[go: up one dir, main page]

CN104132037A - Hoisting point fixing device for emergency repair tower - Google Patents

Hoisting point fixing device for emergency repair tower Download PDF

Info

Publication number
CN104132037A
CN104132037A CN201410342444.3A CN201410342444A CN104132037A CN 104132037 A CN104132037 A CN 104132037A CN 201410342444 A CN201410342444 A CN 201410342444A CN 104132037 A CN104132037 A CN 104132037A
Authority
CN
China
Prior art keywords
component
frame body
clamping sleeve
strip
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410342444.3A
Other languages
Chinese (zh)
Other versions
CN104132037B (en
Inventor
何苍贵
何畅
刘雪飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mudanjiang electric power industry school
State Grid Corp of China SGCC
Original Assignee
Mudanjiang electric power industry school
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mudanjiang electric power industry school, State Grid Corp of China SGCC filed Critical Mudanjiang electric power industry school
Priority to CN201410342444.3A priority Critical patent/CN104132037B/en
Publication of CN104132037A publication Critical patent/CN104132037A/en
Application granted granted Critical
Publication of CN104132037B publication Critical patent/CN104132037B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

用在应急抢修塔上的吊点固定装置,它涉及一种吊点固定装置。本发明为了解决在采用应急抢修塔起吊时因缺少专用的吊点固定装置而存在安全隐患的问题。所述第一组成条体两端分别与两个第二组成条体固接,第一组成条体上加工有第一通孔,副框架体与主框架体形成矩形框架体,多个卡紧器均贴紧在矩形框架体上下端面的对角上;所述第一组成条体两端分别与两个第二组成条体固接,连接吊块的底面位于第一组成条体的水平端并与其固接,连接吊块的一侧面通过连接块体固接在第一组成条体的竖直端上,连接吊块上加工有第二通孔,副框架体与主框架体形成矩形框架体,多个卡紧器均贴紧在矩形框架体上下端面的对角上。本发明用于应急抢修塔起吊过程中。

A lifting point fixing device used on an emergency repair tower relates to a lifting point fixing device. The invention aims to solve the problem of potential safety hazards due to the lack of a special lifting point fixing device when the emergency repair tower is used for lifting. The two ends of the first composition strip body are fixedly connected with two second composition strip bodies respectively, the first through hole is processed on the first composition strip body, the sub-frame body and the main frame body form a rectangular frame body, and multiple clamping The devices are all attached to the opposite corners of the upper and lower end surfaces of the rectangular frame body; the two ends of the first component strip are fixedly connected to the two second component strips respectively, and the bottom surface of the connecting hanging block is located at the horizontal end of the first component strip And fixedly connected with it, one side of the connecting hanging block is fixed on the vertical end of the first component bar through the connecting block, the second through hole is processed on the connecting hanging block, and the sub frame body and the main frame body form a rectangular frame body, and a plurality of clamps are all attached to the opposite corners of the upper and lower end faces of the rectangular frame body. The invention is used in the hoisting process of the emergency repair tower.

Description

用在应急抢修塔上的吊点固定装置The lifting point fixing device used on the emergency repair tower

技术领域technical field

本发明涉及一种吊点固定装置,具体涉及一种用在应急抢修塔上的吊点固定装置。The invention relates to a lifting point fixing device, in particular to a lifting point fixing device used on an emergency repair tower.

背景技术Background technique

在电力系统输电线路运行中,由于各种原因,导致输电线路的铁塔倾倒,一旦事故发生,需要以最快速度抢修,如果按照原设计标准进行抢修,耗时较长,目前运行单位多采用应急抢修塔进行快速修复恢复供电,然后再进行永久性修复,现有使用的应急抢修塔由铝合金制成,由于其重量大,有三十多米高,在应急抢修塔起吊过程中,其吊点的方式一般是利用钢丝绳对其缠绕的方式进行固定,导致钢丝绳的强度、钢丝绳与抢修塔的摩擦以及其吊点的串动,严重影响了铝合金抢修塔起吊的安全性,易给施工过程中造成重大经济损失和二次事故。In the operation of power system transmission lines, due to various reasons, the towers of the transmission lines are toppled. Once an accident occurs, it needs to be repaired at the fastest speed. The emergency repair tower is quickly repaired to restore power supply, and then it is permanently repaired. The existing emergency repair tower is made of aluminum alloy. Due to its heavy weight, it is more than 30 meters high. During the lifting process of the emergency repair tower, its crane The point method is generally to use the steel wire rope to fix it in the way of winding, resulting in the strength of the steel wire rope, the friction between the steel wire rope and the emergency repair tower, and the serial movement of its lifting points, which seriously affects the safety of the aluminum alloy emergency repair tower for lifting. Cause heavy economic losses and secondary accidents.

发明内容Contents of the invention

本发明的目的是提供一种用在应急抢修塔上的吊点固定装置,以解决在采用应急抢修塔起吊时因缺少专用的吊点固定装置而存在安全隐患的问题。The object of the present invention is to provide a lifting point fixing device used on the emergency repair tower to solve the problem of potential safety hazards due to the lack of a special lifting point fixing device when the emergency repair tower is used for lifting.

本发明为解决上述技术问题采取的技术方案是:The technical scheme that the present invention takes for solving the problems of the technologies described above is:

一种用在应急抢修塔上的吊点固定装置,所述用在应急抢修塔上的吊点固定装置包括主框架体、副框架体和多个卡紧器,所述主框架体由第一组成条体、两个第二组成条体和两个第三组成条体组成,所述两个第二组成条体之间平行设置,所述第一组成条体位于两个第二组成条体之间且其两端分别与两个第二组成条体固定连接,每个第二组成条体外侧均固定连接有一个与其垂直设置的第三组成条体,每个第二组成条体与其对应固接的第三组成条体在水平方向形成的横截面均为L形,所述第一组成条体上加工有第一通孔,所述副框架体的形状为撮箕形,副框架体可拆卸连接在两个第二组成条体之间并与主框架体形成矩形框架体,多个卡紧器均贴紧在矩形框架体上下端面的对角上,卡紧器包括第一组成杆、第二组成杆、第一夹紧套、第二夹紧套和两个螺母,所述第一组成杆和第二组成杆位于同一平面内且垂直设置,所述第一组成杆分别与第一夹紧套和一个螺母螺纹连接,一个所述螺母位于第一夹紧套的外侧,所述第一夹紧套上加工有第一挡条,第一挡条朝向第一组成杆的侧面为倾斜的夹紧面,当第一夹紧套沿着第一组成杆从外向内转动时,第一挡条始终具有朝向第一组成杆夹紧的趋势;所述第二组成杆分别与第二夹紧套和另一个螺母螺纹连接,另一个所述螺母位于第二夹紧套的外侧,所述第二夹紧套上加工有第二挡条,第二挡条朝向第二组成杆的侧面为倾斜的夹紧面,当第二夹紧套沿着第二组成杆从外向内转动时,第二挡条始终具有朝向第二组成杆夹紧的趋势。A lifting point fixing device used on an emergency repair tower, the lifting point fixing device used on an emergency repair tower includes a main frame body, a secondary frame body and a plurality of clamps, and the main frame body consists of a first Composed of strips, two second composition strips and two third composition strips, the two second composition strips are arranged in parallel, and the first composition strips are located between the two second composition strips Between and its two ends are respectively fixedly connected with two second composition strips, and each second composition strip is fixedly connected with a third composition strip arranged vertically to the outside of each second composition strip body, and each second composition strip body corresponds to it The horizontal cross-sections of the fixed third component strips are all L-shaped, the first through holes are processed on the first component strips, the shape of the sub-frame is a dustpan, and the sub-frame can be It is disassembled and connected between the two second component bars and forms a rectangular frame body with the main frame body. A plurality of clamps are all attached to the opposite corners of the upper and lower end faces of the rectangular frame body. The clamps include the first component rod, The second component rod, the first clamping sleeve, the second clamping sleeve and two nuts, the first component rod and the second component rod are located in the same plane and vertically arranged, the first component rod is respectively connected to the first The clamping sleeve is threadedly connected with a nut, and one of the nuts is located on the outside of the first clamping sleeve. The first clamping sleeve is processed with a first stop bar, and the first stop bar is inclined towards the side of the first component rod. When the first clamping sleeve rotates from outside to inside along the first component rod, the first bar always has a tendency to clamp toward the first component rod; the second component rod is respectively connected to the second clamp The tight sleeve is screwed to another nut, and the other nut is located on the outside of the second clamping sleeve. The second clamping sleeve is processed with a second bar, and the side of the second bar facing the second component rod is With the inclined clamping surface, when the second clamping sleeve rotates from outside to inside along the second component rod, the second bar always has a tendency to clamp toward the second component rod.

一种用在应急抢修塔上的吊点固定装置,其特征在于:所述用在应急抢修塔上的吊点固定装置包括主框架体、副框架体、连接块体、连接吊块和多个卡紧器,所述主框架体由第一组成条体、两个第二组成条体和两个第三组成条体组成,所述两个第二组成条体之间平行设置,所述第一组成条体位于两个第二组成条体之间且其两端分别与两个第二组成条体固定连接,每个第二组成条体外侧均固定连接有一个与其垂直设置的第三组成条体,每个第二组成条体与其对应固接的第三组成条体在水平方向形成的横截面与所述第一组成条体竖直方向形成的横截面均为L形,所述连接吊块的底面位于第一组成条体的水平端并与其固定连接,所述连接吊块的一侧面通过连接块体固定连接在第一组成条体的竖直端上,所述连接吊块上加工有第二通孔,所述副框架体的形状为撮箕形,副框架体可拆卸连接在两个第二组成条体之间并与主框架体形成矩形框架体,多个卡紧器均贴紧在矩形框架体上下端面的对角上,卡紧器包括第一组成杆、第二组成杆、第一夹紧套、第二夹紧套和两个螺母,所述第一组成杆和第二组成杆位于同一平面内且垂直设置,所述第一组成杆分别与第一夹紧套和一个螺母螺纹连接,一个所述螺母位于第一夹紧套的外侧,所述第一夹紧套上加工有第一挡条,第一挡条朝向第一组成杆的侧面为倾斜的夹紧面,当第一夹紧套沿着第一组成杆从外向内转动时,第一挡条始终具有朝向第一组成杆夹紧的趋势;所述第二组成杆分别与第二夹紧套和另一个螺母螺纹连接,另一个所述螺母位于第二夹紧套的外侧,所述第二夹紧套上加工有第二挡条,第二挡条朝向第二组成杆的侧面为倾斜的夹紧面,当第二夹紧套沿着第二组成杆从外向内转动时,第二挡条始终具有朝向第二组成杆夹紧的趋势。A lifting point fixing device used on an emergency repair tower, characterized in that: the lifting point fixing device used on an emergency repair tower includes a main frame body, an auxiliary frame body, a connecting block, a connecting hanging block and a plurality of Clamping device, the main frame body is composed of a first component strip body, two second component strip bodies and two third component strip bodies, the two second component strip bodies are arranged in parallel, and the first component strip body is arranged in parallel. A composition strip is located between two second composition strips and its two ends are respectively fixedly connected with the two second composition strips, and each second composition strip is fixedly connected with a third composition perpendicular to it. The strip body, the cross section formed in the horizontal direction of each second composition strip body and the third composition strip body correspondingly fixed to it and the cross section formed in the vertical direction of the first composition strip body are both L-shaped, and the connection The bottom surface of the hanging block is located at the horizontal end of the first component bar and is fixedly connected to it, and one side of the connecting block is fixedly connected to the vertical end of the first component bar through the connecting block. A second through hole is processed, and the shape of the sub-frame body is a pan. The sub-frame body is detachably connected between the two second component bars and forms a rectangular frame body with the main frame body. Attached to the opposite corners of the upper and lower end surfaces of the rectangular frame body, the clamping device includes a first component rod, a second component rod, a first clamping sleeve, a second clamping sleeve and two nuts, the first component rod and The second component rods are located in the same plane and vertically arranged, the first component rods are respectively threaded with the first clamping sleeve and a nut, one of the nuts is located outside the first clamping sleeve, and the first clamping sleeve The sleeve is processed with a first bar, and the side of the first bar facing the first component rod is an inclined clamping surface. When the first clamping sleeve rotates from outside to inside along the first component bar, the first bar is always There is a tendency to clamp toward the first component rod; the second component rod is respectively threaded with the second clamping sleeve and another nut, and the other nut is located on the outside of the second clamping sleeve, and the second clamping A second bar is processed on the tight sleeve, and the side of the second bar facing the second component rod is an inclined clamping surface. When the second clamping sleeve rotates from outside to inside along the second component bar, the second bar There is always a tendency to clamp towards the second component rod.

本发明包含的有益效果是:The beneficial effects that the present invention comprises are:

1、本发明技术方案一的结构设计合理,主框架体和副框架体的结构和连接方式的设置是根据应急抢修塔的自身结构以及其所处的实际工作条件而设置的,第一组成条体上加工的第一通孔的设置是为了应急抢修塔起吊的过程中通过卸扣与钢丝绳套连接,使钢丝绳的吊点处的绳长度固定,起吊角度固定,有利于短时间内顺利完成应急抢修塔起吊工作,从而消除了钢丝绳套在应急抢修塔起吊过程中的缠绕、摩擦、吊点串动的缺陷,保证了应急抢修塔起立作业中的安全。1. The structural design of the technical scheme one of the present invention is reasonable, and the structure and connection mode of the main frame body and the sub-frame body are set according to the self-structure of the emergency repair tower and the actual working conditions where it is located. The first component The setting of the first through hole processed on the body is to connect the shackle and the wire rope sleeve through the shackle during the hoisting process of the emergency repair tower, so that the rope length at the hoisting point of the wire rope is fixed, and the hoisting angle is fixed, which is conducive to the smooth completion of the emergency in a short time. The hoisting work of the emergency repair tower eliminates the defects of winding, friction and series movement of the lifting point of the wire rope sleeve during the hoisting process of the emergency repair tower, and ensures the safety of the emergency repair tower erection operation.

2、本发明技术方案二的结构设计合理,主框架体和副框架体的结构和连接方式的设置是根据应急抢修塔的自身结构以及其所处的实际工作条件而设置的,连接吊块上的第二通孔的设置是为了应急抢修塔起吊的过程中通过卸扣与钢丝绳套连接,使钢丝绳的吊点处的绳长度固定,起吊角度固定,有利于短时间内顺利完成应急抢修塔起吊工作,从而消除了钢丝绳套在应急抢修塔起吊过程中的缠绕、摩擦、吊点串动的缺陷,保证了应急抢修塔起立作业中的安全,连接吊块和第二通孔的设置为本发明提供了另外一种连接钢丝绳套的连接关系,这样的设置突出了本发明与卸扣的连接位置,有利于工作人员在短时间内做好通过卸扣与钢丝绳套的连接工作,连接块体的设置是为了辅助连接吊块与第一组成条体稳定可靠地连接。2. The structural design of the technical solution 2 of the present invention is reasonable. The structure and connection mode of the main frame body and the sub-frame body are set according to the self-structure of the emergency repair tower and the actual working conditions in which it is located. The setting of the second through hole is to connect the shackle to the wire rope sleeve during the hoisting of the emergency repair tower, so that the length of the rope at the lifting point of the wire rope is fixed, and the lifting angle is fixed, which is conducive to the smooth completion of the emergency repair tower hoisting in a short time work, thereby eliminating the defects of wire rope sheath winding, friction, and series movement of the lifting point during the lifting process of the emergency repair tower, ensuring the safety in the erection operation of the emergency repair tower. Provides another connection relationship for connecting wire rope sleeves. This setting highlights the connection position between the present invention and the shackle, which is beneficial for the staff to do a good job of connecting the shackle and the wire rope sleeve in a short time, and the connection block. The purpose of setting is to assist the stable and reliable connection between the connecting hanging block and the first component bar.

3、本发明多个卡紧器的结构设计新颖合理,其作用是通过其自身的第一挡条和第二挡条来夹紧应急抢修塔塔身,从而有效阻挡主框架体和副框架体的滑落,有利于起吊工作顺利进行。3. The structural design of multiple clamping devices of the present invention is novel and reasonable, and its function is to clamp the tower body of the emergency repair tower through its own first bar and second bar, thereby effectively blocking the main frame body and the sub-frame body The slippage is conducive to the smooth progress of the lifting work.

4、利用本发明进行应急抢修塔起吊工作的工作效率高,与现有起吊方式相比,减少了重复将钢丝绳捆绑在应急抢修塔塔身的繁琐步骤,缩短的工作时间,增强了应急抢修塔吊点的稳定性,降低事故发生率,安全可靠性达百分之百。4. Using the present invention to carry out the emergency repair tower lifting work has high working efficiency. Compared with the existing lifting methods, it reduces the cumbersome steps of repeatedly binding the steel wire rope to the emergency repair tower body, shortens the working time, and strengthens the emergency repair tower crane. Point stability, reduce the accident rate, safety and reliability up to 100%.

5、本发明成本造价低廉,制作过程简单,适于在电力系统领域大范围推广使用。5. The invention has low cost and simple manufacturing process, and is suitable for widespread use in the field of electric power systems.

附图说明Description of drawings

图1是本发明中技术方案一的主视结构示意图;Fig. 1 is the front view structure schematic diagram of technical scheme one among the present invention;

图2是图1的左视结构示意图;Fig. 2 is a schematic diagram of the left view structure of Fig. 1;

图3是图1的右视结构示意图;Fig. 3 is a schematic diagram of the right view structure of Fig. 1;

图4是图1的俯视结构示意图;Fig. 4 is a top view structural schematic diagram of Fig. 1;

图5是图1的仰视结构示意图;Fig. 5 is a schematic diagram of the bottom view of Fig. 1;

图6是图1的后视结构示意图;Fig. 6 is a rear view structural schematic diagram of Fig. 1;

图7为卡紧器3的主视结构示意图;FIG. 7 is a front structural schematic view of the clamp 3;

图8是本发明中技术方案二的主视结构示意图;Fig. 8 is a schematic diagram of the front view of technical solution 2 in the present invention;

图9是图8的左视结构示意图;Fig. 9 is a left view structural diagram of Fig. 8;

图10是图8的右视结构示意图;Fig. 10 is a schematic diagram of the right view structure of Fig. 8;

图11是图8的俯视结构示意图;Fig. 11 is a top view structural schematic diagram of Fig. 8;

图12是图8的仰视结构示意图;Fig. 12 is a schematic bottom view of Fig. 8;

图13是图8的后视结构示意图;Fig. 13 is a rear view structural schematic diagram of Fig. 8;

图14是本发明中技术方案二的使用状态图;Fig. 14 is a diagram of the usage status of technical solution 2 in the present invention;

具体实施方式Detailed ways

具体实施方式一:结合图1、图2、图3、图4、图5、图6和图7说明本实施方式,本实施方式中所述用在应急抢修塔上的吊点固定装置包括主框架体1、副框架体2和多个卡紧器3,所述主框架体1由第一组成条体1-1、两个第二组成条体1-2和两个第三组成条体1-3组成,所述两个第二组成条体1-2之间平行设置,所述第一组成条体1-1位于两个第二组成条体1-2之间且其两端分别与两个第二组成条体1-2固定连接,每个第二组成条体1-2外侧均固定连接有一个与其垂直设置的第三组成条体1-3,每个第二组成条体1-2与其对应固接的第三组成条体1-3在水平方向形成的横截面均为L形,所述第一组成条体1-1上加工有第一通孔4,所述副框架体2的形状为撮箕形,副框架体2可拆卸连接在两个第二组成条体1-2之间并与主框架体1形成矩形框架体,多个卡紧器3均贴紧在矩形框架体上下端面的对角上,卡紧器3包括第一组成杆3-1、第二组成杆3-2、第一夹紧套3-3、第二夹紧套3-4和两个螺母3-5,所述第一组成杆3-1和第二组成杆3-2位于同一平面内且垂直设置,所述第一组成杆3-1分别与第一夹紧套3-3和一个螺母3-5螺纹连接,一个所述螺母3-5位于第一夹紧套3-3的外侧,所述第一夹紧套3-3上加工有第一挡条8,第一挡条8朝向第一组成杆3-1的侧面为倾斜的夹紧面,当第一夹紧套3-3沿着第一组成杆3-1从外向内转动时,第一挡条8始终具有朝向第一组成杆3-1夹紧的趋势;所述第二组成杆3-2分别与第二夹紧套3-3和另一个螺母3-5螺纹连接,另一个所述螺母3-5位于第二夹紧套3-4的外侧,所述第二夹紧套3-4上加工有第二挡条9,第二挡条9朝向第二组成杆3-2的侧面为倾斜的夹紧面,当第二夹紧套3-4沿着第二组成杆3-2从外向内转动时,第二挡条9始终具有朝向第二组成杆3-2夹紧的趋势。Specific embodiment 1: This embodiment is described in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7. A frame body 1, a sub-frame body 2 and a plurality of clamps 3, the main frame body 1 is composed of a first component strip body 1-1, two second component strip bodies 1-2 and two third component strip bodies 1-3 composition, the two second composition strips 1-2 are arranged in parallel, the first composition strip 1-1 is located between the two second composition strips 1-2 and its two ends are respectively It is fixedly connected with two second constituent strips 1-2, and the outside of each second constituent strip 1-2 is fixedly connected with a third constituent strip 1-3 arranged vertically to it, and each second constituent strip 1-2 and the third component strip body 1-3 that is fixedly connected with it are all L-shaped in horizontal direction, and the first through hole 4 is processed on the first component strip body 1-1, and the auxiliary The shape of the frame body 2 is a pan shape, and the sub-frame body 2 is detachably connected between the two second composition strips 1-2 and forms a rectangular frame body with the main frame body 1, and a plurality of clamps 3 are all attached to the On the opposite corners of the upper and lower end faces of the rectangular frame body, the clamp 3 includes a first component rod 3-1, a second component rod 3-2, a first clamping sleeve 3-3, a second clamping sleeve 3-4 and two A nut 3-5, the first component rod 3-1 and the second component rod 3-2 are located in the same plane and vertically arranged, the first component rod 3-1 is connected with the first clamping sleeve 3-3 respectively It is threadedly connected with a nut 3-5, and one of the nuts 3-5 is located on the outside of the first clamping sleeve 3-3, and the first clamping sleeve 3-3 is processed with a first stop strip 8, the first stop The side of the strip 8 facing the first component rod 3-1 is an inclined clamping surface. When the first clamping sleeve 3-3 rotates from outside to inside along the first component rod 3-1, the first retaining strip 8 always has Clamping trend toward the first component rod 3-1; the second component rod 3-2 is respectively threaded with the second clamping sleeve 3-3 and another nut 3-5, and the other nut 3-5 Located on the outside of the second clamping sleeve 3-4, the second clamping sleeve 3-4 is processed with a second bar 9, and the second bar 9 is an inclined clip facing the side of the second component rod 3-2. On the tight side, when the second clamping sleeve 3-4 rotates from outside to inside along the second component rod 3-2, the second retaining bar 9 always has a tendency to clamp toward the second component rod 3-2.

本实施方式中第一通孔4的设置是为了应急抢修塔起吊的过程中通过卸扣与钢丝绳套连接,卸扣为已有工具;主框架体1和副框架体2均为铁合金或合金钢制成的框架体,主框架体1和副框架体2组成的矩形框架体围绕在应急抢修塔塔身13外,多个卡紧器3分别夹紧应急抢修塔塔身13且同时贴紧在矩形框架体上下端面的对角上,起到阻挡矩形框架体的作用。每个卡紧器3中第一组成杆3-1朝向第一挡条8的侧面上设置有第一挡片11,用来阻挡第一挡条8,每个卡紧器3中第二组成杆3-2朝向第二挡条9的侧面上设置有第二挡片12,用来阻挡第二挡条9。In this embodiment, the setting of the first through hole 4 is to connect the wire rope sleeve through the shackle in the process of hoisting the emergency repair tower, and the shackle is an existing tool; the main frame body 1 and the sub-frame body 2 are both ferroalloy or alloy steel The finished frame body, the rectangular frame body composed of the main frame body 1 and the auxiliary frame body 2 surrounds the emergency repair tower body 13, and a plurality of clamps 3 clamp the emergency repair tower body 13 respectively and are attached to the emergency repair tower body 13 at the same time. The opposite corners of the upper and lower end surfaces of the rectangular frame body play a role of blocking the rectangular frame body. The first component rod 3-1 in each clamper 3 is provided with a first block 11 on the side facing the first bar 8, which is used to block the first bar 8, and the second component in each clamper 3 The side of the rod 3 - 2 facing the second blocking strip 9 is provided with a second blocking piece 12 for blocking the second blocking strip 9 .

具体实施方式二:结合图1、图2、图3、图4、图5、图6和图7说明本实施方式,本实施方式中所述第一组成条体1-1的中心轴线上加工有第一通孔4。第一通孔4的位置设置有利于增强本发明的稳定性。第一通孔4的孔径通常加工为40mm~80mm。其它组成及连接关系与具体实施方式一相同。Specific embodiment two: This embodiment is described in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7, and the processing on the central axis of the first composition bar 1-1 described in this embodiment There are first through holes 4 . The position setting of the first through hole 4 is beneficial to enhance the stability of the present invention. The diameter of the first through hole 4 is usually processed to be 40mm-80mm. Other components and connections are the same as those in the first embodiment.

具体实施方式三:结合图1、图2、图3、图4、图5、图6和图7说明本实施方式,本实施方式中所述副框架体2由底板体2-1、第一侧板体2-2和两个第二侧板体2-3组成,所述第一侧板体2-2和两个第二侧板体2-3均设置在底板体2-1上,第一侧板体2-2设置在两个第二侧板体2-3之间并与两个第二侧板体2-3垂直设置。其它组成及连接关系与具体实施方式一或二相同。Specific embodiment three: This embodiment is described in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7. The side plate body 2-2 and two second side plate bodies 2-3 are composed, and the first side plate body 2-2 and the two second side plate bodies 2-3 are all arranged on the bottom plate body 2-1, The first side plate body 2-2 is arranged between the two second side plate bodies 2-3 and vertically arranged with the two second side plate bodies 2-3. Other compositions and connections are the same as those in Embodiment 1 or 2.

具体实施方式四:结合图1、图2、图3、图4、图5、图6和图7说明本实施方式,本实施方式中所述多个卡紧器3的个数为4~8个,每个卡紧器3还包括两个垫圈3-6,一个垫圈3-6套装在第一组成杆3-1上且位于第一夹紧套3-3和一个螺母3-5之间,另一个垫圈3-6套装在第二组成杆3-2上且位于第二夹紧套3-4和另一个螺母3-5之间。本实施方式中卡紧器3的个数根据应急抢修塔的具体重量和高度来具体设置,通常设置4个卡紧器3,这4个卡紧器3具体位置是在主框架体1和副框架体2组成的矩形框架体上端面的对角上设置两个卡紧器3,在矩形框架体下端面的对角上设置另外两个卡紧器3。每个卡紧器3还包括两个垫圈3-6,两个垫圈3-6的设置是为了增强第一夹紧套3-3、第二夹紧套3-4与两个螺母3-5之间的严密性,使第一夹紧套3-3与一个螺母3-5之间的连接关系更加准确牢固,从而使第一挡条8更加有效地夹紧应急抢修塔的塔身,同时使第二夹紧套3-4与另一个螺母3-5之间的连接关系更加准确牢固,从而使第二挡条9更加有效地夹紧应急抢修塔的塔身。其它组成及连接关系与具体实施方式三相同。Specific Embodiment 4: This embodiment is described in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7, and the number of multiple clampers 3 in this embodiment is 4-8 Each clamp 3 also includes two washers 3-6, one washer 3-6 is set on the first component rod 3-1 and is located between the first clamping sleeve 3-3 and a nut 3-5 , another washer 3-6 is set on the second component rod 3-2 and is located between the second clamping sleeve 3-4 and another nut 3-5. In this embodiment, the number of clamps 3 is specifically set according to the specific weight and height of the emergency repair tower. Usually, 4 clamps 3 are set, and the specific positions of these 4 clamps 3 are between the main frame body 1 and the auxiliary frame. Two clamping devices 3 are arranged on the opposite corners of the upper end surface of the rectangular frame body composed of the frame bodies 2, and the other two clamping devices 3 are arranged on the opposite corners of the lower end surface of the rectangular frame body. Each clamp 3 also includes two washers 3-6, and the arrangement of the two washers 3-6 is to strengthen the first clamping sleeve 3-3, the second clamping sleeve 3-4 and the two nuts 3-5 The tightness between them makes the connection relationship between the first clamping sleeve 3-3 and a nut 3-5 more accurate and firm, so that the first retaining bar 8 can more effectively clamp the tower body of the emergency repair tower, and at the same time The connection relationship between the second clamping sleeve 3-4 and the other nut 3-5 is more accurate and firm, so that the second retaining bar 9 can more effectively clamp the tower body of the emergency repair tower. Other components and connections are the same as those in the third embodiment.

具体实施方式五:结合图1、图2、图3、图4、图5、图6和图7说明本实施方式,本实施方式中所述副框架体2上的每个第二侧板体2-3上加工有多个第一连接孔7-1且在其靠近一个第二组成条体1-2上加工有多个第二连接孔7-2。本实施方式中多个第一连接孔7-1和多个第二连接孔7-2均为螺栓专用孔,每个第一连接孔7-1与其对应的第二连接孔7-2同轴设置,这样设置使每个第二侧板体2-3通过多个螺栓与其对应的第二组成条体1-2可拆卸连接,这样的设置更加适合实际工作情况的需要,操作方便,使用工件易获取,有利于工作顺利开展。其它组成及连接关系与具体实施方式四相同。Specific embodiment five: This embodiment is described in conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and Fig. 7, each second side plate body on the sub-frame body 2 described in this embodiment mode A plurality of first connection holes 7-1 are processed on the 2-3 and a plurality of second connection holes 7-2 are processed on a second component bar 1-2. In this embodiment, a plurality of first connection holes 7-1 and a plurality of second connection holes 7-2 are bolt-specific holes, and each first connection hole 7-1 is coaxial with its corresponding second connection hole 7-2 setting, such that each second side plate body 2-3 is detachably connected to its corresponding second component bar body 1-2 through a plurality of bolts, this setting is more suitable for the needs of actual working conditions, easy to operate, and easy to use Easy access is conducive to the smooth development of work. Other compositions and connections are the same as those in Embodiment 4.

具体实施方式六:结合图7、图8、图9、图10、图11、图12、图13和图14说明本实施方式,本实施方式中所述用在应急抢修塔上的吊点固定装置包括主框架体1、副框架体2、连接块体10、连接吊块5和多个卡紧器3,所述主框架体1由第一组成条体1-1、两个第二组成条体1-2和两个第三组成条体1-3组成,所述两个第二组成条体1-2之间平行设置,所述第一组成条体1-1位于两个第二组成条体1-2之间且其两端分别与两个第二组成条体1-2固定连接,每个第二组成条体1-2外侧均固定连接有一个与其垂直设置的第三组成条体1-3,每个第二组成条体1-2与其对应固接的第三组成条体1-3在水平方向形成的横截面与所述第一组成条体1-1竖直方向形成的横截面均为L形,所述连接吊块5的底面位于第一组成条体1-1的水平端并与其固定连接,所述连接吊块5的一侧面通过连接块体10固定连接在第一组成条体1-1的竖直端上,所述连接吊块5上加工有第二通孔6,所述副框架体2的形状为撮箕形,副框架体2可拆卸连接在两个第二组成条体1-2之间并与主框架体1形成矩形框架体,多个卡紧器3均贴紧在矩形框架体上下端面的对角上,卡紧器3包括第一组成杆3-1、第二组成杆3-2、第一夹紧套3-3、第二夹紧套3-4和两个螺母3-5,所述第一组成杆3-1和第二组成杆3-2位于同一平面内且垂直设置,所述第一组成杆3-1分别与第一夹紧套3-3和一个螺母3-5螺纹连接,一个所述螺母3-5位于第一夹紧套3-3的外侧,所述第一夹紧套3-3上加工有第一挡条8,第一挡条8朝向第一组成杆3-1的侧面为倾斜的夹紧面,当第一夹紧套3-3沿着第一组成杆3-1从外向内转动时,第一挡条8始终具有朝向第一组成杆3-1夹紧的趋势;所述第二组成杆3-2分别与第二夹紧套3-3和另一个螺母3-5螺纹连接,另一个所述螺母3-5位于第二夹紧套3-4的外侧,所述第二夹紧套3-4上加工有第二挡条9,第二挡条9朝向第二组成杆3-2的侧面为倾斜的夹紧面,当第二夹紧套3-4沿着第二组成杆3-2从外向内转动时,第二挡条9始终具有朝向第二组成杆3-2夹紧的趋势。Specific embodiment six: This embodiment is described in conjunction with Fig. 7, Fig. 8, Fig. 9, Fig. 10, Fig. 11, Fig. 12, Fig. 13 and Fig. 14, and the lifting point used on the emergency repair tower described in this embodiment is fixed The device includes a main frame body 1, a sub-frame body 2, a connecting block body 10, a connecting hanging block 5 and a plurality of clamps 3, and the main frame body 1 is composed of a first component bar 1-1 and two second components The strip body 1-2 is composed of two third composition strip bodies 1-3, the two second composition strip bodies 1-2 are arranged in parallel, and the first composition strip body 1-1 is located between the two second composition strip bodies Between the composition strips 1-2 and its two ends are fixedly connected with two second composition strips 1-2 respectively, and each second composition strip 1-2 is fixedly connected with a third composition arranged vertically to the outside of each second composition strip 1-2. The strip body 1-3, each second composition strip body 1-2 and the third composition strip body 1-3 which is fixedly connected to each second composition strip body 1-3 form a cross section in the horizontal direction and the vertical direction of the first composition strip body 1-1 The formed cross sections are all L-shaped, the bottom surface of the connecting hanging block 5 is located at the horizontal end of the first component bar 1-1 and is fixedly connected to it, and one side of the connecting hanging block 5 is fixedly connected through the connecting block 10 On the vertical end of the first composition strip body 1-1, the second through hole 6 is processed on the connecting hanging block 5, the shape of the sub-frame body 2 is a dustpan, and the sub-frame body 2 is detachably connected to the Between the two second constituent bars 1-2 and form a rectangular frame body with the main frame body 1, a plurality of clamps 3 are all attached to the diagonal corners of the upper and lower end faces of the rectangular frame body, and the clamps 3 include the first Composition rod 3-1, the second composition rod 3-2, the first clamping sleeve 3-3, the second clamping sleeve 3-4 and two nuts 3-5, the first composition rod 3-1 and the second The two component rods 3-2 are located in the same plane and arranged vertically, the first component rod 3-1 is respectively threaded with the first clamping sleeve 3-3 and a nut 3-5, and one of the nuts 3-5 is located On the outside of the first clamping sleeve 3-3, the first clamping sleeve 3-3 is processed with a first bar 8, and the first bar 8 is clamped obliquely towards the side of the first component rod 3-1. On the surface, when the first clamping sleeve 3-3 rotates from outside to inside along the first component rod 3-1, the first bar 8 always has a tendency to clamp toward the first component rod 3-1; the second The composition rod 3-2 is threadedly connected with the second clamping sleeve 3-3 and another nut 3-5 respectively, and the other nut 3-5 is located on the outside of the second clamping sleeve 3-4, and the second clamping A second retaining strip 9 is processed on the tight sleeve 3-4, and the side of the second retaining strip 9 facing the second component rod 3-2 is an inclined clamping surface. When the second clamping sleeve 3-4 moves along the second component When the rod 3-2 rotates from outside to inside, the second retaining bar 9 always has a tendency to clamp toward the second component rod 3-2.

本实施方式中第二通孔6的设置是为了应急抢修塔起吊的过程中通过卸扣与钢丝绳套连接,卸扣为已有工具;主框架体1和副框架体2均为铁合金或合金钢制成的框架体,主框架体1和副框架体2组成的矩形框架体围绕在应急抢修塔塔身13外,多个卡紧器3分别夹紧应急抢修塔塔身13且同时贴紧在矩形框架体上下端面的对角上,起到阻挡矩形框架体的作用。连接块体10的设置是辅助连接吊块5的稳定性,其位于第一组成条体1-1和连接吊块5之间,连接块体10和连接吊块5均为铁合金或合金钢制成的块体。每个卡紧器3中第一组成杆3-1朝向第一挡条8的侧面上设置有第一挡片11,用来阻挡第一挡条8,每个卡紧器3中第二组成杆3-2朝向第二挡条9的侧面上设置有第二挡片12,用来阻挡第二挡条9。In this embodiment, the setting of the second through hole 6 is to connect the steel wire rope sleeve through the shackle during the hoisting process of the emergency repair tower, and the shackle is an existing tool; the main frame body 1 and the auxiliary frame body 2 are both ferroalloy or alloy steel The finished frame body, the rectangular frame body composed of the main frame body 1 and the auxiliary frame body 2 surrounds the emergency repair tower body 13, and a plurality of clamps 3 clamp the emergency repair tower body 13 respectively and are attached to the emergency repair tower body 13 at the same time. The opposite corners of the upper and lower end surfaces of the rectangular frame body play a role of blocking the rectangular frame body. The setting of the connecting block 10 is to assist the stability of the connecting hanging block 5, which is located between the first composition bar 1-1 and the connecting hanging block 5, and the connecting block 10 and the connecting hanging block 5 are made of iron alloy or alloy steel formed blocks. The first component rod 3-1 in each clamper 3 is provided with a first block 11 on the side facing the first bar 8, which is used to block the first bar 8, and the second component in each clamper 3 The side of the rod 3 - 2 facing the second blocking strip 9 is provided with a second blocking piece 12 for blocking the second blocking strip 9 .

具体实施方式七:结合图7、图8、图9、图10、图11、图12、图13和图14说明本实施方式,本实施方式中所述第一组成条体1-1的中心轴线上固定连接有连接吊块5,所述连接吊块5为铁合金、碳钢、合金钢、不锈钢或高强度钢制成的块体。这样材料制成的连接吊块5具有更好的拉伸力,更加适应应急抢修塔起吊工作。其它组成及连接关系与具体实施方式六相同。Specific Embodiment Seven: This embodiment is described in conjunction with Fig. 7, Fig. 8, Fig. 9, Fig. 10, Fig. 11, Fig. 12, Fig. 13 and Fig. 14. The center of the first composition bar 1-1 described in this embodiment A connecting hanging block 5 is fixedly connected on the axis, and the connecting hanging block 5 is a block made of iron alloy, carbon steel, alloy steel, stainless steel or high-strength steel. The connecting hanging block 5 made of such material has better tensile force, and is more suitable for emergency repair tower lifting work. Other compositions and connections are the same as those in Embodiment 6.

具体实施方式八:结合图7、图8、图9、图10、图11、图12、图13和图14说明本实施方式,本实施方式中所述副框架体2由底板体2-1、第一侧板体2-2和两个第二侧板体2-3组成,所述第一侧板体2-2和两个第二侧板体2-3均设置在底板体2-1上,第一侧板体2-2设置在两个第二侧板体2-3之间并与两个第二侧板体2-3垂直设置。其它组成及连接关系与具体实施方式六和七相同。Embodiment 8: This embodiment is described in conjunction with Fig. 7, Fig. 8, Fig. 9, Fig. 10, Fig. 11, Fig. 12, Fig. 13 and Fig. 14. , the first side plate body 2-2 and two second side plate bodies 2-3, the first side plate body 2-2 and the two second side plate bodies 2-3 are all arranged on the bottom plate body 2- 1, the first side plate body 2-2 is arranged between the two second side plate bodies 2-3 and vertically arranged with the two second side plate bodies 2-3. Other compositions and connections are the same as those in Embodiments 6 and 7.

具体实施方式九:结合图7、图8、图9、图10、图11、图12、图13和图14说明本实施方式,本实施方式中所述多个卡紧器3的个数为4~8个,每个卡紧器3还包括两个垫圈3-6,一个垫圈3-6套装在第一组成杆3-1上且位于第一夹紧套3-3和一个螺母3-5之间,另一个垫圈3-6套装在第二组成杆3-2上且位于第二夹紧套3-4和另一个螺母3-5之间。本实施方式中卡紧器3的个数根据应急抢修塔的具体重量和高度来具体设置,通常设置4个卡紧器3,这4个卡紧器3具体位置是在主框架体1和副框架体2组成的矩形框架体上端面的对角上设置两个卡紧器3,在矩形框架体下端面的对角上设置另外两个卡紧器3。每个卡紧器3还包括两个垫圈3-6,两个垫圈3-6的设置是为了增强第一夹紧套3-3、第二夹紧套3-4与两个螺母3-5之间的严密性,使第一夹紧套3-3与一个螺母3-5之间的连接关系更加准确牢固,从而使第一挡条8更加有效地夹紧应急抢修塔的塔身,同时使第二夹紧套3-4与另一个螺母3-5之间的连接关系更加准确牢固,从而使第二挡条9更加有效地夹紧应急抢修塔的塔身。其它组成及连接关系与具体实施方式八相同。Specific Embodiment Nine: This embodiment is described in conjunction with FIG. 7, FIG. 8, FIG. 9, FIG. 10, FIG. 11, FIG. 12, FIG. 13 and FIG. 4 to 8, each clamp 3 also includes two washers 3-6, one washer 3-6 is set on the first component rod 3-1 and is located on the first clamping sleeve 3-3 and a nut 3- 5, another washer 3-6 is set on the second component rod 3-2 and is located between the second clamping sleeve 3-4 and another nut 3-5. In this embodiment, the number of clamps 3 is specifically set according to the specific weight and height of the emergency repair tower. Usually, 4 clamps 3 are set, and the specific positions of these 4 clamps 3 are between the main frame body 1 and the auxiliary frame. Two clamping devices 3 are arranged on the opposite corners of the upper end surface of the rectangular frame body composed of the frame bodies 2, and the other two clamping devices 3 are arranged on the opposite corners of the lower end surface of the rectangular frame body. Each clamp 3 also includes two washers 3-6, and the arrangement of the two washers 3-6 is to strengthen the first clamping sleeve 3-3, the second clamping sleeve 3-4 and the two nuts 3-5 The tightness between them makes the connection relationship between the first clamping sleeve 3-3 and a nut 3-5 more accurate and firm, so that the first retaining bar 8 can more effectively clamp the tower body of the emergency repair tower, and at the same time The connection relationship between the second clamping sleeve 3-4 and the other nut 3-5 is more accurate and firm, so that the second retaining bar 9 can more effectively clamp the tower body of the emergency repair tower. Other compositions and connections are the same as those in Embodiment 8.

具体实施方式十:结合图7、图8、图9、图10、图11、图12、图13和图14说明本实施方式,本实施方式中所述副框架体2上的每个第二侧板体2-3上加工有多个第一连接孔7-1且在其靠近一个第二组成条体1-2上加工有多个第二连接孔7-2。本实施方式中多个第一连接孔7-1和多个第二连接孔7-2均为螺栓专用孔,每个第一连接孔7-1与其对应的第二连接孔7-2同轴设置,这样设置使每个第二侧板体2-3通过多个螺栓与其对应的第二组成条体1-2可拆卸连接,这样的设置更加适合实际工作情况的需要,操作方便,使用工件易获取,有利于工作顺利开展。其它组成及连接关系与具体实施方式九相同。Specific Embodiment Ten: This embodiment is described in conjunction with Fig. 7, Fig. 8, Fig. 9, Fig. 10, Fig. 11, Fig. 12, Fig. 13 and Fig. 14. A plurality of first connection holes 7-1 are processed on the side plate body 2-3 and a plurality of second connection holes 7-2 are processed on the side plate body 2-3 close to a second component strip body 1-2. In this embodiment, a plurality of first connection holes 7-1 and a plurality of second connection holes 7-2 are bolt-specific holes, and each first connection hole 7-1 is coaxial with its corresponding second connection hole 7-2 setting, such that each second side plate body 2-3 is detachably connected to its corresponding second component bar body 1-2 through a plurality of bolts, this setting is more suitable for the needs of actual working conditions, easy to operate, and easy to use Easy access is conducive to the smooth development of work. Other compositions and connections are the same as those in Embodiment 9.

结合具体实施方式一、二、三、四、五、六、七、八、九和十说明本发明的工作过程:首先将主框架体1和副框架体2套在应急抢修塔塔身13外侧,使主框架体1和副框架体2组成的矩形框架体紧密贴紧在应急抢修塔塔身13外侧,然后将主框架体1和副框架体2连接完毕后,再将多个卡紧器3逐一的夹紧在应急抢修塔塔身13上且位于矩形框架体上下端面的对角上,最后将钢丝绳套穿过第一通孔4或第二通孔6进行起吊即可。In conjunction with specific embodiment one, two, three, four, five, six, seven, eight, nine and ten illustrate the working process of the present invention: first the main frame body 1 and the secondary frame body 2 are set on the outside of the emergency repair tower body 13 , so that the rectangular frame body composed of the main frame body 1 and the sub-frame body 2 is closely attached to the outside of the emergency repair tower body 13, and then after the main frame body 1 and the sub-frame body 2 are connected, a plurality of clamping devices 3. Clamp them one by one on the emergency repair tower body 13 and on the opposite corners of the upper and lower end faces of the rectangular frame body, and finally pass the wire rope sleeve through the first through hole 4 or the second through hole 6 for lifting.

Claims (10)

1.一种用在应急抢修塔上的吊点固定装置,其特征在于:所述用在应急抢修塔上的吊点固定装置包括主框架体(1)、副框架体(2)和多个卡紧器(3),所述主框架体(1)由第一组成条体(1-1)、两个第二组成条体(1-2)和两个第三组成条体(1-3)组成,所述两个第二组成条体(1-2)之间平行设置,所述第一组成条体(1-1)位于两个第二组成条体(1-2)之间且其两端分别与两个第二组成条体(1-2)固定连接,每个第二组成条体(1-2)外侧均固定连接有一个与其垂直设置的第三组成条体(1-3),每个第二组成条体(1-2)与其对应固接的第三组成条体(1-3)在水平方向形成的横截面均为L形,所述第一组成条体(1-1)上加工有第一通孔(4),所述副框架体(2)的形状为撮箕形,副框架体(2)可拆卸连接在两个第二组成条体(1-2)之间并与主框架体(1)形成矩形框架体,多个卡紧器(3)均贴紧在矩形框架体上下端面的对角上,卡紧器(3)包括第一组成杆(3-1)、第二组成杆(3-2)、第一夹紧套(3-3)、第二夹紧套(3-4)和两个螺母(3-5),所述第一组成杆(3-1)和第二组成杆(3-2)位于同一平面内且垂直设置,所述第一组成杆(3-1)分别与第一夹紧套(3-3)和一个螺母(3-5)螺纹连接,一个所述螺母(3-5)位于第一夹紧套(3-3)的外侧,所述第一夹紧套(3-3)上加工有第一挡条(8),第一挡条(8)朝向第一组成杆(3-1)的侧面为倾斜的夹紧面,当第一夹紧套(3-3)沿着第一组成杆(3-1)从外向内转动时,第一挡条(8)始终具有朝向第一组成杆(3-1)夹紧的趋势;所述第二组成杆(3-2)分别与第二夹紧套(3-3)和另一个螺母(3-5)螺纹连接,另一个所述螺母(3-5)位于第二夹紧套(3-4)的外侧,所述第二夹紧套(3-4)上加工有第二挡条(9),第二挡条(9)朝向第二组成杆(3-2)的侧面为倾斜的夹紧面,当第二夹紧套(3-4)沿着第二组成杆(3-2)从外向内转动时,第二挡条(9)始终具有朝向第二组成杆(3-2)夹紧的趋势。1. A hanging point fixing device used on an emergency repair tower, characterized in that: the hanging point fixing device used on an emergency repair tower includes a main frame body (1), a secondary frame body (2) and a plurality of Clamping device (3), the main frame body (1) is composed of a first component strip body (1-1), two second component strip bodies (1-2) and two third component strip bodies (1- 3) Composition, the two second composition strips (1-2) are arranged in parallel, and the first composition strip (1-1) is located between the two second composition strips (1-2) And its two ends are respectively fixedly connected with two second composition strips (1-2), and the outside of each second composition strip (1-2) is fixedly connected with a third composition strip (1-2) vertically arranged therewith. -3), each second component strip (1-2) and its corresponding third component strip (1-3) are L-shaped in horizontal direction, and the first component strip (1-1) is processed with a first through hole (4), the shape of the sub-frame body (2) is a dustpan shape, and the sub-frame body (2) is detachably connected to the two second component strips (1- 2) form a rectangular frame body with the main frame body (1), and multiple clamps (3) are all attached to the diagonal corners of the upper and lower end faces of the rectangular frame body, and the clamps (3) include the first component rod (3-1), the second component rod (3-2), the first clamping sleeve (3-3), the second clamping sleeve (3-4) and two nuts (3-5), the first A component rod (3-1) and a second component rod (3-2) are located in the same plane and vertically arranged, and the first component rod (3-1) is connected with the first clamping sleeve (3-3) and the A nut (3-5) is threaded, and one nut (3-5) is located on the outside of the first clamping sleeve (3-3), and the first clamping sleeve (3-3) is processed with a first Bar (8), the side of the first bar (8) facing the first component rod (3-1) is an inclined clamping surface, when the first clamping sleeve (3-3) is along the first component rod ( 3-1) When turning from outside to inside, the first bar (8) always has a tendency to clamp towards the first component rod (3-1); The tight sleeve (3-3) is threadedly connected with another nut (3-5), and the other nut (3-5) is located on the outside of the second clamping sleeve (3-4), and the second clamping sleeve (3-4) is processed with a second retaining strip (9), and the side of the second retaining strip (9) facing the second component rod (3-2) is an inclined clamping surface. When the second clamping sleeve (3 -4) When turning from outside to inside along the second component rod (3-2), the second retaining bar (9) always has a tendency to clamp toward the second component rod (3-2). 2.根据权利要求1所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述第一组成条体(1-1)的中心轴线上加工有第一通孔(4)。2. The lifting point fixing device used on the emergency repair tower according to claim 1, characterized in that: a first through hole (4) is processed on the central axis of the first component bar (1-1) . 3.根据权利要求1或2所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述副框架体(2)由底板体(2-1)、第一侧板体(2-2)和两个第二侧板体(2-3)组成,所述第一侧板体(2-2)和两个第二侧板体(2-3)均设置在底板体(2-1)上,第一侧板体(2-2)设置在两个第二侧板体(2-3)之间并与两个第二侧板体(2-3)垂直设置。3. The lifting point fixing device used on the emergency repair tower according to claim 1 or 2, characterized in that: the sub-frame body (2) consists of a bottom plate body (2-1), a first side plate body ( 2-2) and two second side plate bodies (2-3), the first side plate body (2-2) and the two second side plate bodies (2-3) are all arranged on the bottom plate body ( 2-1), the first side plate body (2-2) is arranged between the two second side plate bodies (2-3) and vertically arranged with the two second side plate bodies (2-3). 4.根据权利要求3所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述多个卡紧器(3)的个数为4~8个,每个卡紧器(3)还包括两个垫圈(3-6),一个垫圈(3-6)套装在第一组成杆(3-1)上且位于第一夹紧套(3-3)和一个螺母(3-5)之间,另一个垫圈(3-6)套装在第二组成杆(3-2)上且位于第二夹紧套(3-4)和另一个螺母(3-5)之间。4. The lifting point fixing device used on the emergency repair tower according to claim 3, characterized in that: the number of the plurality of clamps (3) is 4 to 8, and each clamp (3) 3) It also includes two washers (3-6), one washer (3-6) is set on the first component rod (3-1) and is located on the first clamping sleeve (3-3) and a nut (3- 5), another washer (3-6) is set on the second component rod (3-2) and is located between the second clamping sleeve (3-4) and another nut (3-5). 5.根据权利要求4所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述副框架体(2)上的每个第二侧板体(2-3)上加工有多个第一连接孔(7-1)且在其靠近一个第二组成条体(1-2)上加工有多个第二连接孔(7-2)。5. The lifting point fixing device used on the emergency repair tower according to claim 4, characterized in that: each second side plate body (2-3) on the sub-frame body (2) is processed with A plurality of first connecting holes (7-1) and a plurality of second connecting holes (7-2) are processed on a second component bar (1-2). 6.一种用在应急抢修塔上的吊点固定装置,其特征在于:所述用在应急抢修塔上的吊点固定装置包括主框架体(1)、副框架体(2)、连接块体(10)、连接吊块(5)和多个卡紧器(3),所述主框架体(1)由第一组成条体(1-1)、两个第二组成条体(1-2)和两个第三组成条体(1-3)组成,所述两个第二组成条体(1-2)之间平行设置,所述第一组成条体(1-1)位于两个第二组成条体(1-2)之间且其两端分别与两个第二组成条体(1-2)固定连接,每个第二组成条体(1-2)外侧均固定连接有一个与其垂直设置的第三组成条体(1-3),每个第二组成条体(1-2)与其对应固接的第三组成条体(1-3)在水平方向形成的横截面与所述第一组成条体(1-1)竖直方向形成的横截面均为L形,所述连接吊块(5)的底面位于第一组成条体(1-1)的水平端并与其固定连接,所述连接吊块(5)的一侧面通过连接块体(10)固定连接在第一组成条体(1-1)的竖直端上,所述连接吊块(5)上加工有第二通孔(6),所述副框架体(2)的形状为撮箕形,副框架体(2)可拆卸连接在两个第二组成条体(1-2)之间并与主框架体(1)形成矩形框架体,多个卡紧器(3)均贴紧在矩形框架体上下端面的对角上,卡紧器(3)包括第一组成杆(3-1)、第二组成杆(3-2)、第一夹紧套(3-3)、第二夹紧套(3-4)和两个螺母(3-5),所述第一组成杆(3-1)和第二组成杆(3-2)位于同一平面内且垂直设置,所述第一组成杆(3-1)分别与第一夹紧套(3-3)和一个螺母(3-5)螺纹连接,一个所述螺母(3-5)位于第一夹紧套(3-3)的外侧,所述第一夹紧套(3-3)上加工有第一挡条(8),第一挡条(8)朝向第一组成杆(3-1)的侧面为倾斜的夹紧面,当第一夹紧套(3-3)沿着第一组成杆(3-1)从外向内转动时,第一挡条(8)始终具有朝向第一组成杆(3-1)夹紧的趋势;所述第二组成杆(3-2)分别与第二夹紧套(3-3)和另一个螺母(3-5)螺纹连接,另一个所述螺母(3-5)位于第二夹紧套(3-4)的外侧,所述第二夹紧套(3-4)上加工有第二挡条(9),第二挡条(9)朝向第二组成杆(3-2)的侧面为倾斜的夹紧面,当第二夹紧套(3-4)沿着第二组成杆(3-2)从外向内转动时,第二挡条(9)始终具有朝向第二组成杆(3-2)夹紧的趋势。6. A lifting point fixing device used on an emergency repair tower, characterized in that: the lifting point fixing device used on an emergency repair tower includes a main frame body (1), an auxiliary frame body (2), a connecting block Body (10), connecting hanging block (5) and multiple clamping devices (3), the main frame body (1) is composed of a first bar body (1-1), two second bar bodies (1 -2) and two third composition strips (1-3), the two second composition strips (1-2) are arranged in parallel, and the first composition strips (1-1) are located The two second constituent strips (1-2) are fixedly connected to the two second constituent strips (1-2) at both ends, and the outside of each second constituent strip (1-2) is fixed A third component strip (1-3) is connected to it vertically, and each second component strip (1-2) is formed in the horizontal direction by the third component strip (1-3) correspondingly fixed to it. The cross section and the cross section formed in the vertical direction of the first component strip (1-1) are both L-shaped, and the bottom surface of the connecting hanger (5) is located at the level of the first component strip (1-1) One side of the connecting block (5) is fixedly connected to the vertical end of the first component bar (1-1) through the connecting block (10), and the connecting block (5) ) is processed with a second through hole (6), the shape of the sub-frame body (2) is a pan shape, and the sub-frame body (2) is detachably connected between two second composition strips (1-2) And form a rectangular frame body with the main frame body (1), and a plurality of clamps (3) are all attached to the opposite corners of the upper and lower end faces of the rectangular frame body, and the clamps (3) include the first component rod (3-1 ), the second component rod (3-2), the first clamping sleeve (3-3), the second clamping sleeve (3-4) and two nuts (3-5), the first component rod ( 3-1) and the second component rod (3-2) are located in the same plane and vertically arranged, and the first component rod (3-1) is respectively connected with the first clamping sleeve (3-3) and a nut (3 -5) threaded connection, one nut (3-5) is located on the outside of the first clamping sleeve (3-3), and the first retaining strip (8) is processed on the first clamping sleeve (3-3) ), the side of the first bar (8) facing the first component rod (3-1) is an inclined clamping surface, when the first clamping sleeve (3-3) is along the first component rod (3-1) When turning from outside to inside, the first bar (8) always has a tendency to clamp towards the first component rod (3-1); -3) is threaded with another nut (3-5), and the other nut (3-5) is located on the outside of the second clamping sleeve (3-4), and the second clamping sleeve (3-4) ) is processed with a second bar (9), the side of the second bar (9) facing the second component rod (3-2) is an inclined clamping surface, when the second clamping sleeve (3-4) When the second component rod (3-2) rotates from outside to inside, the second retaining bar (9) always has a tendency to clamp toward the second component rod (3-2). 7.根据权利要求6所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述第一组成条体(1-1)的中心轴线上固定连接有连接吊块(5),所述连接吊块(5)为铁合金、碳钢、合金钢、不锈钢或高强度钢制成的块体。7. The lifting point fixing device used on the emergency repair tower according to claim 6, characterized in that: the central axis of the first component bar (1-1) is fixedly connected with a connecting hanging block (5) , the connecting hanging block (5) is a block made of iron alloy, carbon steel, alloy steel, stainless steel or high-strength steel. 8.根据权利要求6或7所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述副框架体(2)由底板体(2-1)、第一侧板体(2-2)和两个第二侧板体(2-3)组成,所述第一侧板体(2-2)和两个第二侧板体(2-3)均设置在底板体(2-1)上,第一侧板体(2-2)设置在两个第二侧板体(2-3)之间并与两个第二侧板体(2-3)垂直设置。8. The lifting point fixing device used on the emergency repair tower according to claim 6 or 7, characterized in that: the sub-frame body (2) consists of a bottom plate body (2-1), a first side plate body ( 2-2) and two second side plate bodies (2-3), the first side plate body (2-2) and the two second side plate bodies (2-3) are all arranged on the bottom plate body ( 2-1), the first side plate body (2-2) is arranged between the two second side plate bodies (2-3) and vertically arranged with the two second side plate bodies (2-3). 9.根据权利要求8所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述多个卡紧器(3)的个数为4~8个,每个卡紧器(3)还包括两个垫圈(3-6),一个垫圈(3-6)套装在第一组成杆(3-1)上且位于第一夹紧套(3-3)和一个螺母(3-5)之间,另一个垫圈(3-6)套装在第二组成杆(3-2)上且位于第二夹紧套(3-4)和另一个螺母(3-5)之间。9. The lifting point fixing device used on the emergency repair tower according to claim 8, characterized in that: the number of the plurality of clamps (3) is 4 to 8, each clamp ( 3) It also includes two washers (3-6), one washer (3-6) is set on the first component rod (3-1) and is located on the first clamping sleeve (3-3) and a nut (3- 5), another washer (3-6) is set on the second component rod (3-2) and is located between the second clamping sleeve (3-4) and another nut (3-5). 10.根据权利要求9所述的用在应急抢修塔上的吊点固定装置,其特征在于:所述副框架体(2)上的每个第二侧板体(2-3)上加工有多个第一连接孔(7-1)且在其靠近一个第二组成条体(1-2)上加工有多个第二连接孔(7-2)。10. The lifting point fixing device used on the emergency repair tower according to claim 9, characterized in that: each second side plate body (2-3) on the sub-frame body (2) is processed with A plurality of first connecting holes (7-1) and a plurality of second connecting holes (7-2) are processed on a second component bar (1-2).
CN201410342444.3A 2014-07-18 2014-07-18 Be used in the suspension centre fixing device on emergency first-aid repair tower Expired - Fee Related CN104132037B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410342444.3A CN104132037B (en) 2014-07-18 2014-07-18 Be used in the suspension centre fixing device on emergency first-aid repair tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410342444.3A CN104132037B (en) 2014-07-18 2014-07-18 Be used in the suspension centre fixing device on emergency first-aid repair tower

Publications (2)

Publication Number Publication Date
CN104132037A true CN104132037A (en) 2014-11-05
CN104132037B CN104132037B (en) 2016-02-03

Family

ID=51804839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410342444.3A Expired - Fee Related CN104132037B (en) 2014-07-18 2014-07-18 Be used in the suspension centre fixing device on emergency first-aid repair tower

Country Status (1)

Country Link
CN (1) CN104132037B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177728A (en) * 1995-12-22 1997-07-11 Nippon Alum Co Ltd Clamping device
CN101209805A (en) * 2007-12-21 2008-07-02 王树声 Method and equipment for hanging iron tower
CN102373826A (en) * 2011-10-26 2012-03-14 宁波天弘电力器具有限公司 Inverted frame of emergency repair tower
US8720129B2 (en) * 2012-02-08 2014-05-13 Simpson Strong-Tie Company, Inc. Component hoist clip
CN203939815U (en) * 2014-07-18 2014-11-12 国家电网公司 Be used in the suspension centre fixing device on emergency first-aid repair tower

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177728A (en) * 1995-12-22 1997-07-11 Nippon Alum Co Ltd Clamping device
CN101209805A (en) * 2007-12-21 2008-07-02 王树声 Method and equipment for hanging iron tower
CN102373826A (en) * 2011-10-26 2012-03-14 宁波天弘电力器具有限公司 Inverted frame of emergency repair tower
US8720129B2 (en) * 2012-02-08 2014-05-13 Simpson Strong-Tie Company, Inc. Component hoist clip
CN203939815U (en) * 2014-07-18 2014-11-12 国家电网公司 Be used in the suspension centre fixing device on emergency first-aid repair tower

Also Published As

Publication number Publication date
CN104132037B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN203869948U (en) T-type sample tensile test tool
CN205998851U (en) A kind of prefabricated panel multipoint hoisting device
CN103334378A (en) Few-circulation sling graded tension construction method of concrete self-anchored suspension bridge
CN204150945U (en) Track clamper and arc orbit rail clamping device
CN205314586U (en) Prefabricated element slings
CN108792924B (en) Reinforcing steel bar positioning frame
CN103296616B (en) Rigid crossing support and crossing method for construction of overhead transmission lines
CN102983517B (en) A kind of integral installation device for transformer test bench
CN104132037B (en) Be used in the suspension centre fixing device on emergency first-aid repair tower
CN104328921B (en) The convenient assemble method of piping bar and device
CN203939815U (en) Be used in the suspension centre fixing device on emergency first-aid repair tower
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN106915686B (en) A kind of device for auxiliary hanging lifting scaffold steel pipe
CN104374566A (en) Conductor passing pulley experiment rack
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN103485572B (en) Method for reinforcing converter station direct current filter suspension steel framework in suspension cable mode and steel framework
CN204607381U (en) A kind of superimposed sheet Steel bar hanger
CN203639016U (en) Balance beam for hoisting reinforcing steel bars by tower crane
CN209703977U (en) Steel structure column overhead connection operating platform
CN205114908U (en) Cable cover plate lifting device
CN207109596U (en) A kind of construction bearing platform for being used to build girder system structure between steel trestle stake
CN205275084U (en) Convenient and practical's purlin hoist device
CN206245702U (en) A kind of hanging construction of beam protection carrier
CN105649317A (en) Fixing mechanism for cantilever I-beam
CN204585213U (en) A kind of tong lifting structure for rotor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20190718

CF01 Termination of patent right due to non-payment of annual fee