[go: up one dir, main page]

CN104316816B - A kind of single-phase resident's electric energy meter is visited one house after another investigation method - Google Patents

A kind of single-phase resident's electric energy meter is visited one house after another investigation method Download PDF

Info

Publication number
CN104316816B
CN104316816B CN201410527333.XA CN201410527333A CN104316816B CN 104316816 B CN104316816 B CN 104316816B CN 201410527333 A CN201410527333 A CN 201410527333A CN 104316816 B CN104316816 B CN 104316816B
Authority
CN
China
Prior art keywords
electric energy
energy meter
spaced apart
zero line
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410527333.XA
Other languages
Chinese (zh)
Other versions
CN104316816A (en
Inventor
赵喜云
刘连岐
刘雪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Training Center of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Training Center of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Training Center of State Grid Hebei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Training Center of State Grid Hebei Electric Power Co Ltd
Priority to CN201410527333.XA priority Critical patent/CN104316816B/en
Publication of CN104316816A publication Critical patent/CN104316816A/en
Application granted granted Critical
Publication of CN104316816B publication Critical patent/CN104316816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种单相居民电能表串户排查方法,该方法采用零线分流方法排查,用导线或电缆逐一短接零线排和客户负荷侧零线,导线对零线电流分流,短接后同一回路各部位零线电流会降为原来一半,通过这种方法找出与此客户有实际连接关系的空开和电能表,与标记为客户的空开、电能表比对、与营销业务应用系统档案比对,如不一致就存在串户。本发明仅采用一根导线和普通钳形电流表就可实现在用户不断电,也不增加负荷的情况下,迅速排查出电能表是否串户及串户的具体情况。本发明简单易行、设备少、投资小、效果明显。

The invention discloses a single-phase resident electric energy meter serial household checking method. The method adopts the zero line shunting method for checking, and wires or cables are used to short-circuit the zero line row and the customer load-side zero line one by one, and the wire shunts the zero line current, shorting the zero line. After the connection, the zero line current of each part of the same circuit will be reduced to half of the original. In this way, find out the circuit breaker and electric energy meter that are actually connected to the customer, and compare it with the electric circuit breaker and electric energy meter marked as the customer, and marketing Business application system file comparison, if inconsistent, there is collusion. The present invention only uses one lead wire and a common clamp ammeter to quickly find out whether the electric energy meter is connected to the household and the specific conditions of the connected household under the condition that the user does not cut off the power supply and does not increase the load. The invention is simple and easy to implement, has less equipment, less investment and obvious effect.

Description

一种单相居民电能表串户排查方法A single-phase household electric energy meter string household investigation method

技术领域technical field

本发明涉及一种单相居民电能表串户排查方法。The invention relates to a single-phase resident electric energy meter serial checking method.

背景技术Background technique

随着智能电网的建设,全国范围了开展了智能电能表安装及更换工作,而数量巨大的低压单相居民用户普遍采用单相多表位电能表表箱,表箱内集中安装多户居民电能表及控制开关,极易出现串户现象,即别人用电,我交电费的现象,导致计量及电费差错,给用电客户带来损失,严重影响供电企业的形象。本文中串户是指电能表与空开(控制开关)之间、空开与用户内线串户。With the construction of the smart grid, the installation and replacement of smart energy meters have been carried out nationwide, and a large number of low-voltage single-phase residential users generally use single-phase multi-meter electric energy meter boxes, and multi-household electric energy meters are centrally installed in the meter boxes. Meters and control switches are prone to collusion, that is, other people use electricity and I pay the electricity bill, which leads to errors in metering and electricity bills, brings losses to electricity customers, and seriously affects the image of power supply companies. In this article, the serial connection refers to the connection between the electric energy meter and the circuit breaker (control switch), between the circuit breaker and the internal line of the user.

以前的电能表串户排查,一般采用两种方式排查。第一种方式是表箱整体停电、再逐一送电的方式进行逐户排查,这种方式需要给表箱内所有用户停电,相关法律、法规是不允许的,在用户的维权意识越来越强今天,也是不现实的。第二种方式是增加用户负荷,通过观察加负荷前后表功率的变化(表盘转速或发脉冲速度)进行排查,这种方法,要多扣减用户的增加负荷部分的电费,既浪费能源,又增加了电费开支,也是不可取的。In the past, there are two ways to check the energy meter serial households. The first way is to conduct a door-to-door investigation by shutting off the overall power of the meter box and then sending power one by one. This method needs to cut off the power to all users in the meter box, which is not allowed by relevant laws and regulations. As users' awareness of rights protection becomes more and more It is unrealistic to be strong today. The second way is to increase the load of the user, and check by observing the change of the power of the meter before and after the load (dial speed or pulse speed). It is not advisable to increase the electricity bill.

发明内容Contents of the invention

本发明要解决的技术问题是提供一种在不停电,也不增加客户负荷情况下,能快速方便的排查单相居民电能表串户情况的方法。The technical problem to be solved by the present invention is to provide a method that can quickly and conveniently check the situation of single-phase residential electric energy meters being connected to households without power failure and without increasing customer load.

为解决上述技术问题,本发明所采取的技术方案是:一种单相居民电能表串户排查方法,该方法步骤如下:In order to solve the above-mentioned technical problems, the technical solution adopted by the present invention is: a single-phase household electric energy meter serial household investigation method, the method steps are as follows:

1)用验电笔检查某客户负荷的相线和零线,找出零线;1) Check the phase wire and neutral wire of a customer load with an electroscope pen to find out the neutral wire;

2)在负荷稳定情况下用钳形电流表快速测试每户电能表出线、空开进线、空开出线的电流;2) When the load is stable, use a clamp ammeter to quickly test the current of the outgoing line of the electric energy meter, the incoming line of the air breaker, and the outgoing line of the air breaker of each household;

3)用导线或电缆短接零线排零线和客户负荷侧零线, 用钳形电流表快速测试每户电能表出线、空开进线、空开出线的电流,并判断;3) Use a wire or cable to short-circuit the neutral line of the neutral line and the zero line of the customer's load side, and use a clamp ammeter to quickly test the current of the outgoing line of the electric energy meter, the incoming line of the air breaker, and the outgoing line of the air breaker, and judge;

短接前同一回路电能表、空开零线电流应相等,短接后同一回路电能表、空开零线电流也相等,但短接后的零线电流明显减少的电能表、空开与客户负荷同一回路,即找出了本客户负荷实际连接的空开和电能表;The current of the electric energy meter and the neutral line of the circuit breaker of the same circuit should be equal before short-circuiting. The load is in the same circuit, that is, the circuit breaker and the electric energy meter actually connected to the customer's load are found;

4)用上述方法找出其他客户负荷实际连接的空开和电能表;4) Use the above method to find out the circuit breakers and electric energy meters actually connected to other customer loads;

5)完成上述步骤后,所有客户负荷实际连接的空开、电能表与现场标注的客户空开、电能表比对,与营销业务应用系统档案是比对,如有不一致,就存在串户,并能判断出串户的具体情况,是电能表处、空开处还是内线处发生串户。5) After completing the above steps, compare the air switch and energy meter actually connected to all customer loads with the customer air switch and energy meter marked on site, and compare with the marketing business application system file. If there is any inconsistency, there is a collusion. And it can judge the specific situation of the cross-connection, whether the cross-connection occurs at the electric energy meter, the open space or the internal line.

采用上述技术方案所产生的有益效果在于:本发明采用一根导线和普通钳形电流表就可实现在用户不断电,也不增加负荷的情况下,迅速排查出电能表是否串户及串户的具体情况。经过多次试验验证,本零线分流法进行电能表串户排查,不停电、不增加用户负荷,就能排查出单相居民用户电能表串户情况,简单易行、设备少、投资小、效果明显。采用本方法对供电公司做好优质服务工作、减少客户损失、有效降低投诉,具有非常实用的价值。The beneficial effect produced by adopting the above-mentioned technical scheme is that the present invention can quickly find out whether the electric energy meter is connected to the household or not without the user’s uninterrupted power supply and without increasing the load by using a wire and an ordinary clamp ammeter. specific situation. After many tests and verifications, this zero line shunt method can be used to check the chain connection of electric energy meters without power outage and without increasing the user load. The effect is obvious. Adopting this method is of very practical value for the power supply company to provide high-quality services, reduce customer losses, and effectively reduce complaints.

附图说明Description of drawings

图1是正常情况下多表位表箱接线示意图;Fig. 1 is a schematic diagram of multi-table meter box wiring under normal conditions;

图2是本发明短接零线法检查串户的示意图;Fig. 2 is the schematic diagram that the present invention short-connects zero line method and checks the serial household;

本文中的空开即空气开关。The air switch in this article is the air switch.

具体实施方式detailed description

下面结合附图和具体实施方式对本发明作进一步详细的说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

1、首先,分析以下单相居民电能表串户原因1. First, analyze the reasons for the following single-phase residential electric energy meters to be connected to one another

图1为多表位表箱接线示意图(以两表位为例),表箱电源总开关合上后,电源经过零线排和相线排分配给每户电能表,为了便于每一户停送电,电能表相线进线侧加单极隔离开关,控制用户停送电,电能表出线接至客户空开,使客户负荷能正常用电。Figure 1 is a schematic diagram of the multi-meter meter box wiring (taking two meter positions as an example). After the main power switch of the meter box is closed, the power is distributed to the electric energy meters of each household through the zero line row and the phase line row. In order to facilitate the shutdown of each household For power transmission, a unipolar isolating switch is added to the incoming side of the phase line of the electric energy meter to control the user to stop power transmission, and the outgoing line of the electric energy meter is connected to the customer's air switch so that the customer's load can use electricity normally.

正常情况,客户电能表、空开、与客户负荷一一对应,且与供电公司档案一致。一旦标记为某客户电能表接到标记为其他客户空开上,或标记为某客户空开接到其他户内线上(负荷上),就产生串户,客户电能表会出现计量差错,标记为自己的电能表电量并不是自己用的电量。Under normal circumstances, the customer's energy meter and air switch correspond to the customer's load one by one, and are consistent with the files of the power supply company. Once the energy meter marked as a customer is connected to the air switch marked as other customers, or the air switch marked as a customer is connected to other indoor lines (on the load), there will be a series of accounts, and the customer's energy meter will have a measurement error, which is marked as The power of your own energy meter is not the power you use.

2、本发明的排查原理和方法:2. Principle and method of investigation of the present invention:

参见附图2,采用零线分流方法排查,用导线或电缆逐一短接零线排和客户负荷侧零线,导线对零线电流分流,短接后同一回路各部位零线电流会降为原来一半,通过这种方法找出与此客户有实际连接关系的空开和电能表,与标记为客户的空开、电能表比对、与营销业务应用系统档案比对,如不一致就存在串户。Refer to attached picture 2, use the zero line shunt method to check, use wires or cables to short-circuit the zero line bar and the customer load side neutral line one by one, the wires will shunt the neutral line current, and after shorting, the zero line current in each part of the same circuit will be reduced to the original Half, use this method to find out the air switch and energy meter that are actually connected to the customer, compare it with the air switch and energy meter marked as the customer, and compare it with the marketing business application system file. If they are inconsistent, there is a chain of accounts .

本发明具体排查步骤如下:The specific investigation steps of the present invention are as follows:

用验电笔检查某客户负荷的相线和零线,找出零线。 Check the phase line and neutral line of a customer's load with an electroscope pen to find out the neutral line.

在负荷稳定情况下用钳形电流表快速测试每户电能表出线、空开进线、空开出线的电流。 When the load is stable, use a clamp ammeter to quickly test the current of the outgoing line of the electric energy meter, the incoming line of the air breaker, and the outgoing line of the air breaker of each household.

用导线或电缆短接零线排零线和客户负荷侧零线, 用钳形电流表快速测试每户电能表出线、空开进线、空开出线的电流。 Use a wire or cable to short-circuit the neutral line of the zero line and the zero line of the customer load side, and use a clamp ammeter to quickly test the current of the outgoing line of the electric energy meter, the incoming line of the air breaker, and the outgoing line of the air breaker.

短接前同一回路电能表、空开零线电流应相等的,短接后同一回路电能表、空开零线电流也相等,但短接后的零线电流明显减少(约为短接前1/2)的电能表、空开与客户负荷同一回路,即找出了本客户负荷实际连接的空开和电能表。The current of the electric energy meter and the neutral line of the same circuit should be equal before short-circuiting, and the current of the electric energy meter and the neutral line of the same circuit after short-circuiting should also be equal, but the current of the neutral line after short-circuiting is significantly reduced (about 1 /2) The electric energy meter, circuit breaker and customer load are in the same circuit, that is, the circuit breaker and electric energy meter actually connected to the customer load are found.

注意:测试时间尽可能短,时间长负荷变化较大。Note: The test time should be as short as possible, and the load will change greatly if the time is long.

同样方法找出其他客户负荷实际连接的空开和电能表。 In the same way, find out the circuit breakers and electric energy meters actually connected to other customer loads.

所有客户负荷实际连接的空气开关、电能表与现场标注的客户空气开关、电能表比对,与营销业务应用系统档案是比对,如有不一致,就存在串户,并能判断出串户的具体情况,是电能表处、空开处还是内线处发生串户。 The air switches and electric energy meters actually connected to all customer loads are compared with the customer air switches and electric energy meters marked on site, and compared with the marketing business application system files. In the specific situation, whether the serial account occurs at the electric energy meter, the open space or the internal line.

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention will not be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (1)

  1. A kind of investigation method 1. single-phase resident's electric energy meter is visited one house after another, it is characterised in that:This method step is as follows:
    1)The phase line and zero line of certain client's load are checked with electroscope, finds out zero line;
    2)The outlet of each household electric energy meter is quickly tested with clamp on amperemeter in the case of steady load, is spaced apart inlet wire, is spaced apart outlet Electric current;
    3) with wire or cable short circuit zero line row's zero line and client's load side zero line, each household electricity is quickly tested with clamp on amperemeter The outlet of energy table, it is spaced apart inlet wire, is spaced apart the electric current of outlet, and judges;
    The same circuit electric energy meter before short circuit, be spaced apart neutral line current should be equal, the same circuit electric energy meter after short circuit, be spaced apart neutral line current Also it is equal, but the neutral line current after short circuit significantly reduce electric energy meter, be spaced apart with client's load the same circuit, that is, have found this visitor Family load is actual being spaced apart of connecting and electric energy meter;
    4) find out in aforementioned manners other client's loads it is actual connect be spaced apart and electric energy meter;
    5) after completing above-mentioned steps, all client's loads are actual connect be spaced apart, the client of electric energy meter and scene mark is spaced apart, Electric energy meter compares, and is compared with sales service application system file, if any inconsistent, there is and visits one house after another, and can judge what is visited one house after another Concrete condition, it is at electric energy meter, is spaced apart at place or interior lines and visits one house after another.
CN201410527333.XA 2014-10-09 2014-10-09 A kind of single-phase resident's electric energy meter is visited one house after another investigation method Active CN104316816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410527333.XA CN104316816B (en) 2014-10-09 2014-10-09 A kind of single-phase resident's electric energy meter is visited one house after another investigation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410527333.XA CN104316816B (en) 2014-10-09 2014-10-09 A kind of single-phase resident's electric energy meter is visited one house after another investigation method

Publications (2)

Publication Number Publication Date
CN104316816A CN104316816A (en) 2015-01-28
CN104316816B true CN104316816B (en) 2017-11-21

Family

ID=52372069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410527333.XA Active CN104316816B (en) 2014-10-09 2014-10-09 A kind of single-phase resident's electric energy meter is visited one house after another investigation method

Country Status (1)

Country Link
CN (1) CN104316816B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104714146B (en) * 2015-03-13 2017-11-03 长沙敏特电力技术有限公司 Ammeter is visited one house after another wiring testing device and its detection method
CN104965147B (en) * 2015-07-15 2018-07-13 国家电网公司 Low-voltage customer electric energy meter is visited one house after another detecting system and detection method
CN105182170B (en) * 2015-10-23 2018-07-03 国家电网公司 A kind of zero firewire calibration equipment of resident's ammeter and its method of calibration
CN105223537B (en) * 2015-11-06 2018-08-28 国网重庆市电力公司电力科学研究院 A kind of electric energy meter is visited one house after another detection device and method
CN106707079B (en) * 2015-11-18 2020-09-25 中国电力科学研究院 Method for checking metering cross-family of power consumers
CN105589011B (en) * 2016-02-26 2018-11-16 国网浙江省电力公司嘉兴供电公司 It visits one house after another before a kind of single-phase resident's electric energy meter installation examination device and investigation method
CN106093692A (en) * 2016-05-27 2016-11-09 国家电网公司 The method and device that detection electric energy meter is visited one house after another
CN109085454B (en) * 2018-07-03 2020-11-24 江苏方天电力技术有限公司 An intelligent screening method for metered households based on big data analysis
CN109541375A (en) * 2018-12-20 2019-03-29 杭州华春科技有限公司 A kind of earth detector for concentrated gas meter box
CN109782090B (en) * 2019-01-08 2021-05-25 国网安徽省电力有限公司合肥供电公司 Method for judging power consumer variable relation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1186960A (en) * 1998-02-13 1998-07-08 天津市阳光电子有限公司 Method for detecting fraudulent use of electricity by short connection
CN101408603A (en) * 2008-11-25 2009-04-15 湖北省电力公司咸宁供电公司 Method for detecting electricity theft-proof electric energy meter
CN101526557A (en) * 2009-04-02 2009-09-09 北京国电富通科技发展有限责任公司 Electricity steal-resistance load management method
CN102540131A (en) * 2010-12-15 2012-07-04 河南省电力公司开封供电公司 Instrument examination method based on electrical energy metering
KR20130055499A (en) * 2011-11-18 2013-05-28 리치테크 테크놀로지 코포레이션 Short-circuit detection circuit and short-circuit detection method
CN103336157A (en) * 2013-06-17 2013-10-02 王怡凡 Single-phase electric energy meter capable of identifying electricity stealing of reverse neutral and fire wire connection and neutral wire disconnection

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1186960A (en) * 1998-02-13 1998-07-08 天津市阳光电子有限公司 Method for detecting fraudulent use of electricity by short connection
CN101408603A (en) * 2008-11-25 2009-04-15 湖北省电力公司咸宁供电公司 Method for detecting electricity theft-proof electric energy meter
CN101526557A (en) * 2009-04-02 2009-09-09 北京国电富通科技发展有限责任公司 Electricity steal-resistance load management method
CN102540131A (en) * 2010-12-15 2012-07-04 河南省电力公司开封供电公司 Instrument examination method based on electrical energy metering
KR20130055499A (en) * 2011-11-18 2013-05-28 리치테크 테크놀로지 코포레이션 Short-circuit detection circuit and short-circuit detection method
CN103336157A (en) * 2013-06-17 2013-10-02 王怡凡 Single-phase electric energy meter capable of identifying electricity stealing of reverse neutral and fire wire connection and neutral wire disconnection

Also Published As

Publication number Publication date
CN104316816A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
CN104316816B (en) A kind of single-phase resident's electric energy meter is visited one house after another investigation method
CN109031184B (en) Monitoring method, system and terminal equipment for electric energy metering device
CN104730410B (en) A kind of distribution line disconnection monitoring method and device based on voltage x current vector
Singh Power system harmonics research: a survey
US10852362B2 (en) Transformer monitoring and data analysis systems and methods
US20180143237A1 (en) Transformer monitoring and data analysis systems and methods
CN104215882B (en) Voltage sag source locating method based on active single-port network resistor polarity
CN107945608A (en) Almightiness type power supply station Training in Comprehensive Skills device
Peppanen et al. Increasing distribution system model accuracy with extensive deployment of smart meters
CN106970347B (en) Method for troubleshooting secondary circuit fault of transformer substation watt-hour meter by utilizing bus unbalance rate
CN101839926A (en) Single-phase three-in electric energy meter for resisting technical electricity larceny
US11243268B2 (en) Systems and methods for monitoring transformers and performing actions based on the monitoring
CN103645415A (en) Practical method of inspecting electric energy metering device wiring in charged mode
CN204649874U (en) A kind of platform district line loss is abnormal checks instrument
CN104251978A (en) Tester for affection of alternating-current crosstalk and voltage fluctuation of direct-current system on relay
CN204462283U (en) A kind of DC feeder Graded coordination proving installation
CN201654095U (en) Single-phase three-entry anti-theft technology electric energy meter
CN105487041A (en) A performance detection system for electric energy metering equipment
CN204789785U (en) Portable intelligent substation relay protection testing arrangement
CN203773023U (en) Intelligent power meter breaker testing device
CN107064689B (en) A simulation method and system for transformer TA disconnection
CN105223465A (en) A kind of fast finding low-voltage circuit leak current fault point apparatus
JP7122677B2 (en) Switches and test methods for switches
CN204992260U (en) Expanded not repeated fixed measuring equipment of single mains operated
CN101179206A (en) Low-voltage electric network remote monitoring and service network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant