BRPI1011128A2 - sistema para monitorar uma operação de equipamento de perfuração, e, método para operar uma operação de equipamento de perfuração - Google Patents
sistema para monitorar uma operação de equipamento de perfuração, e, método para operar uma operação de equipamento de perfuraçãoInfo
- Publication number
- BRPI1011128A2 BRPI1011128A2 BRPI1011128A BRPI1011128A BRPI1011128A2 BR PI1011128 A2 BRPI1011128 A2 BR PI1011128A2 BR PI1011128 A BRPI1011128 A BR PI1011128A BR PI1011128 A BRPI1011128 A BR PI1011128A BR PI1011128 A2 BRPI1011128 A2 BR PI1011128A2
- Authority
- BR
- Brazil
- Prior art keywords
- drilling rig
- rig operation
- monitoring
- operating
- drilling
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title 2
- 238000000034 method Methods 0.000 title 1
- 238000012544 monitoring process Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/003—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings with electrically conducting or insulating means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
- E21B47/13—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Remote Sensing (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Electromagnetism (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Earth Drilling (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18328209P | 2009-06-02 | 2009-06-02 | |
| US61/183282 | 2009-06-02 | ||
| PCT/US2010/036189 WO2010141287A2 (en) | 2009-06-02 | 2010-05-26 | Wireless transmission system and system for monitoring a drilling rig operation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| BRPI1011128A2 true BRPI1011128A2 (pt) | 2016-03-15 |
| BRPI1011128B1 BRPI1011128B1 (pt) | 2021-01-05 |
Family
ID=43298406
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI1011128-0A BRPI1011128B1 (pt) | 2009-06-02 | 2010-05-26 | sistema para monitorar uma operação de equipamento de perfuração, e, método para operar uma operação de equipamento de perfuração |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US9133668B2 (pt) |
| EP (1) | EP2438269B8 (pt) |
| BR (1) | BRPI1011128B1 (pt) |
| CA (1) | CA2761955C (pt) |
| DK (1) | DK2438269T3 (pt) |
| WO (1) | WO2010141287A2 (pt) |
Families Citing this family (36)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8899347B2 (en) * | 2009-03-04 | 2014-12-02 | Intelliserv, Llc | System and method of using a saver sub in a drilling system |
| AU2010236914B2 (en) * | 2009-03-31 | 2016-03-17 | Intelliserv International Holding, Ltd. | System and method for communicating about a wellsite |
| US9546545B2 (en) | 2009-06-02 | 2017-01-17 | National Oilwell Varco, L.P. | Multi-level wellsite monitoring system and method of using same |
| US9133668B2 (en) | 2009-06-02 | 2015-09-15 | National Oilwell Varco, L.P. | Wireless transmission system and system for monitoring a drilling rig operation |
| US8645571B2 (en) * | 2009-08-05 | 2014-02-04 | Schlumberger Technology Corporation | System and method for managing and/or using data for tools in a wellbore |
| CN102359367A (zh) * | 2011-11-01 | 2012-02-22 | 上海思萌特电子科技有限公司 | 一种旋挖钻机监控系统及方法 |
| US20130133899A1 (en) * | 2011-11-29 | 2013-05-30 | Keith A. Holliday | Top drive with automatic positioning system |
| US8960324B2 (en) * | 2012-01-27 | 2015-02-24 | GDS International, LLC | Top drive with automatic anti-rotation safety control |
| US20150021016A1 (en) * | 2012-03-28 | 2015-01-22 | Mccoy Corporation | Device and method for measuring torque and rotation |
| US9605487B2 (en) | 2012-04-11 | 2017-03-28 | Baker Hughes Incorporated | Methods for forming instrumented cutting elements of an earth-boring drilling tool |
| US9212546B2 (en) | 2012-04-11 | 2015-12-15 | Baker Hughes Incorporated | Apparatuses and methods for obtaining at-bit measurements for an earth-boring drilling tool |
| CN103382836B (zh) * | 2012-05-03 | 2015-09-09 | 志馨通信科技(上海)有限公司 | 用于石油钻井现场的录井无线传感器数据传输系统 |
| US20150218936A1 (en) * | 2012-07-25 | 2015-08-06 | Precison Systems Internat Ip Pty Ltd | Down-hole monitoring and survey system |
| US10107089B2 (en) * | 2013-12-24 | 2018-10-23 | Nabors Drilling Technologies Usa, Inc. | Top drive movement measurements system and method |
| KR101436379B1 (ko) * | 2014-04-15 | 2014-09-02 | 주식회사 태강기업 | 오거머신의 스크류헤드 마운트 장치로 활용되는 원격 조종식 조인트클램프 |
| SG10201507702RA (en) | 2014-09-17 | 2016-04-28 | Salunda Ltd | Sensor For A Fingerboard Latch Assembly |
| CN107567531A (zh) | 2015-03-13 | 2018-01-09 | Aps科技公司 | 带有测量地面顶部接头的监测系统 |
| RU2617750C1 (ru) * | 2016-02-12 | 2017-04-26 | Общество с ограниченной ответственностью "ГЕРС Технолоджи" | Способ контроля процесса бурения наклонно-горизонтальных скважин |
| US10370899B2 (en) | 2016-05-09 | 2019-08-06 | Nabros Drilling Technologies USA, Inc. | Mud saver valve measurement system and method |
| US10753191B2 (en) | 2016-06-28 | 2020-08-25 | Baker Hughes, A Ge Company, Llc | Downhole tools with power utilization apparatus during flow-off state |
| WO2018007804A1 (en) | 2016-07-05 | 2018-01-11 | Salunda Limited | Sensor for a fingerboard latch assembly |
| WO2018034637A1 (en) | 2016-08-14 | 2018-02-22 | Halliburton Energy Services, Inc. | Telemetry system |
| US10436658B2 (en) * | 2016-10-28 | 2019-10-08 | Weatherford Technology Holdings, Llc | Automated load cell identification |
| CN110192001B (zh) | 2016-11-09 | 2021-06-11 | 萨兰达有限公司 | 用于可旋转元件的传感器 |
| CN107143328A (zh) * | 2017-07-21 | 2017-09-08 | 西南石油大学 | 一种随钻光纤通信装置 |
| CN108361020B (zh) * | 2018-04-03 | 2021-04-23 | 中煤科工集团西安研究院有限公司 | 基于虚拟仪表的坑道钻机用诊断保护装置及方法 |
| US11530604B2 (en) * | 2018-05-18 | 2022-12-20 | Mccoy Global Inc. | Sensor on clamp device |
| US11180989B2 (en) | 2018-07-03 | 2021-11-23 | Baker Hughes Holdings Llc | Apparatuses and methods for forming an instrumented cutting for an earth-boring drilling tool |
| US10584581B2 (en) | 2018-07-03 | 2020-03-10 | Baker Hughes, A Ge Company, Llc | Apparatuses and method for attaching an instrumented cutting element to an earth-boring drilling tool |
| CN108979617A (zh) * | 2018-09-17 | 2018-12-11 | 临沂矿业集团有限责任公司 | 一种煤矿井下遥控泄压钻机的控制系统 |
| US11976547B2 (en) | 2020-08-18 | 2024-05-07 | Nabors Drilling Technologies Usa, Inc. | Bolt-on wireless vibration sensor assembly |
| KR102498333B1 (ko) * | 2020-12-10 | 2023-02-10 | 동의대학교 산학협력단 | 해양 시추 장비들을 위한 충돌 방지 시스템용 시뮬레이터 구현을 위한 장치 및 방법 |
| US12261636B2 (en) * | 2021-12-15 | 2025-03-25 | Intelliserv, Llc | Wireless data transmission systems, and related devices and methods |
| US12286853B2 (en) | 2022-08-09 | 2025-04-29 | Nabors Drilling Technologies Usa, Inc. | Instrumented sub |
| US12393493B2 (en) * | 2023-09-22 | 2025-08-19 | Dell Products L.P. | Preventing resource starvation in backup session |
| CN118933097B (zh) * | 2024-10-10 | 2025-01-03 | 浙江城乡工程研究有限公司 | 无线测斜水位一体式机器人 |
Family Cites Families (45)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2116120A (en) * | 1934-12-21 | 1938-05-03 | Malmgren George | Bore hole surveying apparatus and method |
| US2380520A (en) * | 1942-04-24 | 1945-07-31 | Shell Dev | Borehole indicating apparatus |
| US2639588A (en) * | 1948-03-22 | 1953-05-26 | Alexander Shipyard Inc | Barge for offshore well drilling |
| US2676787A (en) * | 1949-06-22 | 1954-04-27 | Howard L Johnson | Drilling equipment |
| US3042998A (en) * | 1957-05-06 | 1962-07-10 | Sperry Gyroscope Co Ltd | Slip ring assembly |
| US3037295A (en) * | 1958-04-21 | 1962-06-05 | Alvin R Allison | Process and means for determining hole direction in drilling |
| US3109501A (en) * | 1960-11-07 | 1963-11-05 | James B Pugh | Well drilling guide |
| US3279404A (en) * | 1963-12-20 | 1966-10-18 | Offshore Co | Floating mooring system |
| US3402343A (en) * | 1965-08-02 | 1968-09-17 | Chevron Res | High speed, high resolution, nuclear magnetism well logging apparatus having a plurality of receiving coils and an extended polarizing coil, and method for using same |
| US3390654A (en) * | 1967-03-27 | 1968-07-02 | Automatic Drilling Mach | Stabilized offshore drilling apparatus |
| US3482629A (en) * | 1968-06-20 | 1969-12-09 | Shell Oil Co | Method for the sand control of a well |
| US4616321A (en) | 1979-08-29 | 1986-10-07 | Chan Yun T | Drilling rig monitoring system |
| US4491022A (en) * | 1983-02-17 | 1985-01-01 | Wisconsin Alumni Research Foundation | Cone-shaped coring for determining the in situ state of stress in rock masses |
| US5144126A (en) | 1990-04-17 | 1992-09-01 | Teleco Oilfied Services Inc. | Apparatus for nuclear logging employing sub wall mounted detectors and electronics, and modular connector assemblies |
| US5155916A (en) * | 1991-03-21 | 1992-10-20 | Scientific Drilling International | Error reduction in compensation of drill string interference for magnetic survey tools |
| US6280874B1 (en) | 1998-12-11 | 2001-08-28 | Schlumberger Technology Corp. | Annular pack |
| US7591304B2 (en) | 1999-03-05 | 2009-09-22 | Varco I/P, Inc. | Pipe running tool having wireless telemetry |
| US6267185B1 (en) * | 1999-08-03 | 2001-07-31 | Schlumberger Technology Corporation | Apparatus and method for communication with downhole equipment using drill string rotation and gyroscopic sensors |
| US6429787B1 (en) | 1999-09-10 | 2002-08-06 | Crosslink, Inc. | Rotating RF system |
| US6439325B1 (en) * | 2000-07-19 | 2002-08-27 | Baker Hughes Incorporated | Drilling apparatus with motor-driven pump steering control |
| US6891481B2 (en) * | 2000-10-02 | 2005-05-10 | Baker Hughes Incorporated | Resonant acoustic transmitter apparatus and method for signal transmission |
| US20020156730A1 (en) * | 2001-04-23 | 2002-10-24 | Newman Frederic M. | Method of managing billing information at a well site |
| CA2469029C (en) | 2002-01-14 | 2012-03-20 | Atlas Copco Rock Drills Ab | Remote control of drilling rigs |
| US6778908B2 (en) * | 2002-06-25 | 2004-08-17 | The Charles Stark Draper Laboratory, Inc. | Environmentally mitigated navigation system |
| GB0216647D0 (en) * | 2002-07-17 | 2002-08-28 | Schlumberger Holdings | System and method for obtaining and analyzing well data |
| US6956791B2 (en) | 2003-01-28 | 2005-10-18 | Xact Downhole Telemetry Inc. | Apparatus for receiving downhole acoustic signals |
| US6942043B2 (en) | 2003-06-16 | 2005-09-13 | Baker Hughes Incorporated | Modular design for LWD/MWD collars |
| US7234540B2 (en) * | 2003-08-07 | 2007-06-26 | Baker Hughes Incorporated | Gyroscopic steering tool using only a two-axis rate gyroscope and deriving the missing third axis |
| DK2518259T3 (da) | 2003-12-31 | 2014-11-10 | Varco Int | Intern BOP-ventil (blowout preventer valve) med instrumenter til måling af boreparametre i en borestreng |
| US7054750B2 (en) * | 2004-03-04 | 2006-05-30 | Halliburton Energy Services, Inc. | Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole |
| US8544564B2 (en) * | 2005-04-05 | 2013-10-01 | Halliburton Energy Services, Inc. | Wireless communications in a drilling operations environment |
| US7929270B2 (en) * | 2005-01-24 | 2011-04-19 | Orica Explosives Technology Pty Ltd | Wireless detonator assemblies, and corresponding networks |
| US20070017682A1 (en) * | 2005-07-21 | 2007-01-25 | Egill Abrahamsen | Tubular running apparatus |
| US20080007421A1 (en) * | 2005-08-02 | 2008-01-10 | University Of Houston | Measurement-while-drilling (mwd) telemetry by wireless mems radio units |
| US20070030167A1 (en) | 2005-08-04 | 2007-02-08 | Qiming Li | Surface communication apparatus and method for use with drill string telemetry |
| EP1971748B1 (en) * | 2005-11-30 | 2018-05-23 | Magnomatics Limited | Wellbore motor having magnetic gear drive |
| GB2437647B (en) | 2006-04-27 | 2011-02-09 | Weatherford Lamb | Torque sub for use with top drive |
| US7729860B2 (en) * | 2006-07-21 | 2010-06-01 | Schlumberger Technology Corporation | Drilling system powered by energy-harvesting sensor |
| US7814988B2 (en) * | 2007-01-10 | 2010-10-19 | Baker Hughes Incorporated | System and method for determining the rotational alignment of drillstring elements |
| GB0703470D0 (en) | 2007-02-22 | 2007-04-04 | Gomez Michael J J | Apparatus for determining the dynamic forces on a drill string during drilling operations |
| CN103277056B (zh) * | 2007-04-28 | 2016-04-06 | 国民油井华高有限合伙公司 | 用于在钻机中下送管件的下送设备 |
| EP2350697B1 (en) * | 2008-05-23 | 2021-06-30 | Baker Hughes Ventures & Growth LLC | Reliable downhole data transmission system |
| US8245792B2 (en) * | 2008-08-26 | 2012-08-21 | Baker Hughes Incorporated | Drill bit with weight and torque sensors and method of making a drill bit |
| US8899347B2 (en) | 2009-03-04 | 2014-12-02 | Intelliserv, Llc | System and method of using a saver sub in a drilling system |
| US9133668B2 (en) | 2009-06-02 | 2015-09-15 | National Oilwell Varco, L.P. | Wireless transmission system and system for monitoring a drilling rig operation |
-
2010
- 2010-05-26 US US13/375,864 patent/US9133668B2/en active Active
- 2010-05-26 BR BRPI1011128-0A patent/BRPI1011128B1/pt active IP Right Grant
- 2010-05-26 WO PCT/US2010/036189 patent/WO2010141287A2/en not_active Ceased
- 2010-05-26 DK DK10783819.5T patent/DK2438269T3/da active
- 2010-05-26 CA CA2761955A patent/CA2761955C/en active Active
- 2010-05-26 EP EP10783819.5A patent/EP2438269B8/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CA2761955A1 (en) | 2010-12-09 |
| BRPI1011128B1 (pt) | 2021-01-05 |
| DK2438269T3 (da) | 2019-07-29 |
| US9133668B2 (en) | 2015-09-15 |
| EP2438269A4 (en) | 2017-10-11 |
| WO2010141287A4 (en) | 2011-04-28 |
| EP2438269A2 (en) | 2012-04-11 |
| CA2761955C (en) | 2015-11-24 |
| EP2438269B1 (en) | 2019-05-15 |
| EP2438269B8 (en) | 2019-06-26 |
| US20120080227A1 (en) | 2012-04-05 |
| WO2010141287A2 (en) | 2010-12-09 |
| WO2010141287A3 (en) | 2011-02-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI1011128A2 (pt) | sistema para monitorar uma operação de equipamento de perfuração, e, método para operar uma operação de equipamento de perfuração | |
| BR112012031506A2 (pt) | método para controlar uma operação de poço, e, sistema de monitoramento de um poço | |
| BR112014001831A2 (pt) | método para monitorar uma operação de perfuração, sistema de monitoramento de uma operação de perfuração, e sistema para monitorar e controlar uma operação de perfuração | |
| BRPI1008897A2 (pt) | método, aparelho e sistema para avaliar desempenho de perfuração de furo de poço | |
| BRPI0908790A2 (pt) | Método de sincronizar unidade de um sistema de avaliação de avaliação de formação/operação de perfuração, e sistema | |
| BRPI1015473A2 (pt) | aparelho de controle, sistema de perfuração, e, método para operar um sistema de perfuração. | |
| BR112012009088A2 (pt) | carga conformada , sistema para perfurar uma formação , método para perfurar uma formação , pistola de perfuração, e método para perfurar uma formação | |
| BRPI1006265A2 (pt) | unidade de flutuação, sistema e método para a operação de uma unidade de flutuação | |
| BRPI1006370A2 (pt) | método implementado por computador de monitoramento de uma operação de perfuração e sistema para o monitoramento de uma operação de perfuração | |
| BRPI0906832A2 (pt) | Sistema de perfuração submarina e método de operação do sistema de perfuração | |
| BRPI1011892A2 (pt) | broca de perfuração, ferramenta de perfuração, método para formar uma broca de perfuração, e, sistema de perfuração. | |
| BR112012001196A2 (pt) | métodos para perfurar orifícios de poços offshore | |
| BRPI1007764A2 (pt) | ferramenta de perfuração, e, método para operar uma perfuração furo abaixo | |
| BRPI0919069A2 (pt) | sistema para coletar fluido de uma região especifica de furo de poço, e método. | |
| BRPI1012022A2 (pt) | método e sistema para monitoramento furo abaixo. | |
| BR112012002302A2 (pt) | broca de perfuração impregnada, sistema de perfuração, método para formar uma broca de perfuração impregnada, e, método de perfuração | |
| BRPI0908763A2 (pt) | Dispositivo, método para a obtenção de uma referência de freqüência e sistema. | |
| EP2446113A4 (en) | CONTROL SYSTEM, STONE DRILLING AND STEERING PROCESS | |
| BRPI1012645A2 (pt) | aparelho, sistema, e método para comunicação em torno de um local de poço, e, método para comunicação com uma coluna de perfuração em um furo de poço | |
| BR112012000495A2 (pt) | métodos para degradar uma torta de filtro em uma formação subterrânea, para tratar de uma formação subterrânea, e, para perfurar um poço. | |
| BRPI1014429A2 (pt) | broca de perfuracao, e, metodo para formar uma broca de perfuracao | |
| BR112012004180A2 (pt) | método para tratar uma formação subterrânea, e, dispositivo de ativação | |
| BRPI0923224A2 (pt) | aparelho e metodo de manutenção de furo de poço,e,método de orientação de uma ferramenta de manutenção de furo de poço. | |
| BRPI1008672A2 (pt) | método para tratar um furo de poço. | |
| BR112012002314A2 (pt) | ferramenta, sistema e método de perfuração |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
| B15K | Others concerning applications: alteration of classification |
Free format text: AS CLASSIFICACOES ANTERIORES ERAM: E21B 47/12 , E21B 44/00 Ipc: E21B 17/00 (1968.09), E21B 44/00 (1980.01), E21B 4 |
|
| B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
| B07B | Technical examination (opinion): publication cancelled [chapter 7.2 patent gazette] |
Free format text: ANULADA A PUBLICACAO CODIGO 7.1 NA RPI NO 2531 DE 09/07/2019 POR TER SIDO INDEVIDA. |
|
| B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
| B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
| B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 05/01/2021, OBSERVADAS AS CONDICOES LEGAIS. |