CN104030154A - 烟囱多吊点起吊安装装置 - Google Patents

烟囱多吊点起吊安装装置 Download PDF

Info

Publication number
CN104030154A
CN104030154A CN201410278172.5A CN201410278172A CN104030154A CN 104030154 A CN104030154 A CN 104030154A CN 201410278172 A CN201410278172 A CN 201410278172A CN 104030154 A CN104030154 A CN 104030154A
Authority
CN
China
Prior art keywords
lifting
welded
leading sheave
balance spring
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410278172.5A
Other languages
English (en)
Inventor
朱文良
李继东
张珂铭
秦志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201410278172.5A priority Critical patent/CN104030154A/zh
Publication of CN104030154A publication Critical patent/CN104030154A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明提供一种烟囱多吊点起吊安装装置,将支撑用钢管焊接在烟囱筒身顶部的预埋件上,导向滑轨焊接在支撑用钢管上;第一导向滑轮、第二导向滑轮、天梁法兰与导向滑轨、平衡吊装滑轮整体焊接为一体;通过葫芦将天梁法兰与钢内筒拉结紧固,将平衡弹簧一端焊接在烟囱筒身的预埋件上,另一端连接在第三导向滑轮上,并将平衡弹簧、第三导向滑轮、支撑钢杆、固定钢板支点连接固定;平衡弹簧、支撑钢杆、固定钢板支点铰接。本发明的有益效果为:结构简单,科学合理,成本低廉,投资少,施工安全可靠,易操控,实用性强,有效保证环保施工质量,显著提高安全性,工作效率明显提高,适宜推广使用。

Description

烟囱多吊点起吊安装装置
技术领域
本发明涉及到电力建设设备安装领域,具体是适用于特高空烟囱多吊点起吊安装装置。
背景技术
目前,火力发电厂因烟囱较高,进行烟囱内部钢结构施工过程中,常规吊装使用天轮定点组合吊装装置进行烟囱内部的钢结构吊装工作,吊点单一,吊装过程中往往使用葫芦进行配合使用,因此吊装过程中存在滑落的危险。
发明内容
本发明目的是提供一种烟囱多吊点起吊安装装置,使它具有受力均匀,安全系数高,工程质量佳优点。
为了实现本发明目的,采用以下技术方案:烟囱多吊点起吊安装装置,其特征在于:将支撑用钢管焊接在烟囱筒身顶部的预埋件上,导向滑轨焊接在支撑用钢管上;第一导向滑轮、第二导向滑轮、天梁法兰与导向滑轨、平衡吊装滑轮整体焊接为一体;通过葫芦将天梁法兰与钢内筒拉结紧固,将平衡弹簧一端焊接在烟囱筒身的预埋件上,另一端连接在第三导向滑轮上,并将平衡弹簧、第三导向滑轮、支撑钢杆、固定钢板支点连接固定;平衡弹簧、支撑钢杆、固定钢板支点铰接;将平衡吊装滑轮、吊钩与钢丝绳组合为一体穿过第一导向滑轮、第二导向滑轮、第三导向滑轮中从固定整个烟囱高空吊装装置。
本发明的有益效果为:结构简单,科学合理,成本低廉,投资少,施工安全可靠,易操控,实用性强,有效保证环保施工质量,显著提高安全性,工作效率明显提高,适宜推广使用。
附图说明
图1为本发明的侧视结构示意图;
图2为本发明的平视结构示意图;
图中,第一导向天轮1,第二导向天轮2,天梁法兰3,天梁4,弧形导向滑轨5、平衡吊装滑轮6,吊钩7,支撑用钢管8,钢丝绳9,平衡弹簧10,第三导向滑轮11,支撑钢杆12,固定钢板支点13,葫芦14,钢内筒15,烟囱筒身16。
具体实施方式
下面结合图1、图2对本发明做进一步详细的描述。
本发明作为一种新型的烟囱高空吊装装置,用于吊装烟囱内部所需的钢结构吊装工作。烟囱多吊点起吊安装装置,将支撑用钢管8焊接在烟囱筒身顶部的预埋件上,导向滑轨5焊接在支撑用钢管8上;第一导向滑轮1、第二导向滑轮2、天梁法兰3与导向滑轨5、平衡吊装滑轮6整体焊接为一体;通过葫芦14将天梁法兰3与钢内筒15拉结紧固,将平衡弹簧10一端焊接在烟囱筒身的预埋件上,另一端连接在第三导向滑轮11上,并将平衡弹簧10、第三导向滑轮11、支撑钢杆12、固定钢板支点13连接固定;平衡弹簧10、支撑钢杆12、固定钢板支点13铰接;将平衡吊装滑轮6、吊钩7与钢丝绳9组合为一体穿过第一导向滑轮1、第二导向滑轮2、第三导向滑轮11中从固定整个烟囱高空吊装装置。本实施案例中烟囱高空吊装装置的施工步骤:(1).将吊装的钢结构挂在吊钩7上;(2).使用0m地面的卷扬机缓缓吊装该构件到指定安装位置;(3).施工人员将到达指定安装位置的构件进行组装焊接;(4).循环重复以上操作步骤。本发明未详述部分均为公知技术,本领域的技术人员在本发明技术方案范围内进行的通常变化或替换都应包含在本发明的保护范围内。

Claims (1)

1.烟囱多吊点起吊安装装置,其特征在于:将支撑用钢管焊接在烟囱筒身顶部的预埋件上,导向滑轨焊接在支撑用钢管上;第一导向滑轮、第二导向滑轮、天梁法兰与导向滑轨、平衡吊装滑轮整体焊接为一体;通过葫芦将天梁法兰与钢内筒拉结紧固,将平衡弹簧一端焊接在烟囱筒身的预埋件上,另一端连接在第三导向滑轮上,并将平衡弹簧、第三导向滑轮、支撑钢杆、固定钢板支点连接固定;平衡弹簧、支撑钢杆、固定钢板支点铰接;将平衡吊装滑轮、吊钩与钢丝绳组合为一体穿过第一导向滑轮、第二导向滑轮、第三导向滑轮中从固定整个烟囱高空吊装装置。
CN201410278172.5A 2014-06-20 2014-06-20 烟囱多吊点起吊安装装置 Pending CN104030154A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410278172.5A CN104030154A (zh) 2014-06-20 2014-06-20 烟囱多吊点起吊安装装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410278172.5A CN104030154A (zh) 2014-06-20 2014-06-20 烟囱多吊点起吊安装装置

Publications (1)

Publication Number Publication Date
CN104030154A true CN104030154A (zh) 2014-09-10

Family

ID=51461188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410278172.5A Pending CN104030154A (zh) 2014-06-20 2014-06-20 烟囱多吊点起吊安装装置

Country Status (1)

Country Link
CN (1) CN104030154A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3908801A (en) * 1974-03-13 1975-09-30 Vertical Transport Company Vertical hoist assembly
EP0503749A1 (de) * 1991-03-15 1992-09-16 Walter Krämer GmbH Chemie- und Tankanlagenbau Montagevorrichtung für aus Rohrschüssen zusammengesetzte Abgaszüge in Industrieschornsteinen
CN2253371Y (zh) * 1995-09-01 1997-04-30 西北电力建设第四工程公司 烟囱电动升模装置
CN200971610Y (zh) * 2006-11-23 2007-11-07 西北电力建设第四工程公司 烟囱导轨式提升平台装置
CN201411900Y (zh) * 2009-05-21 2010-02-24 山东丰汇设备技术有限公司 烟囱液压提模装置
CN102619376A (zh) * 2012-04-18 2012-08-01 二十三冶建设集团有限公司 钢筋混凝土尾气烟囱内筒的安装方法及其吊装系统
CN203903770U (zh) * 2014-06-20 2014-10-29 山东电力建设第一工程公司 烟囱多吊点起吊安装装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3908801A (en) * 1974-03-13 1975-09-30 Vertical Transport Company Vertical hoist assembly
EP0503749A1 (de) * 1991-03-15 1992-09-16 Walter Krämer GmbH Chemie- und Tankanlagenbau Montagevorrichtung für aus Rohrschüssen zusammengesetzte Abgaszüge in Industrieschornsteinen
CN2253371Y (zh) * 1995-09-01 1997-04-30 西北电力建设第四工程公司 烟囱电动升模装置
CN200971610Y (zh) * 2006-11-23 2007-11-07 西北电力建设第四工程公司 烟囱导轨式提升平台装置
CN201411900Y (zh) * 2009-05-21 2010-02-24 山东丰汇设备技术有限公司 烟囱液压提模装置
CN102619376A (zh) * 2012-04-18 2012-08-01 二十三冶建设集团有限公司 钢筋混凝土尾气烟囱内筒的安装方法及其吊装系统
CN203903770U (zh) * 2014-06-20 2014-10-29 山东电力建设第一工程公司 烟囱多吊点起吊安装装置

Similar Documents

Publication Publication Date Title
CN103613031B (zh) 变压器简易吊装装置
CN105439005B (zh) 起重机
CN109231023B (zh) 门座式起重机臂架系统的安装方法
CN103708360B (zh) 动臂塔机及其标准节引进系统和标准节引进方法
CN105217506A (zh) 一种风管安装吊具及安装方法
CN105366567A (zh) 一种gis拆装智能辅助平台
CN203903770U (zh) 烟囱多吊点起吊安装装置
CN201952153U (zh) 便携可拆卸式吊装设备
CN104444835A (zh) 简易吊装工具
US20130259609A1 (en) Truss lifter and stabilizer
CN202405695U (zh) 一种钢管杆架空地线提线工具
CN203359889U (zh) 墙板提升及安装一体化操作平台
CN104030154A (zh) 烟囱多吊点起吊安装装置
CN103247966A (zh) 一种高压高空作业升降梯
CN203959697U (zh) 吊装平台桁架的平衡梁
CN202808252U (zh) 小型轻便起重设备
CN204434124U (zh) 塔机自安装和自拆卸平衡重的结构
CN207165365U (zh) 一种露天变压器安装支撑架
CN202657877U (zh) 线路设备施工吊装架
CN104495645A (zh) 一种塔机自安装和自拆卸平衡重的结构
CN203284098U (zh) 塔式吊机拆装部件自吊装置
CN103470057A (zh) 一种高空构件起吊施工方法
CN202657876U (zh) 110kV线路避雷器吊装构架
CN203626372U (zh) 组立抱杆的多功能抱箍装置
CN203486732U (zh) 一种用于液压提升机的吊装装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140910