CN104578011A - Cable line fault isolation method, device and system - Google Patents
Cable line fault isolation method, device and system Download PDFInfo
- Publication number
- CN104578011A CN104578011A CN201510039813.6A CN201510039813A CN104578011A CN 104578011 A CN104578011 A CN 104578011A CN 201510039813 A CN201510039813 A CN 201510039813A CN 104578011 A CN104578011 A CN 104578011A
- Authority
- CN
- China
- Prior art keywords
- zero
- sequence current
- demarcation switch
- load side
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明公开一种电缆线路故障隔离方法、装置和系统。所述方法包括:获取负荷侧的零序电流;判断所述零序电流是否超出预设零序电流值区间;如果是,控制负荷侧的智能分界开关断开。采用发明提供的技术方案,在具体某一负荷侧发生故障时,只需要断开发生故障负荷侧的智能分界开关,不需要将线路开关断开,能够有效减小停电区域。
The invention discloses a cable line fault isolation method, device and system. The method includes: acquiring the zero-sequence current on the load side; judging whether the zero-sequence current exceeds a preset zero-sequence current value interval; if yes, controlling the intelligent boundary switch on the load side to be turned off. By adopting the technical solution provided by the invention, when a specific load side fails, only the intelligent boundary switch on the faulty load side needs to be disconnected, and the line switch does not need to be disconnected, which can effectively reduce the blackout area.
Description
技术领域technical field
本发明涉及电力技术领域,尤其涉及一种电缆线路故障隔离方法、装置和系统。The invention relates to the field of electric power technology, in particular to a cable line fault isolation method, device and system.
背景技术Background technique
电力是以电能作为动力的能源。电力发明于19世纪70年代,电力的发明和应用掀起了第二次工业化高潮,成为18世纪以来,世界发生的三次科技革命之一,从此科技更加快速地改变着人们的生活。20世纪出现的大规模电力系统是人类工程科学史上最重要的成就之一,是由发电、输电、变电、配电和用电等环节组成的电力生产与消费系统,它将自然界的一次能源通过机械能装置转化成电力,再经输电、变电和配电将电力供应到各用户。当今是互联网的时代,但我们仍然对电力有着持续增长的需求,因为我们发明了电脑、家电等更多使用电力的产品。不可否认,新技术的不断出现使得电力成为了人们的必需品。Electricity is an energy source powered by electrical energy. Electricity was invented in the 1870s. The invention and application of electricity set off the second industrialization upsurge and became one of the three scientific and technological revolutions in the world since the 18th century. Since then, technology has changed people's lives more rapidly. The large-scale power system that appeared in the 20th century is one of the most important achievements in the history of human engineering science. It is a power production and consumption system composed of power generation, power transmission, power transformation, power distribution and power consumption. It is converted into electricity through mechanical energy devices, and then supplied to various users through power transmission, transformation and distribution. Today is the age of the Internet, but we still have a growing demand for electricity because we have invented computers, home appliances, and more products that use electricity. It is undeniable that the continuous emergence of new technologies has made electricity a necessity for people.
随着配电线路传输距离远、支线多,环境和气候条件恶劣,外破、设备故障和雷电等自然灾害常常导致故障率较高。目前,10kV配电系统普遍采用电网中性点不接地或经消弧线圈接地的小电流接地方式,采用这种方式,小电流接地选线装置轻巧方便,便于安装和调试,并且故障检测的准确性也有所提高。With the long transmission distance of distribution lines, many branch lines, and harsh environmental and climatic conditions, natural disasters such as external breakage, equipment failure, and lightning often lead to a high failure rate. At present, the 10kV power distribution system generally adopts the small current grounding method in which the neutral point of the power grid is not grounded or grounded through the arc suppression coil. In this way, the small current grounding line selection device is light and convenient, easy to install and debug, and the fault detection is accurate. Sex has also improved.
但是,目前的技术中,在电力系统负荷侧发生单相接地故障时,无法定位到具体的故障点,只能定位到配电线路,因此,一旦负荷侧发生单相接地故障,只能通过跳出线路开关的方式来切除故障线路,使得该线路全部停电,影响区域较大。However, in the current technology, when a single-phase ground fault occurs on the load side of the power system, the specific fault point cannot be located, only the distribution line can be located. Therefore, once a single-phase ground fault occurs on the load side, only by jumping out The faulty line is cut off by means of a line switch, so that all the lines are powered off, and the affected area is relatively large.
发明内容Contents of the invention
有鉴于此,本发明提供了一种电缆线路故障隔离方法、装置和系统,能够在具体某一负荷侧发生故障时,只需要断开发生故障负荷侧的智能分界开关,不需要将线路开关断开,能够有效减小停电区域。In view of this, the present invention provides a fault isolation method, device and system for a cable line. When a fault occurs on a specific load side, only the intelligent boundary switch on the faulty load side needs to be disconnected, and the line switch does not need to be disconnected. Open, can effectively reduce the blackout area.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种电缆线路故障隔离方法,包括:A cable line fault isolation method, comprising:
获取负荷侧的零序电流;Obtain the zero-sequence current on the load side;
判断所述零序电流是否超出预设零序电流值区间;judging whether the zero-sequence current exceeds a preset zero-sequence current value range;
如果是,控制负荷侧的智能分界开关断开。If it is, the intelligent demarcation switch on the control load side is disconnected.
优选的,所述获取负荷侧的零序电流之前,还包括:Preferably, before obtaining the zero-sequence current of the load side, it also includes:
控制零序电流互感器检测负荷侧的所述零序电流。The zero-sequence current transformer is controlled to detect the zero-sequence current at the load side.
优选的,还包括:Preferably, it also includes:
控制通信模块向预设移动终端和配电网服务器发送故障信息,所述故障信息包括所述智能分界开关的位置信息和状态信息。The control communication module sends fault information to the preset mobile terminal and the distribution network server, and the fault information includes position information and status information of the intelligent boundary switch.
优选的,所述通信模块为无线通信模块。Preferably, the communication module is a wireless communication module.
优选的,还包括:Preferably, it also includes:
通过所述通信模块获取对所述智能分界开关的控制指令,所述控制指令包括控制所述智能分界开关闭合。A control instruction for the intelligent boundary switch is obtained through the communication module, and the control instruction includes controlling the closing of the intelligent boundary switch.
一种电缆线路故障隔离装置,包括:A cable line fault isolation device, comprising:
第一获取单元,用于获取负荷侧的零序电流;a first acquisition unit, configured to acquire the zero-sequence current on the load side;
判断单元,用于判断所述零序电流是否超出预设零序电流值区间;A judging unit, configured to judge whether the zero-sequence current exceeds a preset zero-sequence current value interval;
第一控制单元,用于当所述零序电流超出预设零序电流值区间时,控制负荷侧的智能分界开关断开。The first control unit is configured to control the intelligent boundary switch on the load side to turn off when the zero-sequence current exceeds a preset zero-sequence current value interval.
优选的,还包括:Preferably, it also includes:
第二控制单元,用于控制零序电流互感器检测负荷侧的零序电流。The second control unit is used to control the zero-sequence current transformer to detect the zero-sequence current on the load side.
优选的,还包括:Preferably, it also includes:
第三控制单元,用于控制通信模块向预设移动终端和配电网服务器发送故障信息,所述故障信息包括所述智能分界开关的位置信息和状态信息;The third control unit is used to control the communication module to send fault information to the preset mobile terminal and the distribution network server, and the fault information includes the position information and status information of the intelligent boundary switch;
第二获取单元,用于通过所述通信模块获取对所述智能分界开关的控制指令,所述控制指令包括控制所述智能分界开关闭合。The second obtaining unit is configured to obtain a control instruction for the intelligent boundary switch through the communication module, where the control instruction includes controlling the closing of the intelligent boundary switch.
一种电缆线路故障隔离系统,包括:A cable line fault isolation system comprising:
智能分界开关控制器;与所述智能分界开关控制器相连接,设置于所述智能分界开关控制器内部的零序电流互感器;以及与所述智能分界开关控制器相连接的智能分界开关;An intelligent boundary switch controller; connected with the intelligent boundary switch controller, a zero-sequence current transformer arranged inside the intelligent boundary switch controller; and an intelligent boundary switch connected with the intelligent boundary switch controller;
所述智能分界开关控制器的控制操作包括,获取负荷侧的零序电流,判断所述零序电流是否超出预设零序电流值区间,如果是,控制负荷侧的所述智能分界开关断开;The control operation of the intelligent boundary switch controller includes obtaining the zero-sequence current on the load side, judging whether the zero-sequence current exceeds the preset zero-sequence current value range, and if so, controlling the intelligent boundary switch on the load side to turn off ;
所述零序电流互感器用于,检测负荷侧的零序电流。The zero-sequence current transformer is used to detect the zero-sequence current on the load side.
优选的,还包括:Preferably, it also includes:
与所述智能分界开关控制器相连接的通信模块,用于向预设移动终端和配电网服务器发送故障信息,所述故障信息包括所述智能分界开关的位置信息和状态信息,以及获取对所述智能分界开关的控制指令,所述控制指令包括控制所述智能分界开关闭合。The communication module connected with the intelligent demarcation switch controller is used to send fault information to the preset mobile terminal and the distribution network server, the fault information includes the position information and status information of the intelligent demarcation switch, and obtains the corresponding The control instruction of the intelligent boundary switch, the control instruction includes controlling the closing of the intelligent boundary switch.
经由上述的技术方案可知,与现有技术相比,本发明提供了一种电缆线路故障隔离方法、装置和系统。采用本发明提供的技术方案,首先获取负荷侧的零序电流;判断所述零序电流是否超出预设零序电流值区间;如果是,说明负荷侧发生单相接地故障,此时控制负荷侧的智能分界开关断开,所述智能分界开关位于负荷侧,断开某负荷侧的智能分界开关只会使该负荷侧用户用电区域断电。因此,本发明提供的技术方案,负荷侧发生单相接地故障时,能够准确定位故障点,即具体某一负荷侧发生故障,相对于现有技术定位进一步精确,只需要断开发生故障负荷侧的智能分界开关即可,不需要将线路开关断开,因此能够使该线路其他无故障负荷侧正常供电,即有效减小停电区域。It can be seen from the above technical solutions that, compared with the prior art, the present invention provides a cable line fault isolation method, device and system. Using the technical solution provided by the present invention, first obtain the zero-sequence current on the load side; judge whether the zero-sequence current exceeds the preset zero-sequence current value range; The intelligent demarcation switch is disconnected, and the intelligent demarcation switch is located on the load side, and disconnecting the intelligent demarcation switch on a certain load side will only cut off the power supply of the user's power consumption area on the load side. Therefore, the technical solution provided by the present invention can accurately locate the fault point when a single-phase ground fault occurs on the load side, that is, a fault occurs on a specific load side. The intelligent demarcation switch is enough, and there is no need to disconnect the line switch, so the other fault-free load side of the line can be powered normally, that is, the blackout area can be effectively reduced.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only It is an embodiment of the present invention, and those skilled in the art can also obtain other drawings according to the provided drawings without creative work.
图1为本发明实施例提供的一种电缆线路故障隔离方法的流程图;Fig. 1 is a flow chart of a cable line fault isolation method provided by an embodiment of the present invention;
图2为本发明实施例提供的另外一种电缆线路故障隔离方法的流程图;Fig. 2 is the flow chart of another kind of cable line fault isolation method provided by the embodiment of the present invention;
图3为本发明实施例提供的一种电缆线路故障隔离装置的结构图;3 is a structural diagram of a cable line fault isolation device provided by an embodiment of the present invention;
图4为本发明实施例提供的一种电缆线路故障隔离系统的结构图。Fig. 4 is a structural diagram of a cable line fault isolation system provided by an embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
为使本发明的上述目的、特征和优点能够更加明显易懂,下面结合附图和具体实施方式对本发明作进一步详细的说明。In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
实施例一Embodiment one
请参阅图1,图1为本发明实施例提供的一种电缆线路故障隔离方法的流程图。如图1所示,该方法包括:Please refer to FIG. 1 . FIG. 1 is a flow chart of a cable line fault isolation method provided by an embodiment of the present invention. As shown in Figure 1, the method includes:
步骤S101,获取负荷侧的零序电流;Step S101, obtaining the zero-sequence current at the load side;
具体的,通过零序电流互感器获取负荷侧的零序电流。Specifically, the zero-sequence current on the load side is obtained through a zero-sequence current transformer.
进一步的,所述获取零序电流之前,还包括:Further, before obtaining the zero-sequence current, it also includes:
控制零序电流互感器检测负荷侧的零序电流。Control the zero-sequence current transformer to detect the zero-sequence current on the load side.
步骤S102,判断所述零序电流是否超出预设零序电流值区间;Step S102, judging whether the zero-sequence current exceeds a preset zero-sequence current value interval;
具体的,所述预设零序电流值区间可选的,为(i1~i2),其中,i1为所述预设零序电流值区间最小值,i2为所述预设零序电流值区间最大值。执行所述步骤S102得到是或者否的判断结果,若判断结果为是,执行步骤S103;若判断结果为否,所述智能分界开关维持关闭状态,返回所述步骤S101。Specifically, the preset zero-sequence current value interval is optional, and is (i1~i2), wherein, i1 is the minimum value of the preset zero-sequence current value interval, and i2 is the preset zero-sequence current value interval maximum value. Execute the step S102 to obtain a yes or no judgment result, if the judgment result is yes, execute step S103; if the judgment result is no, the intelligent boundary switch remains closed and returns to the step S101.
步骤S103,控制负荷侧的智能分界开关断开;Step S103, control the intelligent boundary switch on the load side to be turned off;
具体的,当所述零序电流超出预设零序电流值区间时,说明该负荷侧发生了单相接地故障,此时控制该负荷侧的智能分界开关断开,切断电力供应以防止安全事故的发生。Specifically, when the zero-sequence current exceeds the preset zero-sequence current value interval, it indicates that a single-phase ground fault has occurred on the load side. At this time, the intelligent boundary switch controlling the load side is turned off, and the power supply is cut off to prevent safety accidents. happened.
采用本发明实施例一提供的技术方案,首先获取负荷侧的零序电流;判断所述零序电流是否超出预设零序电流值区间;如果是,说明负荷侧发生单相接地故障,此时控制负荷侧的智能分界开关断开,所述智能分界开关位于负荷侧,断开某负荷侧的智能分界开关只会使该负荷侧用户用电区域断电。因此,本发明提供的技术方案,负荷侧发生单相接地故障时,能够准确定位故障点,即具体某一负荷侧发生故障,相对于现有技术定位进一步精确,只需要断开发生故障负荷侧的智能分界开关即可,不需要将线路开关断开,因此能够使该线路其他无故障负荷侧正常供电,即有效减小停电区域。Using the technical solution provided by Embodiment 1 of the present invention, first obtain the zero-sequence current on the load side; judge whether the zero-sequence current exceeds the preset zero-sequence current value interval; if so, it means that a single-phase ground fault occurs on the load side, and The intelligent boundary switch on the load side is controlled to be turned off, and the intelligent boundary switch is located on the load side. Turning off the intelligent boundary switch on a certain load side will only cut off power in the user's power consumption area on the load side. Therefore, the technical solution provided by the present invention can accurately locate the fault point when a single-phase ground fault occurs on the load side, that is, a fault occurs on a specific load side. The intelligent demarcation switch is enough, and there is no need to disconnect the line switch, so the other fault-free load side of the line can be powered normally, that is, the blackout area can be effectively reduced.
另外,现有的技术中,控制负荷侧的智能分界开关断开,实施故障隔离之后,检修人员一般在被动的接收到故障负荷侧用户的反馈后才知晓发生了故障,然后才能去检修,效率很低。为了解决这一问题,本发明还公开了具体实施例二。In addition, in the existing technology, the intelligent boundary switch on the control load side is disconnected, and after the fault isolation is implemented, the maintenance personnel usually know that a fault has occurred after passively receiving feedback from the user on the fault load side, and then they can go for maintenance. very low. In order to solve this problem, the present invention also discloses a second specific embodiment.
实施例二Embodiment two
请参阅图2,图2为本发明实施例提供的另外一种电缆线路故障隔离方法的流程图。如图2所示,该方法包括:Please refer to FIG. 2 . FIG. 2 is a flow chart of another cable line fault isolation method provided by an embodiment of the present invention. As shown in Figure 2, the method includes:
步骤S201,获取负荷侧的零序电流;Step S201, obtaining the zero-sequence current at the load side;
步骤S202,判断所述零序电流是否超出预设零序电流值区间;Step S202, judging whether the zero-sequence current exceeds a preset zero-sequence current value interval;
具体的,如果是,依次执行所述步骤S203、S204和S205;如果否,返回所述步骤S201;Specifically, if yes, execute the steps S203, S204 and S205 in sequence; if no, return to the step S201;
步骤S203,控制负荷侧的智能分界开关断开;Step S203, controlling the intelligent boundary switch on the load side to be turned off;
步骤S204,控制通信模块向预设移动终端和配电网服务器发送故障信息;Step S204, controlling the communication module to send fault information to the preset mobile terminal and the distribution network server;
具体的,所述故障信息包括所述智能分界开关的位置信息和状态信息;所述智能分界开关的位置信息能够表征发生单相接地故障的负荷侧的具体位置,所述状态信息包括所述智能分界开关的断开状态或者闭合状态信息。Specifically, the fault information includes position information and state information of the intelligent boundary switch; the position information of the intelligent boundary switch can represent the specific position of the load side where a single-phase ground fault occurs, and the state information includes the intelligent Open state or closed state information of the demarcation switch.
具体的,所述通信模块为无线通信模块,所述通信模块通过无线网络向预设移动终端和配电网服务器发送故障信息。Specifically, the communication module is a wireless communication module, and the communication module sends fault information to a preset mobile terminal and a distribution network server through a wireless network.
进一步的,所述无线通信模块,适用于目前主流的无线通信网络,比如GPRS(General Packet Radio Service,通用分组无线服务技术)网络、CDMA(Code Division Multiple Access,码分多址)网络、WCDMA(Wideband CodeDivision Multiple Access,宽带码分多址)网络、TD-LTE(Time Division LongTerm Evolution,分时长期演进)网络等。Further, the wireless communication module is applicable to current mainstream wireless communication networks, such as GPRS (General Packet Radio Service, general packet radio service technology) network, CDMA (Code Division Multiple Access, code division multiple access) network, WCDMA ( Wideband Code Division Multiple Access (WCDMA) network, TD-LTE (Time Division Long Term Evolution, Time Division Long Term Evolution) network, etc.
步骤S205,通过所述通信模块获取对所述智能分界开关的控制指令;Step S205, obtaining a control instruction for the intelligent boundary switch through the communication module;
具体的,所述控制指令包括控制所述智能分界开关闭合。Specifically, the control instruction includes controlling the closing of the intelligent boundary switch.
步骤S206,响应所述控制指令,控制所述智能分界开关闭合。Step S206, in response to the control instruction, control the smart boundary switch to close.
可见,本发明提供的技术方案,除了在现场人工对设备实施闭合外,还能够通过所述通信模块远程获取闭合指令,所述闭合指令针对所述智能分界开关。所述通信模块为无线通信模块。即,检修人员通过移动终端设备(比如,手机)经无线通信网络发送控制指令给无线通信模块。It can be seen that, in the technical solution provided by the present invention, in addition to manually closing the equipment on site, the closing command can also be obtained remotely through the communication module, and the closing command is aimed at the intelligent boundary switch. The communication module is a wireless communication module. That is, the maintenance personnel send control instructions to the wireless communication module through the mobile terminal equipment (eg, mobile phone) via the wireless communication network.
具体的,响应所述闭合指令,控制所述智能分界开关闭合后,则能够恢复故障负荷侧用户的电力供应。Specifically, after the intelligent boundary switch is controlled to be closed in response to the closing instruction, the power supply to the user at the fault load side can be restored.
本发明实施例二提供的技术方案,在对故障负荷侧执行故障隔离的第一时间,检修人员能够收到通信模块发送的故障信息,从而能够及时获知故障信息,很大程度上能够提高检修人员针对故障的快速反应能力。According to the technical solution provided by Embodiment 2 of the present invention, the maintenance personnel can receive the fault information sent by the communication module at the first time when the fault isolation is performed on the fault load side, so that the fault information can be obtained in time, and the maintenance personnel can be improved to a large extent. Rapid response to failures.
通过本发明实施例二提供的技术方案,能够实现远程对智能分界开关的控制,检修人员排除故障后,不必到断开的智能分界开关现场便可控制智能分界开关闭合,能够提高工作效率。Through the technical solution provided by Embodiment 2 of the present invention, remote control of the intelligent boundary switch can be realized. After troubleshooting, the maintenance personnel can control the closing of the intelligent boundary switch without going to the site of the disconnected intelligent boundary switch, which can improve work efficiency.
为了更加全面的阐述本发明提供的技术方案,本发明还公开一种电缆线路故障隔离装置。In order to describe the technical solution provided by the invention more comprehensively, the invention also discloses a fault isolation device for cable lines.
请参阅图3,图3为本发明实施例提供的一种电缆线路故障隔离装置的结构图。如图3所示,该装置包括:Please refer to FIG. 3 . FIG. 3 is a structural diagram of a cable line fault isolation device provided by an embodiment of the present invention. As shown in Figure 3, the device includes:
第一获取单元301,用于获取负荷侧的零序电流;The first obtaining unit 301 is used to obtain the zero-sequence current of the load side;
判断单元302,用于判断所述零序电流是否超出预设零序电流值区间;A judging unit 302, configured to judge whether the zero-sequence current exceeds a preset zero-sequence current value interval;
第一控制单元303,用于当所述零序电流超出预设零序电流值区间时,控制负荷侧的智能分界开关断开。The first control unit 303 is configured to control the intelligent boundary switch on the load side to turn off when the zero-sequence current exceeds a preset zero-sequence current value range.
进一步的,本发明实施例提供的电缆线路故障隔离装置,还包括:Further, the cable line fault isolation device provided in the embodiment of the present invention also includes:
第二控制单元,用于控制零序电流互感器检测负荷侧的零序电流。The second control unit is used to control the zero-sequence current transformer to detect the zero-sequence current on the load side.
第三控制单元,用于控制通信模块向预设移动终端和配电网服务器发送故障信息,所述故障信息包括所述智能分界开关的位置信息和状态信息;The third control unit is used to control the communication module to send fault information to the preset mobile terminal and the distribution network server, and the fault information includes the position information and status information of the intelligent boundary switch;
第二获取单元,用于通过所述通信模块获取对所述智能分界开关的控制指令,所述控制指令包括控制所述智能分界开关闭合。The second obtaining unit is configured to obtain a control instruction for the intelligent boundary switch through the communication module, where the control instruction includes controlling the closing of the intelligent boundary switch.
第四控制单元,用于响应所述控制指令,控制所述智能分界开关闭合。The fourth control unit is configured to control the intelligent boundary switch to close in response to the control instruction.
进一步的,本发明还公开一种电缆线路故障隔离系统。Furthermore, the present invention also discloses a cable line fault isolation system.
请参阅图4,图4为本发明实施例提供的一种电缆线路故障隔离系统的结构图。如图4所示,该系统包括:Please refer to FIG. 4 . FIG. 4 is a structural diagram of a cable line fault isolation system provided by an embodiment of the present invention. As shown in Figure 4, the system includes:
智能分界开关控制器401;与所述智能分界开关控制器401相连接,设置于所述智能分界开关控制器401内部的零序电流互感器4011;以及与所述智能分界开关控制器401相连接的智能分界开关402;Intelligent boundary switch controller 401; connected with the intelligent boundary switch controller 401, the zero-sequence current transformer 4011 arranged inside the intelligent boundary switch controller 401; and connected with the intelligent boundary switch controller 401 The intelligent boundary switch 402;
所述智能分界开关控制器401的控制操作包括,获取负荷侧的零序电流,判断所述零序电流是否超出预设零序电流值区间,如果是,控制负荷侧的所述智能分界开关402断开;The control operation of the intelligent boundary switch controller 401 includes obtaining the zero-sequence current on the load side, judging whether the zero-sequence current exceeds the preset zero-sequence current value range, and if so, controlling the intelligent boundary switch 402 on the load side disconnect;
所述零序电流互感器4011用于,检测负荷侧的零序电流。The zero-sequence current transformer 4011 is used to detect the zero-sequence current at the load side.
具体的,所述智能分界开关控制器401通过所述零序电流互感器4011获取负荷侧的零序电流。Specifically, the intelligent boundary switch controller 401 obtains the zero-sequence current at the load side through the zero-sequence current transformer 4011 .
进一步的,本发明实施例提供的电缆线路故障隔离系统还包括:Further, the cable line fault isolation system provided in the embodiment of the present invention also includes:
与所述智能分界开关控制器401相连接的通信模块,用于向预设移动终端和配电网服务器发送故障信息,所述故障信息包括所述智能分界开关402的位置信息和状态信息,以及获取对所述智能分界开关402的控制指令,所述控制指令包括控制所述智能分界开关402闭合;则所述智能分界开关控制器401的控制操作还包括:通过所述通信模块获取对所述智能分界开关402的控制指令,响应所述控制指令,控制所述智能分界开关402闭合。A communication module connected to the intelligent boundary switch controller 401, configured to send fault information to preset mobile terminals and distribution network servers, the fault information including position information and status information of the intelligent boundary switch 402, and Obtain the control instruction to the intelligent boundary switch 402, the control instruction includes controlling the closing of the intelligent boundary switch 402; then the control operation of the intelligent boundary switch controller 401 also includes: obtaining the The control instruction of the intelligent boundary switch 402 controls the closing of the intelligent boundary switch 402 in response to the control instruction.
最后,还需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。Finally, it should also be noted that in this text, relational terms such as first and second etc. are only used to distinguish one entity or operation from another, and do not necessarily require or imply that these entities or operations, any such actual relationship or order exists. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。对于实施例公开的装置和系统而言,由于其与实施例公开的方法相对应,所以描述的比较简单,相关之处参见方法部分说明即可。Each embodiment in this specification is described in a progressive manner, each embodiment focuses on the difference from other embodiments, and the same and similar parts of each embodiment can be referred to each other. As for the devices and systems disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and for relevant details, please refer to the description of the method part.
结合本文中所公开的实施例描述的方法或算法的步骤可以直接用硬件、处理器执行的软件模块,或者二者的结合来实施。软件模块可以置于随机存储器(RAM)、内存、只读存储器(ROM)、电可编程ROM、电可擦除可编程ROM、寄存器、硬盘、可移动磁盘、CD-ROM、或技术领域内所公知的任意其它形式的存储介质中。The steps of the methods or algorithms described in connection with the embodiments disclosed herein may be directly implemented by hardware, software modules executed by a processor, or a combination of both. Software modules can be placed in random access memory (RAM), internal memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disk, removable disk, CD-ROM, or any other Any other known storage medium.
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510039813.6A CN104578011A (en) | 2015-01-27 | 2015-01-27 | Cable line fault isolation method, device and system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510039813.6A CN104578011A (en) | 2015-01-27 | 2015-01-27 | Cable line fault isolation method, device and system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104578011A true CN104578011A (en) | 2015-04-29 |
Family
ID=53093486
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510039813.6A Pending CN104578011A (en) | 2015-01-27 | 2015-01-27 | Cable line fault isolation method, device and system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104578011A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108009644A (en) * | 2016-10-29 | 2018-05-08 | 南京理工大学 | A kind of mobile monitoring system of 10KV demarcation switch |
| CN120566439A (en) * | 2025-08-04 | 2025-08-29 | 国网四川省电力公司电力科学研究院 | Distribution network line switch segmentation method, device, storage medium and electronic equipment |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201029200Y (en) * | 2006-07-21 | 2008-02-27 | 北京四方华能电气设备有限公司 | Intelligent demarcation load switch |
| CN202197092U (en) * | 2011-07-05 | 2012-04-18 | 珠海思创电气有限公司 | Boundary switch controller |
| CN203071571U (en) * | 2013-01-10 | 2013-07-17 | 永康市供电局 | Intelligent monitoring device for distributed boundary switches |
| CN203164356U (en) * | 2013-03-06 | 2013-08-28 | 华北电力大学 | Embedded mainboard-based cable fault positioning device |
| CN103278733A (en) * | 2013-05-30 | 2013-09-04 | 孟津县电业公司 | Cable ground connection remote monitoring method and remote monitoring system |
| CN103439625A (en) * | 2013-09-03 | 2013-12-11 | 北京豪锐达科技有限公司 | Cable system fault positioning and load monitoring method |
| CN203896048U (en) * | 2014-05-27 | 2014-10-22 | 湖南英科电力技术有限公司 | Ground fault detection system for power distribution networks |
-
2015
- 2015-01-27 CN CN201510039813.6A patent/CN104578011A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201029200Y (en) * | 2006-07-21 | 2008-02-27 | 北京四方华能电气设备有限公司 | Intelligent demarcation load switch |
| CN202197092U (en) * | 2011-07-05 | 2012-04-18 | 珠海思创电气有限公司 | Boundary switch controller |
| CN203071571U (en) * | 2013-01-10 | 2013-07-17 | 永康市供电局 | Intelligent monitoring device for distributed boundary switches |
| CN203164356U (en) * | 2013-03-06 | 2013-08-28 | 华北电力大学 | Embedded mainboard-based cable fault positioning device |
| CN103278733A (en) * | 2013-05-30 | 2013-09-04 | 孟津县电业公司 | Cable ground connection remote monitoring method and remote monitoring system |
| CN103439625A (en) * | 2013-09-03 | 2013-12-11 | 北京豪锐达科技有限公司 | Cable system fault positioning and load monitoring method |
| CN203896048U (en) * | 2014-05-27 | 2014-10-22 | 湖南英科电力技术有限公司 | Ground fault detection system for power distribution networks |
Non-Patent Citations (3)
| Title |
|---|
| 单亦先等: "《电工电子测量与实验》", 30 September 2009, 石油大学出版社 * |
| 吕继伟 等: "电缆分界负荷开关控制器故障判断算法", 《电力与能源》 * |
| 董张卓等: "《配电网和配电自动化系统》", 31 August 2014, 机械工业出版社 * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108009644A (en) * | 2016-10-29 | 2018-05-08 | 南京理工大学 | A kind of mobile monitoring system of 10KV demarcation switch |
| CN120566439A (en) * | 2025-08-04 | 2025-08-29 | 国网四川省电力公司电力科学研究院 | Distribution network line switch segmentation method, device, storage medium and electronic equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103426128B (en) | Self adaptation relay protection constant value changing method based on power distribution network dispatching patcher | |
| CN103972981A (en) | Cloud-based intelligent low-voltage switch cabinet monitoring system | |
| CN102945028B (en) | Cloud technology application smart home with intelligent house grid control function | |
| CN204349579U (en) | A kind of distribution line automatic switching system | |
| CN103792468A (en) | Electric power line fault position location conforming method and device | |
| KR101769664B1 (en) | Redundant controller of hvdc system | |
| US10524140B2 (en) | Commercial power restore indicator for sites, such as for cellular telecommunications sites | |
| CN114710538A (en) | Intelligent operation and maintenance system of circuit breaker | |
| CN109450092A (en) | Power distribution network overload early-warning monitoring system | |
| CN104578011A (en) | Cable line fault isolation method, device and system | |
| CN204425047U (en) | A kind of electrical power distribution automatization system | |
| CN105870956A (en) | Type selection method for direct-current breaker used in multiterminal flexible direct-current transmission system | |
| CN105208106A (en) | Network security system of intelligent power distribution network system | |
| CN205786883U (en) | A kind of arrester on-line monitoring system | |
| CN103825241B (en) | A kind of automatic obtaining method of electric network element Zero sequence parameter | |
| CN104243615A (en) | Central control method with intelligent heartbeat automatic log-on and offline reconnection functions | |
| CN104578000A (en) | Power supply line fault isolating method, device and system | |
| CN103235224A (en) | Grid fault analytical method | |
| CN203218878U (en) | Intelligent grounding line selection and fault management system for power distribution network | |
| CN204442421U (en) | A kind of long distance service system | |
| CN104539052B (en) | Intelligent power manager | |
| CN206272658U (en) | A kind of production information real-time publishing system | |
| CN205429872U (en) | ESD system | |
| CN104079062A (en) | Method for making mobile power generation system be connected into power grid for operation through spare power automatic switching technology | |
| CN103853125A (en) | Household-based intelligent control system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20160318 Address after: 315700, No. 286, Xinfeng Road, Dan city, Xiangshan County, Ningbo, Zhejiang Applicant after: STATE GRID ZHEJIANG XIANGSHAN POWER SUPPLY COMPANY Applicant after: State Grid Corporation of China Applicant after: Ningbo Power Supply Company of State Grid Zhejiang Electric Power Company Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: STATE GRID ZHEJIANG XIANGSHAN POWER SUPPLY COMPANY Applicant before: Ningbo Power Supply Company of State Grid Zhejiang Electric Power Company |
|
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150429 |
|
| RJ01 | Rejection of invention patent application after publication |