ground to maintain construction safety.
地面人员可通过显示器看到设于施工平台的摄像头拍摄的场面,从而了解施工平台上的作业情况;地面人员与空中施工人员之间也可通过对讲机进行信息沟通。 The ground personnel can see the scene captured by the camera installed on the construction platform through the monitor, so as to understand the operation situation on the construction platform; the ground personnel and the aerial construction personnel can also communicate with each other through the walkie-talkie.
与现有技术相比,本发明所具有的有益效果为:本发明具有准备时间短,作业效率高的优点,可以极大地改善施工环境。 Compared with the prior art, the invention has the beneficial effects that: the invention has the advantages of short preparation time and high operation efficiency, and can greatly improve the construction environment.
附图说明 Description of drawings
图1为本发明所述装备处于施工状态时的示意图; Fig. 1 is the schematic diagram when equipment described in the present invention is in construction state;
图2为图1的B向局部视图; Fig. 2 is the partial view of B direction of Fig. 1;
图3为电力供应系统示意图; Fig. 3 is a schematic diagram of the power supply system;
图4为控制系统示意图; Fig. 4 is a schematic diagram of the control system;
图5为图1中Ⅰ处局部放大视图; Fig. 5 is a partial enlarged view of place I in Fig. 1;
图6为清洗系统示意图。 Figure 6 is a schematic diagram of the cleaning system.
具体实施方式 Detailed ways
如图1所示,本发明一实施例包括包括运载工具1、施工平台5、控制系统3、电力供应系统4以及清洗系统2,所述的施工平台3由多个模块拼装而成,并可由所述的运载工具1进行转场运输,施工时,所述的施工平台5安装在风电塔筒6上,并可沿塔筒6上、下移动或者在某一高度悬停。 As shown in Figure 1, an embodiment of the present invention includes a vehicle 1, a construction platform 5, a control system 3, a power supply system 4, and a cleaning system 2. The construction platform 3 is assembled from a plurality of modules, and can be assembled by The vehicle 1 is used for transit transportation. During construction, the construction platform 5 is installed on the wind power tower 6 and can move up and down along the tower 6 or hover at a certain height.
如图2所示,连接所述控制系统3的空中控制部分31与地面控制部分36的信号线7、电力供应系统4向施工平台5供电的输电线9、连接水泵38与喷枪11的水管8,松弛部分都旋绕在设于运载工具1的卷盘10上,随着卷盘10对管线的放与收对应施工平台5的升与降,以避免管线之间的缠绕及混乱。 As shown in Figure 2, the signal line 7 connecting the air control part 31 of the control system 3 and the ground control part 36, the power supply line 9 for the power supply system 4 to the construction platform 5, and the water pipe 8 connecting the water pump 38 and the spray gun 11 , the slack part is all wound on the reel 10 provided on the vehicle 1, and the construction platform 5 is raised and lowered as the reel 10 releases and retracts the pipeline, so as to avoid entanglement and confusion between the pipelines.
所述的电力供应系统4如图3所示,包括设置在运载工具1上的底盘发电机组17、备用发电机组16、塔筒电源19、变电装置21等,并通过输电线9与施工平台5上的耗电设施相连。 Described electric power supply system 4 is as shown in Figure 3, comprises the chassis generator set 17 that is arranged on the vehicle 1, backup generator set 16, tower tube power source 19, power transformation device 21 etc., and through transmission line 9 and construction platform 5 connected to the power-consuming facilities.
所述的底盘发电机组17通过取力器18从运载工具1的底盘发动机上获取动力,也即由运载工具1附带的发动机驱动发电,所述的备用发电机组16由自身的发动机驱动发电,所述的塔筒电源19为风力发电机现场预留的电源。 The chassis generator set 17 obtains power from the chassis engine of the vehicle 1 through the power take-off 18, that is, it is driven by the engine attached to the vehicle 1 to generate power, and the backup generator set 16 is driven by its own engine to generate power, so The tower power supply 19 mentioned above is the power supply reserved on site for the wind power generator.
所述的底盘发电机组17、备用发电机组16、塔筒电源19三者并联布置,并皆与选择开关20相连,在对塔筒6进行维护作业时,施工人员可根究实际情况三种供电设备中的一种或几种,并通过选择开关20将进入供电状态的电源设备接通。 The chassis generator set 17, the standby generator set 16, and the tower power supply 19 are arranged in parallel, and are all connected to the selector switch 20. When performing maintenance on the tower tube 6, the construction personnel can investigate the actual situation of the three power supply equipment One or more of them, and the power supply equipment that enters the power supply state is connected through the selection switch 20.
所述选择开关20下游设有变电装置21,所述的变电装置21包括并联布置的变压器22和转化器25,所述变压器22的作用在于将发电设施发出的交流电变成满足使用要求的交流电源23对整个装备供电;所述转化器25的作用在于将发电设施发出的交流电转化成满足要求的直流电,并与电瓶24一起形成直流电源26对整个装备供电。电源与用电设备之间由输电线9相连。 The downstream of the selector switch 20 is provided with a power transformation device 21, the power transformation device 21 includes a transformer 22 and a converter 25 arranged in parallel, and the function of the transformer 22 is to convert the alternating current generated by the power generation facility into a power that meets the requirements of use. The AC power supply 23 supplies power to the entire equipment; the function of the converter 25 is to convert the AC power generated by the power generation facility into a required DC power, and forms a DC power supply 26 together with the storage battery 24 to supply power to the entire equipment. The power supply and the electrical equipment are connected by a transmission line 9 .
所述的控制系统3如图4所示,包括设置在运载工具1上的地面控制部分36和设置在施工平台5上的空中控制部分31,两部分之间通过信号线7相连。所述空中控制部分31包括设置在所述的施工平台上5的摄像头13、遥控器12、急停按钮14、传感器32、执行器33、数据转发器15、空中对讲机34等设施;所述地面控制部分36包括设置在所述的运输工具1上的显示器27、操作台28、控制单元30、地面对讲机35等设施。 The control system 3 shown in FIG. 4 includes a ground control part 36 set on the vehicle 1 and an air control part 31 set on the construction platform 5 , and the two parts are connected by a signal line 7 . The air control part 31 includes facilities such as a camera 13, a remote controller 12, an emergency stop button 14, a sensor 32, an actuator 33, a data transponder 15, and an air intercom 34 arranged on the construction platform 5; The control part 36 includes facilities such as a display 27 , an operating console 28 , a control unit 30 , and a ground intercom 35 arranged on the vehicle 1 .
对于所述的空中控制部分31: For the air control part 31:
所述的急停按钮13数量为1个或多个,均设于施工平台5便于施工人员在紧急状态下操作的位置,并通过数据线与数据转发器15相连: Described emergency stop button 13 quantity is 1 or more, is all located on construction platform 5 and is convenient to the position that construction personnel operate in emergency state, and links to each other with data transponder 15 by data line:
所述摄像头14数量也可为1个或多个,均设于施工平台5有利于清晰、完整地察看施工平台5情景的位置,各摄像头皆通过数据线与数据转发器15相连; Described camera 14 quantity also can be 1 or more, is all located at construction platform 5 and is conducive to the position of clear, complete observation construction platform 5 scene, each camera all links to each other with data transponder 15 by data line;
所述的遥控器12数量也可为1个或多个,设于施工平台5上便于施工人员操作的位置,也通过数据线或者无线电信号与数据转发器15相连。 The number of the remote controllers 12 can also be one or more, which are arranged on the construction platform 5 at a position convenient for construction workers to operate, and are also connected to the data transponder 15 through data lines or radio signals.
所述的传感器32用于探测施工平台5工作状态、姿势、位置及其他参数,所述的执行器33用于实现施工平台5各种功能、动作的实现等功能,二者皆通过数据线与数据转发器15相连。 The sensor 32 is used to detect the working state, posture, position and other parameters of the construction platform 5, and the actuator 33 is used to realize various functions and actions of the construction platform 5. Data transponder 15 is connected.
所述的施工平台5上还设有空中对讲机34,可与地面对讲机35进行实时语音通讯,保证地面工作人员与空中工作人员之间的信息交流。 The construction platform 5 is also provided with an intercom 34 in the air, which can carry out real-time voice communication with the intercom 35 on the ground, so as to ensure the information exchange between the ground staff and the air staff.
对于所述的地面控制部分36: For the ground control section 36:
所述的显示器27既可用于显示摄像头13拍摄的内容,实现工作平台与地面之间的即时信息协调,也可显示维护装备的有关参数,以便地面人员实时掌握装备的状态。 The display 27 can be used to display the content captured by the camera 13 to realize instant information coordination between the work platform and the ground, and can also display relevant parameters of the maintenance equipment so that the ground personnel can grasp the status of the equipment in real time.
所述的操作台28可以总设1个,也可根据需要分设多个,以便在不同的地方皆可进行操作。 Described operating table 28 can be set up as a whole, also can set up a plurality of according to need, so that all can carry out operation in different places.
所述的显示器27既可与操作台28可集成于一体,也可二者分开设计。 The display 27 can be integrated with the console 28, or both can be designed separately.
所述的显示器27、操作台28均通过数据线29与控制单元30相连。 Both the display 27 and the console 28 are connected to the control unit 30 through the data line 29 .
所述的施工平台5作业时,所述的空中控制部分31的数据通过数据转发器15初步处理之后,通过信号线7或者无线通讯的方式送往地面控制部分36,并与操作台28的数据经过数据线29一起输入控制单元30,经过控制单元30处理、决策后的数据及指令再通过数据线29线送往显示器27,同时通过信号线7或者无线电方式发送至数据转发器15,最终送往各动作执行器33,从而实现对施工平台的控制。 When the construction platform 5 is in operation, the data of the air control part 31 is preliminarily processed by the data transponder 15, and then sent to the ground control part 36 through the signal line 7 or wireless communication, and is connected with the data of the console 28. Input the control unit 30 together through the data line 29, the data and instructions processed and decided by the control unit 30 are then sent to the display 27 through the data line 29, and at the same time sent to the data transponder 15 through the signal line 7 or radio, and finally sent to the data transponder 15. To each action actuator 33, so as to realize the control of the construction platform.
所述的清洗系统2如图5和图6所示,包括设置在运载工1具上的水箱37、水泵38,以及设置在施工平台5上的喷枪11等设施,所述的水泵38与喷枪11之间通过水管8相连。当风电塔筒6外壁需要清洗时,可开通水泵38,将水箱37中的水通过水管8泵送至喷枪11,并通过喷枪11喷向塔筒6需要清洗的部位,实现对塔筒6的清洗作业。 Described cleaning system 2 as shown in Figure 5 and Figure 6, comprises the water tank 37 that is arranged on the vehicle 1, water pump 38, and facilities such as the spray gun 11 that is arranged on the construction platform 5, described water pump 38 and spray gun 11 are connected by water pipe 8. When the outer wall of the wind power tower 6 needs to be cleaned, the water pump 38 can be turned on, the water in the water tank 37 is pumped to the spray gun 11 through the water pipe 8, and sprayed to the position of the tower 6 to be cleaned by the spray gun 11, so as to realize cleaning of the tower 6 Cleaning job.
当某一风电塔筒6外壁需要进行维护作业时, 所述的运载工具1携带施工平台5的分解模块、电力供应系统4、清洗系统2、控制系统3等设备及工具至塔筒6附近,将施工平台5的模块在塔筒6底座进行拼装成完整的施工平台5,启动电力供应系统4,接通并调试好控制系统3,维护人员搭乘施工平台5对塔筒6进行检修或者维护。 When the outer wall of a wind power tower 6 needs to be maintained, the vehicle 1 carries equipment and tools such as the decomposition module of the construction platform 5, the power supply system 4, the cleaning system 2, and the control system 3 to the vicinity of the tower 6, The modules of the construction platform 5 are assembled on the base of the tower 6 to form a complete construction platform 5, the power supply system 4 is started, the control system 3 is connected and debugged, and the maintenance personnel take the construction platform 5 to overhaul or maintain the tower 6.
正常情况下,施工平台5上的维护人员可通过遥控器34控制施工平台5的上升、下降、悬停、调整水平度等动作;当遥控器34失灵或者故障时,地面人员可通所述操作台28对施工平台进行控制,以保证施工平台5安全可控地沿塔筒6回到地面; 当施工平台5出现紧急情况时,除了施工平台5本身的紧急状态探测装置之外,作业人员可通过遥控器34、设于施工平台5上的急停按钮14、控制台28等装置快速启动施工平台5的紧急保护装置,维护施工安全。 Under normal circumstances, the maintenance personnel on the construction platform 5 can control actions such as rising, falling, hovering, and level adjustment of the construction platform 5 through the remote controller 34; Platform 28 controls the construction platform to ensure that the construction platform 5 returns to the ground along the tower tube 6 in a safe and controllable manner; Quickly start the emergency protection device of the construction platform 5 through the remote controller 34, the emergency stop button 14 located on the construction platform 5, the console 28 and other devices to maintain construction safety.
本发明的施工平台包绕在塔筒外壁上,施工平台上安装了多组动力臂,各组动力臂上装有用于将施工平台固定在塔筒外壁上的电控磁铁组件,各组动力臂在驱动元件的驱动下可竖向伸缩而带动施工平台沿着塔筒外壁下降或上升,急停按钮安装在施工平台上,用于在施工平台紧急下坠时将施工平台锁定在塔筒外壁上,控制系统控制各组动力臂的伸缩,同时控制对应的电控磁铁组件与塔筒的吸紧与解吸。 The construction platform of the present invention is wrapped on the outer wall of the tower tube, and multiple groups of power arms are installed on the construction platform, and each group of power arms is equipped with an electronically controlled magnet assembly for fixing the construction platform on the outer wall of the tower tube. Driven by the driving element, it can be vertically stretched and extended to drive the construction platform down or up along the outer wall of the tower tube. The emergency stop button is installed on the construction platform to lock the construction platform on the outer wall of the tower tube when the construction platform falls in an emergency. The system controls the expansion and contraction of each group of power arms, and at the same time controls the suction and desorption of the corresponding electronically controlled magnet assembly and the tower.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510246059.3A CN104819108A (en) | 2015-05-15 | 2015-05-15 | Maintenance and construction device of outer wall of tower drum of wind driven generator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510246059.3A CN104819108A (en) | 2015-05-15 | 2015-05-15 | Maintenance and construction device of outer wall of tower drum of wind driven generator |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104819108A true CN104819108A (en) | 2015-08-05 |
Family
ID=53729535
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510246059.3A Pending CN104819108A (en) | 2015-05-15 | 2015-05-15 | Maintenance and construction device of outer wall of tower drum of wind driven generator |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104819108A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105858554A (en) * | 2016-06-03 | 2016-08-17 | 江苏科技大学 | Self-lifting platform used for maintaining wind power tower tube outer wall |
| CN110885040A (en) * | 2019-11-19 | 2020-03-17 | 山东七运集团有限公司 | Lifting platform for wind power generation tower cylinder |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005054672A1 (en) * | 2003-12-04 | 2005-06-16 | Pp Energy Aps | Method and apparatus for treatment of a part of a wind turbine |
| CN201415634Y (en) * | 2009-03-23 | 2010-03-03 | 中国电力科学研究院 | An electric emergency engineering vehicle |
| EP2698528A1 (en) * | 2011-04-14 | 2014-02-19 | Mantenimientos Eléctricos Campo de Aviación, S.L. | Repair/cleaning scaffolding tower for wind turbines |
| CN103608129A (en) * | 2011-04-05 | 2014-02-26 | D·延森 | Wind turbine fluid application apparatus |
| KR101434288B1 (en) * | 2012-12-10 | 2014-08-26 | 케이.엘.이.에스 주식회사 | Wind power worktable comprising worktable free vertical movement |
| DE102013007991A1 (en) * | 2013-04-30 | 2014-10-30 | Harald Kohrs | Mobile platform on tower-like structures or masts |
| KR101496962B1 (en) * | 2014-04-15 | 2015-03-02 | 주식회사 케이렘 | A maintenance plaform for wind power generator |
-
2015
- 2015-05-15 CN CN201510246059.3A patent/CN104819108A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005054672A1 (en) * | 2003-12-04 | 2005-06-16 | Pp Energy Aps | Method and apparatus for treatment of a part of a wind turbine |
| CN201415634Y (en) * | 2009-03-23 | 2010-03-03 | 中国电力科学研究院 | An electric emergency engineering vehicle |
| CN103608129A (en) * | 2011-04-05 | 2014-02-26 | D·延森 | Wind turbine fluid application apparatus |
| EP2698528A1 (en) * | 2011-04-14 | 2014-02-19 | Mantenimientos Eléctricos Campo de Aviación, S.L. | Repair/cleaning scaffolding tower for wind turbines |
| KR101434288B1 (en) * | 2012-12-10 | 2014-08-26 | 케이.엘.이.에스 주식회사 | Wind power worktable comprising worktable free vertical movement |
| DE102013007991A1 (en) * | 2013-04-30 | 2014-10-30 | Harald Kohrs | Mobile platform on tower-like structures or masts |
| KR101496962B1 (en) * | 2014-04-15 | 2015-03-02 | 주식회사 케이렘 | A maintenance plaform for wind power generator |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105858554A (en) * | 2016-06-03 | 2016-08-17 | 江苏科技大学 | Self-lifting platform used for maintaining wind power tower tube outer wall |
| CN110885040A (en) * | 2019-11-19 | 2020-03-17 | 山东七运集团有限公司 | Lifting platform for wind power generation tower cylinder |
| CN110885040B (en) * | 2019-11-19 | 2020-11-17 | 山东七运集团有限公司 | Lifting platform for wind power generation tower cylinder |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103729737B (en) | A kind of wind power plant O&M based on image stream treatment technology supports system | |
| WO2013060165A1 (en) | Energy-storing and power-generating system and method for vertical-axis wind generator | |
| CN103042016B (en) | Cleaning robot for wind driven generator tower | |
| CN208062887U (en) | A control device for large island operation of offshore wind power generators | |
| CN203308655U (en) | Remote monitoring and diagnosing system of wind driven generator bin | |
| CN205179972U (en) | Time pin type sprinkling irrigation machine automated control device | |
| CN204013581U (en) | A kind of microgrid energy communication protocol testing system | |
| CN201990448U (en) | Automatic climbing machine for tower of wind generator | |
| CN104819108A (en) | Maintenance and construction device of outer wall of tower drum of wind driven generator | |
| CN206827835U (en) | A kind of combination unit for power transmission and transformation installation | |
| CN106650956A (en) | Freeze-proof power transmission and transformation equipment monitoring system | |
| CN218767870U (en) | Mobile operation monitoring system based on edge calculation | |
| CN105375383A (en) | Power transmission and transformation intelligent monitoring and controlling maintenance system and usage method thereof | |
| CN109956048A (en) | A kind of unmanned plane parking system applied to offshore wind energy plant | |
| CN106762473A (en) | Wind power generating set | |
| CN207382453U (en) | A kind of upkeep operation on-site data gathering device | |
| CN106481512B (en) | Wind power plant and method for replacing equipment in its nacelle | |
| CN105375384A (en) | Power transmission and transformation intelligent monitoring maintenance system maintenance unit and usage method thereof | |
| CN205212324U (en) | Maintaining system is maintained in control of power transmission and transformation intelligent monitoring | |
| Guo et al. | Application of the green port technology | |
| CN204613327U (en) | Pitch system of wind driven generator charhing unit and storage battery maintenance test platform | |
| CN209056843U (en) | A kind of monitoring of ultra-high-tension power transmission line unmanned plane and obstacle eliminating system based on wireless charging | |
| CN106374541A (en) | Power-taking apparatus based on insulated grounding line of alternating current overhead power transmission line | |
| CN1975154B (en) | Wind power machine and its wind power system and wind power generation system | |
| CN205559176U (en) | Aerogenerator power alarm system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| EXSB | Decision made by sipo to initiate substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150805 |