CN104695753B - Lifting antenna tower and erection method thereof - Google Patents
Lifting antenna tower and erection method thereof Download PDFInfo
- Publication number
- CN104695753B CN104695753B CN201310649653.8A CN201310649653A CN104695753B CN 104695753 B CN104695753 B CN 104695753B CN 201310649653 A CN201310649653 A CN 201310649653A CN 104695753 B CN104695753 B CN 104695753B
- Authority
- CN
- China
- Prior art keywords
- lifting
- tower
- antenna
- lifting tower
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Support Of Aerials (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种升降天线塔及其架设方法,属于天线架设装配技术领域。The invention relates to a lifting antenna tower and an erection method thereof, belonging to the technical field of antenna erection and assembly.
背景技术Background technique
通常使用的大功率天线都需要架设在较高的天线塔上。常规天线塔的架设需要较大的场地,并且需要吊车的辅助才能完成架设。但是,经常由于地理条件限制原因(比如陡峭的山坡、可用面积较小的楼顶等地方),常规天线塔架设较为困难。因此现有的天线塔的架设方式还是不够理想。Commonly used high-power antennas need to be erected on relatively high antenna towers. The erection of conventional antenna towers requires a large site and requires the assistance of a crane to complete the erection. However, due to geographical constraints (such as steep hillsides, roofs with small usable areas, etc.), it is difficult to erect conventional antenna towers. Therefore the erection mode of existing antenna tower is still not ideal enough.
发明内容Contents of the invention
本发明解决的技术问题是:提供一种占地面积较小、不需要吊车即可进行架设和拆除、并且架设方便的升降天线塔及其架设方法,以克服现有技术的不足。The technical problem to be solved by the present invention is to provide a lifting antenna tower and its erection method which occupy a small area, can be erected and dismantled without a crane, and are convenient to erect, so as to overcome the deficiencies of the prior art.
本发明是这样实现的:本发明的一种升降天线塔为,它包括由型钢构成且为中空的升降塔座1,在升降塔座1上设有电动绞车2和与其连接的传动机构,在升降塔座1内设有与传动机构连接且由电动绞车2控制升降动作的起重托板3,在起重托板3上放置有多段结构的升降塔4,在位置最高的一段升降塔4顶部设有天线座5,在升降塔座1的一侧面开有可通过一段升降塔4的窗口6。The present invention is realized like this: a kind of lifting antenna tower of the present invention is, it comprises and is made of section steel and is hollow lifting tower base 1, is provided with electric winch 2 and the transmission mechanism connected with it on lifting tower base 1, in The lifting tower base 1 is provided with a lifting pallet 3 connected with a transmission mechanism and controlled by an electric winch 2. A lifting tower 4 with a multi-section structure is placed on the lifting pallet 3. A lifting tower 4 with the highest position is installed on the top of the lifting tower 4. An antenna base 5 is arranged, and a window 6 that can pass through a section of the lifting tower 4 is provided on one side of the lifting tower base 1 .
上述的升降天线塔中,所述的传动机构是由置于电动绞车2上方的上滚轮7,置于电动绞车2下方的两个下滚轮8构成,电动绞车2、上滚轮7以及下滚轮8之间通过钢丝绳9连接。In the above-mentioned lifting antenna tower, the transmission mechanism is composed of an upper roller 7 placed above the electric winch 2 and two lower rollers 8 placed below the electric winch 2. The electric winch 2, the upper roller 7 and the lower roller 8 Connect by steel wire rope 9 between.
前述的升降天线塔中,在升降塔座1上还设有与传动机构连接的手摇绞车10。In the aforementioned lifting antenna tower, a hand winch 10 connected with a transmission mechanism is also provided on the lifting tower base 1 .
前述的升降天线塔中,在升降塔座1内固定有与升降塔4外侧边接触的定位槽钢11。In the aforementioned lifting antenna tower, a positioning channel steel 11 in contact with the outer side of the lifting tower 4 is fixed inside the lifting tower base 1 .
前述的升降天线塔中,在升降塔座1的顶部设有与升降塔4的侧边卡合的导向轮12。In the aforementioned lifting antenna tower, the top of the lifting tower base 1 is provided with a guide wheel 12 that engages with the side of the lifting tower 4 .
前述的升降天线塔中,所述的升降塔座1和升降塔4是三菱柱形。In the aforementioned lifting antenna tower, the lifting tower base 1 and the lifting tower 4 are in the shape of a triangular column.
用于上述升降天线塔的本发明的一种升降天线塔的架设方法为,该方法是在架设升降天线塔时,先将升降塔座固定在需要安装天线的地基上后,将位置最高一段的、顶部安装有天线座的升降塔通过升降塔座的窗口放置在起重托板上;然后启动电动绞车或手摇绞车使传动机构将起重托板连同该段升降塔一起提升,当起重托板升至最高位置时,将起重托板上的升降塔通过螺栓或压板暂时固定在升降塔座上;然后通过电动绞车或手摇绞车将起重托板下降到最低位置处后,再将下一段升降塔通过升降塔座的窗口放置在起重托板上,然后通过电动绞车或手摇绞车使传动机构将起重托板连同该段升降塔一起提升,使其顶端与上一段升降塔的底端对接后,并用螺栓将这两段升降塔连接在一起,然后解除第一段升降塔的固定螺栓或压板后,启动电动绞车或手摇绞车使传动机构将起重托板再次提升到最高位置处后,再通过螺栓或压板将该段升降塔暂时固定在升降塔座上后,再进行下一段的升降塔连接操作,如此循环操作,直至达到所需的天线高度后,将最下面一段的升降塔通过螺栓固定在升降塔座上后,即可完成天线的架设。The erection method of a kind of lifting antenna tower of the present invention that is used for above-mentioned lifting antenna tower is that when erecting the lifting antenna tower, the lifting tower base is first fixed on the foundation where the antenna needs to be installed, and then the highest section of the position is fixed. 1. The lifting tower with the antenna base installed on the top is placed on the lifting pallet through the window of the lifting tower; When reaching the highest position, the lifting tower on the lifting pallet is temporarily fixed on the lifting tower base through bolts or pressure plates; then the lifting pallet is lowered to the lowest position by an electric winch or a hand winch, and then the next lifting tower Place it on the lifting pallet through the window of the lifting tower, and then use the electric winch or hand winch to make the transmission mechanism lift the lifting pallet together with the lifting tower so that the top is docked with the bottom of the previous lifting tower, And use bolts to connect the two sections of lifting towers together, and then remove the fixing bolts or pressure plates of the first section of lifting towers, start the electric winch or hand winch to make the transmission mechanism lift the lifting pallet to the highest position again, and then pass Bolts or pressure plates temporarily fix the section of the lifting tower on the lifting tower base, and then proceed to the next section of the lifting tower connection operation, and so on, until the required antenna height is reached, then the bottom section of the lifting tower is fixed by bolts After being on the lifting tower, the erection of the antenna can be completed.
由于采用了上述技术方案,与现有技术相比,本发明的升降塔座采用常规的型钢,并将升降塔制作成多段结构,一方面大幅节省了占地面积,且便于运输、拆卸;另一方面,在架设时,不需要吊车即可进行架设,并且架设操作非常方便,可轻松地在3~30m范围内调节架设高度。另外,本发明的其余部分采用常规的产品或构件,结构也相对简单,易于制作,生产成本较低。本发明特别适用于高山、狭窄场地等架设困难的场地使用。Due to the adoption of the above technical solution, compared with the prior art, the lifting tower base of the present invention adopts conventional section steel, and the lifting tower is made into a multi-section structure, which greatly saves the floor area on the one hand, and is convenient for transportation and disassembly; on the other hand On the one hand, during erection, it can be erected without a crane, and the erection operation is very convenient, and the erection height can be easily adjusted within the range of 3-30m. In addition, the rest of the invention adopts conventional products or components, and the structure is relatively simple, easy to manufacture, and the production cost is low. The invention is especially suitable for use in places where erection is difficult, such as high mountains and narrow places.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为升降塔座的结构示意图;Fig. 2 is the structural representation of lift tower;
图3为一段升降塔的结构示意图;Fig. 3 is a schematic structural view of a lift tower;
图4为起重托板的结构示意图;Fig. 4 is the structural representation of lifting pallet;
附图的标记为:1-升降塔座,2-电动绞车,3-起重托板,4-升降塔,5-天线座,6-窗口,7-上滚轮,8-下滚轮,9-钢丝绳,10-手摇绞车,11-定位槽钢,12-导向轮。The accompanying drawings are marked as: 1-lifting tower, 2-electric winch, 3-lifting pallet, 4-lifting tower, 5-antenna seat, 6-window, 7-upper roller, 8-lower roller, 9-wire rope , 10-hand winch, 11-positioning channel steel, 12-guiding wheels.
具体实施方式detailed description
本发明的实施例:如图1所示,采用常规的型钢制作一个中空的升降塔座1(其结构如图2所示),在升降塔座1上安装现有市售的电动绞车2和与电动绞车2连接的常规的传动机构,在升降塔座1内安装起重托板3(其结构如图4所示),并将起重托板3与传动机构连接,起重托板3的升降动作由电动绞车2控制,在起重托板3上放置有多段结构的升降塔4(即将升降塔4制作为数段连接的结构,如图3所示为一段升降塔的结构),在位置最高的一段升降塔4顶部安装常规的天线座5,在升降塔座1的一侧面开设可通过一段升降塔4的窗口6。Embodiment of the present invention: as shown in Figure 1, adopt conventional shaped steel to make a hollow lifting tower 1 (its structure as shown in Figure 2), on lifting tower 1, existing commercially available electric winch 2 and The conventional transmission mechanism connected with the electric winch 2 installs the lifting pallet 3 in the lifting tower 1 (its structure is shown in Figure 4), and connects the lifting pallet 3 with the transmission mechanism, and the lifting action of the lifting pallet 3 Controlled by the electric winch 2, a lifting tower 4 with a multi-section structure is placed on the lifting pallet 3 (that is, the lifting tower 4 is made into a structure connected by several sections, as shown in Figure 3, which is a section of the lifting tower structure). A conventional antenna base 5 is installed on the lifting tower 4 top, and one side of the lifting tower base 1 is provided with a window 6 that can pass through a section of the lifting tower 4 .
为了进一步节省制作成本,本发明提供了一种传动机构的结构,即将传动机构由置于电动绞车2上方的上滚轮7,置于电动绞车2下方的两个下滚轮8构成,再将电动绞车2、上滚轮7以及下滚轮8之间通过钢丝绳9连接。In order to further save production costs, the present invention provides a transmission mechanism structure, that is, the transmission mechanism is composed of an upper roller 7 placed above the electric winch 2 and two lower rollers 8 placed below the electric winch 2, and then the electric winch 2. The upper roller 7 and the lower roller 8 are connected by a wire rope 9 .
为了保证在难以接电的环境下架设,进一步提高本发明的实用性,可在升降塔座1上安装一个与传动机构连接的常规手摇绞车10。In order to ensure erection in an environment that is difficult to connect to electricity and further improve the practicability of the present invention, a conventional hand winch 10 connected with a transmission mechanism can be installed on the lifting tower 1 .
为了保证在升降塔4上升或静止时稳定,进一步提高本发明的可靠性,可在升降塔座1内固定连接定位槽钢11,并将定位槽钢11与升降塔4外侧边接触,起到夹持定位的作用。In order to ensure stability when the lifting tower 4 rises or is still, and further improve the reliability of the present invention, the positioning channel steel 11 can be fixedly connected in the lifting tower base 1, and the positioning channel steel 11 is contacted with the outer side of the lifting tower 4 to start to the role of clamping and positioning.
为了保证在升降塔4上升时稳定,更进一步提高本发明的可靠性,可在升降塔座1的顶部安装导向轮12,并将导向轮12与升降塔4的侧边卡合。In order to ensure stability when the lifting tower 4 rises and to further improve the reliability of the present invention, a guide wheel 12 can be installed on the top of the lifting tower base 1, and the guide wheel 12 is engaged with the side of the lifting tower 4.
为了进一步提高本发明整体的稳定性,可将升降塔座1和升降塔4制作成三菱柱形。In order to further improve the overall stability of the present invention, the lifting tower base 1 and the lifting tower 4 can be made into a Mitsubishi column shape.
用于上述升降天线塔的本发明的一种升降天线塔的架设方法为,在架设上述升降天线塔时,先将升降塔座1固定在需要安装天线的地基上后,将位置最高一段的、顶部安装有天线座5的升降塔4通过升降塔座1的窗口6放置在起重托板3上;然后启动电动绞车2或手摇绞车10使传动机构将起重托板3连同该段升降塔4一起提升,当起重托板3升至最高位置时,将起重托板3上的升降塔4通过螺栓或压板暂时固定在升降塔座1上;然后通过电动绞车2或手摇绞车10将起重托板3下降到最低位置处后,再将下一段升降塔4通过升降塔座1的窗口6放置在起重托板3上,然后通过电动绞车2或手摇绞车10使传动机构将起重托板3连同该段升降塔4一起提升,使其顶端与上一段升降塔4的底端对接后,并用螺栓将这两段升降塔4连接在一起,然后解除第一段升降塔4的固定螺栓或压板后,启动电动绞车2或手摇绞车10使传动机构将起重托板3再次提升到最高位置处后,再通过螺栓或压板将该段升降塔4暂时固定在升降塔座1上后,再进行下一段的升降塔4连接操作,如此循环操作,直至达到所需的天线高度后,将最下面一段的升降塔4通过螺栓固定在升降塔座1上后,即可完成天线的架设。The erection method of a kind of lifting antenna tower of the present invention that is used for above-mentioned lifting antenna tower is, when erecting above-mentioned lifting antenna tower, after first fixing lifting tower base 1 on the foundation that needs to install antenna, place the highest section, The lifting tower 4 with the antenna base 5 installed on the top is placed on the lifting pallet 3 through the window 6 of the lifting tower base 1; Lift together, when the lifting pallet 3 rises to the highest position, the lifting tower 4 on the lifting pallet 3 is temporarily fixed on the lifting tower base 1 through bolts or pressure plates; After the plate 3 is lowered to the lowest position, the next lifting tower 4 is placed on the lifting pallet 3 through the window 6 of the lifting tower base 1, and then the transmission mechanism drives the lifting pallet 3 through the electric winch 2 or the hand winch 10. Lift together with the lift tower 4 of this section, make the top end dock with the bottom end of the lift tower 4 of the previous section, and connect the two lift towers 4 together with bolts, and then release the fixing bolts or pressure plates of the lift tower 4 of the first section Finally, start the electric winch 2 or the hand winch 10 to make the transmission mechanism lift the lifting pallet 3 to the highest position again, and then temporarily fix the lifting tower 4 on the lifting tower base 1 by bolts or pressure plates, and then carry out The lifting tower 4 of the next section is connected and operated, and the operation is repeated like this until the required antenna height is reached. After the lifting tower 4 of the bottom section is fixed on the lifting tower base 1 by bolts, the erection of the antenna can be completed.
当需要拆除本发明的升降天线塔时,只需按上述架设方法相反的操作程序操作即可,即通过启动电动绞车2或手摇绞车10使起重托板3将最低一段的升降塔4托住后,将升降塔4与升降塔座1连接的固定螺栓松开,然后通过起重托板3将所有的升降塔4一起下降到一定位置后,将倒数第二段升降塔4通过螺栓或压板暂时固定到升降塔座1上后,即可将最低一段升降塔4与倒数第二段升降塔4的螺栓拆除,这样即可将最低一段的升降塔4从升降塔座1的窗口6处取出,如此循环操作,即可将所有的升降塔4拆除。When the lifting antenna tower of the present invention needs to be removed, it is only necessary to operate according to the opposite operation procedure of the above-mentioned erection method, that is, by starting the electric winch 2 or the hand winch 10, the lifting pallet 3 will support the lifting tower 4 of the lowest section Finally, loosen the fixing bolts connecting the lifting tower 4 to the lifting tower base 1, and then lower all the lifting towers 4 to a certain position through the lifting pallet 3, and temporarily place the penultimate lifting tower 4 through the bolt or the pressure plate. After being fixed on the lifting tower 1, the bolts of the lowest section of the lifting tower 4 and the penultimate section of the lifting tower 4 can be removed, so that the lowest section of the lifting tower 4 can be taken out from the window 6 of the lifting tower 1, By operating in such a cycle, all lifting towers 4 can be removed.
本发明的实施方式不限于上述实施例,在不脱离发明宗旨的前提下做出的各种变化均属于发明的保护范围。The embodiments of the present invention are not limited to the above examples, and various changes made without departing from the gist of the invention belong to the protection scope of the invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310649653.8A CN104695753B (en) | 2013-12-06 | 2013-12-06 | Lifting antenna tower and erection method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310649653.8A CN104695753B (en) | 2013-12-06 | 2013-12-06 | Lifting antenna tower and erection method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104695753A CN104695753A (en) | 2015-06-10 |
| CN104695753B true CN104695753B (en) | 2017-02-22 |
Family
ID=53343264
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310649653.8A Expired - Fee Related CN104695753B (en) | 2013-12-06 | 2013-12-06 | Lifting antenna tower and erection method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104695753B (en) |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20030213647A1 (en) * | 2002-05-20 | 2003-11-20 | Andre St-Germain | Removable tower sleeve |
| CN101858164A (en) * | 2010-06-11 | 2010-10-13 | 吉林省弘邦钢结构制造有限公司 | Lifting communication base station iron tower |
| JP5902513B2 (en) * | 2012-03-09 | 2016-04-13 | 大成建設株式会社 | Construction device |
| CN202651342U (en) * | 2012-07-10 | 2013-01-02 | 刘石泉 | Electric antenna elevating gear |
| CN203603582U (en) * | 2013-12-06 | 2014-05-21 | 贵州振华天通设备有限公司 | Lifting antenna tower |
-
2013
- 2013-12-06 CN CN201310649653.8A patent/CN104695753B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN104695753A (en) | 2015-06-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110745714B (en) | Self-lifting installation method of hoisting tower system | |
| EP2766542A1 (en) | Tower erection system and method | |
| CN103266779B (en) | A kind of sliding and lifting construction equipment and method thereof of crossing horizontal obstacle thing | |
| US8578679B1 (en) | Smokestack assembly | |
| CN201224671Y (en) | Hoisting device for reversely mounting storage tank | |
| CN203715100U (en) | Part replacement device and part replacement system of wind driven generator | |
| CN101774511B (en) | Climbing type hoist and using method thereof | |
| CN103754772B (en) | The part replacement device of wind-driven generator, system and method | |
| CN106759925A (en) | A kind of structure jacking apparatus and structure jacking method | |
| CN212251443U (en) | Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device | |
| CN104695753B (en) | Lifting antenna tower and erection method thereof | |
| CN201338910Y (en) | Simple movable type traveling crane | |
| CN101580214A (en) | Hydraulic lifting method for large-scale equipment | |
| CN201687218U (en) | Installation device of steel shaft well | |
| CN101660660B (en) | Novel installing method of gas cabinet | |
| CN205077842U (en) | Multi -use architecture support | |
| CN203603582U (en) | Lifting antenna tower | |
| CN103663183A (en) | Fast self-mounting tower crane | |
| CN202689498U (en) | Liftable scaffold for simple and easy building outer wall | |
| KR20130073117A (en) | Tower structure construction process | |
| CN203430138U (en) | Ejecting column used for reversely mounting steel stack cylinder | |
| CN205632575U (en) | A elevating platform for segmenting anti - attitude installation fitting -out spare | |
| KR101322917B1 (en) | Method of establishing wind power generator and apparatus thereof | |
| CN103343641B (en) | A kind of Portable lifting signal tower | |
| CN203373771U (en) | Split tower crane foundation transforming steel bearing platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A lifting antenna tower and its erection method Effective date of registration: 20220418 Granted publication date: 20170222 Pledgee: China Construction Bank Corporation Guiyang Chengbei sub branch Pledgor: GUIZHOU ZHENHUA COMMUNICATION EQUIPMENT CO.,LTD. Registration number: Y2022520000017 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 |