CN104539051A - 一种智能变电站二次设备在线评估系统 - Google Patents
一种智能变电站二次设备在线评估系统 Download PDFInfo
- Publication number
- CN104539051A CN104539051A CN201410841131.2A CN201410841131A CN104539051A CN 104539051 A CN104539051 A CN 104539051A CN 201410841131 A CN201410841131 A CN 201410841131A CN 104539051 A CN104539051 A CN 104539051A
- Authority
- CN
- China
- Prior art keywords
- evaluation
- module
- assessment
- substation
- secondary equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
| 序号 | 评估子项 | 评估分值 |
| 1 | 运行环境 | 5 |
| 2 | 无故障时间 | 15 |
| 3 | 家族性无故障时间 | 15 |
| 4 | 正确动作率(RCO) | 15 |
| 5 | 绝缘状况 | 10 |
| 6 | 装置状态信息 | 10 |
| 7 | 装置过程层状态信息 | 10 |
| 8 | 通讯状况 | 10 |
| 9 | 通道运行情况 | 10 |
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410841131.2A CN104539051B (zh) | 2014-12-30 | 2014-12-30 | 一种智能变电站二次设备在线评估系统 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410841131.2A CN104539051B (zh) | 2014-12-30 | 2014-12-30 | 一种智能变电站二次设备在线评估系统 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104539051A true CN104539051A (zh) | 2015-04-22 |
| CN104539051B CN104539051B (zh) | 2017-06-23 |
Family
ID=52854541
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410841131.2A Active CN104539051B (zh) | 2014-12-30 | 2014-12-30 | 一种智能变电站二次设备在线评估系统 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104539051B (zh) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105046402A (zh) * | 2015-06-23 | 2015-11-11 | 国家电网公司 | 一种应用于智能变电站二次设备的状态评估方法 |
| CN106611244A (zh) * | 2016-12-06 | 2017-05-03 | 国电南瑞科技股份有限公司 | 一种配电自动化二次设备状态多维度综合评估方法 |
| CN107294205A (zh) * | 2017-06-27 | 2017-10-24 | 国家电网公司 | 一种基于保信主站数据的变电站状态监视方法 |
| CN107493207A (zh) * | 2017-08-30 | 2017-12-19 | 南方电网科学研究院有限责任公司 | 智能变电站二次设备管控方法、装置及系统 |
| CN107657381A (zh) * | 2017-09-27 | 2018-02-02 | 北京龙德时代技术服务有限公司 | 民爆物品安全风险评估系统 |
| CN109005076A (zh) * | 2018-09-27 | 2018-12-14 | 广东电网有限责任公司 | 一种智能变电站交换机监控系统及交换机监控方法 |
| CN110795680A (zh) * | 2019-10-16 | 2020-02-14 | 国网湖北省电力有限公司电力科学研究院 | 一种基于多目标规划的直流保护系统状态综合评价方法 |
| WO2020052098A1 (zh) * | 2018-09-14 | 2020-03-19 | 国电南瑞科技股份有限公司 | 变电站集中运维的分级管控系统、方法及计算机存储介质 |
| CN113346614A (zh) * | 2021-05-28 | 2021-09-03 | 国网甘肃省电力公司白银供电公司 | 一种电网智能变电站二次设备状态评估系统 |
| CN115310851A (zh) * | 2022-08-19 | 2022-11-08 | 国网河南省电力公司经济技术研究院 | 一种电力设备大修投资方案综合评价方法 |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108183482B (zh) * | 2018-01-31 | 2019-11-12 | 国网安徽省电力有限公司 | 一种智能变电站数字化二次回路在线状态评估的方法 |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102035258A (zh) * | 2010-12-08 | 2011-04-27 | 宁夏电力公司宁东供电局 | 电力监控管理系统及电力监控管理方法和变电站用通信设备 |
| CN102222276A (zh) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | 电网二次设备状态检修方法及装置 |
| CN102832708A (zh) * | 2012-08-06 | 2012-12-19 | 华北电力大学 | 基于多级综合服务器架构的智能变电站 |
| CN103078403A (zh) * | 2012-12-28 | 2013-05-01 | 中国电力科学研究院 | 一种智能变电站二次系统的在线状态评估方法 |
| CN103218695A (zh) * | 2013-05-03 | 2013-07-24 | 国家电网公司 | 二次设备智能状态评估诊断系统及其方法 |
| CN103545924A (zh) * | 2013-09-24 | 2014-01-29 | 许继集团有限公司 | 二次设备状态在线监测方法 |
| CN103617561A (zh) * | 2013-12-02 | 2014-03-05 | 深圳供电局有限公司 | 一种电网智能变电站二次设备状态评估系统和方法 |
| CA2903912A1 (en) * | 2013-03-07 | 2014-09-12 | State Grid Anhui Wuhu Power Supply Company | Network for online monitoring of power transformer at intelligent substation |
-
2014
- 2014-12-30 CN CN201410841131.2A patent/CN104539051B/zh active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102035258A (zh) * | 2010-12-08 | 2011-04-27 | 宁夏电力公司宁东供电局 | 电力监控管理系统及电力监控管理方法和变电站用通信设备 |
| CN102222276A (zh) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | 电网二次设备状态检修方法及装置 |
| CN102832708A (zh) * | 2012-08-06 | 2012-12-19 | 华北电力大学 | 基于多级综合服务器架构的智能变电站 |
| CN103078403A (zh) * | 2012-12-28 | 2013-05-01 | 中国电力科学研究院 | 一种智能变电站二次系统的在线状态评估方法 |
| CA2903912A1 (en) * | 2013-03-07 | 2014-09-12 | State Grid Anhui Wuhu Power Supply Company | Network for online monitoring of power transformer at intelligent substation |
| CN103218695A (zh) * | 2013-05-03 | 2013-07-24 | 国家电网公司 | 二次设备智能状态评估诊断系统及其方法 |
| CN103545924A (zh) * | 2013-09-24 | 2014-01-29 | 许继集团有限公司 | 二次设备状态在线监测方法 |
| CN103617561A (zh) * | 2013-12-02 | 2014-03-05 | 深圳供电局有限公司 | 一种电网智能变电站二次设备状态评估系统和方法 |
Non-Patent Citations (1)
| Title |
|---|
| 陈愚: "四川电网二次设备在线监视与分析系统实用化浅析", 《四川电力技术》 * |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105046402A (zh) * | 2015-06-23 | 2015-11-11 | 国家电网公司 | 一种应用于智能变电站二次设备的状态评估方法 |
| CN106611244A (zh) * | 2016-12-06 | 2017-05-03 | 国电南瑞科技股份有限公司 | 一种配电自动化二次设备状态多维度综合评估方法 |
| CN107294205A (zh) * | 2017-06-27 | 2017-10-24 | 国家电网公司 | 一种基于保信主站数据的变电站状态监视方法 |
| CN107294205B (zh) * | 2017-06-27 | 2020-05-05 | 国家电网公司 | 一种基于保信主站数据的变电站状态监视方法 |
| CN107493207A (zh) * | 2017-08-30 | 2017-12-19 | 南方电网科学研究院有限责任公司 | 智能变电站二次设备管控方法、装置及系统 |
| CN107657381A (zh) * | 2017-09-27 | 2018-02-02 | 北京龙德时代技术服务有限公司 | 民爆物品安全风险评估系统 |
| WO2020052098A1 (zh) * | 2018-09-14 | 2020-03-19 | 国电南瑞科技股份有限公司 | 变电站集中运维的分级管控系统、方法及计算机存储介质 |
| CN109005076A (zh) * | 2018-09-27 | 2018-12-14 | 广东电网有限责任公司 | 一种智能变电站交换机监控系统及交换机监控方法 |
| CN110795680A (zh) * | 2019-10-16 | 2020-02-14 | 国网湖北省电力有限公司电力科学研究院 | 一种基于多目标规划的直流保护系统状态综合评价方法 |
| CN110795680B (zh) * | 2019-10-16 | 2023-04-18 | 国网湖北省电力有限公司电力科学研究院 | 一种基于多目标规划的直流保护系统状态综合评价方法 |
| CN113346614A (zh) * | 2021-05-28 | 2021-09-03 | 国网甘肃省电力公司白银供电公司 | 一种电网智能变电站二次设备状态评估系统 |
| CN115310851A (zh) * | 2022-08-19 | 2022-11-08 | 国网河南省电力公司经济技术研究院 | 一种电力设备大修投资方案综合评价方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104539051B (zh) | 2017-06-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104539051B (zh) | 一种智能变电站二次设备在线评估系统 | |
| CN103454516B (zh) | 智能化变电站二次设备健康状态诊断方法 | |
| CN102063651B (zh) | 一种基于在线采集数据的城市电网风险评估系统 | |
| CN104833893B (zh) | 漏电检测系统及方法 | |
| CN110048507B (zh) | 一种配电自动化系统的自动巡检方法及系统 | |
| CN107506849A (zh) | 一种智能优化配变停电研判系统 | |
| CN107967520A (zh) | 一种面向新型智能站继电保护设备的综合状态评估理论方法 | |
| CN102737287B (zh) | 一种地区电网在线供电风险评估系统 | |
| CN102737286A (zh) | 一种地区电网在线风险分析系统和方法 | |
| CN102074956A (zh) | 一种电网风险管理方法以及系统 | |
| CN103559654A (zh) | 一种配电网综合分析系统和方法 | |
| CN107147215A (zh) | 结合线路过载数据分析的配电网故障定位系统及方法 | |
| CN105653764A (zh) | 电网安全事故风险等级在线评估与预警方法 | |
| CN104318374A (zh) | 计及上游恢复供电操作时间的中压配电网可靠性评估方法 | |
| CN108318782A (zh) | 基于网络拓扑与配变停电信息的配电网故障区域辨识方法 | |
| CN104156881A (zh) | 配电网故障风险综合评估方法 | |
| CN106815770A (zh) | 一种综合考虑系统充裕性和系统安全性的风险评估方法 | |
| CN104410169A (zh) | 一种台区智能在线监控系统及其实现方法 | |
| CN102938106A (zh) | 基于电网停电计划的主网n-1风险评估方法和系统 | |
| CN105550793A (zh) | 一种第二道安全防线切负荷事故等级风险在线评估方法 | |
| CN103995172A (zh) | 变电站gis母线负荷电流在线监测方法 | |
| CN112396311A (zh) | 一种变压器负载过载风险评估方法 | |
| CN105447774A (zh) | 一种电网安全事故风险等级在线评估与预警方法及装置 | |
| CN118232530A (zh) | 一种城市电网的供电全景感知管控平台及方法 | |
| CN106952178B (zh) | 一种基于量测平衡的遥测不良数据辨识与原因分辨方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant after: STATE GRID JIANGSU ECONOMIC RESERCH INSTITUTE Applicant after: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: JIANGSU ELECTRIC POWER Co. Applicant before: JIANGSU ELECTRIC POWER COMPANY ECONOMIC Research Institute Applicant before: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. |
|
| CB02 | Change of applicant information | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20170523 Address after: 210008 Gulou District, Jiangsu, Zhongshan Road, No. 251, No. Applicant after: STATE GRID JIANGSU ECONOMIC RESERCH INSTITUTE Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant after: State Grid Corporation of China Applicant after: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co. Applicant before: STATE GRID JIANGSU ECONOMIC RESERCH INSTITUTE Applicant before: FIVE-C SMART POWER GRID TECHNOLOGY Co.,Ltd. |
|
| TA01 | Transfer of patent application right | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |