[go: up one dir, main page]

CN104806247B - 露天矿采场中间搭建纵向组合桥运输方法 - Google Patents

露天矿采场中间搭建纵向组合桥运输方法 Download PDF

Info

Publication number
CN104806247B
CN104806247B CN201510209695.9A CN201510209695A CN104806247B CN 104806247 B CN104806247 B CN 104806247B CN 201510209695 A CN201510209695 A CN 201510209695A CN 104806247 B CN104806247 B CN 104806247B
Authority
CN
China
Prior art keywords
bridge
stripping
open
pit
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510209695.9A
Other languages
English (en)
Other versions
CN104806247A (zh
Inventor
陈树召
杨飞
周伟
才庆祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201510209695.9A priority Critical patent/CN104806247B/zh
Publication of CN104806247A publication Critical patent/CN104806247A/zh
Application granted granted Critical
Publication of CN104806247B publication Critical patent/CN104806247B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种露天矿下部剥离物运输方法——露天矿采场中间搭建纵向组合桥运输方法。纵向组合桥搭桥方式有:线性叠桥;扇形叠桥。在露天开采的过程中,由于工作线长,物料剥离运距大,在采场内部剥离物料重心处搭建垂直于工作线中间桥,可减少桥体上下物料的垂直运距。在单桥的基础上建立子桥,则可增加桥体所能服务剥离台阶。本发明露天矿采场中间搭建纵向组合桥运输方法,适用于水平或近水平露天煤矿采用单斗挖掘机,卡车开采工艺的内排露天矿山,可减少下部剥离物汽车运距、降低运输成本,增加经济效益,具有广泛的实用性。

Description

露天矿采场中间搭建纵向组合桥运输方法
技术领域
本发明涉及露天矿采场中间搭建纵向组合桥运输方法,尤其适用于大型近水平露天矿内排时下部剥离物运输,以减少运距,节省运输成本。
背景技术
露天开采作为采矿行业的一个重要分支,承担着越来越重要的煤炭开采任务,其本质即剥离矿体上覆岩层,获得有用矿物。大型近水平内排的露天矿,由于开采强度大,工作线长,传统环端帮内排运输,不仅难以回收端帮残煤,而且剥离台阶中部物料运距较大,运输成本占生产成本较高。
发明内容
技术问题:本发明的目的是克服已有技术中的不足之处,提供一种减小露天矿汽车运距、实现等标高排弃、回收端帮残煤、提高矿山整体效益的露天矿采场中间搭建纵向组合桥运输方法。
技术方案:本发明的露天矿下部中间搭建纵向组合桥运输方法,包括剥离表土,直至煤层底部,形成露天矿坑,包括如下步骤:
a.利用采掘机械在坑底中部面向煤层方向采掘出一条1/3-1/2年推进度长的沟槽,然后用剥离物料回填沟槽并压实;
b.在工作帮和排土帮中间建立纵向组合桥,先从沟槽处向排土帮方向用剥离物料建立基桥,将工作帮连通排土帮,再在基桥上方搭建子桥,子桥的高度与现场剥离台阶的相同;第一剥离台阶的剥离物料通过基桥运至排土帮,第二剥离台阶的剥离物料通过子桥运至排土帮,第三剥离台阶及以上剥离台阶经斜坡道从子桥至排土帮,进行多通道排土工作;
c.随着采剥作业的进行,纵向组合桥逐渐向前延伸,直至回填沟槽尽头时,挖断纵向组合桥体;
d.重复步骤a、b、c,继续下一段中间搭建纵向组合桥的采剥作业,直到完成整个采剥作业。
所述采场内部搭建中间纵向组合桥为扇形叠桥或线性叠桥;依据现场实际需要可在子桥靠近排土帮侧搭建倾斜子桥。
有益效果:由于在大型内排露天矿开采过程中,工作帮和排土帮均沿推进方向向前平移。于工作帮煤层上部剥离台阶重心O 处,本发明在现有的露天矿山运输理论的基础上衍生而来,搭建同煤层厚度H 1相同高度的基桥,再于基桥上搭建同剥离台阶相同高度H 2的子桥。本发明包括扇形叠桥、线性叠桥两种露天矿采场中间搭建纵向组合桥的方式。扇形叠桥连接工作帮和排土帮,桥体于工作帮处窄,至排土帮逐渐加宽,而线性叠桥连接工作帮和排土帮,桥体宽度不变。工作帮下部剥离台阶中部物料通过中间纵向组合桥运输至内排土场,减少该部分物料内排运输的运距,降低运输成本。能够在保证矿山正常生产的情况下,减少运输距离、降低运输成本、提高经济效益,具有推广价值。
附图说明
图1 为露天矿搭建纵向组合桥的方式一示意图;
图2为露天矿搭建纵向组合桥的方式二示意图;
图3为露天矿扇形叠桥俯视图;
图4为图3的A-A剖面示意图。
图5为图3的B-B处桥体纵剖面示意图。
图6为图3的B-B处桥体侧视三维立体图。
图中:1、工作帮,2、排土帮,3、基桥,4、子桥,5、倾斜子桥,6、第一剥离台阶,7、第二剥离台阶,8、第三剥离台阶,9、沟槽,10、端帮,11、端帮运输通道。
具体实施方式
下面将结合附图对本发明的实施例作进一步的描述:
实例1、本发明的露天矿下部中间搭建纵向组合桥运输方法,包括剥离表土,直至煤层底部,形成露天矿坑,步骤如下:
a.利用采掘机械在坑底中部面向煤层方向采掘出一条1/3-1/2年推进度长的沟槽9,然后用剥离物料回填沟槽9并压实;
b.在工作帮1和排土帮2中间建立纵向组合桥,先从沟槽9处向排土帮方向用剥离物料建立基桥3,将工作帮1连通排土帮2,再在基桥3上方搭建子桥4,子桥4的高度与现场剥离台阶的相同;第一剥离台阶6的剥离物料通过基桥3运至排土帮2,第二剥离台阶7的剥离物料通过子桥4运至排土帮2,第三剥离台阶8及以上剥离台阶经斜坡道从子桥4至排土帮2,进行多通道排土工作;所述采场内部搭建中间纵向组合桥为扇形叠桥;依据现场实际需要可在子桥4靠近排土帮2侧搭建倾斜子桥5。
c.随着采剥作业的进行,纵向组合桥逐渐向前延伸,直至回填沟槽9尽头时,挖断纵向组合桥体;
d.重复步骤a、b、c,继续下一段中间搭建纵向组合桥的采剥作业,直到完成整个采剥作业。
如图1-6所示:在工作帮1剥离物料重心处,向内挖掘一沟槽9,预先采出其中煤炭资源,利用剥离物料将其填充,并垂直于工作帮1向排土帮2呈扇形延伸,与排土帮底部台阶对接,完成基桥3建设;基桥贯通后,于其上部搭建同剥离台阶高度等同的子桥4,在子桥靠近排土场处,则于子桥4上继续搭建倾斜子桥5。第一剥离台阶6中部物料通过基桥3运输至排土帮2等标高排土,第二剥离台阶7中部物料通过子桥4运输至排土帮等标高排土,第三剥离台阶8及以上剥离台阶中部物料,下降至子桥4运输,再通过倾斜子桥5爬坡运输至排土帮2相应台阶排土。与绕端帮10运输相比较,减少了物料在工作帮和排土帮的横向运距。
实施例2、与实施例1其本相同,相同之处略。不同之外在于:所述采场内部搭建中间纵向组合桥为线性叠桥,贯通采场的基桥宽度不变。

Claims (3)

1.一种露天矿下部中间搭建纵向组合桥运输方法,包括剥离表土,直至煤层底部,形成露天矿坑,其特征是包括如下步骤:
a.利用采掘机械在坑底中部面向煤层方向采掘出一条1/3-1/2年推进度长的沟槽(9),然后用剥离物料回填沟槽(9)并压实;
b.在工作帮(1)和排土帮(2)中间建立纵向组合桥,先从沟槽(9)处向排土帮方向用剥离物料建立基桥(3),将工作帮(1)连通排土帮(2),再在基桥(3)上方搭建子桥(4),子桥(4)的高度与现场剥离台阶的相同;第一剥离台阶(6)的剥离物料通过基桥(3)运至排土帮(2),第二剥离台阶(7)的剥离物料通过子桥(4)运至排土帮(2),第三剥离台阶(8)及以上剥离台阶经斜坡道从子桥(4)至排土帮(2),进行多通道排土工作;
c.随着采剥作业的进行,纵向组合桥逐渐向前延伸,直至回填沟槽(9)尽头时,挖断纵向组合桥体;
d.重复步骤a、b、c,继续下一段中间搭建纵向组合桥的采剥作业,直到完成整个采剥作业。
2.根据权利要求1所述的露天矿下部中间搭建纵向组合桥运输方法,其特征是:所述在工作帮(1)和排土帮(2)中间建立的纵向组合桥为扇形叠桥或线性叠桥。
3.根据权利要求1所述的露天矿下部中间搭建纵向组合桥运输方法,其特征是:依据现场实际需要可在子桥(4)靠近排土帮(2)侧搭建倾斜子桥(5)。
CN201510209695.9A 2015-04-28 2015-04-28 露天矿采场中间搭建纵向组合桥运输方法 Expired - Fee Related CN104806247B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510209695.9A CN104806247B (zh) 2015-04-28 2015-04-28 露天矿采场中间搭建纵向组合桥运输方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510209695.9A CN104806247B (zh) 2015-04-28 2015-04-28 露天矿采场中间搭建纵向组合桥运输方法

Publications (2)

Publication Number Publication Date
CN104806247A CN104806247A (zh) 2015-07-29
CN104806247B true CN104806247B (zh) 2017-03-08

Family

ID=53691399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510209695.9A Expired - Fee Related CN104806247B (zh) 2015-04-28 2015-04-28 露天矿采场中间搭建纵向组合桥运输方法

Country Status (1)

Country Link
CN (1) CN104806247B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971609A (zh) * 2016-06-03 2016-09-28 华能伊敏煤电有限责任公司 电铲采掘的坡道置换方式
CN108716402B (zh) * 2018-05-21 2019-11-05 中国矿业大学 一种露天煤矿半连续工艺中间桥布置方式
CN109630121B (zh) * 2019-01-30 2020-08-28 新疆天池能源有限责任公司 一种露天矿采区转向开拓运输系统
CN110107299B (zh) * 2019-06-17 2020-12-25 王建鑫 露天煤矿采剥台阶与运输道路布置系统及方法及开采方法
CN110331651B (zh) * 2019-07-24 2021-03-02 辽宁工程技术大学 一种用于连接露天矿采场和内排土场的自移式行车桥
CN110939446B (zh) * 2019-07-29 2020-11-03 中国矿业大学 一种巨厚倾斜煤层采区转向方法
CN110984991B (zh) * 2019-12-12 2021-06-29 神华准格尔能源有限责任公司 露天采场中间桥移设方法
CN112030773B (zh) * 2020-09-17 2021-12-14 王建鑫 一种露天煤矿采场与排土场之间搭桥施工方法
CN115110956B (zh) * 2022-08-11 2025-05-30 中国神华能源股份有限公司哈尔乌素露天煤矿 厚煤层露天矿端帮桥修筑方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100575664C (zh) * 2005-10-15 2009-12-30 中国矿业大学 露天煤矿迈步式搭桥贯通内排运输通路
CN101418690A (zh) * 2008-11-21 2009-04-29 平朔煤炭工业公司 近水平露天矿端帮运输工艺方法
CN103133003B (zh) * 2013-02-25 2015-10-21 中国矿业大学 露天矿端帮靠帮开采方法
CN104405396A (zh) * 2014-12-05 2015-03-11 辽宁工程技术大学 一种过无煤区的露天煤矿留岛搭桥开采方法

Also Published As

Publication number Publication date
CN104806247A (zh) 2015-07-29

Similar Documents

Publication Publication Date Title
CN104806247B (zh) 露天矿采场中间搭建纵向组合桥运输方法
CN109882240B (zh) 一种露天端帮压煤充填开采系统
CN105781554B (zh) 一种露天煤矿拉斗铲无运输倒堆工艺开采方法
CN103306720B (zh) 一种特厚煤层倾斜分层固体充填采煤方法
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN104131829B (zh) 一种固体充填采煤液压支架撤架方法
CN103470262A (zh) 一种露天煤田近水平矿床倒堆内排的开采方法
CN106593448B (zh) 露天煤矿的开采方法
CN108915764A (zh) 一种预留巷道胶结充填回收房式煤柱的方法
US11994027B2 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN103758568A (zh) 露天煤矿端帮充填开采方法
CN104405396A (zh) 一种过无煤区的露天煤矿留岛搭桥开采方法
CN103306713A (zh) 一种高突煤层穿层钻孔网络化加固方法
CN108005657B (zh) 一种含夹石急倾斜薄矿脉群/组的开采方法
JP6684922B2 (ja) ぼたゼロ排出短切羽無支柱石炭採掘方法
CN109869150A (zh) 一种矿山资源分段全采局充开采方法
CN103557001B (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN103334754A (zh) 一种近水平矿床相邻条区转向期间转向方式与开采方法
CN113882860A (zh) 一种重复采动条件下膏体充填围岩控制与保水开采方法
CN113847031A (zh) 一种水体下压煤下行膏体充填围岩维稳方法
JP2020504253A5 (zh)
CN103388478B (zh) 露天煤矿应用吊斗铲的运输道路形成方法
CN108952725B (zh) 一种适用于缓倾斜薄矿体的低贫化采矿方法
CN106468177A (zh) 一种煤与瓦斯协调开采方法
CN203756173U (zh) 一种采后充填原巷道无煤柱沿空掘巷系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu

Applicant after: China Mining Technology Univ.

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China Mining Technology Univ.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20180428