CN104044813B - Heavy-duty wind tower offshore double-layer transport bracket - Google Patents
Heavy-duty wind tower offshore double-layer transport bracket Download PDFInfo
- Publication number
- CN104044813B CN104044813B CN201410295636.3A CN201410295636A CN104044813B CN 104044813 B CN104044813 B CN 104044813B CN 201410295636 A CN201410295636 A CN 201410295636A CN 104044813 B CN104044813 B CN 104044813B
- Authority
- CN
- China
- Prior art keywords
- column
- parallel
- arrangeding
- heavy
- wind tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Wind Motors (AREA)
Abstract
Description
技术领域 technical field
本发明公开一种运输托架,特别是一种重型风塔海上双层运输托架。 The invention discloses a transport bracket, in particular to a double-layer transport bracket on the sea for a heavy-duty wind tower.
背景技术 Background technique
目前, 在风力发电风塔海上运输过程中,由于海上运输时间较长,且海上状况多样性,一般通过船上绑扎点、运输过程的起吊点、最低点防止法兰变形,但是在风浪较大船体晃动幅度大时,托架会发生大的位移从而造成塔筒表面碰伤,塔筒在海上运输过程当中得不到最充分的保护。 At present, during the offshore transportation of wind power generation wind towers, due to the long transportation time at sea and the diversity of sea conditions, the flange deformation is generally prevented by lashing points on the ship, lifting points during transportation, and the lowest point. When the shaking range is large, the bracket will have a large displacement, which will cause the surface of the tower to be damaged, and the tower will not be fully protected during sea transportation.
发明内容 Contents of the invention
本发明的目的是为了克服以上的不足,提供一种结构简单,使用方便,固定牢靠,占地面积小,运输能力强,能够很好的保护塔筒不受伤害的重型风塔海上双层运输托架。 The object of the present invention is to overcome the above deficiencies, and provide a double-layer transportation of heavy-duty wind towers at sea with simple structure, convenient use, firm fixation, small footprint, strong transportation capacity, and good protection of the tower tube from damage. bracket.
本发明的目的通过以下技术方案来实现:一种重型风塔海上双层运输托架,包括两个上下设置的连接横撑,连接横撑包括两根平行设置的横钢和两根平行设置的纵钢,横纲与纵钢组成四边形,在四边形的四角下端面连接有立柱,在每个立柱都对称设有一组连接板,立柱的下端设有下地脚板,在立柱的上端设有上底脚板,在相邻两个立柱之间设有两根加强撑板和两根踏棍,且两根踏棍位于两根加强撑板之间,在上底脚板的上端对称设有一组限位块,两个连接横撑之间的上底脚板与下底脚板通过螺栓相连接。 The purpose of the present invention is achieved through the following technical solutions: a heavy-duty wind tower offshore double-layer transport bracket, including two connecting cross braces arranged up and down, and the connecting cross braces include two parallel horizontal steel bars and two parallel horizontal steel bars. The vertical steel, the horizontal steel and the vertical steel form a quadrilateral. There are uprights connected to the four corners of the quadrilateral. A set of connection plates are symmetrically arranged on each upright. , there are two reinforced struts and two rungs between two adjacent columns, and the two rungs are located between the two reinforced struts, and a set of limit blocks are arranged symmetrically on the upper end of the upper foot plate, The upper base plate and the lower base plate between the two connecting cross braces are connected by bolts.
本发明结构简单,使用和制作方便,占地面积小,运输能力强,固定牢靠,能够很好的保护塔筒不受伤害,能够适用海上状况的多样性,在风浪较大船体晃动幅度大时不变形,不移位,从而给塔筒最充分的保护。 The invention has the advantages of simple structure, convenient use and manufacture, small footprint, strong transportation capacity, firm fixation, good protection of the tower tube from damage, and adaptability to the diversity of sea conditions. No deformation, no displacement, so as to give the most sufficient protection to the tower.
附图说明:Description of drawings:
图1为本发明的侧视图; Fig. 1 is a side view of the present invention;
图2为本发明的主视图; Fig. 2 is the front view of the present invention;
图中标号:1-连接横撑、2-横钢、3-纵钢、4-立柱、5-下地脚板、6-上底脚板、7-加强撑板、8-踏棍、9-限位块、10-链接板。 Labels in the figure: 1-connecting horizontal brace, 2-horizontal steel, 3-longitudinal steel, 4-column, 5-lower foot plate, 6-upper foot plate, 7-reinforced support plate, 8-running stick, 9-limit block, 10-link board.
具体实施方式:detailed description:
为了加深对本发明的理解,下面将结合实施例和附图对本发明作进一步详述,该实施例仅用于解释本发明,并不构成对本发明保护范围的限定。 In order to deepen the understanding of the present invention, the present invention will be further described below in conjunction with the embodiments and accompanying drawings. The embodiments are only used to explain the present invention and do not constitute a limitation to the protection scope of the present invention.
如图1、图2示出了本发明一种重型风塔海上双层运输托架的具体实施方式,包括两个上下设置的连接横撑1,连接横撑1包括两根平行设置的横钢2和两根平行设置的纵钢3,横纲2与纵钢3组成四边形,在四边形的四角下端面连接有立柱4,在每个立柱4都对称设有一组连接板10,立柱4的下端设有下地脚板5,在立柱4的上端设有上底脚板6,在相邻两个立柱4之间设有两根加强撑板7和两根踏棍8,且两根踏棍8位于两根加强撑板7之间,在上底脚板6的上端对称设有一组限位块9,两个连接横撑1之间的上底脚板6与下底脚板5通过螺栓相连接,当两个连接横撑1限上下定位安装时,定位块9能够很好的将其定位和固定。 Figure 1 and Figure 2 show a specific embodiment of a heavy-duty wind tower offshore double-layer transport bracket of the present invention, including two connecting cross braces 1 arranged up and down, and the connecting cross braces 1 include two horizontal steels arranged in parallel 2 and two vertical steels 3 arranged in parallel, the horizontal steel 2 and the vertical steels 3 form a quadrilateral, the four corners of the quadrilateral are connected with a column 4, and each column 4 is symmetrically provided with a set of connecting plates 10, and the lower end of the column 4 A lower foot plate 5 is provided, an upper foot plate 6 is provided on the upper end of the column 4, and two reinforcement braces 7 and two running sticks 8 are arranged between two adjacent columns 4, and the two running sticks 8 are located on the two sides. Between the root reinforcing braces 7, a group of limit blocks 9 are symmetrically arranged on the upper end of the upper foot plate 6, and the upper foot plate 6 and the lower foot plate 5 between the two connecting cross braces 1 are connected by bolts, when two When the horizontal brace 1 is connected to the upper and lower positioning installations, the positioning block 9 can position and fix it well.
本发明结构简单,使用和制作方便,固定牢靠,占地面积小,运输能力强,能够很好的保护塔筒不受伤害,能够适用海上状况的多样性,在风浪较大船体晃动幅度大时不变形,不移位,从而给塔筒最充分的保护。 The invention has the advantages of simple structure, convenient use and manufacture, firm fixation, small footprint, strong transportation capacity, can well protect the tower tube from damage, and can be applied to the diversity of sea conditions. No deformation, no displacement, so as to give the most sufficient protection to the tower.
Claims (1)
- null1. a heavy wind tower sea double-layered transporting bracket,It is characterized in that: include two connection stulls (1) setting up and down,Described connection stull (1) includes two horizontal steel (2) be arrangeding in parallel and two vertical steel (3) be arrangeding in parallel,Described horizontal steel (2) forms tetragon with vertical steel (3),Connect in the lower surface, corner of described tetragon and have column (4),It is arranged with one group of connecting plate (10) each described column (4),The lower end of described column (4) is provided with sole of going to the bottom (5),It is provided with upper footing piece (6) in the upper end of described column (4),Between adjacent two described columns (4), it is provided with two strengthens fagging (7) and two riding clubs (8),And two described riding clubs (8) are positioned at two and strengthen between fagging (7),On described, the upper end of footing piece (6) is arranged with one group of limited block (9),Upper footing piece (6) between two described connection stulls (1) is connected by bolt with sole of going to the bottom (5).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410295636.3A CN104044813B (en) | 2014-06-27 | 2014-06-27 | Heavy-duty wind tower offshore double-layer transport bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410295636.3A CN104044813B (en) | 2014-06-27 | 2014-06-27 | Heavy-duty wind tower offshore double-layer transport bracket |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104044813A CN104044813A (en) | 2014-09-17 |
| CN104044813B true CN104044813B (en) | 2016-08-10 |
Family
ID=51498282
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410295636.3A Expired - Fee Related CN104044813B (en) | 2014-06-27 | 2014-06-27 | Heavy-duty wind tower offshore double-layer transport bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104044813B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110775495B (en) * | 2018-07-29 | 2021-06-08 | 宝武特种冶金有限公司 | Device for storing on-site spare trackless vehicle tires |
| CN114475924B (en) * | 2022-02-23 | 2022-11-29 | 中天科技集团海洋工程有限公司 | Tower drum transportation device based on self-elevating platform and loading and unloading process thereof |
| CN117533636A (en) * | 2023-12-14 | 2024-02-09 | 沈阳航天新光集团有限公司 | A new type of road vehicle transport bracket |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB0621372D0 (en) * | 2006-10-27 | 2006-12-06 | Aalco Metals Ltd | A stillage |
| CN102765545A (en) * | 2012-07-26 | 2012-11-07 | 国电联合动力技术(保定)有限公司 | Marine transport tooling device for wind generator tower |
| CN203019512U (en) * | 2013-01-10 | 2013-06-26 | 新疆西营海华新型建材有限公司 | Double-layered maintenance bracket |
| CN203997411U (en) * | 2014-06-27 | 2014-12-10 | 中航虹波风电设备有限公司 | The marine double-layered transporting bracket of heavy wind tower |
-
2014
- 2014-06-27 CN CN201410295636.3A patent/CN104044813B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN104044813A (en) | 2014-09-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104044813B (en) | Heavy-duty wind tower offshore double-layer transport bracket | |
| CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
| CN205296206U (en) | Tower cane foundation | |
| CN202273241U (en) | Suction bucket- pile composite type base | |
| CN207484935U (en) | Shear wall elevator adjustable operating platform | |
| CN204491564U (en) | A kind of jacket for offshore structure | |
| CN203668935U (en) | Steel casing guide support | |
| CN204938800U (en) | Tower crane cross beam foundation | |
| CN207331720U (en) | A cofferdam with combined steel pipe sheet piles | |
| CN103971884A (en) | Angle steel tower-type rack distribution transformer | |
| CN107700450B (en) | A kind of mounting process of floating-supported type offshore wind farm mounting platform | |
| CN205501971U (en) | Attached component of special integrated form of marine wind power | |
| CN104164889A (en) | Demountable tower crane foundation | |
| CN202228859U (en) | Mudflat construction equipment and barrel-shaped foundation thereof | |
| CN203807949U (en) | Assembly type overwater pier body construction support | |
| CN204727238U (en) | The support frame of jacket, chunk ro-ro transport | |
| CN204775838U (en) | A device of passing a bridge for it is current between container ship ladder | |
| CN203812681U (en) | Angle steel tower-type rack power distribution transformer | |
| CN203257075U (en) | Core tube inner lifting type multifunctional operating platform for high-rise building construction | |
| CN203997411U (en) | The marine double-layered transporting bracket of heavy wind tower | |
| CN208102270U (en) | Detachable storage pipe support | |
| CN207644600U (en) | a height work basket | |
| CN206829751U (en) | A kind of energy-saving structure steel pipe pole | |
| CN204384755U (en) | Bridge construction tower crane sustaining wall structure | |
| CN203452356U (en) | Combined frame type scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20200113 Address after: 313000 No.5-8, Changhe Road, Huaxi street, Changxing County, Huzhou City, Zhejiang Province Patentee after: Zhejiang Changxing green battery technology Co.,Ltd. Address before: The three group of Tongzhou District Xingren Zhen Sun Jia Qiao Cun, Jiangsu city of Nantong province 226000 Patentee before: AVIC HONGBO WINDPOWER EQUIPMENT Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20200916 Address after: Room 501, Office Building of Market Supervision Bureau of Langchuan Avenue, Jianping Town, Langxi County, Xuancheng City, Anhui Province Patentee after: Langxi pinxu Technology Development Co.,Ltd. Address before: 313000 No.5-8, Changhe Road, Huaxi street, Changxing County, Huzhou City, Zhejiang Province Patentee before: Zhejiang Changxing green battery technology Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240226 Address after: 412000 Yinshanchong Group, Dafeng Community, Xuelin Office, Yunlong Demonstration Zone, Zhuzhou City, Hunan Province Patentee after: Hunan Zhongchen Equipment Co.,Ltd. Country or region after: China Address before: Room 501, office building, Langchuan Avenue, Jianping Town, Langxi County, Xuancheng City, Anhui Province Patentee before: Langxi pinxu Technology Development Co.,Ltd. Country or region before: China |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 |