CN104005496A - Fabricated environment-friendly external wall - Google Patents
Fabricated environment-friendly external wall Download PDFInfo
- Publication number
- CN104005496A CN104005496A CN201410259908.4A CN201410259908A CN104005496A CN 104005496 A CN104005496 A CN 104005496A CN 201410259908 A CN201410259908 A CN 201410259908A CN 104005496 A CN104005496 A CN 104005496A
- Authority
- CN
- China
- Prior art keywords
- wall
- keel
- plate
- connecting plate
- exterior wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
本发明属于组合墙技术领域,具体涉及一种集隔热、隔音和防火于一体的组合墙;所要解决的技术问题为:提供一种安装方便且质量轻的组合墙;解决技术问题所采用的技术方案为:可装配环保外墙,环保墙从外向内依次设置有外墙、挂件、隔热墙、第一龙骨、填充墙、第二龙骨和内墙,挂件包括横杆和垂直设置在横杆同一侧的两块安装板,横杆上开有横槽,两块安装板的大小相同,安装板上开有四个安装孔,外墙的上下两端分别插装在两块挂件的横槽内,挂件通过多个螺钉穿过安装孔后连接在隔热墙上;本发明很好地一次性解决了外墙的保温防火隔音保暖的要求,而且实现了工厂化制作,现场一次性吊装施工,极大的提高了工作效率减小成本。
The invention belongs to the technical field of composite walls, and specifically relates to a composite wall integrating heat insulation, sound insulation and fire prevention; the technical problem to be solved is: to provide a composite wall that is easy to install and light in weight; The technical solution is: the environmental protection exterior wall can be assembled, and the environmental protection wall is provided with the exterior wall, the pendant, the heat insulation wall, the first keel, the filling wall, the second keel and the inner wall in sequence from the outside to the inside. There are two mounting plates on the same side of the bar. There is a horizontal groove on the bar. The two mounting plates are of the same size. There are four mounting holes on the mounting plate. In the groove, the pendant is connected to the heat insulation wall after passing through the installation holes with multiple screws; the invention solves the heat preservation, fire, sound insulation and heat preservation requirements of the exterior wall at one time, and realizes factory production and one-time hoisting on site Construction, greatly improving work efficiency and reducing costs.
Description
技术领域 technical field
本发明属于组合墙技术领域,具体涉及一种集隔热、隔音和防火于一体的组合墙。 The invention belongs to the technical field of composite walls, in particular to a composite wall integrating heat insulation, sound insulation and fire prevention.
背景技术 Background technique
现阶段外墙做法分为:外墙主体、外墙保温、外墙防水、外墙面装饰和内墙面装饰五大部分,做法很多而且每个部分都有很复杂的工序,造成资源的浪费。比如现在普通的框剪楼的加气混凝土外墙做法,首先在楼的主体结构完工后,在预留墙体位置将加气混凝土砌块砌成墙,保温层是将挤塑板或其他保温材料用胶贴在加气混凝土外墙上,然后外墙面用耐碱玻纤网,摸柔性抗裂砂浆找平后刷涂料或贴砖;内墙面打腻子后水泥砂浆找平后抹白。工序之多而且复杂,而且要用到胶水等对人体有害的工业材料,这种做法相对来说在现在的建筑行业来说已经算比较成熟和方便的做法了。但依然不能一下解决外墙的保温防火隔音保暖等问题。外墙的做法复杂而且先后要经过三至五道工序才能完成。施工周期长,耗费大量劳动力和资源,无法做到工业化、产业化、装配化、绿色节能的要求。 At present, the methods of exterior walls are divided into five parts: exterior wall main body, exterior wall insulation, exterior wall waterproofing, exterior wall decoration and interior wall decoration. There are many methods and each part has very complicated procedures, resulting in waste of resources. For example, the current common practice of aerated concrete exterior walls for frame-shear buildings is to build walls with aerated concrete blocks at the reserved wall position after the main structure of the building is completed, and the insulation layer is made of extruded board or other insulation The material is pasted on the outer wall of aerated concrete with glue, and then the outer wall is covered with alkali-resistant glass fiber mesh, and the flexible anti-crack mortar is leveled and then painted or tiled; the inner wall is puttyed, and the cement mortar is leveled and then whitewashed. There are many and complicated processes, and glue and other industrial materials that are harmful to the human body are used. This method is relatively mature and convenient in the current construction industry. But still can't solve the problems such as thermal insulation, fire prevention, sound insulation and warmth of exterior wall at once. The method of exterior wall is complicated and has to go through three to five processes to complete. The construction period is long, consumes a lot of labor and resources, and cannot meet the requirements of industrialization, industrialization, assembly, green and energy saving.
发明内容 Contents of the invention
本发明克服现有技术存在的不足,所要解决的技术问题为提供一种安装方便,质量轻,集隔热、隔音和防火于一体的组合墙。 The invention overcomes the deficiencies in the prior art, and the technical problem to be solved is to provide a composite wall which is easy to install, light in weight, and integrates heat insulation, sound insulation and fire prevention.
为了解决上述技术问题,本发明采用的技术方案为:可装配环保外墙,环保墙从外向内依次设置有外墙、挂件、隔热墙、第一龙骨、填充墙、第二龙骨和内墙,所述挂件包括横杆和垂直设置在横杆同一侧的两块安装板,所述横杆上开有横槽,所述两块安装板的大小相同,安装板上开有四个安装孔,所述外墙的上下两端分别插装在两块挂件的横槽内,所述挂件通过多个螺钉穿过安装孔后连接在隔热墙上; In order to solve the above technical problems, the technical solution adopted by the present invention is: the environmental protection external wall can be assembled, and the environmental protection wall is provided with an external wall, a pendant, a heat insulation wall, a first keel, a filling wall, a second keel and an inner wall in sequence from the outside to the inside , the pendant includes a cross bar and two mounting plates vertically arranged on the same side of the cross bar, a transverse groove is opened on the cross bar, the size of the two mounting plates is the same, and four mounting holes are opened on the mounting plate , the upper and lower ends of the outer wall are respectively inserted into the transverse grooves of two pendants, and the pendants are connected to the heat insulation wall after passing through the mounting holes with a plurality of screws;
其中,所述第一龙骨包括两根竖杆,两根竖杆之间通过多根横架相连,一根竖杆上部设置有带有通孔的第一连接板,第一连接板相对于横架垂直设置,另一根竖杆的上部设置有带有安装槽的第二连接板,第二连接板相对于横架平行设置,所述第一连接板和第二连接板均设置在第一龙骨的同一侧,两根竖杆之间设置有隔热墙,安装槽与工字架上的插槽配合后,通孔与工字架通过螺栓活动连接; Wherein, the first keel includes two vertical bars, which are connected by a plurality of horizontal frames, and a first connecting plate with a through hole is arranged on the upper part of the vertical bar, and the first connecting plate is opposite to the horizontal frame. The frame is vertically arranged, and the upper part of the other vertical bar is provided with a second connecting plate with a mounting groove. The second connecting plate is arranged parallel to the horizontal frame. The first connecting plate and the second connecting plate are both arranged on the first On the same side of the keel, a heat insulation wall is set between the two vertical bars. After the installation groove matches the slot on the I-shaped frame, the through hole and the I-shaped frame are movably connected by bolts;
其中,所述第二龙骨包括中间板和垂直设置在中间板同一侧的两块折板,所述两块折板的结构相同,折板包括第一卡板、连扳和第二卡板,所述第一卡板的一端垂直设置在中间板上,另一端与第二卡板之间通过连扳相连,所述第一卡板与第二卡板平行设置,两块所述第一卡板之间的距离大于两块所述第二卡板之间的距离,所述内墙通过自攻螺钉活动连接在中间板的一侧,中间板另一侧的两块第一卡板卡装有填充墙,两块第二卡板通过自攻螺钉连接在第一龙骨的两侧。 Wherein, the second keel includes a middle plate and two folded plates vertically arranged on the same side of the middle plate, the two folded plates have the same structure, and the folded plates include a first clamping plate, a connecting plate and a second clamping plate, One end of the first clamp is vertically arranged on the middle plate, and the other end is connected to the second clamp through a connecting plate. The first clamp and the second clamp are arranged in parallel, and the two first clamps The distance between the boards is greater than the distance between the two second clip boards, the inner wall is movably connected to one side of the middle board by self-tapping screws, and the two first clip boards on the other side of the middle board are clamped There is a filling wall, and two second clamping plates are connected on both sides of the first keel by self-tapping screws.
本发明的各个墙板均可拆卸,运输方便,运输到现场后,即可安装,十分方便。而且本发明很好地一次性解决了外墙的保温防火隔音保暖的要求,而且实现了工厂化制作,现场一次性吊装施工,极大的提高了工作效率,减小了生产成本,满足了当今建筑的发展趋势。是一种保温、防火、隔音和保暖于一体可装配施工的新型外墙,颠覆了传统外墙做法,满足了现代施工的要求,更易配合钢结构施工。 Each wall panel of the present invention can be disassembled, and the transportation is convenient. After being transported to the site, it can be installed, which is very convenient. Moreover, the present invention solves the thermal insulation, fireproof, sound insulation and thermal insulation requirements of the outer wall well at one time, and realizes factory production, one-time hoisting construction on site, greatly improves work efficiency, reduces production cost, and satisfies today's Architecture trends. It is a new type of external wall that can be assembled and constructed with thermal insulation, fire prevention, sound insulation and thermal insulation. It subverts the traditional external wall method, meets the requirements of modern construction, and is easier to cooperate with steel structure construction.
进一步地,所述外墙为石材板,能够防止雨水腐蚀,耐用性好。 Further, the outer wall is a stone board, which can prevent rainwater corrosion and has good durability.
进一步地,所述隔热墙为挤塑板,隔热效果好,而且质量轻,结构简洁。 Further, the heat insulation wall is an extruded plastic board, which has good heat insulation effect, light weight and simple structure.
进一步地,所述填充墙为轻质隔墙板,隔音效果好。 Further, the filling wall is a lightweight partition board with good sound insulation effect.
进一步地,所述内墙为水泥压力板,内墙无需复杂处理,即可作为装饰墙。 Further, the inner wall is a cement pressure board, and the inner wall can be used as a decorative wall without complicated treatment.
进一步地,所述第一龙骨和第二龙骨的外部均设置有1.5mm厚的镀锌层,耐腐蚀,龙骨的使用寿命长。 Further, both the first keel and the second keel are provided with a galvanized layer with a thickness of 1.5 mm, which is corrosion-resistant and has a long service life of the keel.
本发明与现有技术相比具有以下有益效果:本发明很好地一次性解决了外墙的保温防火隔音保暖的要求,而且实现了工厂化制作,现场一次性吊装施工,极大的提高了工作效率,减小了制造成本,满足了当今建筑的发展趋势。是一种保温防火隔音保暖于一体可装配施工的新型外墙,颠覆了传统外墙做法,满足了现代施工的要求,更易配合钢结构施工。 Compared with the prior art, the present invention has the following beneficial effects: the present invention solves the heat preservation, fireproof, sound insulation and heat preservation requirements of the outer wall at one time, and realizes factory production, one-time hoisting construction on site, which greatly improves The working efficiency reduces the manufacturing cost and meets the development trend of today's buildings. It is a new type of external wall that can be assembled and constructed with thermal insulation, fire protection, sound insulation and warmth. It subverts the traditional external wall method, meets the requirements of modern construction, and is easier to cooperate with steel structure construction.
附图说明 Description of drawings
下面结合附图对本发明做进一步详细的说明。 The present invention will be described in further detail below in conjunction with the accompanying drawings.
图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.
图2为图1中外墙的结构示意图。 Fig. 2 is a schematic structural diagram of the outer wall in Fig. 1 .
图3为图1中挂件的结构示意图。 FIG. 3 is a schematic structural diagram of the pendant in FIG. 1 .
图4为图1中第一龙骨的结构示意图。 Fig. 4 is a schematic structural diagram of the first keel in Fig. 1 .
图5为图1中第二龙骨的结构示意图。 Fig. 5 is a schematic structural diagram of the second keel in Fig. 1 .
图6为工字架的结构示意图。 Figure 6 is a schematic structural view of the I-shaped frame.
图中:1为外墙,2为挂件,3为隔热墙,4为第一龙骨,5为第二龙骨,6为内墙,7为工字架,21为横杆,22为安装板, 41为竖杆,42为横架,43为通孔,44为安装槽,51为中间板,52为折板,71为插槽,211为横槽,221为安装孔,521为第一卡板,522为连扳,523第二卡板。 In the figure: 1 is the outer wall, 2 is the pendant, 3 is the heat insulation wall, 4 is the first keel, 5 is the second keel, 6 is the inner wall, 7 is the I-shaped frame, 21 is the cross bar, and 22 is the installation plate , 41 is a vertical bar, 42 is a horizontal frame, 43 is a through hole, 44 is a mounting groove, 51 is a middle plate, 52 is a folding plate, 71 is a slot, 211 is a horizontal groove, 221 is a mounting hole, 521 is the first Clamp, 522 is to pull continuously, and 523 the second clamps.
具体实施方式 Detailed ways
可装配环保外墙1,环保墙从外向内依次设置有外墙1、挂件2、隔热墙3、第一龙骨4、填充墙、第二龙骨5和内墙6,所述挂件2包括横杆21和垂直设置在横杆21同一侧的两块安装板22,所述横杆21上开有横槽211,所述两块安装板22的大小相同,安装板22上开有四个安装孔221,所述外墙1的上下两端分别插装在两块挂件2的横槽211内,所述挂件2通过多个螺钉穿过安装孔221后连接在隔热墙3上; The environmental protection exterior wall 1 can be assembled, and the environmental protection wall is provided with the exterior wall 1, the pendant 2, the heat insulation wall 3, the first keel 4, the filling wall, the second keel 5 and the inner wall 6 from the outside to the inside, and the pendant 2 includes a horizontal The bar 21 and the two mounting plates 22 vertically arranged on the same side of the cross bar 21 have a transverse groove 211 on the cross bar 21. The two mounting plates 22 are of the same size. Holes 221, the upper and lower ends of the outer wall 1 are respectively inserted into the transverse grooves 211 of two pendants 2, and the pendants 2 are connected to the heat insulation wall 3 after passing through the mounting holes 221 with a plurality of screws;
其中,所述第一龙骨4包括两根竖杆41,两根竖杆41之间通过多根横架42相连,一根竖杆41上部设置有带有通孔43的第一连接板,第一连接板相对于横架42垂直设置,另一根竖杆41的上部设置有带有安装槽44的第二连接板,第二连接板相对于横架42平行设置,所述第一连接板和第二连接板均设置在第一龙骨4的同一侧,两根竖杆41之间设置有隔热墙3,安装槽44与工字架7上的插槽71配合后,通孔43与工字架7通过螺栓活动连接; Wherein, the first keel 4 includes two vertical rods 41, and the two vertical rods 41 are connected by a plurality of horizontal frames 42, and the upper part of one vertical rod 41 is provided with a first connecting plate with a through hole 43. One connecting plate is vertically arranged relative to the horizontal frame 42, and the top of the other vertical bar 41 is provided with a second connecting plate with a mounting groove 44, and the second connecting plate is arranged parallel to the horizontal frame 42. The first connecting plate and the second connecting plate are all arranged on the same side of the first keel 4, a heat insulating wall 3 is arranged between the two vertical bars 41, and after the installation groove 44 cooperates with the slot 71 on the I-shaped frame 7, the through hole 43 and The I-shaped frame 7 is movably connected by bolts;
其中,所述第二龙骨5包括中间板51和垂直设置在中间板51同一侧的两块折板52,所述两块折板52的结构相同,折板52包括第一卡板521、连扳522和第二卡板523,所述第一卡板521的一端垂直设置在中间板51上,另一端与第二卡板523之间通过连扳522相连,所述第一卡板521与第二卡板523平行设置,两块所述第一卡板521之间的距离大于两块所述第二卡板523之间的距离,所述内墙6通过自攻螺钉活动连接在中间板51的一侧,中间板51另一侧的两块第一卡板521卡装有填充墙,两块第二卡板523通过自攻螺钉连接在第一龙骨4的两侧。 Wherein, the second keel 5 includes an intermediate plate 51 and two folded plates 52 vertically arranged on the same side of the intermediate plate 51. Pull 522 and the second clamp 523, one end of the first clamp 521 is vertically arranged on the middle plate 51, and the other end is connected with the second clamp 523 through the connecting pull 522, the first clamp 521 and The second clamping plates 523 are arranged in parallel, the distance between the two first clamping plates 521 is greater than the distance between the two second clamping plates 523, and the inner wall 6 is flexibly connected to the middle plate by self-tapping screws One side of 51, two first clamping plates 521 on the other side of the middle plate 51 are clamped with filling walls, and two second clamping plates 523 are connected to both sides of the first keel 4 by self-tapping screws.
作为优选地,所述外墙1为石材板,能够防止雨水腐蚀,耐用性好。 Preferably, the outer wall 1 is a stone board, which can prevent rainwater corrosion and has good durability.
作为优选地,所述隔热墙3为挤塑板,隔热效果好,而且质量轻,结构简洁。 Preferably, the heat insulation wall 3 is an extruded plastic board, which has good heat insulation effect, light weight and simple structure.
作为优选地,所述填充墙为轻质隔墙板,隔音效果好。 Preferably, the filling wall is a lightweight partition board with good sound insulation effect.
作为优选地,所述内墙6为水泥压力板,内墙6无需复杂处理,即可作为装饰墙。 Preferably, the inner wall 6 is a cement pressure board, and the inner wall 6 can be used as a decorative wall without complicated treatment.
作为优选地,所述第一龙骨4和第二龙骨5的外部均设置有1.5mm厚的镀锌层,耐腐蚀,龙骨的使用寿命长。 Preferably, both the first keel 4 and the second keel 5 are provided with a galvanized layer with a thickness of 1.5mm, which is corrosion-resistant and has a long service life of the keel.
本发明很好地一次性解决了外墙1的保温防火隔音保暖的要求,而且实现了工厂化制作,现场一次性吊装施工,极大的提高了工作效率减小成本,满足了当今建筑的发展趋势。是一种保温防火隔音保暖于一体可装配施工的新型墙体,颠覆了传统墙体做法,满足了现代施工的要求,更易配合钢结构施工。 The present invention solves the thermal insulation, fireproof, sound insulation and thermal insulation requirements of the outer wall 1 well at one time, and realizes factory production, one-time hoisting construction on site, greatly improves work efficiency and reduces cost, and satisfies the development of today's buildings trend. It is a new type of wall that can be assembled for thermal insulation, fire protection, sound insulation and warmth. It subverts the traditional wall method, meets the requirements of modern construction, and is easier to cooperate with steel structure construction.
现在结合附图对本发明作进一步详细的说明,附图为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。 The present invention will now be further described in detail in conjunction with the accompanying drawings. The accompanying drawings are simplified schematic diagrams, which only schematically illustrate the basic structure of the present invention, and therefore only show the configurations related to the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410259908.4A CN104005496B (en) | 2014-06-12 | 2014-06-12 | Can assemble environmental protection exterior wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410259908.4A CN104005496B (en) | 2014-06-12 | 2014-06-12 | Can assemble environmental protection exterior wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104005496A true CN104005496A (en) | 2014-08-27 |
| CN104005496B CN104005496B (en) | 2016-05-18 |
Family
ID=51366382
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410259908.4A Expired - Fee Related CN104005496B (en) | 2014-06-12 | 2014-06-12 | Can assemble environmental protection exterior wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104005496B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105544799A (en) * | 2015-12-08 | 2016-05-04 | 智房科技股份有限公司 | Fabricated horizontal external wall panel module, wall body, and assembling method |
| CN107435394A (en) * | 2016-05-25 | 2017-12-05 | 北新集团建材股份有限公司 | A kind of partition wall and its attachment structure |
| CN108978954A (en) * | 2017-05-31 | 2018-12-11 | 北新集团建材股份有限公司 | A kind of assembled wall body structure and its installation method |
| CN110656732A (en) * | 2019-10-12 | 2020-01-07 | 华北理工大学 | Assembled light steel frame-composite wall structure and its assembly method |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09125567A (en) * | 1995-11-07 | 1997-05-13 | Shoji Matsuzawa | Wall panel and its installation structure |
| CN2344463Y (en) * | 1998-08-17 | 1999-10-20 | 格满林(南京)实业有限公司 | Combined wall body |
| US6339907B1 (en) * | 1996-06-07 | 2002-01-22 | Herman Miller, Inc. | System of wall panels |
| CN2549085Y (en) * | 2002-08-16 | 2003-05-07 | 郭乾桂 | Hanging outer-wall panels |
| CN2888001Y (en) * | 2006-04-24 | 2007-04-11 | 张礼信 | Assembled heat preservation wallboard |
| CN201074389Y (en) * | 2007-08-21 | 2008-06-18 | 河北北方绿野居住环境发展有限公司 | Prefabricated assembled external wall insulation board |
| CN201531074U (en) * | 2009-09-16 | 2010-07-21 | 吉林省恒宁建筑墙体新技术开发有限公司 | Filling and heat insulating integral fabricated wall body of building exterior wall |
| CN203867001U (en) * | 2014-06-12 | 2014-10-08 | 亚太绿色(北京)建筑科技发展有限公司 | Assemblable and environment-friendly outer wall |
-
2014
- 2014-06-12 CN CN201410259908.4A patent/CN104005496B/en not_active Expired - Fee Related
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09125567A (en) * | 1995-11-07 | 1997-05-13 | Shoji Matsuzawa | Wall panel and its installation structure |
| US6339907B1 (en) * | 1996-06-07 | 2002-01-22 | Herman Miller, Inc. | System of wall panels |
| CN2344463Y (en) * | 1998-08-17 | 1999-10-20 | 格满林(南京)实业有限公司 | Combined wall body |
| CN2549085Y (en) * | 2002-08-16 | 2003-05-07 | 郭乾桂 | Hanging outer-wall panels |
| CN2888001Y (en) * | 2006-04-24 | 2007-04-11 | 张礼信 | Assembled heat preservation wallboard |
| CN201074389Y (en) * | 2007-08-21 | 2008-06-18 | 河北北方绿野居住环境发展有限公司 | Prefabricated assembled external wall insulation board |
| CN201531074U (en) * | 2009-09-16 | 2010-07-21 | 吉林省恒宁建筑墙体新技术开发有限公司 | Filling and heat insulating integral fabricated wall body of building exterior wall |
| CN203867001U (en) * | 2014-06-12 | 2014-10-08 | 亚太绿色(北京)建筑科技发展有限公司 | Assemblable and environment-friendly outer wall |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105544799A (en) * | 2015-12-08 | 2016-05-04 | 智房科技股份有限公司 | Fabricated horizontal external wall panel module, wall body, and assembling method |
| CN107435394A (en) * | 2016-05-25 | 2017-12-05 | 北新集团建材股份有限公司 | A kind of partition wall and its attachment structure |
| CN107435394B (en) * | 2016-05-25 | 2020-12-22 | 北新集团建材股份有限公司 | A partition wall and its connecting structure |
| CN108978954A (en) * | 2017-05-31 | 2018-12-11 | 北新集团建材股份有限公司 | A kind of assembled wall body structure and its installation method |
| CN110656732A (en) * | 2019-10-12 | 2020-01-07 | 华北理工大学 | Assembled light steel frame-composite wall structure and its assembly method |
| CN110656732B (en) * | 2019-10-12 | 2021-04-02 | 华北理工大学 | Assembled light steel frame-composite wall structure and its assembly method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104005496B (en) | 2016-05-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102182260B (en) | A foam concrete composite armored thermal insulation wall and its construction method | |
| CN202467240U (en) | Assembled steel structure hollow building | |
| CN108930357A (en) | A kind of assembled wallboard and preparation method thereof with switch enclosure and penetration pipe | |
| CN206859453U (en) | A kind of modified insulated wall light steel skeleton | |
| CN104005496B (en) | Can assemble environmental protection exterior wall | |
| CN205134705U (en) | Decorate compound side fascia of integration assembled that keeps warm | |
| CN108756109A (en) | A kind of decoration integrated heat-insulation wall plate of separate assembling and its mounting process | |
| CN103669707A (en) | Light composite prefabricated wallboard for house and preparation method thereof | |
| CN203867001U (en) | Assemblable and environment-friendly outer wall | |
| CN206571006U (en) | Decorate the insulation and decoration combined wall of panel and template integration | |
| CN201915551U (en) | High-strength composite molding external wall panel | |
| CN204715617U (en) | A kind of light composite insulating wall board | |
| CN208685979U (en) | A kind of decoration integrated heat-insulation wall plate of separate assembling | |
| CN203846672U (en) | PVC (polyvinyl chloride) hollow partition board | |
| CN104314228B (en) | Light-weight metal battenboard and processing method thereof | |
| CN203412141U (en) | Integral installation wall with window | |
| CN110685396A (en) | Assembled keeps warm and decorates integrative outer wallboard and connected node | |
| CN211690962U (en) | Assembled keeps warm and decorates integrative outer wallboard and connected node | |
| CN204139448U (en) | String reinforced foam concrete composite partition wall plate | |
| CN210288866U (en) | Light fireproof heat-preservation assembled composite external wall panel | |
| CN205134636U (en) | Novel fire prevention heat insulation structure | |
| CN105544825B (en) | Combined GRC double-layer curtain wall panel | |
| CN203594198U (en) | Novel wall support | |
| CN205134638U (en) | Thermal insulation wall structure | |
| CN204781454U (en) | Dress unit formula partition wall structure is hung to superelevation steel construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 100022, Beijing, Gaobeidian Township, Gaobeidian village Chaoyang District folk culture street, No. 1702, C101-105 Applicant after: ASIA PACIFIC GREEN ARCHITECTURE (BEIJING) TECHNOLOGY GROUP CO.,LTD. Address before: 100022 Beijing City, Chaoyang District No. 39 East Third Ring Road, SOHO6 building 16 floor of No. 1903 Applicant before: YATAI GREEN (BEIJING) BUILDING SCIENCE & TECHNOLOGY DEVELOPMENT CO.,LTD. |
|
| COR | Change of bibliographic data | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160518 |