[go: up one dir, main page]

CN104695753B - Lifting antenna tower and erection method thereof - Google Patents

Lifting antenna tower and erection method thereof Download PDF

Info

Publication number
CN104695753B
CN104695753B CN201310649653.8A CN201310649653A CN104695753B CN 104695753 B CN104695753 B CN 104695753B CN 201310649653 A CN201310649653 A CN 201310649653A CN 104695753 B CN104695753 B CN 104695753B
Authority
CN
China
Prior art keywords
lifting
tower
antenna
lifting tower
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310649653.8A
Other languages
Chinese (zh)
Other versions
CN104695753A (en
Inventor
潘红兵
王宝刚
王鹰
张海彦
毛云云
郑晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU ZHENHUA TIANTONG EQUIPMENT CO Ltd
Original Assignee
GUIZHOU ZHENHUA TIANTONG EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU ZHENHUA TIANTONG EQUIPMENT CO Ltd filed Critical GUIZHOU ZHENHUA TIANTONG EQUIPMENT CO Ltd
Priority to CN201310649653.8A priority Critical patent/CN104695753B/en
Publication of CN104695753A publication Critical patent/CN104695753A/en
Application granted granted Critical
Publication of CN104695753B publication Critical patent/CN104695753B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Support Of Aerials (AREA)

Abstract

The invention discloses a lifting antenna tower and an erection method of the lifting antenna tower. When the lifting antenna tower is erected, firstly, fixing a lifting tower base to a foundation on which an antenna needs to be installed, and placing the lifting tower on a hoisting support board through a window of the lifting tower base; then starting an electric winch or a manual winch, and temporarily fixing the lifting tower on the hoisting support board to the lifting tower base through bolts or a pressing plate when the hoisting support board is lifted to the highest position along with the section of the lifting tower; lowering the hoisting support board to the lowest position, placing a next section of the lifting tower on the hoisting support board, lifting the hoisting support board and the section of the lifting tower together by means of the electric winch or the manual winch, connecting the two sections of the lifting tower together by bolts after the top end of the section of the lifting tower is abutted with the bottom end of the previous section of the lifting tower, lifting the hoisting support board to the highest position again by removing the fixing bolts or the pressing plate from the section of the lifting tower, temporarily fixing the section of the lifting tower to the hoisting support board by means of the bolts or the pressing plate, and then performing connection operation of another section of the lifting tower. The lifting antenna tower and the erection method of the lifting antenna tower have the advantages of simple structure, convenience in operation, low production cost and the like.

Description

一种升降天线塔及其架设方法Lifting antenna tower and erection method thereof

技术领域technical field

本发明涉及一种升降天线塔及其架设方法,属于天线架设装配技术领域。The invention relates to a lifting antenna tower and an erection method thereof, belonging to the technical field of antenna erection and assembly.

背景技术Background technique

通常使用的大功率天线都需要架设在较高的天线塔上。常规天线塔的架设需要较大的场地,并且需要吊车的辅助才能完成架设。但是,经常由于地理条件限制原因(比如陡峭的山坡、可用面积较小的楼顶等地方),常规天线塔架设较为困难。因此现有的天线塔的架设方式还是不够理想。Commonly used high-power antennas need to be erected on relatively high antenna towers. The erection of conventional antenna towers requires a large site and requires the assistance of a crane to complete the erection. However, due to geographical constraints (such as steep hillsides, roofs with small usable areas, etc.), it is difficult to erect conventional antenna towers. Therefore the erection mode of existing antenna tower is still not ideal enough.

发明内容Contents of the invention

本发明解决的技术问题是:提供一种占地面积较小、不需要吊车即可进行架设和拆除、并且架设方便的升降天线塔及其架设方法,以克服现有技术的不足。The technical problem to be solved by the present invention is to provide a lifting antenna tower and its erection method which occupy a small area, can be erected and dismantled without a crane, and are convenient to erect, so as to overcome the deficiencies of the prior art.

本发明是这样实现的:本发明的一种升降天线塔为,它包括由型钢构成且为中空的升降塔座1,在升降塔座1上设有电动绞车2和与其连接的传动机构,在升降塔座1内设有与传动机构连接且由电动绞车2控制升降动作的起重托板3,在起重托板3上放置有多段结构的升降塔4,在位置最高的一段升降塔4顶部设有天线座5,在升降塔座1的一侧面开有可通过一段升降塔4的窗口6。The present invention is realized like this: a kind of lifting antenna tower of the present invention is, it comprises and is made of section steel and is hollow lifting tower base 1, is provided with electric winch 2 and the transmission mechanism connected with it on lifting tower base 1, in The lifting tower base 1 is provided with a lifting pallet 3 connected with a transmission mechanism and controlled by an electric winch 2. A lifting tower 4 with a multi-section structure is placed on the lifting pallet 3. A lifting tower 4 with the highest position is installed on the top of the lifting tower 4. An antenna base 5 is arranged, and a window 6 that can pass through a section of the lifting tower 4 is provided on one side of the lifting tower base 1 .

上述的升降天线塔中,所述的传动机构是由置于电动绞车2上方的上滚轮7,置于电动绞车2下方的两个下滚轮8构成,电动绞车2、上滚轮7以及下滚轮8之间通过钢丝绳9连接。In the above-mentioned lifting antenna tower, the transmission mechanism is composed of an upper roller 7 placed above the electric winch 2 and two lower rollers 8 placed below the electric winch 2. The electric winch 2, the upper roller 7 and the lower roller 8 Connect by steel wire rope 9 between.

前述的升降天线塔中,在升降塔座1上还设有与传动机构连接的手摇绞车10。In the aforementioned lifting antenna tower, a hand winch 10 connected with a transmission mechanism is also provided on the lifting tower base 1 .

前述的升降天线塔中,在升降塔座1内固定有与升降塔4外侧边接触的定位槽钢11。In the aforementioned lifting antenna tower, a positioning channel steel 11 in contact with the outer side of the lifting tower 4 is fixed inside the lifting tower base 1 .

前述的升降天线塔中,在升降塔座1的顶部设有与升降塔4的侧边卡合的导向轮12。In the aforementioned lifting antenna tower, the top of the lifting tower base 1 is provided with a guide wheel 12 that engages with the side of the lifting tower 4 .

前述的升降天线塔中,所述的升降塔座1和升降塔4是三菱柱形。In the aforementioned lifting antenna tower, the lifting tower base 1 and the lifting tower 4 are in the shape of a triangular column.

用于上述升降天线塔的本发明的一种升降天线塔的架设方法为,该方法是在架设升降天线塔时,先将升降塔座固定在需要安装天线的地基上后,将位置最高一段的、顶部安装有天线座的升降塔通过升降塔座的窗口放置在起重托板上;然后启动电动绞车或手摇绞车使传动机构将起重托板连同该段升降塔一起提升,当起重托板升至最高位置时,将起重托板上的升降塔通过螺栓或压板暂时固定在升降塔座上;然后通过电动绞车或手摇绞车将起重托板下降到最低位置处后,再将下一段升降塔通过升降塔座的窗口放置在起重托板上,然后通过电动绞车或手摇绞车使传动机构将起重托板连同该段升降塔一起提升,使其顶端与上一段升降塔的底端对接后,并用螺栓将这两段升降塔连接在一起,然后解除第一段升降塔的固定螺栓或压板后,启动电动绞车或手摇绞车使传动机构将起重托板再次提升到最高位置处后,再通过螺栓或压板将该段升降塔暂时固定在升降塔座上后,再进行下一段的升降塔连接操作,如此循环操作,直至达到所需的天线高度后,将最下面一段的升降塔通过螺栓固定在升降塔座上后,即可完成天线的架设。The erection method of a kind of lifting antenna tower of the present invention that is used for above-mentioned lifting antenna tower is that when erecting the lifting antenna tower, the lifting tower base is first fixed on the foundation where the antenna needs to be installed, and then the highest section of the position is fixed. 1. The lifting tower with the antenna base installed on the top is placed on the lifting pallet through the window of the lifting tower; When reaching the highest position, the lifting tower on the lifting pallet is temporarily fixed on the lifting tower base through bolts or pressure plates; then the lifting pallet is lowered to the lowest position by an electric winch or a hand winch, and then the next lifting tower Place it on the lifting pallet through the window of the lifting tower, and then use the electric winch or hand winch to make the transmission mechanism lift the lifting pallet together with the lifting tower so that the top is docked with the bottom of the previous lifting tower, And use bolts to connect the two sections of lifting towers together, and then remove the fixing bolts or pressure plates of the first section of lifting towers, start the electric winch or hand winch to make the transmission mechanism lift the lifting pallet to the highest position again, and then pass Bolts or pressure plates temporarily fix the section of the lifting tower on the lifting tower base, and then proceed to the next section of the lifting tower connection operation, and so on, until the required antenna height is reached, then the bottom section of the lifting tower is fixed by bolts After being on the lifting tower, the erection of the antenna can be completed.

由于采用了上述技术方案,与现有技术相比,本发明的升降塔座采用常规的型钢,并将升降塔制作成多段结构,一方面大幅节省了占地面积,且便于运输、拆卸;另一方面,在架设时,不需要吊车即可进行架设,并且架设操作非常方便,可轻松地在3~30m范围内调节架设高度。另外,本发明的其余部分采用常规的产品或构件,结构也相对简单,易于制作,生产成本较低。本发明特别适用于高山、狭窄场地等架设困难的场地使用。Due to the adoption of the above technical solution, compared with the prior art, the lifting tower base of the present invention adopts conventional section steel, and the lifting tower is made into a multi-section structure, which greatly saves the floor area on the one hand, and is convenient for transportation and disassembly; on the other hand On the one hand, during erection, it can be erected without a crane, and the erection operation is very convenient, and the erection height can be easily adjusted within the range of 3-30m. In addition, the rest of the invention adopts conventional products or components, and the structure is relatively simple, easy to manufacture, and the production cost is low. The invention is especially suitable for use in places where erection is difficult, such as high mountains and narrow places.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为升降塔座的结构示意图;Fig. 2 is the structural representation of lift tower;

图3为一段升降塔的结构示意图;Fig. 3 is a schematic structural view of a lift tower;

图4为起重托板的结构示意图;Fig. 4 is the structural representation of lifting pallet;

附图的标记为:1-升降塔座,2-电动绞车,3-起重托板,4-升降塔,5-天线座,6-窗口,7-上滚轮,8-下滚轮,9-钢丝绳,10-手摇绞车,11-定位槽钢,12-导向轮。The accompanying drawings are marked as: 1-lifting tower, 2-electric winch, 3-lifting pallet, 4-lifting tower, 5-antenna seat, 6-window, 7-upper roller, 8-lower roller, 9-wire rope , 10-hand winch, 11-positioning channel steel, 12-guiding wheels.

具体实施方式detailed description

本发明的实施例:如图1所示,采用常规的型钢制作一个中空的升降塔座1(其结构如图2所示),在升降塔座1上安装现有市售的电动绞车2和与电动绞车2连接的常规的传动机构,在升降塔座1内安装起重托板3(其结构如图4所示),并将起重托板3与传动机构连接,起重托板3的升降动作由电动绞车2控制,在起重托板3上放置有多段结构的升降塔4(即将升降塔4制作为数段连接的结构,如图3所示为一段升降塔的结构),在位置最高的一段升降塔4顶部安装常规的天线座5,在升降塔座1的一侧面开设可通过一段升降塔4的窗口6。Embodiment of the present invention: as shown in Figure 1, adopt conventional shaped steel to make a hollow lifting tower 1 (its structure as shown in Figure 2), on lifting tower 1, existing commercially available electric winch 2 and The conventional transmission mechanism connected with the electric winch 2 installs the lifting pallet 3 in the lifting tower 1 (its structure is shown in Figure 4), and connects the lifting pallet 3 with the transmission mechanism, and the lifting action of the lifting pallet 3 Controlled by the electric winch 2, a lifting tower 4 with a multi-section structure is placed on the lifting pallet 3 (that is, the lifting tower 4 is made into a structure connected by several sections, as shown in Figure 3, which is a section of the lifting tower structure). A conventional antenna base 5 is installed on the lifting tower 4 top, and one side of the lifting tower base 1 is provided with a window 6 that can pass through a section of the lifting tower 4 .

为了进一步节省制作成本,本发明提供了一种传动机构的结构,即将传动机构由置于电动绞车2上方的上滚轮7,置于电动绞车2下方的两个下滚轮8构成,再将电动绞车2、上滚轮7以及下滚轮8之间通过钢丝绳9连接。In order to further save production costs, the present invention provides a transmission mechanism structure, that is, the transmission mechanism is composed of an upper roller 7 placed above the electric winch 2 and two lower rollers 8 placed below the electric winch 2, and then the electric winch 2. The upper roller 7 and the lower roller 8 are connected by a wire rope 9 .

为了保证在难以接电的环境下架设,进一步提高本发明的实用性,可在升降塔座1上安装一个与传动机构连接的常规手摇绞车10。In order to ensure erection in an environment that is difficult to connect to electricity and further improve the practicability of the present invention, a conventional hand winch 10 connected with a transmission mechanism can be installed on the lifting tower 1 .

为了保证在升降塔4上升或静止时稳定,进一步提高本发明的可靠性,可在升降塔座1内固定连接定位槽钢11,并将定位槽钢11与升降塔4外侧边接触,起到夹持定位的作用。In order to ensure stability when the lifting tower 4 rises or is still, and further improve the reliability of the present invention, the positioning channel steel 11 can be fixedly connected in the lifting tower base 1, and the positioning channel steel 11 is contacted with the outer side of the lifting tower 4 to start to the role of clamping and positioning.

为了保证在升降塔4上升时稳定,更进一步提高本发明的可靠性,可在升降塔座1的顶部安装导向轮12,并将导向轮12与升降塔4的侧边卡合。In order to ensure stability when the lifting tower 4 rises and to further improve the reliability of the present invention, a guide wheel 12 can be installed on the top of the lifting tower base 1, and the guide wheel 12 is engaged with the side of the lifting tower 4.

为了进一步提高本发明整体的稳定性,可将升降塔座1和升降塔4制作成三菱柱形。In order to further improve the overall stability of the present invention, the lifting tower base 1 and the lifting tower 4 can be made into a Mitsubishi column shape.

用于上述升降天线塔的本发明的一种升降天线塔的架设方法为,在架设上述升降天线塔时,先将升降塔座1固定在需要安装天线的地基上后,将位置最高一段的、顶部安装有天线座5的升降塔4通过升降塔座1的窗口6放置在起重托板3上;然后启动电动绞车2或手摇绞车10使传动机构将起重托板3连同该段升降塔4一起提升,当起重托板3升至最高位置时,将起重托板3上的升降塔4通过螺栓或压板暂时固定在升降塔座1上;然后通过电动绞车2或手摇绞车10将起重托板3下降到最低位置处后,再将下一段升降塔4通过升降塔座1的窗口6放置在起重托板3上,然后通过电动绞车2或手摇绞车10使传动机构将起重托板3连同该段升降塔4一起提升,使其顶端与上一段升降塔4的底端对接后,并用螺栓将这两段升降塔4连接在一起,然后解除第一段升降塔4的固定螺栓或压板后,启动电动绞车2或手摇绞车10使传动机构将起重托板3再次提升到最高位置处后,再通过螺栓或压板将该段升降塔4暂时固定在升降塔座1上后,再进行下一段的升降塔4连接操作,如此循环操作,直至达到所需的天线高度后,将最下面一段的升降塔4通过螺栓固定在升降塔座1上后,即可完成天线的架设。The erection method of a kind of lifting antenna tower of the present invention that is used for above-mentioned lifting antenna tower is, when erecting above-mentioned lifting antenna tower, after first fixing lifting tower base 1 on the foundation that needs to install antenna, place the highest section, The lifting tower 4 with the antenna base 5 installed on the top is placed on the lifting pallet 3 through the window 6 of the lifting tower base 1; Lift together, when the lifting pallet 3 rises to the highest position, the lifting tower 4 on the lifting pallet 3 is temporarily fixed on the lifting tower base 1 through bolts or pressure plates; After the plate 3 is lowered to the lowest position, the next lifting tower 4 is placed on the lifting pallet 3 through the window 6 of the lifting tower base 1, and then the transmission mechanism drives the lifting pallet 3 through the electric winch 2 or the hand winch 10. Lift together with the lift tower 4 of this section, make the top end dock with the bottom end of the lift tower 4 of the previous section, and connect the two lift towers 4 together with bolts, and then release the fixing bolts or pressure plates of the lift tower 4 of the first section Finally, start the electric winch 2 or the hand winch 10 to make the transmission mechanism lift the lifting pallet 3 to the highest position again, and then temporarily fix the lifting tower 4 on the lifting tower base 1 by bolts or pressure plates, and then carry out The lifting tower 4 of the next section is connected and operated, and the operation is repeated like this until the required antenna height is reached. After the lifting tower 4 of the bottom section is fixed on the lifting tower base 1 by bolts, the erection of the antenna can be completed.

当需要拆除本发明的升降天线塔时,只需按上述架设方法相反的操作程序操作即可,即通过启动电动绞车2或手摇绞车10使起重托板3将最低一段的升降塔4托住后,将升降塔4与升降塔座1连接的固定螺栓松开,然后通过起重托板3将所有的升降塔4一起下降到一定位置后,将倒数第二段升降塔4通过螺栓或压板暂时固定到升降塔座1上后,即可将最低一段升降塔4与倒数第二段升降塔4的螺栓拆除,这样即可将最低一段的升降塔4从升降塔座1的窗口6处取出,如此循环操作,即可将所有的升降塔4拆除。When the lifting antenna tower of the present invention needs to be removed, it is only necessary to operate according to the opposite operation procedure of the above-mentioned erection method, that is, by starting the electric winch 2 or the hand winch 10, the lifting pallet 3 will support the lifting tower 4 of the lowest section Finally, loosen the fixing bolts connecting the lifting tower 4 to the lifting tower base 1, and then lower all the lifting towers 4 to a certain position through the lifting pallet 3, and temporarily place the penultimate lifting tower 4 through the bolt or the pressure plate. After being fixed on the lifting tower 1, the bolts of the lowest section of the lifting tower 4 and the penultimate section of the lifting tower 4 can be removed, so that the lowest section of the lifting tower 4 can be taken out from the window 6 of the lifting tower 1, By operating in such a cycle, all lifting towers 4 can be removed.

本发明的实施方式不限于上述实施例,在不脱离发明宗旨的前提下做出的各种变化均属于发明的保护范围。The embodiments of the present invention are not limited to the above examples, and various changes made without departing from the gist of the invention belong to the protection scope of the invention.

Claims (3)

1.一种升降天线塔,其特征在于:它包括由型钢构成且为中空的升降塔座(1),在升降塔座(1)上设有电动绞车(2)和与其连接的传动机构,在升降塔座(1)内设有与传动机构连接且由电动绞车(2)控制升降动作的起重托板(3),在起重托板(3)上放置有多段结构的升降塔(4),在位置最高的一段升降塔(4)顶部设有天线座(5),在升降塔座(1)的一侧面开有可通过一段升降塔(4)的窗口(6);在升降塔座(1)上还设有与传动机构连接的手摇绞车(10),在升降塔座(1)内固定有与升降塔(4)外侧边接触的定位槽钢(11),在升降塔座(1)的顶部设有与升降塔(4)的侧边卡合的导向轮(12)。1. A lifting antenna tower, characterized in that: it comprises a hollow lifting tower base (1) made of section steel, an electric winch (2) and a transmission mechanism connected thereto are arranged on the lifting tower base (1), A lifting pallet (3) connected to the transmission mechanism and controlled by an electric winch (2) is provided inside the lifting tower (1), and a lifting tower (4) with a multi-stage structure is placed on the lifting pallet (3) , an antenna base (5) is provided on the top of the lift tower (4) at the highest position, and a window (6) that can pass through a lift tower (4) is opened on one side of the lift tower base (1); (1) is also provided with a hand winch (10) connected to the transmission mechanism, and a positioning channel steel (11) in contact with the outer side of the lifting tower (4) is fixed in the lifting tower base (1). The top of the seat (1) is provided with a guide wheel (12) engaged with the side of the lifting tower (4). 2.根据权利要求1所述的升降天线塔,其特征在于:所述的传动机构是由置于电动绞车(2)上方的上滚轮(7),置于电动绞车(2)下方的两个下滚轮(8)构成,电动绞车(2)、上滚轮(7)以及下滚轮(8)之间通过钢丝绳(9)连接。2. The lifting antenna tower according to claim 1, characterized in that: the transmission mechanism is composed of an upper roller (7) placed above the electric winch (2), and two rollers placed below the electric winch (2). The lower roller (8) is formed, and the electric winch (2), the upper roller (7) and the lower roller (8) are connected by a wire rope (9). 3.一种升降天线塔的架设方法,其特征在于:在架设升降天线塔时,先将升降塔座(1)固定在需要安装天线的地基上后,将位置最高一段的、顶部安装有天线座(5)的升降塔(4)通过升降塔座(1)的窗口(6)放置在起重托板(3)上;然后启动电动绞车(2)或手摇绞车(10)使传动机构将起重托板(3)连同该段升降塔(4)一起提升,当起重托板(3)升至最高位置时,将起重托板(3)上的升降塔(4)通过螺栓或压板暂时固定在升降塔座(1)上;然后通过电动绞车(2)或手摇绞车(10)将起重托板(3)下降到最低位置处后,再将下一段升降塔(4)通过升降塔座(1)的窗口(6)放置在起重托板(3)上,然后通过电动绞车(2)或手摇绞车(10)使传动机构将起重托板(3)连同该段升降塔(4)一起提升,使其顶端与上一段升降塔(4)的底端对接后,并用螺栓将这两段升降塔(4)连接在一起,然后解除第一段升降塔(4)的固定螺栓或压板后,启动电动绞车(2)或手摇绞车(10)使传动机构将起重托板(3)再次提升到最高位置处后,再通过螺栓或压板将该段升降塔(4)暂时固定在升降塔座(1)上后,再进行下一段的升降塔(4)连接操作,如此循环操作,直至达到所需的天线高度后,将最下面一段的升降塔(4)通过螺栓固定在升降塔座(1)上后,即可完成天线的架设。3. A method for erecting an elevating antenna tower, characterized in that: when erecting an elevating antenna tower, first fix the elevating tower base (1) on the foundation where the antenna needs to be installed, and then install the highest section with the antenna on the top The lifting tower (4) of the lifting tower (5) is placed on the lifting pallet (3) through the window (6) of the lifting tower (1); then start the electric winch (2) or the hand winch (10) so that the transmission mechanism will The lifting pallet (3) is lifted together with the lifting tower (4) of this section, when the lifting pallet (3) is raised to the highest position, the lifting tower (4) on the lifting pallet (3) is temporarily fixed by bolts or pressure plates On the lifting tower (1); then lower the lifting pallet (3) to the lowest position through the electric winch (2) or hand winch (10), and then pass the next section of the lifting tower (4) through the lifting tower The window (6) of (1) is placed on the lifting pallet (3), and then through the electric winch (2) or the hand winch (10), the transmission mechanism will connect the lifting pallet (3) together with the lifting tower (4) Lift together so that the top end is docked with the bottom end of the previous lifting tower (4), and connect the two lifting towers (4) together with bolts, and then remove the fixing bolts or pressure plates of the first lifting tower (4) Finally, start the electric winch (2) or hand winch (10) to make the transmission mechanism lift the lifting pallet (3) to the highest position again, and then temporarily fix the lifting tower (4) on the lifting After the tower base (1) is installed, the next section of the lifting tower (4) is connected, and the operation is repeated until the required antenna height is reached, and the bottom section of the lifting tower (4) is fixed to the lifting tower by bolts After the seat (1) is installed, the erection of the antenna can be completed.
CN201310649653.8A 2013-12-06 2013-12-06 Lifting antenna tower and erection method thereof Expired - Fee Related CN104695753B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310649653.8A CN104695753B (en) 2013-12-06 2013-12-06 Lifting antenna tower and erection method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310649653.8A CN104695753B (en) 2013-12-06 2013-12-06 Lifting antenna tower and erection method thereof

Publications (2)

Publication Number Publication Date
CN104695753A CN104695753A (en) 2015-06-10
CN104695753B true CN104695753B (en) 2017-02-22

Family

ID=53343264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310649653.8A Expired - Fee Related CN104695753B (en) 2013-12-06 2013-12-06 Lifting antenna tower and erection method thereof

Country Status (1)

Country Link
CN (1) CN104695753B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030213647A1 (en) * 2002-05-20 2003-11-20 Andre St-Germain Removable tower sleeve
CN101858164A (en) * 2010-06-11 2010-10-13 吉林省弘邦钢结构制造有限公司 Lifting communication base station iron tower
JP5902513B2 (en) * 2012-03-09 2016-04-13 大成建設株式会社 Construction device
CN202651342U (en) * 2012-07-10 2013-01-02 刘石泉 Electric antenna elevating gear
CN203603582U (en) * 2013-12-06 2014-05-21 贵州振华天通设备有限公司 Lifting antenna tower

Also Published As

Publication number Publication date
CN104695753A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN110745714B (en) Self-lifting installation method of hoisting tower system
EP2766542A1 (en) Tower erection system and method
CN103266779B (en) A kind of sliding and lifting construction equipment and method thereof of crossing horizontal obstacle thing
US8578679B1 (en) Smokestack assembly
CN201224671Y (en) Hoisting device for reversely mounting storage tank
CN203715100U (en) Part replacement device and part replacement system of wind driven generator
CN101774511B (en) Climbing type hoist and using method thereof
CN103754772B (en) The part replacement device of wind-driven generator, system and method
CN106759925A (en) A kind of structure jacking apparatus and structure jacking method
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN104695753B (en) Lifting antenna tower and erection method thereof
CN201338910Y (en) Simple movable type traveling crane
CN101580214A (en) Hydraulic lifting method for large-scale equipment
CN201687218U (en) Installation device of steel shaft well
CN101660660B (en) Novel installing method of gas cabinet
CN205077842U (en) Multi -use architecture support
CN203603582U (en) Lifting antenna tower
CN103663183A (en) Fast self-mounting tower crane
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
KR20130073117A (en) Tower structure construction process
CN203430138U (en) Ejecting column used for reversely mounting steel stack cylinder
CN205632575U (en) A elevating platform for segmenting anti - attitude installation fitting -out spare
KR101322917B1 (en) Method of establishing wind power generator and apparatus thereof
CN103343641B (en) A kind of Portable lifting signal tower
CN203373771U (en) Split tower crane foundation transforming steel bearing platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A lifting antenna tower and its erection method

Effective date of registration: 20220418

Granted publication date: 20170222

Pledgee: China Construction Bank Corporation Guiyang Chengbei sub branch

Pledgor: GUIZHOU ZHENHUA COMMUNICATION EQUIPMENT CO.,LTD.

Registration number: Y2022520000017

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222