CN104164887A - Large deepwater prefabricated bearing platform installation device - Google Patents

Large deepwater prefabricated bearing platform installation device Download PDF

Info

Publication number
CN104164887A
CN104164887A CN201310196691.2A CN201310196691A CN104164887A CN 104164887 A CN104164887 A CN 104164887A CN 201310196691 A CN201310196691 A CN 201310196691A CN 104164887 A CN104164887 A CN 104164887A
Authority
CN
China
Prior art keywords
water
steel pipe
prefabricated
bearing platforms
prefabricated bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310196691.2A
Other languages
Chinese (zh)
Inventor
颜可仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310196691.2A priority Critical patent/CN104164887A/en
Publication of CN104164887A publication Critical patent/CN104164887A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

According to large water bearing platform installation at present, a water stopping device is arranged below a preformed hole, cofferdam construction is carried out on the upper portion through steel pouring jackets, and when the depth of water exceeds 30 meters, the construction difficulty of the steel pouring jackets becomes larger along with the increasing of the depth of water. The invention provides a large deepwater prefabricated bearing platform installation device to meet requirements of deepwater bearing platform installation. Water stopping devices are pre-installed below and above preformed holes of prefabricated bearing platforms, and water pumping pipes are buried above the preformed holes of the prefabricated bearing platforms. After the bearing platforms are placed to the designed elevation positions, water in the preformed holes of the prefabricated bearing platforms is completely pumped away, and a manhole is formed in the bottoms of redundant steel pipe piles. The steel pipe piles are connected with the bearing platforms in a welding mode through shear keys, the steel pipe piles are cut off, and the redundant steel pipes are ejected to the tops of the preformed holes of the prefabricated bearing platforms through a hydraulic jack and are fixed through check blocks. Preformed hole concrete is poured, and the redundant steel pipe piles and the water pumping pipes are pulled out.

Description

The prefabricated cushion cap erecting device of large-sized deep water
Technical field
The present invention relates to the prefabricated cushion cap erecting device of a kind of large-sized deep water.
Technical background
Current large-scale underwater support table is installed as preformed hole bottom and establishes antipriming, constructs with steel boxed cofferdam in top, and when the depth of water is above over 30m, steel jacket box difficulty of construction is just along with the depth of water degree of depth increases and strengthens.
Summary of the invention
The needs of installing for solving deep water cushion cap, the invention provides a kind of large-sized deep water cushion cap erecting device.
The technical solution adopted for the present invention to solve the technical problems is, at the bottom of each prefabricated cushion cap preformed hole, top, antipriming is installed in advance, buries drinking-water pipe underground.Cushion cap is put into after design elevation, and water in prefabricated cushion cap preformed hole is drained, and offers one cross manhole in unnecessary steel pipe pile bottom.With shear connector, by steel pipe pile and cushion cap welding, cut off steel pipe pile, unnecessary steel pipe is arrived to prefabricated cushion cap preformed hole top with hydraulic jack jacking, with block, fix.Build preformed hole concrete, extract unnecessary steel pipe pile, drinking-water pipe.
The invention has the beneficial effects as follows, simple in structure, can meet deep water cushion cap needs are installed.
Accompanying drawing explanation
Fig. 1 is the prefabricated cushion cap erecting device of large-sized deep water plan view
Fig. 2 is the prefabricated cushion cap of the prefabricated cushion cap erecting device of large-sized deep water sectional drawing while putting into
Fig. 3 is sectional drawing after the unnecessary steel pipe pile jacking of the prefabricated cushion cap erecting device of large-sized deep water
Fig. 4 is sectional drawing after the concreting of the prefabricated cushion cap preformed hole of the prefabricated cushion cap erecting device of large-sized deep water
Fig. 5 is that the prefabricated cushion cap erecting device of large-sized deep water is pulled out sectional drawing after unnecessary steel pipe pile
In figure: 1. prefabricated cushion cap; 2. prefabricated cushion cap preformed hole; 3. steel pipe pile; 4. descend antipriming; 5. go up antipriming; 6. preformed hole concrete seven. block; 8. drinking-water pipe; 9. shear connector; 10. cross manhole; 11. unnecessary steel pipe piles.
Specific implementation method
In Fig. 2: establish a lower antipriming (4) in prefabricated cushion cap preformed hole (2) bottom, a upper antipriming (5) is established at top, drinking-water pipe (8), prefabricated cushion cap preformed hole (2) is inserted in to steel pipe pile (3) and transfers to design altitude, after drawing water, in unnecessary steel pipe pile (11) bottom, open one and cross manhole (10), with shear connector (9) and steel pipe pile (3), prefabricated cushion cap (1) welding, cut off steel pipe pile (3) unnecessary steel pipe pile (11) is arrived to prefabricated cushion cap preformed hole (2) top with jack jacking, fixing with block (7), build preformed hole concrete (6) and pull out unnecessary steel pipe pile (11), drinking-water pipe (8).

Claims (1)

1. the prefabricated cushion cap erecting device of large-sized deep water, is characterized in that establishing an antipriming at prefabricated cushion cap preformed hole top.
CN201310196691.2A 2013-05-17 2013-05-17 Large deepwater prefabricated bearing platform installation device Pending CN104164887A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310196691.2A CN104164887A (en) 2013-05-17 2013-05-17 Large deepwater prefabricated bearing platform installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310196691.2A CN104164887A (en) 2013-05-17 2013-05-17 Large deepwater prefabricated bearing platform installation device

Publications (1)

Publication Number Publication Date
CN104164887A true CN104164887A (en) 2014-11-26

Family

ID=51908860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310196691.2A Pending CN104164887A (en) 2013-05-17 2013-05-17 Large deepwater prefabricated bearing platform installation device

Country Status (1)

Country Link
CN (1) CN104164887A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245667A (en) * 2016-09-20 2016-12-21 国网浙江省电力公司经济技术研究院 A small-sized clump of piles and the attachment structure of cushion cap

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0046418A1 (en) * 1980-07-09 1982-02-24 COYNE ET BELLIER Bureau d'Ingénieurs Conseils Anchoring method and foundation device for a platform, especially a mobile one
KR100744693B1 (en) * 2005-10-24 2007-08-01 (주) 선암기술연구소 Concrete steel house and pile foundation footing method using the same
CN101476327A (en) * 2009-01-09 2009-07-08 广州市市政集团有限公司 Subaqueous bearing platform construction method
CN101476326A (en) * 2009-01-23 2009-07-08 广州市市政集团有限公司 Bearing platform prefabrication and construction method
US20120003048A1 (en) * 2008-12-12 2012-01-05 Hosoey Oeyvind Devices and method for equipment foundation in the sea bed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0046418A1 (en) * 1980-07-09 1982-02-24 COYNE ET BELLIER Bureau d'Ingénieurs Conseils Anchoring method and foundation device for a platform, especially a mobile one
KR100744693B1 (en) * 2005-10-24 2007-08-01 (주) 선암기술연구소 Concrete steel house and pile foundation footing method using the same
US20120003048A1 (en) * 2008-12-12 2012-01-05 Hosoey Oeyvind Devices and method for equipment foundation in the sea bed
CN101476327A (en) * 2009-01-09 2009-07-08 广州市市政集团有限公司 Subaqueous bearing platform construction method
CN101476326A (en) * 2009-01-23 2009-07-08 广州市市政集团有限公司 Bearing platform prefabrication and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245667A (en) * 2016-09-20 2016-12-21 国网浙江省电力公司经济技术研究院 A small-sized clump of piles and the attachment structure of cushion cap

Similar Documents

Publication Publication Date Title
US10253475B2 (en) Construction device and method for offshore wind turbine foundation with piling performed later
CN206298888U (en) Shoe Jacket Structure for Offshore Booster Station
CN113737808B (en) Assembly type concrete supporting pile group structure for deep foundation pit supporting and construction method
CN103132537A (en) Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method
CN206034408U (en) A back pitching pile formula jacket structure for marine booster station
CN104895034A (en) Suction pile bottom hull type self-lifting platform and installation method
CN101705687B (en) Deep foundation pit reinforced concrete waist rail detaching device and construction method
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN105501396A (en) Negative pressure bucket anchoring device provided with barbs, installation method and floating type offshore wind plant
CN203741801U (en) Suction pile mat type self-lifting platform
CN201962696U (en) Underwater cup-shaped foundation with functions of hydraulic scouring assisted sinking and foundation consolidation
KR101665979B1 (en) Concrete base of offshore wind substructure and the construction method therefor
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN102888847B (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN101851923B (en) Support pillar construction and erection method
CN201310089Y (en) Offshore wellhead platform supported by water-proof sleeve pipes
CN104164887A (en) Large deepwater prefabricated bearing platform installation device
CN204825955U (en) After drive piles construction equipment on marine fan basis
CN104120699B (en) Steel sheet pile bucket base man-made island dado structure
KR20090120997A (en) Construction method of underwater structure
CN206448293U (en) A kind of reverse construction ground prop structure
CN105625429A (en) Pile pulling device and application method thereof
CN104164890A (en) Large deepwater prefabricated bearing platform installation device
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
CN104594319B (en) The lifting installation method of integral of deep water ocean platform pump pillar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141126