CN104564107A - Construction method for pre-positioning water stop belt of setting arc-shaped die of quadratic lining concrete end head - Google Patents
Construction method for pre-positioning water stop belt of setting arc-shaped die of quadratic lining concrete end head Download PDFInfo
- Publication number
- CN104564107A CN104564107A CN201410852503.1A CN201410852503A CN104564107A CN 104564107 A CN104564107 A CN 104564107A CN 201410852503 A CN201410852503 A CN 201410852503A CN 104564107 A CN104564107 A CN 104564107A
- Authority
- CN
- China
- Prior art keywords
- concrete
- secondary lining
- lining
- poured
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Lining And Supports For Tunnels (AREA)
Description
技术领域technical field
本发明涉及一种隧道施工领域,特别涉及一种二次衬砌砼端头定形弧模回定止水带施工方法。The invention relates to the field of tunnel construction, in particular to a method for constructing a back-fixed waterstop of a secondary lining concrete end-shaped arc mold.
背景技术Background technique
在铁路、公路隧道每板二衬砼施工时,由于传统的隧道二衬端头止水带安装固定没有使用专用的器具固定,造成混凝土浇筑完毕后止水带不居中、偏位、埋进二衬砼中过多或者整条止水带没埋进砼,最终造成砼施工完毕后需对止水带返工处理,处理不当必将造成渗水隐患,后期处理费用高昂;因此需要一种能精确定位隧道二衬端头止水带的施工方法。In the construction of the second lining concrete of each slab in railway and highway tunnels, because the traditional waterstop at the end of the second lining of the tunnel is installed and fixed without using special equipment, the waterstop is not centered, offset, and buried in the second lining after the concrete is poured. If there is too much lining concrete or the entire waterstop is not buried in concrete, the waterstop needs to be reworked after the concrete construction is completed. Improper treatment will inevitably cause water seepage hazards and high post-processing costs; therefore, a precise positioning method is required. The construction method of the water stop at the end of the second lining of the tunnel.
发明内容Contents of the invention
有鉴于此,本发明所要解决的技术问题是提供一种能精确定位隧道二衬端头止水带的施工方法。In view of this, the technical problem to be solved by the present invention is to provide a construction method capable of accurately positioning the water stop at the end of the second lining of the tunnel.
本发明的目的是这样实现的:The purpose of the present invention is achieved like this:
本发明提供的二次衬砌砼端头定形弧模回定止水带施工方法,包括二次衬台车、二衬端头定型弧模,包括以下步骤:The construction method for setting the arc mold of the end of the secondary lining concrete to fix the water stop provided by the present invention comprises a trolley for the secondary lining and an arc mold for shaping the end of the second lining, and includes the following steps:
S1:在二次衬砌台车端头焊接钢板,所述钢板的弧度与二次衬砌台车端头的弧度匹配;S1: welding a steel plate at the end of the secondary lining trolley, the arc of the steel plate matches the arc of the end of the secondary lining trolley;
S2:在钢板端头点焊的U形钢筋箍,将中埋式橡胶止水带一端安装在U形钢筋箍内,另一端反压在钢板上,使得预埋在下一幅浇筑二次衬砌砼内的中埋式橡胶止水带与已经浇筑的二次衬砌台的砼面隔离开;S2: U-shaped steel hoop spot-welded at the end of the steel plate, one end of the buried rubber waterstop is installed in the U-shaped steel hoop, and the other end is pressed against the steel plate so that it is pre-buried in the next pouring of the secondary lining concrete The internal buried rubber waterstop is isolated from the concrete surface of the poured secondary lining platform;
S3:采用木模板封端模;S3: Use wooden formwork to seal the mold;
S4:二次衬砌浇筑完成砼后,拆除二次衬砌台车,使得U形钢筋箍与钢板脱离。S4: After the concrete is poured for the secondary lining, the trolley for the secondary lining is removed to separate the U-shaped steel hoop from the steel plate.
进一步,所述二衬端头定型弧模的模宽为18-22cm;采用4-6mm厚钢板焊接在二衬台车端头模板上。Further, the mold width of the two-lined end shaping arc mold is 18-22cm; a 4-6mm thick steel plate is welded on the end formwork of the two-lined trolley.
进一步,所述中埋式橡胶止水带为预埋在已浇筑二次衬砌砼14-16cm;外露14-16cm在待浇二次衬砌砼内。Furthermore, the mid-buried rubber waterstop is pre-embedded in the poured secondary lining concrete 14-16cm; the exposed 14-16cm is in the secondary lining concrete to be poured.
进一步,所述U形钢筋箍为长14-16cm的直径为5-7mm的钢筋的U形箍。Further, the U-shaped steel hoop is a U-shaped hoop of a steel bar with a length of 14-16 cm and a diameter of 5-7 mm.
进一步,还包括以下步骤:所述浇筑二次衬砌砼是通过以下步骤形成的:Further, the following steps are also included: the pouring of the secondary lining concrete is formed through the following steps:
S21:洞外拌和砼:在隧道外搅拌混合混凝土形成呈流塑状态的砼;S21: mixing concrete outside the tunnel: mixing concrete outside the tunnel to form concrete in a flow-plastic state;
S22:运送砼进洞:将砼运输到隧道中待浇筑处;所述待浇筑处为隧道二次衬砌施工缝中有橡胶止水带的部位;S22: transporting concrete into the tunnel: transporting the concrete to the place to be poured in the tunnel; the place to be poured is the part where there is a rubber waterstop in the construction joint of the secondary lining of the tunnel;
S23:浇注砼:在待浇筑处进行砼浇注;S23: pouring concrete: pouring concrete at the place to be poured;
S24:砼养生:对浇注的砼进行养护;S24: Concrete maintenance: maintaining the poured concrete;
S25:撤模:撤除隧道二衬端头模板;S25: mold removal: remove the formwork at the end of the second lining of the tunnel;
S26:洒水养护:对浇注处的砼进行洒水养护。S26: Sprinkling and curing: Sprinkling and curing the concrete at the pouring place.
进一步,在浇注砼时还包括以下步骤:Further, the following steps are also included when pouring concrete:
S231:防水层施做:对隧道二衬端头模板进行防水层处理;S231: Waterproof layer application: perform waterproof layer treatment on the formwork at the end of the second lining of the tunnel;
S232:钢筋绑扎:对防水层处理的隧道二衬端头模板进行钢筋绑扎;S232: Binding of steel bars: Binding of steel bars to the formwork at the end of the second lining of the tunnel treated with the waterproof layer;
S233:台车就位;S233: the trolley is in place;
S234:校正刷脱模剂。S234: Correcting brush release agent.
本发明的有益效果在于:本发明采用的二次衬砌砼端头定形弧模回定止水带施工方法,通过加工二衬端头定型弧模,可确保中埋式橡胶止水带要确保预埋在已浇筑二次衬砌砼15cm、外露15cm在待浇二次衬砌砼内。定型弧模宽20cm、采用5mm厚钢板,焊接在二衬台车端头模板上,投入小、加工容易,施工操作简便,可大面积推广。The beneficial effect of the present invention is that: the construction method of the secondary lining concrete end shaped arc mold back-fixed waterstop adopted in the present invention can ensure that the buried rubber waterstop can ensure the Buried in the poured secondary lining concrete 15cm, exposed 15cm in the secondary lining concrete to be poured. The shaping arc mold is 20cm wide and adopts 5mm thick steel plate, which is welded on the end formwork of the second lining trolley, with small investment, easy processing, simple construction and operation, and can be popularized in a large area.
在二次衬砌台车端头,环向焊接5mm厚钢板,宽20cm。在钢板端头点焊长15cm的Φ6钢筋的U形箍,将中埋式橡胶止水带安装15cm在U形箍内,另一端反压在20cm宽的钢板上(这样可确保预埋在下一幅浇筑二次衬砌砼内的止水带没有与马上浇筑二衬砌衬砼面接触),然后再采用传统的15cm宽、50~110cm长的木模板封端模。因为U形箍是点焊在钢板上,二次衬砌台车移时即可脱离。二次衬砌台车端头采用弧形钢模的施工技术,对客运专线隧道二次衬砌施工缝埋设橡胶式止水带具有指导意义。采用二次衬砌台车端头采用弧形钢模的施工技术可确保中埋式橡胶止水带预埋15cm在已浇筑砼内、外露15cm在待浇砼内,确保了止水带止水效果,避免了因预埋不准确而造成二次衬砌返工的现象。通过采用本工法,降低了二次衬砌施工费用。At the end of the secondary lining trolley, a 5mm thick steel plate with a width of 20cm is welded circumferentially. Spot weld the U-shaped hoop of Φ6 steel bar with a length of 15cm at the end of the steel plate, install the buried rubber waterstop 15cm in the U-shaped hoop, and press the other end on the 20cm wide steel plate (this can ensure that it is pre-buried in the next The water stop in the second lining concrete is not in contact with the surface of the second lining concrete pouring), and then the traditional 15cm wide and 50-110cm long wooden formwork sealing mold is used. Because the U-shaped hoop is spot-welded on the steel plate, the secondary lining trolley can be removed when it is moved. The construction technology of arc-shaped steel formwork at the end of the secondary lining trolley has guiding significance for embedding rubber waterstops in the secondary lining construction joints of passenger dedicated line tunnels. The construction technology of using arc-shaped steel mold at the end of the secondary lining trolley can ensure that the buried rubber waterstop 15cm is embedded in the poured concrete, and the exposed 15cm is in the concrete to be poured, ensuring the waterstop effect of the waterstop , avoiding the phenomenon of secondary lining rework caused by inaccurate pre-embedding. By adopting this construction method, the construction cost of secondary lining is reduced.
附图说明Description of drawings
为了使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明作进一步的详细描述,其中:In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail below in conjunction with the accompanying drawings, wherein:
图1为本发明实施例提供的二次衬砌砼端头定形弧模回定止水带施工方法流程图。Fig. 1 is a flow chart of the construction method for the back-fixed waterstop of the concrete end of the secondary lining provided by the embodiment of the present invention.
具体实施方式Detailed ways
以下将参照附图,对本发明的优选实施例进行详细的描述。应当理解,优选实施例仅为了说明本发明,而不是为了限制本发明的保护范围。Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the preferred embodiments are only for illustrating the present invention, but not for limiting the protection scope of the present invention.
如图所示,本发明提供的二次衬砌砼端头定形弧模回定止水带施工方法,包括二次衬台车、二衬端头定型弧模,包括以下步骤:As shown in the figure, the construction method of the secondary lining concrete end shaping arc mold returning fixed waterstop provided by the present invention includes the secondary lining trolley and the second lining end shaping arc mold, including the following steps:
S1:在二次衬砌台车端头焊接钢板,所述钢板的弧度与二次衬砌台车端头的弧度匹配;S1: welding a steel plate at the end of the secondary lining trolley, the arc of the steel plate matches the arc of the end of the secondary lining trolley;
S2:在钢板端头点焊的U形钢筋箍,将中埋式橡胶止水带一端安装在U形钢筋箍内,另一端反压在钢板上,使得预埋在下一幅浇筑二次衬砌砼内的中埋式橡胶止水带与已经浇筑的二次衬砌台的砼面隔离开;S2: U-shaped steel hoop spot-welded at the end of the steel plate, one end of the buried rubber waterstop is installed in the U-shaped steel hoop, and the other end is pressed against the steel plate so that it is pre-buried in the next pouring of the secondary lining concrete The internal buried rubber waterstop is isolated from the concrete surface of the poured secondary lining platform;
S3:采用木模板封端模;S3: Use wooden formwork to seal the mold;
S4:二次衬砌浇筑完成砼后,拆除二次衬砌台车,使得U形钢筋箍与钢板脱离。S4: After the concrete is poured for the secondary lining, the trolley for the secondary lining is removed to separate the U-shaped steel hoop from the steel plate.
所述二衬端头定型弧模的模宽为18-22cm;采用4-6mm厚钢板焊接在二衬台车端头模板上。The mold width of the shaping arc mold for the end of the second lining is 18-22cm; a 4-6mm thick steel plate is welded on the end template of the second lining trolley.
所述中埋式橡胶止水带为预埋在已浇筑二次衬砌砼14-16cm;外露14-16cm在待浇二次衬砌砼内。The mid-buried rubber waterstop is pre-buried in the 14-16cm of the secondary lining concrete that has been poured; the exposed 14-16cm is in the secondary lining concrete to be poured.
所述U形钢筋箍为长14-16cm的直径为5-7mm的钢筋的U形箍。The U-shaped steel hoop is a U-shaped hoop of steel bars with a length of 14-16 cm and a diameter of 5-7 mm.
还包括以下步骤:所述浇筑二次衬砌砼是通过以下步骤形成的:It also includes the following steps: the pouring of the secondary lining concrete is formed through the following steps:
S21:洞外拌和砼:在隧道外搅拌混合混凝土形成呈流塑状态的砼;S21: mixing concrete outside the tunnel: mixing concrete outside the tunnel to form concrete in a flow-plastic state;
S22:运送砼进洞:将砼运输到隧道中待浇筑处;所述待浇筑处为隧道二次衬砌施工缝中有橡胶止水带的部位;S22: transporting concrete into the tunnel: transporting the concrete to the place to be poured in the tunnel; the place to be poured is the part where there is a rubber waterstop in the construction joint of the secondary lining of the tunnel;
S23:浇注砼:在待浇筑处进行砼浇注;S23: pouring concrete: pouring concrete at the place to be poured;
S24:砼养生:对浇注的砼进行养护;S24: Concrete maintenance: maintaining the poured concrete;
S25:撤模:撤除隧道二衬端头模板;S25: mold removal: remove the formwork at the end of the second lining of the tunnel;
S26:洒水养护:对浇注处的砼进行洒水养护。S26: Sprinkling and curing: Sprinkling and curing the concrete at the pouring place.
在浇注砼时还包括以下步骤:The following steps are also included when pouring concrete:
S231:防水层施做:对隧道二衬端头模板进行防水层处理;S231: Waterproof layer application: perform waterproof layer treatment on the formwork at the end of the second lining of the tunnel;
S232:钢筋绑扎:对防水层处理的隧道二衬端头模板进行钢筋绑扎;S232: Binding of steel bars: Binding of steel bars to the formwork at the end of the second lining of the tunnel treated with the waterproof layer;
S233:台车就位;S233: the trolley is in place;
S234:校正刷脱模剂。S234: Correcting brush release agent.
本实施例提供的二次衬砌砼端头定形弧模回定止水带施工方法,在隧道环向施工缝采用的中埋式橡胶止水带,宽度不小于300mm、厚度不小于8mm,止水带表面不允许有开裂、缺胶、海绵状等影响使用的缺陷,中心孔偏心不允许超过管状断面厚度的1/3,止水带表面不允许有凹痕,直径不大于1mm的气泡每米不允许超过3处,面积不大于4mm2的杂质每米不得超过3处,接缝缺陷中高度不大于1.5mm的凸起或不平,每米不得超过2处。中埋式橡胶止水带要确保预埋在已浇筑二次衬砌砼15cm、外露15cm在待浇二次衬砌砼内。The construction method of the fixed arc mold back-fixed waterstop at the end of the secondary lining concrete provided in this embodiment uses a mid-buried rubber waterstop used in the circumferential construction joint of the tunnel, with a width of not less than 300mm and a thickness of not less than 8mm. The surface of the belt is not allowed to have cracks, lack of glue, spongy and other defects that affect the use. The eccentricity of the center hole is not allowed to exceed 1/3 of the thickness of the tubular section. There are no dents on the surface of the waterstop. The diameter of the bubble is not greater than 1mm per meter. No more than 3 places are allowed, impurities with an area not greater than 4mm2 shall not exceed 3 places per meter, and seam defects with protrusions or unevenness with a height not greater than 1.5mm shall not exceed 2 places per meter. The mid-buried rubber waterstop should be pre-buried in the 15cm of the secondary lining concrete that has been poured, and 15cm exposed in the secondary lining concrete to be poured.
通过加工二衬端头定型弧模,可确保中埋式橡胶止水带要确保预埋在已浇筑二次衬砌砼15cm、外露15cm在待浇二次衬砌砼内。By processing the shaped arc mold at the end of the secondary lining, it can be ensured that the buried rubber waterstop is pre-embedded in the poured secondary lining concrete 15cm, and the exposed 15cm is in the secondary lining concrete to be poured.
定型弧模宽20cm、采用5mm厚钢板。The stereotyped arc mold is 20cm wide and adopts 5mm thick steel plate.
在二次衬砌台车端头,环向焊接5mm厚钢板,宽20cm。在钢板端头点焊长15cm的Φ6钢筋的U形箍,将中埋式橡胶止水带安装15cm在U形箍内,另一端反压在20cm宽的钢板上(这样可确保预埋在下一幅浇筑二次衬砌砼内的止水带没有与马上浇筑二衬砌衬砼面接触),然后再采用传统的15cm宽、50~110cm长的木模板封端模。因为U形箍是点焊在钢板上,二次衬砌台车移时即可脱离。At the end of the secondary lining trolley, a 5mm thick steel plate with a width of 20cm is welded circumferentially. Spot weld the U-shaped hoop of Φ6 steel bar with a length of 15cm at the end of the steel plate, install the buried rubber waterstop 15cm in the U-shaped hoop, and press the other end on the 20cm wide steel plate (this can ensure that it is pre-buried in the next The water stop in the second lining concrete is not in contact with the surface of the second lining concrete pouring), and then the traditional 15cm wide and 50-110cm long wooden formwork sealing mold is used. Because the U-shaped hoop is spot-welded on the steel plate, the secondary lining trolley can be removed when it is moved.
⑴二次衬砌台车端头焊接20cm宽5mm钢板,弧度与二次衬砌台车相同。(1) The end of the secondary lining trolley is welded with a 20cm wide 5mm steel plate, and the arc is the same as that of the secondary lining trolley.
⑵在钢板端头点焊长15cm的Φ6钢筋的U形箍,将中埋式橡胶止水带安装15cm在U形箍内,另一端反压在20cm宽的钢板上,这样可确保预埋在下一幅浇筑二次衬砌砼内的止水带没有与马上浇筑二衬砌衬砼面接触。(2) Spot-weld the U-shaped hoop of Φ6 steel bar with a length of 15cm at the end of the steel plate, install the buried rubber waterstop 15cm in the U-shaped hoop, and press the other end against the 20cm wide steel plate, so as to ensure that it is pre-buried under the U-shaped hoop. The water stop in the concrete of the secondary lining is not in contact with the concrete surface of the secondary lining to be poured immediately.
⑶采用传统的15cm宽、50~110cm长的木模板封端模⑶Adopt the traditional 15cm wide, 50-110cm long wooden formwork sealing mold
⑷二次衬砌浇筑完成砼后,拆除二次台车,因为U形箍是点焊在钢板上,二次衬砌台车移时即可脱离。⑷After the concrete is poured for the secondary lining, remove the secondary trolley, because the U-shaped hoop is spot-welded on the steel plate, and the secondary lining trolley can be removed when it is moved.
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管通过参照本发明的优选实施例已经对本发明进行了描述,但本领域的普通技术人员应当理解,可以在形式上和细节上对其做出各种各样的改变,而不偏离本发明所限定的精神和范围。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described with reference to the preferred embodiments of the present invention, those skilled in the art should understand that it can be described in the form Various changes may be made in matter and details thereof without departing from the spirit and scope of the invention as defined.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410852503.1A CN104564107A (en) | 2014-12-31 | 2014-12-31 | Construction method for pre-positioning water stop belt of setting arc-shaped die of quadratic lining concrete end head |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410852503.1A CN104564107A (en) | 2014-12-31 | 2014-12-31 | Construction method for pre-positioning water stop belt of setting arc-shaped die of quadratic lining concrete end head |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104564107A true CN104564107A (en) | 2015-04-29 |
Family
ID=53081087
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410852503.1A Pending CN104564107A (en) | 2014-12-31 | 2014-12-31 | Construction method for pre-positioning water stop belt of setting arc-shaped die of quadratic lining concrete end head |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104564107A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106321116B (en) * | 2015-06-15 | 2018-06-15 | 中国葛洲坝集团国际工程有限公司 | A kind of tunnel is dug and the construction method of lining concrete parallel operations |
| CN108547638A (en) * | 2018-03-07 | 2018-09-18 | 李市生 | A kind of lining concrete adjustable type watering device of constructing tunnel |
| CN109667602A (en) * | 2018-11-28 | 2019-04-23 | 中铁隧道局集团有限公司 | For preventing the construction method of concrete capping at two lining circular construction joints |
| CN110056372A (en) * | 2019-03-12 | 2019-07-26 | 中交一公局桥隧工程有限公司 | Concrete pouring method in lining construction |
| CN113898383A (en) * | 2021-10-09 | 2022-01-07 | 中铁二十三局集团第四工程有限公司 | Secondary lining pouring method with rubber waterstop |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20030129029A1 (en) * | 2000-06-12 | 2003-07-10 | Sachio Shimizu | Tunnel waterproofing method |
| CN101929344A (en) * | 2010-07-14 | 2010-12-29 | 中铁隧道集团二处有限公司 | Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint |
| CN202441391U (en) * | 2012-02-28 | 2012-09-19 | 中铁十二局集团有限公司 | End template device for mounting waterstop in tunnel secondary lining concrete |
| CN103291329A (en) * | 2013-05-09 | 2013-09-11 | 中铁工程设计咨询集团有限公司 | Waterproofing and gas tightness construction method and structure for subsurface tunnel |
| CN103437791A (en) * | 2013-09-13 | 2013-12-11 | 中铁隧道集团二处有限公司 | Installation method of buried waterstop at tip of tunnel lining trolley |
-
2014
- 2014-12-31 CN CN201410852503.1A patent/CN104564107A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20030129029A1 (en) * | 2000-06-12 | 2003-07-10 | Sachio Shimizu | Tunnel waterproofing method |
| CN101929344A (en) * | 2010-07-14 | 2010-12-29 | 中铁隧道集团二处有限公司 | Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint |
| CN202441391U (en) * | 2012-02-28 | 2012-09-19 | 中铁十二局集团有限公司 | End template device for mounting waterstop in tunnel secondary lining concrete |
| CN103291329A (en) * | 2013-05-09 | 2013-09-11 | 中铁工程设计咨询集团有限公司 | Waterproofing and gas tightness construction method and structure for subsurface tunnel |
| CN103437791A (en) * | 2013-09-13 | 2013-12-11 | 中铁隧道集团二处有限公司 | Installation method of buried waterstop at tip of tunnel lining trolley |
Non-Patent Citations (1)
| Title |
|---|
| 第8期: "隧道二次衬砌浇筑混凝土施工技术要点", 《黑龙江交通科技》 * |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106321116B (en) * | 2015-06-15 | 2018-06-15 | 中国葛洲坝集团国际工程有限公司 | A kind of tunnel is dug and the construction method of lining concrete parallel operations |
| CN108547638A (en) * | 2018-03-07 | 2018-09-18 | 李市生 | A kind of lining concrete adjustable type watering device of constructing tunnel |
| CN109667602A (en) * | 2018-11-28 | 2019-04-23 | 中铁隧道局集团有限公司 | For preventing the construction method of concrete capping at two lining circular construction joints |
| CN110056372A (en) * | 2019-03-12 | 2019-07-26 | 中交一公局桥隧工程有限公司 | Concrete pouring method in lining construction |
| CN113898383A (en) * | 2021-10-09 | 2022-01-07 | 中铁二十三局集团第四工程有限公司 | Secondary lining pouring method with rubber waterstop |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104564107A (en) | Construction method for pre-positioning water stop belt of setting arc-shaped die of quadratic lining concrete end head | |
| CN202644997U (en) | Simple plugging device for wall-penetrating holes of wall | |
| CN104989102B (en) | A kind of improved concrete walls, column construction method | |
| CN204024679U (en) | Buried water stop fastening devices in a kind of tunnel lining hoop | |
| CN204174935U (en) | A kind of outer wall of basement one side formwork supporting and protection structure | |
| CN108005692A (en) | A kind of waterstop fixture, tunnel longitudinal direction water sealing structure and construction method | |
| CN104153296B (en) | A kind ofly improve the method for deck paving planeness and the comb shape template of employing thereof | |
| CN211736057U (en) | Concrete protective layer thickness control piece | |
| CN104047419A (en) | Wall linking method of scaffold and wall-linking member used by scaffold | |
| CN107313787B (en) | Tunnel lining trolley end die and construction method | |
| JP2008202274A (en) | Wet curing equipment for lining concrete | |
| CN104328919A (en) | Construction method for fixing preburied iron elements | |
| CN103821049A (en) | CA (cement asphalt) mortar pouring steel pipe and angle steel combined edge sealing and pressing device for CRTS (China Railway Track System) II-type moulding boards | |
| CN204851292U (en) | Tunnel waterstop connects mounting fixture | |
| CN105386588B (en) | The method that concrete embedded part sets expansion joint | |
| CN210069151U (en) | A concrete floor pump pipe fixing tool | |
| CN207892633U (en) | A kind of waterstop fixture and tunnel longitudinal direction water sealing structure | |
| CN206655473U (en) | Waterstop, which pours, uses template | |
| CN106988530B (en) | Waterstop pouring device | |
| CN210660131U (en) | A formwork device for tunnel secondary lining plugging ends | |
| CN204343676U (en) | A plugging formwork for reserved holes in concrete floor slabs | |
| CN205999940U (en) | A kind of Side Template structure of the ground fissure waterproof construction in subway tunnel | |
| CN201809683U (en) | CRTSⅡ track plate fast edge banding device | |
| CN115354875B (en) | A device for reinforcing weak parts of templates at wall-penetrating steel pipes and its construction method | |
| CN108915245A (en) | Casting method without supporting steel plate device and concrete water flat structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150429 |
|
| RJ01 | Rejection of invention patent application after publication |